NATIONAL HIGHWAY

INFRASTRUCTURE
DEVELOPMENT
CORPORATION
LIMITED

MONTHLY PROGRESS
REPORT
SEPTEMBER - 2019

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing
pre-construction services for up gradation of newly declared National Highway, Thathri-
Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to Makhan-Chachool (10 km, District-
Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR
of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
Monthly Progress Report
September – 2019
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

DOCUMENT / REPORT CONTROL FORM

Project Name: Consultancy Services for Feasibility Study, Preparation of Detailed Project Report
and providing pre-construction services for up gradation of newly declared National
Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
i
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with
paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4
km near Kahaljugasar in the state of Jammu and Kashmir.

Job Number: JK/DPR/TKKC/2018-19

Report for: National Highways and Infrastructure Development Corporation Ltd.

Report Name: Monthly Progress Report – JULY 2019

PREPARATION, REVIEW
Approved for issue
AND AUTHORISATION: Date Prepared by Reviewed by
by
Revision

Nishanlulu
A – R0 07.10.2019 Shivam Behl Muhamed CP Tiwari
Jaleel

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
i
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER’19

ABBREVIATIONS AND ACRONYMS

IRC Indian Roads Congress

km Kilometer

NH National Highway

PWD Public Works Department

NHIDCL National Highways and Infrastructure Development Corporation Ltd.

OD Origin-Destination

CVC Classified Traffic Volume Count

QAP Quality Assurance Plan

RFP Request for Proposal

AGICL Almondz Global Infra-Consultants Limited

TOR Terms of Reference as provided in Consultant’s Contract Agreement

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
i
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER’19

CONTENTS

1. PROJECT BACKGROUND ...................................................................................... 1


2. PROJECT APPRECIATION .................................................................................... 1
3. TARGETS FOR REPORTING ................................................................................. 3
4. PROGRESS AND ACHIEVED MILESTONES...................................................... 4
5 DETAIL OF MEETINGS ........................................................................................ 11
6 DETAIL OF CORRESPONDENCE ....................................................................... 11

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
i
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER’19

LIST OF TABLES

Table 1: Schedule for Submission of Reports and Documents.......................................................... 3


Table 2: Status of Project Activities .................................................................................................. 10
Table 3: Detail of Correspondence .................................................................................................... 11

LIST OF FIGURES

Figure 1: Location Map of the Project Highway ................................................................................ 2


Figure 2: Work Plan for Deliverables ................................................................................................. 5
Figure 3: Manning Schedule ................................................................................................................ 6
Figure 4: Activity Schedule .................................................................................................................. 7

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
i
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER’19

1. PROJECT BACKGROUND

The NHIDCL has been entrusted with the assignment of Consultancy Services for Feasibility
Study / Preparation of Detaled Project Report and providing pre-construction services for
upgradation of Newly Declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km,
District – Doda, J & K) to Makhan-Chachool (10 km, District-Chamba- Himachal Pradesh) to 2-
Lane with paved shoulder including Feasibility study cum DPR of Tunnel of approx. length 4
KM near Kahaljugasar in the state of Jammu and Kashmir.
Almondz Global Infra Consultant Ltd (AGICL) in joint venture with Subterra, has been
selected as consultant to undertake Consultancy Services for Feasibility Study / Preparation of
Detaled Project Report and providing pre-construction services for upgradation of Newly
Declared National Highway, Tharthri-Kahaljugasar-Kilhotran (70 km, District – Doda, J & K)
to Makhan-Chachool (10 km, District-Chamba- Himachal Pradesh) to 2-Lane with paved
shoulder including Feasibility study cum DPR of Tunnel of approx. length 4 KM near
Kahaljugasar, on 05.10.2018 vide letter no. NHIDCL/J&K/DPR/Thathri-Chachool/2017-
18/2669.
2. PROJECT APPRECIATION

