01
Construction
Page: 1-1/ 60 Health & Safety Plan
Contract: 2.2068
02
QUAIS 1, 2 and 4
PJ-Q3392-FLS-SE-ORG-45040
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 1-2/ 60 Health & Safety Plan
Contract: 2.2068
CONTENTS
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen. 04.12.2009
Rev.01
Construction
Page: 1-3/ 60 Health & Safety Plan
Contract: 2.2068
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen. 04.12.2009
Rev.01
Construction
Page: 1-5/ 60 Health & Safety Plan
Contract: 2.2068
Distribution Matrix
This document will be issued to all Contractors. Amendments will be issued to the
Contractors by means of a project document transmittal sheet. Revisions are indicated
by a vertical line in the right hand margin.
Abbreviations
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 5/ 60 Health & Safety Plan
Contract: 2.2068
1. PROJECT DETAILS
1.1 PROJECT TITLE & LOCATION
The project name is « SUPERSTRUCTURES », Contract N° CPG-4396/4397 D 10
including the following lots:
The Project is located in the JORF LASFAR harbor, at 100km of south Casablanca,
Morocco, near El Jadhida town.
1.4 DESIGNERS
1.4.1 Plant Layout
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 6/ 60 Health & Safety Plan
Contract: 2.2068
The project comprises the design, supply, "turnkey" installation, trials and in-
dustrial commissioning of OCP superstructures extending the existing facilities
of the Port of Jorf Lasfar.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen. 04.12.2009
Rev.01
Construction
Page: 7/ 60 Health & Safety Plan
Contract: 2.2068
The construction project is to take place within the environment of a live op-
erational harbour. There will be interfaces with the Harbour users, coal quai 3
user and Clients operational activities throughout the works including new
quays civil work, material deliveries, security, emergency procedures, permit
systems, authorised access in harbour, sulphur handling on quai 4, etc.
UNIT P1
Adaptation and replace- Shall be set by mu- One week Prior to Prior to
ment work of the tele- tual agreement (**) per gantry 1/09/2013 15/09/2013
scopic chutes on existing crane
gantry cranes
FIRST PHASE - LOT 3 - Continuous unloading lines for solid sulphur (screw
ship unloaders)
End of work of major infrastructure construction for Unit P4bis allowing for un-
interrupted installation of equipment: 31 December 2012
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen. 04.12.2009
Rev.01
Construction
Page: 8/ 60 Health & Safety Plan
Contract: 2.2068
End of work of major infrastructure construction for Unit P2 allowing for unin-
terrupted installation of equipment: 1 December 2014
End of work of major infrastructure construction for Unit P4 allowing for unin-
terrupted installation of equipment: 15 October 2013
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen. 04.12.2009
Rev.01
Construction
Page: 9/ 60 Health & Safety Plan
Contract: 2.2068
FLS project team and Clients own Safety Department will monitor the health,
safety and environmental performance of the project. It is our intention to
work closely with the Client, our Contractors and Suppliers in order to develop
and implement shared and improved procedures and standards and to pro-
mote a safe working environment.
This Health and Safety Plan will be supplemented and supported by Health and
Safety Plans from each of the sub-contractors, which will contain compatible
safety management systems. Specialist Contractors will comply with the re-
spective parts of the overall Health and Safety Plan.
The ownership of safety rests at all levels within the project with representa-
tives of all main parties proactively contributing to the maintenance of the
highest possible standards of health, safety and environmental performance.
During the project specific measurable targets will be identified and measured.
These will reflect both the Health and Safety Executive’s yearly plan of action
and project specific topics.
In line with both the Principal Contractors and Clients objectives the project
has set a target of zero lost time accidents and incidents. In addition the fol-
lowing specific topics will be monitored:
Manual Handling
Falls (general)
Hand Arm Vibration
Noise elimination/ reduction.
Hand Contact Injuries
Plant/Equipment/Pedestrian separation
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen. 04.12.2009
Rev.01
Construction
Page: 10/ 60 Health & Safety Plan
Contract: 2.2068
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 11/ 60 Health & Safety Plan
Contract: 2.2068
3. MANAGEMENT
3.1 PROJECT TEAM - ORGANISATION CHART
Refer to FLS overall project organisation chart contained in PEP
Safety Manager
Principal Contractor
FLSmidth Wadgassen
Resident Occupational Nurse
DLM Contractor
Barge Scaffold
trans- Contrac- Crane
port tor Co- Contrac- Co-
ordinator ordinator
tor
Specialist Contractors
VSP
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 12/ 60 Health & Safety Plan
Contract: 2.2068
Reports to the FLSmidth Wadgassen Senior Management and has overall re-
sponsibility for health and safety on the contract.
Provision for adequate resources for health and safety at all stages of a con-
tract
Provision of an overall project health and safety plan
Ensure the competence in roles adopted under construction management
Provision of a robust risk management strategy during design and construc-
tion (see section 4)
Appointment of competence sub-contractors, designers and consultants (see
section 5, 5.1 & 5.2)
Provision of trained and competent project staff
Management of health and safety documentation (see section 14 & 15)
Report deficiencies in application/effectiveness of health and safety policy
(see section 10 & 15)
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 13/ 60 Health & Safety Plan
Contract: 2.2068
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 14/ 60 Health & Safety Plan
Contract: 2.2068
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 15/ 60 Health & Safety Plan
Contract: 2.2068
Implement and regularly update the fire safety and emergency plan (see
section 9.1 & 9.2)
Monitor that fire exit routes are maintained in accordance with the pro-
gramme (see section 9 & 9.1.6)
Communicate requirements of the Plan to the Workforce (see section 7)
Undertake regular fire safety inspections (see section 9.1.6)
Conduct regular fire drills and co-ordinate with the Client (see section 9.1.6)
Ensure fire fighting equipment and fire points are maintained (see section
9.1)
Liaise with the Fire Brigade and emergency services (see section 9.2)
Occupational Nurse
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 16/ 60 Health & Safety Plan
Contract: 2.2068
Provide dedicated first aid and occupational health assistance (see section
11.1)
Monitor and supervise the provision and maintenance of a site first aid facil-
ity (see section 11.1)
Advise on the requirement for any occupational health surveillance pro-
grammes
Participate in and monitor any health promotion campaigns
Assist in the implementation of various safety initiatives
Maintain accident and incident statistics (see section 10)
Assist in accident investigations as required (see section 10.1)
Liaise with local Accident and Emergency Department
Regular liaison will be maintained with all Contractors Safety Advisors through
weekly safety co-ordination meetings, joint site inspections and an open door
policy for all site personnel.
Contact list for personnel responsible for health, safety and environmental is-
sues:
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 17/ 60 Health & Safety Plan
Contract: 2.2068
E-mail: dominique.tomyn@flsmidth.com
Average: 130
Maximum: 200
Sunday: no work
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 18/ 60 Health & Safety Plan
Contract: 2.2068
4. STANDARDS
These will be incorporated into the Construction Health and Safety Plan as re-
quired.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 19/ 60 Health & Safety Plan
Contract: 2.2068
It is a requirement that the OCP safety induction must be introduce to all per-
sons on the project prior to commencing work.
