Professional Documents
Culture Documents
AF HalfCycle
AF HalfCycle
AF HalfCycle
Bus ID Equipment Nom kV Equipment Gap X Factor Grounding Limited AppLimited App
Bus1 0.48 Switchgear 32.0 1.473 Grounded 10 3.5
Bus2 0.48 Switchboar 32.0 1.473 Grounded 10 3.5
Bus23A Bus 3 0.48 Switchboar 32.0 1.473 Grounded 10 3.5
LVBus LV Bus 0.48 MCC 25.0 1.641 Ungrounde 10 3.5
Main Bus Main Bus 34.5 Open Air 0 Grounded 10 6
MCC1 MCC1 0.48 MCC 25.0 1.641 Grounded 10 3.5
Sub2A Sub 2A 13.8 Switchgear 153.0 0.973 Ungrounde 10 5
Sub2B Sub 2B 13.8 Switchgear 153.0 0.973 Grounded 10 5
Sub 3 Sub 3 4.16 Switchgear 102.0 0.973 Grounded 10 5
Sub3 Swgr Sub3 Swgr 4.16 Switchgear 102.0 0.973 Grounded 10 5
Sub22 3.45 Switchgear 102.0 0.973 Grounded 10 5
Sub23 3.45 Switchgear 102.0 0.973 Grounded 10 5
Page 1
Bus Report
Restricted Available PTotal Bus BTotal Bus ASource PD Source PD Source TripSource TripSource Tri
1 10 28.087 14.884 28.087 14.884 CB22
1 5 12.624 7.646 12.624 7.646 CB31
1 0 16.474 9.544 0 0
1 0 15.766 9.675 14.87 9.125 CB40
2.58 10 21.95 21.95 20.483 20.483 CB1 OCR1 Overcurren
1 0 17.856 9.146 1.857 0.951 CB3 Relay4 Overcurren
2.16 10 6.434 6.292 5.55 5.427 CB11 OCR4 Overcurren
2.16 5 11.388 11.028 3.059 2.962 CB10 OCR2 Overcurren
2.16 0 26.332 25.14 25.393 24.243 CB8 OCR7 Overcurren
2.16 0 24.327 23.257 23.379 22.351 CB8 OCR7 Overcurren
2.16 5 10.931 10.593 2.1 2.035 CB12 OCR4 Overcurren
2.16 4 10.537 10.218 0.686 0.665 CB10 OCR2 Overcurren
Page 2
Bus Report
Trip Time ( Open Time Total FCT AFB (ft) Incident EnWorking DisEnergy LevPPE DescriInsulated G
10.5 0 10.5 5.738 5.67 24 Level C FR long-sle 500
3.6 0 3.6 1.702 0.946 24 Level A Non-melting 500
0 0 0 0 0 24 500
12 0 12 4.878 8.312 18 Level D Multilayer 500
9.153 5 14.153 28.701 109.422 36 Level G 36000
92.411 5 97.411 14.37 48.951 18 Level F 500
7.15 6 13.15 5.634 2.216 36 Level B FR long-sle 17000
9.75 5 14.75 9.051 3.515 36 Level B FR long-sle 17000
8.859 5 13.859 18.569 7.072 36 Level C FR long-sle 7500
8.859 5 13.859 17.031 6.502 36 Level C FR long-sle 7500
24.694 6 30.694 16.096 6.154 36 Level C FR long-sle 7500
177.272 5 182.272 96.48 35.147 36 Level E Multilayer 7500
Page 3
Bus Report
Page 4
PD Report
Page 5
PD Report
PD FCT (C Arcing kA f Upstream Source PD Source PD Upstream SAFB (ft) Incident EnWorking Dis
10.500 12.652 CB8 OCR7 Overcurren111.022 25.252 50.291 24
14.884 CB22 10.500 5.738 5.67 24
7.646 CB31 3.600 1.702 0.946 24
3.600 7.646 CB23 4.200 1.889 1.104 24
0 0 0 24
9.544 0 0 24
9.675 CB40 12.000 4.878 8.312 18
9.675 CB40 12.000 4.878 8.312 18
12.000 8.224 Fuse4 66.525 12.445 38.657 18
9.675 CB40 12.000 4.878 8.312 18
9.675 CB40 12.000 4.878 8.312 18
0 CB1 OCR1 Overcurren14.153 28.701 109.422 36
0 CB1 OCR1 Overcurren14.153 28.701 109.422 36
56.838 21.95 CB1 OCR1 Overcurren14.153 28.701 109.422 36
21.95 CB1 OCR1 Overcurren14.153 28.701 109.422 36
14.153 0 0 0 36
314.777 9.146 CB3 Relay4 Overcurren97.411 14.37 48.951 18
9.146 CB3 Relay4 Overcurren97.411 14.37 48.951 18
9.146 CB3 Relay4 Overcurren97.411 14.37 48.951 18
9.146 CB3 Relay4 Overcurren97.411 14.37 48.951 18
9.146 CB3 Relay4 Overcurren97.411 14.37 48.951 18
9.146 CB3 Relay4 Overcurren97.411 14.37 48.951 18
6.292 CB11 OCR4 Overcurren13.150 5.634 2.216 36
13.150 6.292 CB11 OCR4 Overcurren13.150 5.634 2.216 36
13.150 0 CB2 OCR3 Overcurren14.292 6.137 2.408 36
11.028 CB10 OCR2 Overcurren14.750 9.051 3.515 36
11.028 CB10 OCR2 Overcurren14.750 9.051 3.515 36
11.028 CB10 OCR2 Overcurren14.750 9.051 3.515 36
8.951 0 0 0 36
13.859 0 0 0 36
25.14 CB8 OCR7 Overcurren13.859 18.569 7.072 36
25.14 CB8 OCR7 Overcurren13.859 18.569 7.072 36
25.14 CB8 OCR7 Overcurren13.859 18.569 7.072 36
25.14 CB8 OCR7 Overcurren13.859 18.569 7.072 36
23.257 CB8 OCR7 Overcurren13.859 17.031 6.502 36
23.257 CB8 OCR7 Overcurren13.859 17.031 6.502 36
23.257 CB8 OCR7 Overcurren13.859 17.031 6.502 36
23.257 CB8 OCR7 Overcurren13.859 17.031 6.502 36
10.593 CB12 OCR4 Overcurren30.694 16.096 6.154 36
10.218 CB10 OCR2 Overcurren182.272 96.48 35.147 36
Page 6
PD Report
Page 7