The project road starts at the chainage KM82 of NH244 at Thathri in the Doda district of the state
J & K, ( Easting 574510.81m E Northing 3667756.65m N and passes through the villages Donadi
Kahara ,Bhatri,Bhatiyas Malikpura, Gandoh, Gawadi, Goel Bhad, Seeru, and Kahal Jugaser At
Kahal Jugaser a tunnel of 4-7 km length is proposed to connect the state of Jammu and Kashmir to
Makhan and Chachul of the Chamba district of Himachal Pradesh. The project length awarded as
per the TOR was 70 kms in the state J&K and length of 10 kms in the state of Himachal Pradesh
making it of 80km approx length . The road passes through some unstable zones where numerous
landslides along the road stretch .The terrain has been described as composed of unstable, fissured
rock dipping towards the road side.
The existing road is present only on the J & K side which is a steep terrain with road widths
ranging from 4m to 11m in certain sections; while at the local Built-up areas, it ranges from 8.5m
to 9 m. The road is predominantly of poor condition with a few stretches that can be described to
be of fair condition.
There are landslide zones all along the project highway. Breast walls and retaining walls both have
been constructed but are majorly of poor to very poor condition. The shoulders of the road are of
poor condition due to this and the culverts are mostly choked. The DRR return walls are
constructed all along the project highway owing to the balanced cut-fill method adopted for the
construction of the road.
The major built up areas are namely Donadi, Malikpura, Kahara, Bhathri, Bhatiyas, Gandoh,
Gawadi and Seeru. The Dunadi area is to come under the submergence zone due to a Dam
proposed at the location. The other built up areas have encroached into the existing road to a large
extent and have constructed 2-3 storey buildings on either side.

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
1
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER’19

The existing road contains 1 Major bridge, 7 Minor bridges and 114 culverts. The bridges are all
single span steel structures. The culverts are mainly pipes which are choked at multiple locations
due to landslides and possibly due to the reconstruction of the road.
The Greenfield alignment that lies beyond the existing road leads to the tunnel point in Kahal
Jugaser. It is a steep mountainous terrain. There is a small habitation in the area, with agricultural
land spread out along the sides of the mountain. The altitude here comes to about 2300 to 2400 m
above MSL. The area is affected by snowfall during some parts of the year, although mainly
through November to January. Connection via tunnel has to be provided to other side of the
mountain range which lies in Himachal Pradesh. There side also is a Greenfield alignment up to
Makkan/Chachool. Approach Alignment and road has to be constructed to the both side of the
tunnel entery and exit points
The only connecting road to Makkan/Chachool from Himachal Pradesh is an underconstruction
PMGSY road. This 3.5m PMGSY road connects to SH 37 but has only been constructed upto
Sanwal which is about 8 km from Makkan.
The Key Map depicting the project road is presented in Figure 1.

Figure 1: Location Map of the Project Highway

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
2
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER’19

3. TARGETS FOR REPORTING

The targets dates set for various deliverables as per consultancy services agreement are given in
Table 1. The Consultants expect to achieve these targets dates with the cooperation from all
concerned. The date of commencement (D) being 29.11.2018.

Table 1: Schedule for Submission of Reports and Documents


Time
Period
Targets date
S. from date
Activity No. of copies set by as per
No. of
TOR
commence
ment (D)**
By 10th day 10th day of
1 Monthly Reports 3 (2+1) of Every Following
Month Month
Inception Report
Draft Inception Report including QAP
3 (2+1) 21 D+21
2 document

Inception Report including QAP document 3 (2+1) 30 D+30

F.S. Report

Draft Feasibility Study Report including option


4 (2+2) 75 D+75
study report

Comments of client 90 D+90


3

Final Feasibility Study Report incorporating


4 (2+2) 105 D+105
compliance of comments of Client

LA & Clearances I Report

Draft LA & Clearance I Report 4 (2+2) 90 D+90


4

Comments of client 1 105 D+105

Final LA & Clearance I Report incorporating


4 (2+2) 120 D+120
compliance of comments of Client

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
3
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER’19

Detailed Project Report


4 (2+2) 165 D+165
Draft DPR
5 Comments of client 1 195 D+195

Final DPR incorporating compliance of


6 (2+4) 210 D+210
comments of Client

Technical Schedule
4 (2+2) 135 D+135
6 Draft Technical Schedule
Comments of client 1 150 D+150
Final Technical Schedule 6 (2+4) 165 D+165

LA & Clearances II Report

6 (2+4) Original
Approval of project Clearance from concerned letters from the
agencies e.g. from MOEF; Rly for approval of concerned agencies
7 GAD and detail engineering drawing of 240 D+240
and 5 phtocopies
ROB/RUB; Irrigation Dept. each

Land Acquisitions: 3(a), 3(A), 3(D)


3 copies each
Notifications

4. PROGRESS AND ACHIEVED MILESTONES

The tasks described in the terms of reference are scheduled to be completed in a period of 8
months. The Work Plan for Deliverables and Manning Schedule for Key Personnel are given in
Figure 2 and Figure 3 respectively. The Activity Schedule is given in Figure 4.