The following standards are set down by the Principal Contractor as the mini-
mum safety performance level required on site. All Contractors are required to
comply with these standards.
4.6.1 Generally
All contractors are to ensure that they are familiar with and have allowed for
working within the relevant standards contained within the following publica-
tions:
4.6.2 Arrangements
The following site rules will be enforced by the Principal Contractor for the du-
ration of the Project:
1. Each Contractor must allow for their operatives participating in the site induc-
tion and at intervals hereafter if the nature of the site significantly changes.
2. The Contractor must prepare a programme of toolbox talks and to deliver them
to all persons under their control.
3. All supervisors must carry out appropriate briefings of their operatives prior to
the start of work on the tasks to be undertaken, location, equipment, materials,
and PPE and safety considerations.
4. Unless otherwise agreed each Contractor must arrange for a competent Safety
Adviser to conduct a safety inspection at weekly intervals as a minimum, with a
copy of the report submitted immediately following the inspection to the Princi-
pal Contractor.
5. There will be a monthly safety/housekeeping inspection by the Principal Con-
tractor, which all Contractors must make a site representative available for. If
the Principal Contractor thereafter has to instigate a further clean up, then the
costs of this must be borne by the Contractor.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 20/ 60 Health & Safety Plan
Contract: 2.2068
1. The tallest tower crane must have an anemometer with readout at base level
and a red light on the top of the crane.
2. All tower crane cabs must have a suitable fire extinguisher.
3. In case of emergency backup tower crane drivers must be available
4. Slingers/signallers and plant banks men must wear identification as agreed by
the Principal Contractor.
5. Powered suspended equipment for temporary access must have failsafe de-
vices including where appropriate, automatic overload devices, upper and
lower limit switches, self-levelling devices, central control of multiple power
units, slack rope devices, arrestor devices and harness attachment points.
6. All material and passenger carrying hoists must have interlocks fitted such that
the landing gates are unable to be opened unless the hoist is at the landing
and movement of the hoist is prevented when any gates are open.
7. Technical document: the vehicles, cranes, etc... must have a insurance and
the necessary certificate; the documents will be reviewed by JESA/OCP be-
fore starting work.
1. Operatives using hydraulic extending arm type mobile elevating work plat-
forms, suspended cradles or platforms must be attached by harness to a se-
cure anchorage at all times.
2. All mobile elevating working platforms are to have guarding in accordance with
the Provision and Use of Work Equipment Regulations.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 21/ 60 Health & Safety Plan
Contract: 2.2068
3. Platforms and cradles on mobile plant are to have close mesh guarding below
the upper handrail
4. The visual inspection tagging system must bear the date of the next inspection
due upon it.
5. All mobile scaffold towers are to be in accordance with the European standard
unless otherwise agreed with the Principal Contractor.
6. All persons erecting, altering or dismantling mobile tower scaffolds must be
trained and certificated.
7. Trestle scaffolds and bandstands must not to be used for work at heights of
greater than 1.2m.
8. Stepladders will only be permitted subject to a specific assessment where
preference is given to other working platforms assessed as safer e.g. mobile
towers.
9. All hop-ups must be purpose made, not makeshift.
10. All scaffolders are required to comply with the European guidance on the use
of safety harnesses and other means of fall prevention during the erection,
modification and dismantling of working platforms.
11. Technical document: the powered platform, etc... must have a insurance and
the necessary certificate; the documents will be reviewed by JESA/OCP be-
fore starting work.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 22/ 60 Health & Safety Plan
Contract: 2.2068
7. All persons on site and within the operational harbour environment will wear
high visibility jackets or waistcoats to EN 471 (incorporating reflective strips).
8. All persons working directly on quays ( outside the protected area ) will wear
high visibility life jackets to EN 395.
9. All PPE must be compatible.
1. All electrical tools, leads & equipment will be visually inspected before using
on site and must have a inspection sheet.
2. Heavy duty jackhammers must only be used if noise suppression systems are
an integral part.
3. Heavy-duty jackhammers used in the horizontal must be accompanied by an
additional labourer.
4. Compressed air tools must be fitted with appropriate anti-whiplash devices.
5. Oxy-acetylene bottles must be moved on a proprietary trolley, which must
have an appropriate fire extinguisher held on the trolley and follow the safety
rules.
6. All fuel and oxygen bottles must fitted with appropriate flashback arrestors.
7. All flexible gas lines must meet the relevant European rules.
8. Full screening to arc welding is required where controlled access to the weld-
ing area is not possible by restricting access.
9. Barriers are required to be placed around pipe threading machines, bench
mounted wood and metal working machine areas and band saws.
10. Reinforcement starter bars which are left protruding in areas adjacent to which
there are regular pedestrian routes or above & around where there are regular
means to access vertically must be protected.
11. Rubbish bins in offices, canteen & welfare areas must be metal or plastic, with
the exception of the bins used to hold paper towels in the toilets and the card-
board recycling bins.
12. All craft knives i.e. Stanley type must have automatically retractable blades.
13. Halogen lights are not permitted, unless properly mounted on a rigid structure.
14. The use of gas ring and exposed electric element fires on site is prohibited.
15. Hot water boilers are to be secured upright by chains.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 23/ 60 Health & Safety Plan
Contract: 2.2068
5. SELECTION PROCEDURES
5.1 CONTRACTORS
All Contractors will be required to provide details of their Safety Management
System and performance record when being invited to tender. Where required
this may be supplemented with the following information:
All Contractors will be issued with the Construction Health and Safety Plan.
They will be required to submit a project specific safety plan, which identifies
the principle hazards likely to be encountered and details the means by which
risks to health and safety will be minimised. This will include detailed risk as-
sessments and method statements.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 24/ 60 Health & Safety Plan
Contract: 2.2068
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 25/ 60 Health & Safety Plan
Contract: 2.2068
6. DESIGN MANAGEMENT
6.1 CONTRACTOR DESIGN LISTING
Design
Construction
Commissioning/Operation/Maintenance
Decommissioning/Demolition
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 26/ 60 Health & Safety Plan
Contract: 2.2068
As a result of any design change required the risk action report will be updated
accordingly and circulated to all parties.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 27/ 60 Health & Safety Plan
Contract: 2.2068
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 28/ 60 Health & Safety Plan
Contract: 2.2068
Frequency and
Name of Meeting H&S Agenda Topics Attendees
Format
Prior to start on site Reinforce key H&S PC
Pre-construction Formal Plan standards and Contractors senior site
Minuted procedures. management
Weekly Current and planned PC
Safety Coordina-
Formal work activities and site Contractors site man-
tion
Minuted issues agement
Weekly
PC
Client Coordination Formal Interface issues
Client representative
Minuted
PC
Monthly Communication of in- Nominated workforce
Safety Consultation Formal formation to and from representatives
Minuted the workforce TU appointed Safety
Representatives
Daily Planning and work se- PC
Daily progress Informal quencing of hazardous Contractors manage-
Un-minuted activities ment
st PC
Monthly H&S 1 agenda item
Client representative
Site Meeting Formal Project progress and
Contractor represen-
Minuted programme
tative
PC
As determined by RSP
H&S Seminar Periodically Selected Contractors
and work activities
management
Additional meetings may be called as required.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 29/ 60 Health & Safety Plan
Contract: 2.2068
The Principal Contractor and his sub-contractors will develop logistics draw-
ings, phasing strategies, environmental impacts and method statements as
appropriate in order to set out the overall arrangements for health and safety.
