Prepared By: ToolPusher / HSE Advisor

Risk Assessment Register


Reviewed By: Drilling Superintendent

Approved By: HSE Manager Date : 1st November, 2015 Rev. No. 1

INITIAL RISK CONTROL MEASURES RESIDUAL RISK


Risk Number

HAZARDS Effect
Main Activity Sub Activity HAZARDS

Likelihood

Likelihood
Risk Level

Risk Level
( If the Hazard is Released )

Severity
Severity

Class

Class
Prevention & Mitigation Recovery Measures

1 Living in Camp Living in Camp  Electrical appliances  Personnel injury / electric C 4P C4 M  Provision of safety signs. ERP, C 1P C1P L
Accommodation Accommodation  Hot water shock P  Provision of Smoke detectors MEDEVAC,
 Noise  Skin burns  Regular pest control shall be applied to landfills as needed. Medical
 Slippery surfaces  Loss of consciousness  Weekly and monthly camp inspections. facilities
 Wild animals  Fatality  Provision of fire alarm system and firefighting equipment’s.
 Flies/Insects  Respiratory distress  Provision of safety layout and evacuation layout.
 Sharp edges  Deafness  Maintain good housekeeping inside rooms and camp surroundings
 Inadequate lighting  Fire  Provision of grounding system.
 Flammable  Equipment damage  Controlled power supply system
materials  Good quality of electrical cables and connections.
 Toxic gases  Training and awareness campaign on camp hazards and risks.
 Providing electric fly-killers, improve general hygienic condition & awareness of
dangers due to insects.
 Provision of different waste skids
 Implementation of minder buddy system.

Refer to the following documentations:

 PDO Haz-ID Section # 12.Electrical.


 PDO SP-1099 Electrical Safety Rules.
 PDO SP-1111 Specification for Temporary Electrical Supplies for Construction &
Maintenance Work.
 Housekeeping procedures.
 No Smoking Policy
 OHS Health specification