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
4
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

Figure 2: Work Plan for Deliverables as per TOR

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Thathri-
Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of
Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
5
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

Figure 3: Manning Schedule


Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Thathri-
Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of
Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
6
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Thathri-
Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of
Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
7
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

Figure 4: Activity Schedule

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Thathri-
Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of
Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
8
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

DETAILS OF PERSONNEL DEPLOYED


Period of deployment
S. No. Name of Key Personnel Designation Remarks
From To
1 Chain Singh Sr. Survey Engineer 01.09.2019 30.09.2019 Site
2 Ujwal patil Environmental Specialist 07.09.2019 14.09.2019 Site

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services for up gradation of newly declared National Highway, Thathri-
Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study cum DPR of
Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
9
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

4.1 MILE STONE ACHIEVED IN MONTH OF SEPTEMBER – 2019

i. Topographical Survey was initiated


ii. Meeting with the DGM – NHIDCL BO regarding Alignment
iii. Meeting with the SDM Gandoh
iv. Socio Economic Profile Completed
v. Reconnaissance Survey for the Tissa-Makkan Portion
vi. Road, pavement and structure inventories for Tissa-Makkan Portion

4.2 PROGRAMMES FOR THE MONTH OF OCTOBER – 2019

(i) Completion of Topographical Survey


(ii) Submission of Draft Feasibility Report

4.3 STATUS OF PROJECT ACTIVITIES AS OF 01.10.2019


The current status of project activities given in Table 2:

Table 2: Status of Project Activities

S.
Activities Status Remarks
No.
1 Monthly Reports Completed
Submitted vide letter
Draft Inception Report including
2 Completed ALMONDZ:JK/DPR/TKKC/2018-
QAP document
19/08 on 03.12.18
Submitted vide letter
3 Final Inception Report and QAP Completed ALMONDZ:JK/DPR/TKKC/2018-
19/13 on 21.01.19
Received vide letter NHIDCL/
4 Alignment Approval Completed J&K/DPR/Thathri-Chachool/2017-
18/324
5 Draft Feasibility Report Yet to start Yet to start
6 Draft LA and Clearance Report Yet to start Yet to start
7 Final Feasibility Report Yet to start Yet to start
8. Final LA and Clearance Report Yet to start Yet to start
9. Draft Technical Schedule Yet to start Yet to start
8. Final Technical Schedule Yet to start Yet to start
9. Draft DPR Yet to start Yet to start
11. Final DPR Yet to start Yet to start
12. Project Clearances Yet to start Yet to start

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
1
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