This will be supported by suitable risk assessments within the overall project
risk register.
8.1.3 The provision and use of common means of access and places of
work
The Principal Contractor will provide common means of access and places of
work for all Sub-contractors on site. All scaffolding will be under the control of
the Principal Contractor including all alterations and inspections. A visual sys-
tem of inspection will be utilised, Scafftag or similar. Each sub-contractors is
responsible to provide a correct equipment.
Contractors will be required to provide all mobile scaffold towers for specific
task activities identified within the risk assessment. Only trained and compe-
tent operatives will be allowed to erect, modify or dismantle working plat-
forms. The Principal Contractor will require certificates of competence.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 30/ 60 Health & Safety Plan
Contract: 2.2068
8.1.4 The provision and use of temporary services, e.g. lighting, power,
water, drainage, etc
The client will provide power across the site ( on new quays and FLS camp lo-
cated in OCP area near old sub-station PE4 ) in accordance with the schedule
of activities. Contractors will be responsible for providing all temporary ser-
vices required for their own task activities. The utilities for the pre-assembly
area of the machines on quai 13 are under mechanical erector DLM responsi-
bility.
The Temporary Works Designer must inform the FLs supervisor of any risk (erec-
tion, use, dismantling) not obvious to a competent contractor.
The Contractor will identify any Temporary Works requirements and appoint a
competent Temporary Works Co-ordinator who will
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 31/ 60 Health & Safety Plan
Contract: 2.2068
Identify responsibility
Assess the level of risk
Identify the level of checking required dependant upon that risk
e.g. a) In house by contractor
b) External by third party
Review Temporary Works submitted by any sub-contractor to identify:
- Interfaces with other works
- Safety
- Adequacy for the purpose
- Additional loading, which may occur
- Liaison with other interested parties
Consider the effects on permanent works
Maintain a Register of Temporary Works
Ensure that Temporary Works are checked as required
Supervise Temporary Works
Operate Permit to erect
Operate Permit to dismantle.
All tower and mobile cranes will be provided, operated and maintained by a
specialist crane contractor.
All Contractors are to discuss and co-ordinate all mechanical lifting operations with
the crane co-ordinator prior to all site lifting. All crane operations will be subject to
an appropriate ‘crane lifting study‘ completed by a competent person.
All crane operators are to have received an approved training and have a
minimum of 3 years experience. Certificates confirming training are to be issued to
the Principal Contractor in advance of lifting.
All manufacturers and suppliers are to provide relevant information on the weight
and recommended lifting points of components.
Cranage and lifting activities present a major risk on site. All will adhere to the fol-
lowing procedures.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 32/ 60 Health & Safety Plan
Contract: 2.2068
The use of hazardous substances will be kept to a minimum. All Contractors will
be required to submit COSHH assessments for all hazardous substance prior to
their use on site. Safety data sheets will be held on site and readily available in the
event of an accident/incident.
Storage areas for hazardous substances will be agreed with the Principal Contrac-
tor and clearly identified and signed. Fire extinguishers will be provided by the
Contractor as required. Contractors will arrange for appropriate PPE to be avail-
able.
8.1 LOGISTICS
8.2.1 Security
The construction site is located within the existing harbour and only the construc-
tion/erection area of the extended quays will be ring fenced to provide a secure
site environment. All other site periphery will be guarded and the main access
point is by the harbour main gate. Designated security points on extended quays
controlled by the Mechanical Contractor will enable access and egress. No other
access will be provided other than emergency evacuation gates.
The FLS camp area will be guarded 24h/24h, 7 days/week. The mechanical con-
tractor DLM will assure the same service on the machine pre-assembly area. In
addition, during the erection/commissioning on the quays, a service guard will be
employ to keep an eye on the fenced areas on first steps quays 1 and 4 and on
second step, quays 2 and 4.
Entry onto harbour will only be permitted by the presentation of a valid site security
pass. Security passes will only be issued to those operatives and personnel who
have attended induction training. All security passes will have a unique identifica-
tion and will be delivering by the client.
Any person brought onto site as a temporary visitor, who has not attended the site
induction course, will be fully supervised by a competent person at all times. No
person may supervise more than four others who have not been inducted. It is the
responsibility of the competent person to ensure that a visitor to site swipes onto
and off of site using a ‘visitors card’ available from harbour reception.
Security passes must be worn at all times. Any person who loses or mislays their
security pass should report immediately to security control.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 34/ 60 Health & Safety Plan
Contract: 2.2068
New starters/visitors
Security guard will issue a temporary pass to allow access to the site
Travel by bus/car onto the FLS construction site offices.
New starters attend induction course
Issue of swipe/induction card
Commence work
Visitors sign in at reception and then responsibility of competent person who
will instruct and direct them whilst they are on site.
Construction Personnel
Show swipe/induction card to the harbour gate guard
Travel by bus/car onto the construction site
Note: Lists of new starters/visitors will be issued to the client and harbour security
guard on a daily basis for issue of temporary passes. Persons not contained on
the list will not be allowed to pass the gate until permission to do so is received
from the main offices by telephone.
FLS and sub-contractors bus drivers, and a number of nominated key personnel
will be issued with entry cards for the harbour security gate to allow entry for work-
ing outside of normal working hours.
Construction personnel will not be authorised to access the harbour site unless in
possession of a valid security pass or permit to work.
All traffic movements on site will be segregated from pedestrian movement where
possible. Appropriate warning signs and physical barriers will be located at cross
over points. An overall site speed limit of 15 mph will be enforced.
Contractor parking is allowed on site, but buses will be used to limit the number of
cars on site and mainly on the respective working areas.
FLD site offices and welfare facilities will be accessible from the main harbour en-
trance without the need to cross-operational parts of the site or wear personal pro-
tective equipment. Use of the site offices car park is by a ‘staff car park pass’.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 35/ 60 Health & Safety Plan
Contract: 2.2068
All delivery vehicles will be required to arrive at harbour main gate, be regis-
tered, escorted across site by trained and authorised drivers and allowed to
park on site at agreed locations for off-loading. All drivers will remain with their
vehicles during the off-loading process.
Regular and scheduled deliveries, by the same driver, may be issued an access
card covering the sequence of deliveries and thereby be allowed to by-pass
harbour gate.
Small deliveries will be left at harbour security for collection by FLS site person-
nel.
All delivery drivers will be issued with a temporary driver’s pass together with a
set of rules and location plan which the driver will be required to read and sign
to confirm that they have been understood.
