Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LEGEND :

SIZE DESCRIPTION TYPE

50mm.O
/ SOIL BRANCH
PIPE

100mm. O/ DOWNSPOUT
100mm.O
/ SOIL WASTE
PIPE
STORM WATER

50mm. O/ VENT THRU ROOF


150mm.O
/
DRAINAGE GENERAL NOTES :
50mm.O
/ VENT PIPE ALL PLUMBING WORKS TO BE DONE AND SIZES OF THE PIPES TO
BE USED SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF
100mm.O
/ DOWNSPOUT LL
UNIFORM PLUMBING CODE OF THE PHILIPPINES AND LOCAL
WA REGULATIONS AND ORDINANCES.
H RU
TT
19mm.O
/ CWL .V
EN
mm ALL PIPES SHALL BE INSTALLED AS INDICATED IN THE WORKING
50
DRAWINGS. ANY RELOCATION REQUIRED FOR PROPER
50mm. O
/ CB
EXECUTION OF OTHER TRADES SHALL BE UPON THE APPROVAL
BRANCH PIPE
CO
OF SANITARY ENGINEER.
LAV LAV
15
KS 0m
m.
FD
O/
STO
ALL PIPES SHALL BE PROVIDED
FD
BY PROPER HANGER AND SUPPORT.
WC RM
DR
AIN
AG
E
ALL FIXTURES SHALL BE VENTED INDIVIDUALLY AND WATER LINES
SHALL BE VALVE BY GROUP.
PROPERTY LINE PROPERTY LINE

50mm. O/ PIPE ALL PLUMBING FITTING SHALL BE ACCESSIBLE FOR MAINTENANCE.


PROVIDE MANHOLE IF SUCH INSTALLATION ARE INSIDE CEILING.

100mm. O/ DOWNSPOUT
IPE
EP
ST
WA
OIL ALL CHANGES IN DIRECTION SHALL BE MADE BY THE APPROPRIATE
OS

/
.
3-CHAMBER 0 mm USE OF FORTY FIVE (45) WYE LONG SWEEP QUARTER BEND. ONE
50mm. O/ PIPE 10
CONVENTIONAL
SEPTIC VAULT EIGHT WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO
IPE
G EP VERTICAL A SINGLE BEND COMBINATION MAY BE USED ONLY ON
CB A INA
M
DR VENT PIPE.
OR
O ST

/
50mm. O
/ VENT CO m.
THRU ROOF F
15
0m NO DOUBLE HUB OR DOUBLE TEE BRANCH SHALL BE USED ON
19mm. O/ CWL HORIZONTAL SOIL AND WASTE LINES.
FD SHO
KS KS
PROVIDE PIPE SLEEVES AT WALL, COLUMNS OR SLAB TO PROTECT
FROM BREAKAGE.
50mm. O
/ VENT
THRU WALL TO STREET
WC MAIN SEWER ALL SLOPES FROM HORIZONTAL DRAINAGE PIPES SHALL MAINTAIN
CB CB 1% UNLESS OTHERWISE SPECIFIED.
IPE
EP
LAV IN AG
LAV D RA THE BRAND AND OTHER DETAILED PLUMBING FIXTURES SHALL
M
T OR
OS BE IN ACCORDANCE WITH THE SCHEDULE FURNISHED BY
150mm. O/ STORM DRAINAGE PIPE

SEWER AND DRAINAGE

/
m.
0m THE ARCHITECT.
15

19mm. O/ CWL
TO STREET
MAIN SEWER
3 ISOMETRIC LAYOUT GATE VALVE SHALL BE BRONZE BODY, SOLID WEDGE TYPE,
P-1 SCALE : 1 : 50 MTS. SCREWED OR FLANGED END.

USED uPVC SANITARY PIPING SYSTEM SERIES 1000 FOR 100 O/


AND SMALLER AND SBR-34 GRAVITY SEWER MAIN uPVC PIPING
100mm. O/ SOIL WASTE PIPE

SYSTEM FOR 150 O/ AND BIGGER.

SHO ENGINEER-IN-CHARGE
SHOTO VERIFY ACTUAL LOCATION AND ELEVATION

OF STREET DRAINAGE, STREET SEWER AND STREET WATER MAINS


FOR CONNECTION BEFORE CONSTRUCTION.

F
FB

LAV

KS
C WL
O/
m.
CB 1 9m
19
mm.
O/ C
WL
3-CHAMBER
CONVENTIONAL HOSE BIBB / FAUCET
SEPTIC VAULT

G.I. PIPE ADAPTOR

PROPERTY LINE PROPERTY LINE CV


WM
GV

20mm.O COLD
CW
L WATER LINE
TO STREET TO STREET . O/
mm
MAIN SEWER MAIN SEWER 19
FROM STREET
MAIN WATER LINE
HOSE BIBB / FAUCET
5 INSTALLATION DETAIL
SCALE : NOT DRAWN TO SCALE
SEWER AND DRAINAGE P-1

1 LAYOUT 2 WATER SUPPLY LAYOUT GV


CV
WATER SUPPLY
P-1 SCALE : 1 : 50 MTS. P-1 SCALE : 1 : 50 MTS. WM
4 ISOMETRIC LAYOUT
P-1 SCALE : 1 : 50 MTS.
FROM STREET
MAIN WATER LINE

PROJECT TITLE : Republic of the Philippines ARCHITECT / ENGINEER DESIGNED: PLIBARDALOZA CHECKED: RGRAMOS SHEET NO.
MUNICIPALITY OF TIGAON Office of the President
Tigaon, Camarines Sur DRAWN: PLIBARDALOZA DATE:
NATIONAL HOUSING AUTHORITY
CHECKED BY RECOMMENDING APPROVAL SHEET CONTENT District II, VGH, Concepcion Grande, Naga City

HOUSE MODEL ( 33sqm. R.H. ) SEWER & DRAINAGE LAYOUT / WATER REVIEWED BY RECOMMENDING APPROVAL APPROVED BY P-1
SUPPLY LAYOUT / SEWER & DRAINAGE

TIGAON RES. PROJECT Phase I APPROVED BY


DESIGNATION
ISO. LAYOUT / WATER SUPPLY ISO. LAYOUT

REVISIONS DATE:

LOCATION : Engr. CRISTINA A. CABANGON Engr. ALBERT A. PERFECTO MARCELINO P. ESCALADA JR. 12 13
REG No.: DATE: PROJECT MANAGER, DISTRICT II - REGION V ACTING REGIONAL MANAGER, REGION V GENERAL MANAGER, NHA
BRGY. SALVACION, TIGAON, CAMARINES SUR Hon.
MUNICIPAL MAYOR PTR No.: PLACE:

You might also like