4 DETAIL OF MEETINGS
i. Meeting with the DGM- NHIDCL BO Jammu on 19.09.2019
5 DETAILS OF CORRESPONDENCE AS OF 01.10.2019
The detail of correspondence given in Table 3:
Table 3: Detail of Correspondence
S.
From To Letter no Dated Remarks
No.
NHIDCL/BO-
Almondz Global Letter to
1 NHIDCL-HQ-Delhi JK/DPR/Thathri- 29.11.2018
Infra Consultants Ltd. proceed
Chachool/2017-18
Almondz Global ALMONDZ:JK/DP Submission of
2 Infra Consultants NHIDCL- Jammu R/TKKC/2018- 03.12.2018 Draft Inception
Ltd. 19/08 Reprt and QAP
Request for
Almondz Global ALMONDZ:JK/DP Presentation on
3 Infra Consultants NHIDCL- Jammu R/TKKC/2018- 17.12.2018 Inception Report
Ltd. 19/10 and Alignment
Options
Meeting on
NHIDCL/BO- Draft Inception
Almondz Global
4 NHIDCL – Jammu JK/DPR/TKKC/20 21.12.2018 report and QAP
Infra Consultants Ltd.
17-18/957 at NHIDCL
Jammu Office
EMAIL from Meeting on
Draft Inception
roshan.nhidcl@g
Almondz Global report and
5 NHIDCL-HQ- Delhi mail.comdated 28.12.2018
Infra Consultants Ltd. Alignment at
28/12/2018 Time: NHIDCL
15:37 Jammu Office
NHIDCL/BO- Comments on
Almondz Global
6 NHIDCL –Jammu JK/DPR/TKKC/20 01.01.2019 the Draft
Infra Consultants
17-18/993 Inception Report
Compliances to
Almondz Global ALMONDZ:JK/DP
the Comments
7 Infra Consultants NHIDCL- Jammu R/TKKC/2018- 21.01.2019
on the Draft
Ltd. 19/11
Inception Report
Almondz Global ALMONDZ:JK/DP Monthly
8 Infra Consultants NHIDCL- Jammu R/TKKC/2018- 21.01.2019 Progress Report
Ltd. 19/12 - December
Almondz Global ALMONDZ:JK/DP Submission of
9 Infra Consultants NHIDCL- Jammu R/TKKC/2018- 21.01.2019 Final Inception
Ltd. 19/13 Report and QAP

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
1
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

S.
From To Letter no Dated Remarks
No.
NHIDCL/
Minutes of the
NHIDCL – HQ Almondz Global J&K/DPR/Thathri-
10 25.01.2019 Meeting –
Delhi Infra Consultants Chachool/2017-
31.12.2018
18/128
ALMONDZ:JK/DP Submission of
Almondz Global
11 NHIDCL- Jammu R/TKKC/2018- 06.02.2019 Alignment
Infra Consultants
19/14 Report
NHIDCL/BO- Minutes of
Almondz Global
12 NHIDCL –Jammu JK/DPR/TKKC/20 12.02.2019 Meeting –
Infra Consultants
17-18/1211 07.02.2019
Invoice for
ALMONDZ:JK/DP
Almondz Global Stage-1
13 NHIDCL- Jammu R/TKKC/2018- 15.02.2019
Infra Consultants Inception Report
19/15
and QAP
ALMONDZ:JK/DP
Almondz Global
14 NHIDCL- Jammu R/TKKC/2018- 20.02.2019 MPR-January
Infra Consultants
19/16
ALMONDZ:JK/DP Delay in
Almondz Global
15 NHIDCL- Jammu R/TKKC/2018- 26.02.2019 payment of
Infra Consultants
19/17 Invoice
ALMONDZ:JK/DP
Almondz Global Collection of
16 NHIDCL- Jammu R/TKKC/2018- 26.02.2019
Infra Consultants Revenue Map
19/18
NHIDCL/BO- Deployment of
Almondz Global
17 NHIDCL –Jammu JK/DPR/TKKC/20 27.02.2019 Key Personnel -
Infra Consultants
17-18/1232 Attendance
NHIDCL/BO-
The Deputy JK/Almondz Collection of
18 NHIDCL –Jammu 28.02.2019
Commisssioner Global/2018- Revenue Maps
19/1244
ALMONDZ:JK/DP Include
Almondz Global
19 NHIDCL- Jammu R/TKKC/2018- 05.03.2019 Deployment
Infra Consultants
19/19 Details in MPR
ALMONDZ:JK/DP
Almondz Global Scanned Copies
20 NHIDCL- Jammu R/TKKC/2018- 06.03.2019
Infra Consultants of Toposheets
19/19
Details of
NHIDCL/BO-
Almondz Global Deployment for
21 NHIDCL –Jammu JK/DPR/TKKC/20 06.03.2019
Infra Consultants processing
17-18/1256
payment
ALMONDZ:JK/DP
Almondz Global Details of
22 NHIDCL- Jammu R/TKKC/2018- 07.03.2019
Infra Consultants Deployment
19/20

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
1
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