Suitable arrangements will be put in place for out of hour’s arrivals and the facil-
ity to park up overnight. Continuous security arrangements will be put in place
during 24 hr working periods.
Deliveries/Vehicle Entry
Report to harbour gate and register with the security guard
Security guard issues a delivery pass
Delivery pass to be placed in windscreen
Proceed from harbour gate through FLS camp or to construction site gate-
house by the designated route
Delivery/vehicle and driver will be booked in by the harbour gateman
Delivery drivers will be directed to the required location
Regular Vehicle drivers to show the induction pass to gain access to the
main construction site. If they are not inducted they will be directed to the main
office to attend an induction meeting for issue of an induction card prior to
commencing work
Gateman will retrieve the delivery pass and book out both vehicle and driver
on leaving the site
Delivery passes will be returned to harbour when leaving.
Permanent pass for delivery will be given only to mechanical contractor DLM.
Note: Regular delivery drivers and vehicles will be issued with a regular delivery
pass to allow by-pass of harbour gate. Vehicle delivery passes are numbered
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 36/ 60 Health & Safety Plan
Contract: 2.2068
Storage areas will be laid out so that where possible a single storage site will
service a number of working areas. Where storage is required in close proximity
to immediate working areas, special laydown areas will be established.
Only trained, competent and appointed personnel are to attach lifting gear to
any loads being lifted by crane. All loads are to be securely attached and test
lifted prior to delivery to their landing sites.
The main storage areas will be in the Workshop of DLM ( DGM area ), located
on the top of harbour entry, approximately 2 km of the site. The imported mate-
rial will be stored in this area, outside or inside buildings depending of packing
instructions.
SPHINX will have also their own storage in JORF LASFAR platform and a store
directly in their camp.
The material from Morocco Workshop will be delivered on site in the meaning of
“ just on time “ to be erected immediately.
All Contractors are to identify their waste products and separate these into “con-
trolled waste” and “special waste” categories.
All Contractors will be responsible for clearing their own rubbish and debris on a
regular basis in progress with the work. No excess rubbish or debris will be
permitted to be left on site at the end of the working shift. Bins are to be emptied
on a daily basis. Rubbish and debris is not to block access or egress routes.
All waste removed from site will be subject to an effective management control
regime to ensure statutory compliance. All waste carriers will be appropriately
licensed with accredited copies held on site. Contractors will maintain copies of
all waste transfer notes on site.
Storage of diesel, similar fuels, and significant quantities of oils and other or-
ganic liquids will be of such type as to minimise the risks of contamination of the
ground, drains and watercourses. Bulk storage will be of one of the following
types:
a) Single skin storage tank: - Properly designed bund will be constructed around
the storage capable of containing 110% of the anticipated possible release.
Organic absorbent skimmer pillows will be placed in the bund so as to absorb
any drips from fuel or similar.
b) Double Skin Tanks: - The tank will be mounted on weighted absorbent pad of
adequate surface area to ensure all drips and spillages are caught. Tanks will
be located in an area of the compound, which is not subject to danger from
through traffic.
c) 200 Litre (45 Gallon) Drums: - These will be stored on either bunded pallets
or on a concrete pad area with sufficient up stand to allow 220 litres to be
contained.
All storage areas will have appropriate hazard signage and be designated “No
Smoking” areas.
Where appropriate static plant and equipment will have a weighted absorbent
pad under and encompassing its ground area to ensure drips spills and
leakage’s are controlled and collected to 110% of capacity.
In all cases materials will be available to mop up any spillage’s that might arise.
Each Contractor will formulate appropriate emergency procedures to deal with
the consequences of a spillage.
In case of changing oils/lubricants, the old oils will be removed from site in a
proper way (barrels) and will be send to an appropriate local company for
recycling.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 38/ 60 Health & Safety Plan
Contract: 2.2068
All Contractors will be required to address the following minimum standard for
the production of the safety and environmental component parts in a method
statement:
1. Details
Method Statement No.
Risk Assessment No.
Section No.
3. Areas of Work
5. Activity Supervision
a. Supervision
b. Labour
7. Stabilisation/Safety Checks
12. Documentation
a. Permits
b. Certificates
c. Specific Training
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 39/ 60 Health & Safety Plan
Contract: 2.2068
Prepared by
Submitted to
Approval status
Operatives Briefing Register
The following permit schedule identifies the anticipated activities that will require
formal permits to work to be instigated.
All permits to work will be co-ordinated through the Principal Contractor. A list of
designated personnel authorised to raise and control permits will be maintained
by the Principal Contractor. All permits will have a specified time period. The fol-
lowing permits have been identified as required for the current phase of the
works.
.
Zone or Permit Con- Authorised
Area troller Issuers
Permit Matrix
Permit to Work General All FLS
Work requiring the use of naked All FLS
flame, heat or sparks (Hot works).
Working in confined spaces All FLS
Work involving excavations All FLS
Work with pipelines or plant contain-
ing:
High Temperature hot water
Hazardous Chemicals
Gases
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 40/ 60 Health & Safety Plan
Contract: 2.2068
Specific permit procedures and flow charts will be produced for all applicable
operations including a schedule of issuing authorities. All permit controllers will
be competent and suitably trained. Permit notice boards will be located at en-
trances to all appropriate locations including the main site office indicating the
permits in operation.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 41/ 60 Health & Safety Plan
Contract: 2.2068
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 42/ 60 Health & Safety Plan
Contract: 2.2068
9. EMERGENCY PROCEDURES
9.1.1 Introduction
A fire risk assessment will be undertaken on the project that will be developed
into a site Fire Action Plan and updated throughout the duration of the works in
response to the construction programme.
The Project Manager and his delegated authorities will hold meetings with the
HSE/local fire authority and the client in order to review construction activities
and the Fire Action Plan as necessary.
Fire Wardens nominated by each Contractor and the Principal Contractor have
specific duties identified. Inspections will be conducted monthly. A fire safety
audit will be undertaken every 6 months.
Halogen lights will not be allowed on site unless rigidly mounted for general
security lighting
Petrol operated plant and tools are not permitted on site without the Principal
Contractors authorisation.
All fire hydrants adjacent to the site are to be kept free of obstruction
All fire extinguishers are to be under a regular system of annual inspection
and test.
Combustible materials, LPG cylinders and other flammable materials are not
to be stockpiled on site and Contractors are to operate a “just in time” supply to
the working areas.
All combustible waste materials are to be immediately placed in the skips
provided. Containers are to be emptied on a daily basis
Unattended sources of ignition e.g. bitumen boilers, space heaters etc. are
not permitted at any time.
All site storage and accommodation will be in accordance with the require-
ments of the Client and Principal Contractor.
Access for the Fire Brigade and emergency services is to be kept clear at all
times.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 43/ 60 Health & Safety Plan
Contract: 2.2068
All escape routes and stairs are to be clearly signed and indicate fire assembly
points and action to be taken. Emergency lighting levels will be maintained to
the required standard.
