Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Zhengzhou Zhengyang Machinery Equipment Co.

,Ltd
Office Address: No. 172, 5th Avenue, Economic And Technological
Development Zone, Zhengzhou, Henan, China (Mainland)
Tel: 0086-371-86058620 Ph: 86 18839127331 Whatsapp:0086-18839127331

Raw Materials Price

Grame
Product Picture specification Price
Weight

White
Non-Woven SS 25g $4,000/ton
Fabric

Blue
Non-Woven SS 25g $4,300/ton
Fabric

Melt Blown BFE99+(PFE95+) 25gsm $46,000/ton

3mm
Air-Corn Round
Wire
Ear-loop 900m $6,300/ton
The tension ratio
1:2.7

3mm
Single Core
Nose Wire 400m $4,300/ton
Galvanized Nose
Wire
Zhengzhou Zhengyang Machinery Equipment Co.,Ltd
Office Address: No. 172, 5th Avenue, Economic And Technological
Development Zone, Zhengzhou, Henan, China (Mainland)
Tel: 0086-371-86058620 Ph: 86 18839127331 Whatsapp:0086-18839127331
Zhengzhou Zhengyang Machinery Equipment Co.,Ltd
Office Address: No. 172, 5th Avenue, Economic And Technological
Development Zone, Zhengzhou, Henan, China (Mainland)
Tel: 0086-371-86058620 Ph: 86 18839127331 Whatsapp:0086-18839127331

Electret PP Melt Blown material


Color White/blue

width 175mm/260mm

weight 25g/m2

PFE.32L 90%-100%

BFE.32L ≥99%

Pa <100

Raw material Dow polypropylene (PP) Z1500/Dow electret masterbatch

Weight(one roller) 8kg

Diameter(one roller) 55cm

Length (one roller) 1000 米

Box size 52.5*52.5*74cm

Box weight 1.5kg

Quantity in each box 4卷

total weight(Box and 34kg


material)
Zhengzhou Zhengyang Machinery Equipment Co.,Ltd
Office Address: No. 172, 5th Avenue, Economic And Technological
Development Zone, Zhengzhou, Henan, China (Mainland)
Tel: 0086-371-86058620 Ph: 86 18839127331 Whatsapp:0086-18839127331

Article 2: TERMS OF PAYMENT

100%T/T in advance

Bank’s Name: BANK OF CHINA HENAN BRANCH

Bank’s Address: HUAYUAN ROAD 40TH ZHENGZHOU CITY HENAN CHINA


Beneficiary’s Name: ZhengZhou SUNY Industrial CO., Ltd
Account Number: 261162359166
SWIFT: BKCHCNBJ530

Article 3: DOCUMENT REQUIRED :

A. Party B will be responsible for all the shipping documents needed to customs clearance.
B. Party B will send the full set of documents (such as commercial invoice, packing list, certificate
of origin, B/L) to Party A within 15 days after the B/L date.
C. All shipping documents to be issued in English except for stamps and letterhead.
Article 3: PACKING AND QUALITY

Origin: China
Quality: As per export standard of the manufacturer and 100% new.
Packing: Packing in exporting standard, be support in sea worthy container in sea / air
transport.
Packing should state that the deformity and destroy to the goods due to the weak packing
shall be borne and compensated by the seller.

Article 4: DELIVERY

Loading port: Qingdao, China


Transshipment: Allowed.
Partial shipment is not allowed.
Shipment period: Within 7 working days after receipt of your advanced payment.
Zhengzhou Zhengyang Machinery Equipment Co.,Ltd
Office Address: No. 172, 5th Avenue, Economic And Technological
Development Zone, Zhengzhou, Henan, China (Mainland)
Tel: 0086-371-86058620 Ph: 86 18839127331 Whatsapp:0086-18839127331

You might also like