S.
From To Letter no Dated Remarks
No.
NHIDCL/BO-
Almondz Global Scanned
23 NHIDCL –Jammu JK/DPR/TKKC/20 15.03.2019
Infra Consultants Toposheets
17-18/1297
ALMONDZ:JK/DP
Almondz Global Deployment of
24 NHIDCL- Jammu R/TKKC/2018- 26.03.2019
Infra Consultants Key Personnel
19/20
ALMONDZ:JK/DP
Almondz Global Deployment of
25 NHIDCL- Jammu R/TKKC/2018- 26.03.2019
Infra Consultants Key Personnel
19/20
ALMONDZ:JK/DP
Almondz Global
26 NHIDCL- Jammu R/TKKC/2018- 20.03.2019 MPR-Feb
Infra Consultants
19/21
ALMONDZ:JK/DP
Almondz Global
27 NHIDCL- Jammu R/TKKC/2018- 08.04.2019 MPR-March
Infra Consultants
19/22
ALMONDZ:JK/DP Public
Almondz Global
28 NHIDCL- Jammu R/TKKC/2018- 15.04.2019 Consultation
Infra Consultants
19/23 Report
NHIDCL/BO-
Almondz Global Slow Progress
29 NHIDCL –Jammu JK/DPR/TKKC/20 30.04.2019
Infra Consultants of DPR Work
19-20/137
ALMONDZ:JK/DP
Almondz Global Monthly
30 NHIDCL- Jammu R/TKKC/2018- 06.05.2019
Infra Consultants Progress Report
19/24
ALMONDZ:JK/DP Reply to
Almondz Global
31 NHIDCL- Jammu R/TKKC/2018- 08.05.2019 NHIDCL BO
Infra Consultants
19/25 letter 137
ALMONDZ:JK/DP Submission of
Almondz Global
32 NHIDCL- Jammu R/TKKC/2018- 31.05.2019 Alignment
Infra Consultants
19/26 report
NHIDCL/BO-
Almondz Global
33 NHIDCL –Jammu JK/DPR/TKKC/20 14.05.2019 MPR April’19
Infra Consultants
19-20/215
NHIDCL/BO-
Almondz Global Deployment of
34 NHIDCL –Jammu JK/MORT&H 15.05.2019
Infra Consultants Key Personnel
Policy/2019-20/225
NHIDCL/BO- Submission of
Almondz Global
35 NHIDCL –Jammu JK/MORT&H 20.05.2019 Reports as per
Infra Consultants
Policy/2019-20/242 CA
NHIDCL/BO-
Almondz Global
36 NHIDCL –Jammu JK/DPR/TKKC/20 24.05.2019 -
Infra Consultants
19-20/263

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
1
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

S.
From To Letter no Dated Remarks
No.
NHIDCL/BO-
Almondz Global Minutes of
37 NHIDCL –Jammu JK/DPR/TKKC/20 24.05.2019
Infra Consultants Meeting
19-20/265
ALMONDZ:JK/DP Submission of
Almondz Global
38 NHIDCL- Jammu R/TKKC/2018- 31.05.2019 Alignment
Infra Consultants
19/26 report
ALMONDZ:JK/DP
Almondz Global
39 NHIDCL- Jammu R/TKKC/2018- 07.06.2019 MPR – May’19
Infra Consultants
19/27
ALMONDZ:JK/DP Reply to
Almondz Global
40 NHIDCL- Jammu R/TKKC/2018- 08.05.2019 NHIDCL BO
Infra Consultants
19/25 letter 137
ALMONDZ:JK/DP
Almondz Global Review Meeting
41 NHIDCL- HQ R/TKKC/2018- 13.06.2019
Infra Consultants at NHIDCL
19/28
Recommendatio
NHIDCL/BO-
n on Final
42 NHIDCL- Jammu NHIDCL HQ JK/DPR/TKKC/20 17.06.2019
Alignment
19-20/363
Report
Recommendatio
NHIDCL/BO-
n on Final
43 NHIDCL- Jammu NHIDCL HQ JK/DPR/TKKC/20 17.06.2019
Alignment
19-20/363
Report
ALMONDZ:JK/DP Presentation for
Almondz Global
44 NHIDCL- HQ R/TKKC/2018- 19.06.2019 Alignment
Infra Consultants
19/29 Approval
NHIDCL/
NHIDCL – HQ Almondz Global J&K/DPR/Thathri- Presentation of
45 01.07.2019
Delhi Infra Consultants Chachool/2017- Alignment
18/298
ALMONDZ:JK/DP Request for
Almondz Global
46 NHIDCL- HQ R/TKKC/2018- 17.07.2019 Extension of
Infra Consultants
19/30 Time
NHIDCL/BO-
Almondz Global
47 NHIDCL- Jammu JK/DPR/TKKC/20 31.07.2019 Slow Progress
Infra Consultants
19-20/483
NHIDCL/
NHIDCL – HQ Almondz Global J&K/DPR/Thathri- Alignment
48 05.08.2019
Delhi Infra Consultants Chachool/2017- Approval
18/324
ALMONDZ:JK/DP
Almondz Global
49 NHIDCL- HQ R/TKKC/2018- 07.08.2019 MPR-July’19
Infra Consultants
19/31