The fire point will contain a combination of the following extinguishers relating to
the fire hazard present:
Water
Dry Powder
All Contractors are required to provide their own fire extinguishers for specific
activities e.g. hot works. A brief introduction to the use of fire extinguishers will
be undertaken within the induction training. Contractors are to ensure all opera-
tives are trained in the use of appropriate fire extinguishers.
The fire risk assessment and accommodation plan will be defined commonly
with the client and port authorities.
All flammable materials and gases are to be stored in suitable cages or con-
tainers external to the structures. Only minimum daily requirements are to be
taken to the work place. All materials are to be returned to storage areas at the
end of each shift. No storage will be allowed at the work place.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 44/ 60 Health & Safety Plan
Contract: 2.2068
Give your name and the location of the site: JORF LASFAR PORT
Send a representative to the harbour gate to meet and direct the emergency
services.
Hospital:
El Jadida
023 39 39 39
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 46/ 60 Health & Safety Plan
Contract: 2.2068
All accidents and incidents must be reported to the FLS construction manager and/or to
EHS manager.
Records of all accidents and near misses will be recorded in the accident book maintained
by the Principal Contractor. Copies of all accident and incident reports will be issued if
required to the Client on a weekly basis.
Both the Principal Contractor and individual Contractor will investigate all incidents. Addi-
tionally other accidents or incidents will be investigated depending on their nature. The
Client will be invited to accompany any investigations and will be issued with reports if re-
quired.
Accident/Dangerous Occurrence
Y
Immediately Immediately
notify FLS Safety notify FLS Safety
Investigate
Employer to Notify HSE Employer to
as appro-
complete form complete form
priate
and issue within and issue within
10 days 10 days
Copy of form to
Copy form to FLS FLS Safety Man-
Complete Major
Safety Manage- agement
ment Incident
Investigate and
complete report
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 47/ 60 Health & Safety Plan
Contract: 2.2068
Emergency contact names and contact numbers will be posted at specific locations
throughout the site.
The Client will be issued with copies of the all accident/incident reports and accident book
entries if required. Reportable accidents and incidents will be notified immediately.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 48/ 60 Health & Safety Plan
Contract: 2.2068
11. WELFARE
A dedicated first aid facility will be provided and maintained on site and manned
by a qualified site occupational nurse. The principal Contractor will provide a
minimum of two other qualified first aiders within his Management Team. (Dur-
ing the first few months of site activity, the level of first aid facilities will be ad-
justed to take account of the vastly reduced number of site personnel).
The first aid facility will be located in the FLS camp. A defibrillator will be availa-
ble with the nurse.
First aiders will wear a white safety helmet with a green cross on each side.
All main contractors are required to undertake an assessment of their own spe-
cific first aid requirements and provide a 4 day trained first aider on site at all
times whilst activities are being undertaken (where appropriate/required). Addi-
tional first aid equipment may need to be provided. Copies of training certifi-
cates are required by the Principal Contractor.
The common facilities will be provided with water dispensers, the tap water is
potable.
Using a dry toilet is also permitted in the erection areas for a maximum of 15
persons each.
11.3 CANTEEN
11.4 DRYING/CHANGING
Contractors will be responsible for the safe storage, maintenance and cleaning
of all personal protective equipment provided for use by their own operatives on
site.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 50/ 60 Health & Safety Plan
Contract: 2.2068
Prior to starting on site all personnel must receive project specific induction
training. The client will be responsible for providing this training and for ensuring
that site personnel attend. This is MANDATORY.
The Principal Contractor will maintain a training record of all project personnal.
Housekeeping
Scaffolding
Ladders
Fire
Manual handling
Portable electric tools
Personal Protective Equipment
Electricity
Noise
Hand tools
Excavations
Demolition
Lifting
Welding
Roof work
COSHH – Product safety data sheet
Method Statements
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 51/ 60 Health & Safety Plan
Contract: 2.2068
Where project staff are required to work on site for only short duration e.g. spe-
cialist-commissioning staff, technical support etc., trained site personnel will ac-
company them.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 52/ 60 Health & Safety Plan
Contract: 2.2068
Site notice boards will be located at suitable locations within the site, FLS camp
and DLM pre-assembly area.
The notice will be used to display all relevant statutory notices and site rules. Addi-
tionally the notice board will be used to identify specific daily hazards or changes
in procedures.
List of Notices:
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 53/ 60 Health & Safety Plan
Contract: 2.2068
The responsibilities for monitoring will operate at various levels within both the
project and the business organisational structure.
All inspection will indicate the corrective actions required and provide an audit-
able trail to confirm close out actions. Liaison will occur between the relevant
parties on identified hazards, changes in method statements or site conditions.
Where necessary the Principal Contractor will amend and re-issues the Con-
struction Health and Safety Plan.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 54/ 60 Health & Safety Plan
Contract: 2.2068
Property Damage
Environmental Incidents
First Aid Injuries
Complaints by third parties
Reports by Enforcement Authorities
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 55/ 60 Health & Safety Plan
Contract: 2.2068
During the project the Planning Supervisor and HSE manager with the Project
Team will develop the Health and Safety File.
As built drawings and plans used and produced throughout the construction
project along with the design criteria.
General details of the construction methods and materials used
Details of the structures equipment and maintenance facilities
Maintenance procedures and requirements for the structure
Operation and maintenance manuals produced by specialist contractor
Schedules of plant and equipment
Details on the location and nature of utilities and services, including emer-
gency and fire-fighting systems
For details of the contents and organisation of this file, see appendix I.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 56/ 60 Health & Safety Plan
Contract: 2.2068
This Health and Safety Plan will be subject to a regular system of review to ensure
that it reflects the progress of the construction project. It will be formally issued to
all relevant parties and be a controlled document under the Quality Assurance
System.
Suggestions and comments on the document are encouraged in order that the
process of continuous improvement is maintained. To enable this, a system im-
provement notice is attached at Section 16.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 57/ 60 Health & Safety Plan
Contract: 2.2068
The safety manager for contractor’s supervisors and animators will have an
evaluation and validation by JESA HSE responsible before starting of work on site.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 58/ 60 Health & Safety Plan
Contract: 2.2068
DOCUMENT TITLE:
FORM REFERENCE:
SUGGESTED IMPROVEMENT:
FROM:
NAME:
COMPANY:
CONTACT NO:
GENERAL NOTE:
ALL IMPROVEMENT NOTICES WILL BE CONSIDERED AND THE AUTHOR
WILL BE ADVISED OF THE OUTCOME IN DUE COURSE.
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Rev.01
Construction
Page: 59/ 60 Health & Safety Plan
Contract: 2.2068
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Construction
Health & Safety Plan
Contract: 2.2068
APPENDIX A
Organisation Charts
Client
OCP / JESA
A. Qaissouni
FLS
Contract Manager
Senior Mgnt
M. Schmidt
Romuald HARTMANN.
Deputy Contract
Manager
J.M. Moelo Technical Coordination
Commercial Manager Site Management Morocco Organisation
F. Hubertus
P. Dethlefsen G. Steeg Separate sheet
(Dr. Schumann)
Electr.
Statical Calc.
Procurement SSM Coordinator Shipping Techn. Coordinat. Engineering Civil
Coordination DLM Contract QA Wulkow
Coordinator Fabrication Coordination BC./ galleries Wdg. Coordination
J.M. Moelo Hermann Blatt
Contract Assistant S. Aubertin A. Leinen P. Brettnacher F. Hubertus R. Wulkow
L.Loizeau / v. Weiss
Electrical Electr.
Coordinator Engineering Engineering
Document Quality Assurance U. Kaltenegger FLS Automation Civil
Procurement Shipping
Contractual Control ITP, WEP
Adviser Sub Supplier Carsten Stein
Dr. Turner
Engineering
Non FLS Eng. FLS Engineering
Belt Conveyor
R. Wulkow FLS India
Contract Fabrication Inspection G. Laub
Controller Supervison Amann
J. Kurz
Statical Coord.
Fabrication Techn. Con.Mgr. A. Theobald
Document Supervison Expediting Grab type SUL
Controller S. Antrade
D. Schweitzer
Electrical Electr.
Coordinator Engineering
Fabrication Fabrication F. Schütz ISKRA
CDM Risk Supervison Supervison
Manager Non FLS Eng.
Dr. Specht Grab type SUL
NOKRAN
Documentation Electr.
M. Fünfrock Statical Engineering
Techn, Con. Mgr. Calculation Wdg.
SL A. Theobald
W. Bertele
Electrical Electr.
Hazop - Risk
Coordinator Engineering
J. Mesberger
F. Schütz FLS Automation
Engineering
FLS Engineering Non FLS Engineering
SL
FLS India Noll
M. Faschinka
Site manager
Gérard STEEG
Gardien Decennale
Sphinx + Contrôle
DLM Superviseur Superviseur SOCOTEC
Vis Bennes
Site assistant INDIA NOKRAN
NN Superviseur Elec Superviseur Elec
Engins Convoyeurs Réseau incendie
NN SPHINX
Site EHS NN
O. HANATY Superviseur Superviseur Superviseur Mec
Bennes/vis Chargeurs Convoyeurs
DLM DLM DLM
Site QA/QC Génie civil
NN
LUMIERES
& TECHNOLOGIES Géomètre
Documentation Logistics
Shipping Manager DLM
NN DLM
APPENDIX B
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Construction
Health & Safety Plan
Contract: 2.2068
APPENDIX C
FLS policy
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Safety & Health Policy
1. Our aim is to conduct our business in a manner which is efficient and which
provides for a safe working environment for our employees, our partners and
for the users of our products and services]
2. Accordingly it is the responsibility of our employees and managers to provide
a safe and healthy environment for themselves, their colleagues, contractors
and our customers through the creation of proper safety & health practices for
their respective workplace
3. FLSmidth products and services shall support the company’s reputation as a
responsible, reliable and professional supplier. The safety & health for the
users of our products and services is therefore an inherent part of our
deliveries
We intend to:
• Comply with relevant laws, regulations and internal FLSmidth policies,
standards and procedures which support our health & safety objectives.
• Ensure clear leadership and competence within safety & health in the
organisation.
• Proactively assess and strive to reduce occupational injury and illness risk
as well as promote employee health and well-being.
• Commit ourselves to an aim of continual improvement by tracking, setting
targets and reviewing our performance in safety & health.
• Implement a documented management system to prevent, detect and
correct violations of safety & health laws, regulations, permits and internal
policies, standards and procedures.
• Provide each employee with appropriate training of the skills and
techniques needed for safe and healthy performance of his or her work.
• Aim at developing new technologies, products, services and instructions,
that contribute to the safety & health of the users thereof
• Continue our evaluation of security risk related to travel and to working
abroad and take proper measures to protect our employees where we can
exert influence.
Environmental policy
Being an engineering company and a products and services supplier with limited
proprietary manufacturing, we strive to achieve our goal primarily by developing
processes, equipment and services that help our customers setting ambitious
environmental standards in their production processes.
• Products and services supplied by FLSmidth must comply with the applicable
environmental regulation
• FLSmidth’s products and services shall be designed so as to support the
company’s image of being a responsible, reliable and professional supplier who
meets the market’s expectations and requirements for new sustainable
technology
• When developing new products and services, consideration must be given to the
full life cycle of our products and services, and efforts must be made to reduce
the consumption of energy and natural resources and, to the extent possible, to
reduce or eliminate emissions and noise nuisance
• FLSmidth will, with due care to environmental aspects, aim at training and
motivating our customers with a view to ensuring optimum usage of our products
and services
• FLSmidth will collect data to ascertain the Group's direct environmental impact in
the form of energy consumption and intends to use such data as part of the basis
for setting environmental goals and plans of action
Construction
Health & Safety Plan
Contract: 2.2068
APPENDIX D
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Appendix D ‐ Risk Matrix
An occupational risk shall never remain classified over border risk.
As long as it has to be classified over border risk, there is need for action, what means, there must be additional protection measures for health and safety.
The risk matrix is a tool to classify occupational risks as over, in or under border risk.
Appendix D ‐ Risk_Matrix.xls
Construction
Health & Safety Plan
Contract: 2.2068
APPENDIX E
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Construction
Health & Safety Plan
Contract: 2.2068
APPENDIX G
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Application for permit to work
Contractors will submit a written application for a permit together with risk assessment and
method statements for the work to be undertaken in accordance with the following flow chart:-
Contractor submits
permit application to
FLSmidth
Contractor re-
appraises application
The Acceptor of the Permit shall be the person carrying out the excavation or his immediate
Supervisor. The Permit will be issued to carry out the excavation only.
On completion of the excavation work, the Permit shall be cleared by the current holder &
returned to FLS. Any subsequent work on any cable or other service so excavated must be
carried out under a separate Permit appropriate to the work.
The Permit Issuer should consider any precautions necessary under the Confined Spaces
Regulations if deemed appropriate.
The Issuer:
The issuer is responsible for ensuring that the Acceptor of the Permit understands the
Construction Safety Rules requirements of the work. In particular that the recipient
understands the precise location and extent of the excavation.
The Acceptor:
The Acceptor in charge of the work is responsible for co-ordinating all activities associated with
ensuring safety during the excavation. In particular he is responsible for ensuring that the
precise location & extent of the excavation is understood by all parties. The limits of the area to
be excavated are marked on the ground in paint. That precaution is taken to prevent danger
resulting from the excavation by the use of barriers and lights as appropriate. An appropriate
request for permission to excavate form is attached (Attachment 1).
Page 1/1
Construction
Health & Safety Plan
Contract: 2.2068
APPENDIX I
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Construction
Health & Safety Plan
Contract: 2.2068
JORF LASFAR - SUPERSTRUCTURES
ANALYSE D’ACCIDENT
Accidents résultat d'une cause directe, cause indirecte, et une cause de base ou racine. Ces causes se produisent dans la séquence ci-dessous. Examiner le déroulement de
l'accident. Vérifiez tous les facteurs qui s'appliquent.