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
1
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

S.
From To Letter no Dated Remarks
No.
ALMONDZ:JK/DP Invoice for Final
Almondz Global
49 NHIDCL- HQ R/TKKC/2018- 13.08.2019 Alignment
Infra Consultants
19/32 Report
Mobilization of
ALMONDZ:JK/DP
Almondz Global team for
50 NHIDCL- HQ R/TKKC/2018- 14.08.2019
Infra Consultants Toposurvey and
19/33
other activities
ALMONDZ:JK/DP
Almondz Global
51 NHIDCL- HQ R/TKKC/2018- 06.09.2019 MPR-Sept’19
Infra Consultants
19/34
Almondz Global Thu 9/5/2019
52 NHIDCL- BO Email Road Width
Infra Consultants 2:48 PM
Mon Payment for
Almondz Global
53 NHIDCL- BO Email 9/9/2019 Final Alignment
Infra Consultants
2:59 PM Report
Mon
NHIDCL-Jammu Almondz Global Clarification on
54 Email 9/9/2019
BO Infra Consultants EOT
4:57 PM
Mon Traffic through
NHIDCL-Jammu Almondz Global
52 Email 9/9/2019 Tissa
BO Infra Consultants
5:09 PM Connectivity
NHIDCL-Jammu Almondz Global Fri 9/13/2019
53 Email Meeting Notice
BO Infra Consultants 6:11 PM
Mon
Almondz Global Update on
NHIDCL- BO Email 9/16/2019
Infra Consultants Toposurvey
12:12 PM
Mon
Almondz Global
NHIDCL- BO Email 9/16/2019 Meeting Notice
Infra Consultants
12:19 PM
Wed
NHIDCL-Jammu Almondz Global
54 Email 9/18/2019 Meeting Notice
BO Infra Consultants
10:43 AM
ALMONDZ:JK/DP
Almondz Global Justification for
NHIDCL- BO R/TKKC/2018- 18.09.2019
Infra Consultants EOT
19/35
ALMONDZ:JK/DP
Almondz Global Presence of
DFO, Doda R/TKKC/2018- 19.09.2019
Infra Consultants Forest Area
19/36
ALMONDZ:JK/DP
Almondz Global Presence of
DFO, Chamba R/TKKC/2018- 19.09.2019
Infra Consultants Forest Area
19/37

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
1
Almondz Global Infra-Consultants Ltd. JV Monthly Report
Subterra SEPTEMBER ‘19

S.
From To Letter no Dated Remarks
No.
NHIDCL/BO-
NHIDCL-Jammu Almondz Global Authorization
55 JK/DPR/TKKC/20 23.09.2019
BO Infra Consultants Letter
19-20/580
NHIDCL/BO-
NHIDCL-Jammu Almondz Global
56 JK/DPR/MOM/201 24.09.2019 MOM
BO Infra Consultants
9-20/584

Consultancy Services for Feasibility Study, Preparation of Detailed Project Report and providing pre-construction services
for up gradation of newly declared National Highway, Thathri-Kahajugasar-Kilhotran (70 km, District – Doda, J&K) to
Makhan-Chachool (10 km, District- Chamba, Himachal Pradesh) to 2-lane with paved shoulder including Feasibility study
cum DPR of Tunnel of approx. length 4 km near Kahaljugasar in the state of Jammu and Kashmir.
1

You might also like