CAUSES DIRECT
Acte risqué Condition risqué
Autres Autres
Autres
Organiser Contrôle
Tâche non exécutée comme planifiée
Pas de ressources (outillage, personnel, etc)
Avancements des travaux non surveillés
Ressources non appropriées (outillage, personnel, etc)
Autres
Condition de travail non sécurisée
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Décrire ce qui s’est passé, juste avant, pendant et juste après l’accident :
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
___________________
Signature
Date : ____________
Nom: _______________________________ Qualification : ________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
___________________
Signature
RAPPORT MENSUEL STATISTIQUES SECURITE
MOIS: EXCERICE A CE JOUR
jours de jours de
Total des blessures Jours d'arrêt travail Total des blessures Jours d'arrêt travail
enregistrés de travail par restreints enregistrés de travail par restreints par
cas par cas cas cas
Heures Cas Taux Heures Cas
Total des Taux Total Taux Total Total des Taux Total Taux Total Taux
de premiers des de premiers
blessures d'incidence des cas des cas des cas blessures d'incidence des cas des cas des cas des cas
travail soins cas travail soins
PROJET / SEGMENT
TOTAL
Annexe I‐4 RAPPORT MENSUEL STATISTIQUE SECURITE.doc
Construction
Health & Safety Plan
JORF LASFAR ‐ SUPERSTRUCTURES ‐ Contract: 2.2068
RAPPORT ANNUEL STATISTIQUES SECURITE
Exercice à
PROJET / SEGMENT Octobre Novembre Décembre Janvier Février Mars Avril Mai Juin Juillet Aout Septembre
ce jour
Feuille des heures de travail
Annexe I‐4 RAPPORT MENSUEL STATISTIQUE SECURITE.doc
Construction
Health & Safety Plan
JORF LASFAR ‐ SUPERSTRUCTURES ‐ Contract: 2.2068
RAPPORT MENSUEL STATISTIQUES SECURITE
Catégorie enregistrable
premiers MED
Projet Date Nom du blessé blessure Descriptif bref de l'accident DAW REST
soins ONLY
TOTAL
Annexe I‐4 RAPPORT MENSUEL STATISTIQUE SECURITE.doc
Construction
Health & Safety Plan
Contract: 2.2068
Observation:
Est ce qu’il y a des mesures correctives immédiates qui ont était prises ? Oui Non
Observateurs
Nom imprimé: Signature:
Superviseur/Manager
Nom imprimé: Signature: Date d’achèvement
PLAN D’ACTION SECURITE
Numéro du projet: ___________________________________ Activité / tâche : __________________
Zone de travail: ____________________________________________ Date : __________________
Etapes d’activité / Danger / Réaction à
Plan de sécurité Ressources
Tâche changer
Signatures de personnes impliquées dans le développement du PLAN D’ ACTION SECURITE
__________________ __________________ __________________ __________________
__________________ __________________ __________________ __________________
Signatures des Superviseurs: ___________________________________________________ Date: ___________
Vérifier la liste avec le remplissage de la première page du PLAN D’ACTION SECURITE (PAS).
Un nouveau plan d’action sécurité est nécessaire si l'envergure du poste ou des conditions de travail changent.
Espace clos Utilités aériennes nécessité mise hors tension nécessité couverture d’isolation nécessité surveillant câble
Levage critique Distance sécurité exigée= _______ m. zone sécurisée marquée
Travail à chaud Grue ou autre signaleur attribué marquage en cours d’utilisation Zone autour de la grue
Consignation appareils de levage Vérification des appareils de levage Personnel protégé contre les charges aériennes
Perturbation du sol (>12”) Conduites souterraines revoir les plans TQC sondage du sol permis de fouille reçu
Limitation zone de travail Distance se sécurité exigée= _______ m. zone de travail sécurisée marquée
EPI Requis Consignation Permission requise? Confirmation de la mise hors tension de
Electrique l’équipement
Casque, Class C procédures de sécurité électrique à jour
Casque, Class E (Protect.Elect.) Excavations Permis Inspectés avant d'entrer Une bonne pente / étayage
Anti-bruit (bouchons /casques) Barricades fournis Accès / sorties fournies Protection contre l’eau accumulée
Protection des yeux: Danger de feu permis de feu extincteurs veille de feux
Lunettes de sécurité Zone adjacente protégé Matériel inflammable inutile enlevé
Ecran faciale Circulation véhicules ou zone de trafic Cônes Signes signaleurs voie clôture
Lunettes antiacide équipement lourd Communication avec le conducteur d’engin
Masques de soudage Bruit >85 dB Protection auditive est nécessaire: bouchons d’oreilles casque anti bruit les deux
Protection des mains: Vérification des cond.gen. GFCI en application EPI identifié pour chaque outil
outils à main électrique
Gants anti coupures Normes de sécurité dans les manuels d’utilisation vérifiées Garde OK
Gants soudeurs Mains en danger Liste des matériels et équipements tranchants:__________________________________________
Gants en nitrile EPI, gants, etc. Obligation de protection des bords tranchants
Gants chirurgicaux Levage manuelle Techniques de levages vérifiées Matériel nécessaire au levage d’équipement identifié
Gants en caoutchouc Protection de mains nécessaire Ceinture de soutien dorsale
Gants isolants Echelles vérification des conditions générales avant utilisation Echelle inspectée
Manches bras Echelle attaché ou tenue bon angle et placement Sécurité des échelles revue
Protection des pieds: Echafaudage vérifier conditions générales avant utilisation Marquage en place Correctement sécurisé
Panneaux latéraux utilisés Semelles adéquates Matériels correctement entreposés sur
Bottes robustes de travail l’échafaudage
Bottes pied sécurisée Glissades, chutes Inspecter pour ne pas trébucher Risques marqués Matériel et outillage proprement posés
Bottes en caoutchouc Rallonges électriques proprement rangés Zone de travail nettoyé des débris
Bottes à couverture caoutchouc Points de pincement Liste des points potentiels de pincement:______________________________________________
Chaussures diélectrique Travailler à proximité d’équipement en exploitation Positionnement des mains et du corps
Protection respiratoire: Travaux environnement Liste des produits chimiques concernés et les risques et les précautions affichés sur la face avant.
chimique MSDS revus Contrôle de l’exposition nécessaire Avoir conteneurs appropriés et étiques.
Masque poussière Identifié EPI approprié (respirateurs, vêtements , gants , etc.)
Appareil respiratoire filtrant L’amiante ou peinture Zone de travail peut contenir de l’amiante ou peinture à plomb Contrôle d’amiante intégré
Appareil respiratoire Contenant du plomb contrôle de plomb sur place Contrôle d’exposition effectué.
o
SCBA indicateur de température (>85 ) Liquides disponibles Périodes de froid
Respirateur d’évacuation Contrainte thermique
d’urgence potentiel Ecran solaire Revoir les symptômes des contraintes thermiques
Potentiel stress lié au froid Vêtements appropriés (i.e.. gants, manteau, combinaison) refroidissement éolien <32o
Vêtements spéciaux:
Revoir les symptômes du stress du froid Périodes d’échauffement
Tyvek ® Environnemental Emissions d’air Evacuation d’eaux Déchets dangereux Autres déchets
Poly enrobés Tyvek ® Prévention de pollution minimisation de déchets
Combinaison résistance au feu Risques naturels ou sur site Météo Terrain Opération ou procès adjacents Dangers biologiques
Imperméable Risques animaux /reptiles et insectes
Veste de sécurité Travaux adjacent processus leur notifié notre présence Les autres travailleurs adjacentes, au-dessus ou en dessous.
Coordonné avec le superviseur adjacente / client / opérateur Besoin barrières entre les deux.
Protection anti chute:
Barricades/couvertures Bandes barricade Attention requise Bandes barricade Danger requise Rambarde rigide
Harnais nécessaire Couvre plus de l’ouverture Signes précurseurs nécessaires
Double lanière obligatoires Information additionnelle:
Point d’ancrage disponible
Besoin connecteur supplémentaire
d’ancrage : Brassard de la croix, etc.
Dispositif rétractable nécessaire
Système ligne de vie horizontale
Espace libre adéquat
Plan de sauvetage et de
récupération
JORF LASFAR ‐ SUPERSTRUCTURES
REGISTRE DES PREMIERS SOINS
Société : ____________________________ Nom et numéro du projet :________________________
Situation chantier : _____________________________ Mois / Année : ________________________
Chef d’équipe / Type de blessure, partie du corps et
Date Heure Nom ‐ Prénom
Superviseur descriptif bref de la blessure
Responsable chantier : ______________________________________________
Annexe I‐1 REGISTRE DES PREMIERS SOINS.doc
Construction
Health & Safety Plan
Contract: 2.2068
APPENDIX J
The information transmitted by this document is the proprietary and confidential property of FLSmidth Wadgassen
and may not be duplicated, disclosed or utilized without written consent from FLSmidth Wadgassen.
Permit to work - Mechanical
Date Permit
Valid from Valid to
Contractor
Location of installation:
Declaration:
I hereby declare that it is safe to work on the following mechanical equipment/system, which is isolated.
Name:………………………………………………….. Name:………………………………………………….
Signature:……………………………………………… Signature:……………………………………………...
Date:………………………………………….………... Date:……………………………………………………
Time:…………………………………………………… Time:…………………………………………………...
Signatories – cancellation
3. Contractor’s acceptor 4. FLSmidth issuer
I hereby declare that the work for which this permit I accept that the work has been safely completed. The
was issued has now been *completed/suspended top and first copy of this permit has been destroyed.
and that all persons under my charge have been
withdrawn and warned that it is no longer safe to work
on equipment/system specified in this permit. Tools
and equipment are clear.
Name:………………………………………………….. Name:………………………………………………….
Signature:……………………………………………… Signature:……………………………………………..
Date:………………………………………….………… Date:……………………………………………………
Time:……………………………………………….…... Time:………………………………………………….…
*delete as appropriate
Page 1/1
Permit to work – Hot work
Date Permit no
Valid from Valid to
Contractor
For cutting and welding with portable gas/arc equipment or grinding.
Location of work:
Description of work:
Conditions:
1. Before starting hot work, the area must be cleared of all loose combustible material and if work is to take
place on one side of a wall or partition, the opposite side must be examined to ensure no combustible
material will be ignited by conducted heat.
2. Suitable extinguishers of appropriate type must be at hand with careful watch being maintained for fire
breaking out whilst work is in progress.
3. Exposed scaffolding boards and other items of combustible material which cannot be removed must be
protected with non-combustible material.
4. When welding, cutting or grinding the work area must be suitably screened using non-combustible
material.
5. Gas cylinders must be secured in a vertical position and fitted with a regulator and flashback arrestor at
the regulator.
6. The area of any hot work must be thoroughly examined one hour after the work has finished.
Further special conditions and precautions:
Name:………………………………………………….. Name:………………………………………………….
Signature:……………………………………………… Signature:……………………………………………...
Date:………………………………………….………... Date:……………………………………………………
Time:…………………………………………………… Time:…………………………………………………...
Signatories – cancellation
3. Contractor’s acceptor 4. FLSmidth issuer
I hereby declare that the work for which this permit I accept that the work has been safely completed. The
was issued has now been completed and that all top and first copy of this permit have been destroyed.
persons under my charge have been withdrawn. Tools
and equipment are clear. The work area and all
adjacent areas to which sparks may have spread
(including floors above and below) were inspected 1
hour after operation was completed and were found
firesafe.
Name:………………………………………………….. Name:………………………………………………….
Signature:……………………………………………… Signature:……………………………………………..
Date:………………………………………….………… Date:……………………………………………………
Time:……………………………………………….…... Time:………………………………………………….…
Page 1/1
Permit to work - Excavation work
Date Permit no
Valid from Valid to
Contractor
Work to be carried out:
Signatories - cancellation
3. Contractor’s acceptor 4. FLSmidth issuer
Name:…………………………………………. Name:…………………………………………
Signature:……………………………………. Signature:…………………………………….
Date:…………………………………………... Date:…………………………………………..
Time:………………………………………….. Time:…………………………………………..
Page 1/1
Permit to work – Electrical equipment
Date Permit no
Valid from Valid to
Contractor
Location of installation:
Declaration:
I hereby declare that it is safe to work on the following lv equipment, which is dead and isolated from all live
conductors.
Name:………………………………………………….. Name:………………………………………………….
Signature:……………………………………………… Signature:……………………………………………...
Date:………………………………………….………... Date:……………………………………………………
Time:…………………………………………………… Time:…………………………………………………...
Signatories – cancellation
3. Contractor’s acceptor 4. FLSmidth issuer
I hereby declare that the work for which this permit I accept that the work has been safely completed. The
was issued has now been *completed/suspended top and first copy of this permit has been destroyed.
and that all persons under my charge have been
withdrawn and warned that it is no longer safe to work
on apparatus specified in this permit. Work, and all
gear, tools and additional earthing connections are
clear.
Name:………………………………………………….. Name:………………………………………………….
Signature:……………………………………………… Signature:……………………………………………..
Date:………………………………………….………… Date:……………………………………………………
Time:……………………………………………….…... Time:………………………………………………….…
*delete as appropriate
Page 1/1
Permit to work in confined spaces
Date Permit no
Valid from Valid to
Contractor
Work to be carried out:
Signatories – cancellation
3. Contractor’s acceptor 4. FLSmidth issuer
I have completed the work detailed in this permit, and I accept that the work has been safely completed. The
have restored the location to a safe and orderly top and first copy of this permit has been destroyed.
condition. I have returned my copy and the display
copy of this permit to the issuer.
Name:………………………………………………….
Name:…………………………………………………..
Signature:……………………………………………..
Signature:……………………………………………...
Date:……………………………………………………
Date:………………………………………….…………
Time:…………………………………………………...
Page 1/1
Construction
Health & Safety Plan
Contract: 2.2068
APPENDIX K
PORT OBLIGATOIRE
PORTER TOUJOURS LE D'EQUIPEMENT DE
GILET DE SECURITE PROTECTION DES YEUX