DC Room Type-2-S02
DC Room Type-2-S02
MAKKAH
SD
LAV
MR
WWC
PH
S=8%
UP
S=8%
UP
1 2 3 4 5 1 2 3 4 5
DC ROOM TYPE-2 S=8%
UP
S=10%
UP
S=8%
UP
21900
DC1+DC2
PH
WWC
MR
SD
LAV
5033 5033 5033 6800
1054
PARTITION
LIGHT
EE
MF-007
GB1 GB1 GB1 GB1 A
200
A
LAWN
A
48703.22
GRAVEL
GRADED EARTH
1250
GRAVEL
GRADED EARTH
GRADED EARTH
C
GRAVEL
D
GRAVEL
GRAVEL
GRAVEL
DC ROOM TYPE-2
LAWN
FENCE
4000
1200
GB1
GB1
DC5+DC6
1
GB1
UP UP
DN
DN
DN
DN
DN
DN
OPEN ABOVE
DN
DN
SDH1
FM2
PTD
LAV1 SD LAV2 HS1
WC1
PTD
2XRH1 TPH1
SLOPE 1:12
RAMP-DN
CARPORT
1350
2400 300 3750 1
UP
2
3
MAIN SLOPE-10%
ENTRANCE
3
UP
23
2
45
SLOPE-9%
4
12
5
SLOPE-10%
RAMP
RAMP
LOADIN
21
34
5
6
12
2
1
B GB1
B
OLD ROAD
JEDDAH MAKKAH
1200 200MM THK. SLAB
∅14 @200 C/C, 200MM THK. SLAB
B/W (T&B) ∅16 @200 C/C,
300MM THK. SLAB
B/W (T&B)
∅14 @200 C/C, 200
5500
5500
GB1
KEYPLAN
GB1
GB1
B/W (T&B)
GB1
GB1
350 800
150 500
GB1
GB2
LEGEND
C C
250
SSL- STRUCTURAL SLAB LEVEL
GB2
00.000
GB2
800
FFL- FINISH FLOOR LEVEL
CN
B.L.B- BOTTOM LEVEL OF BEAM
T.L.S- TOP LEVEL OF SLAB
4250
4300
GB1
GB1
2900
REINFORCED CONCRETE WALL
1050 1200 2583 5033 2483
GB1
GB1
800 800
GB1 GB1 GB1
D
GB1 NOTES
D
1. ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS
ARE IN METER.
7. CONCRETE :
CONCRETE CYLINDRICAL SPECIFIED COMPRESSIVE
STRENGTH (f'c) AT 28 DAYS SHOULD NOT BE LESS THAN
35 Mpa FOR ALL SUBSTRUCTURES & SUPERSTRUCTURES.
8. REINFORCEMENT :
DEFORMED REINFORCING BARS WITH A SPECIFIED YIELD
STRENGTH fy = 415MPa.
1 2 3 4 5
5033 5033
23300
5033 6800
COLUMN & WALL SCHEDULE
REINFORCEMENT
COLUMN I.D SIZE REMARKS
LONGITUDINAL TIES (LATERAL)
C1 400x400 8-Ø16 Ø12@200 C/C
FOOTING SCHEDULE
4000
SLAB SCHEDULE
REINFORCEMENT
C1 C1 C1 C1 C1 REMARKS
D BOTTOM TOP
I.D THICKNESS
mm
SHORT LONG SHORT LONG
DIM DIM DIM DIM
400
∅12@150 C/C
200
MASTIC SEALANT
R.C.BEAM
FOR REINFORCEMENT
GROUND FLOOR SLAB
REFER TO BEAMS SCHEDULE
RS
ON
N
FA
I
AL GUARD HEALT H AF
I
500MM THK. RAFT FOUNDATION Ø12@150 C/C
PROJECT TITLE:
∅16 @200 C/C, B.W (T&B) CONCRETE WALL
Thk. 200 mm
750
FOR REINFORCEMENT REFER Ø12@200 C/C
TO WALL SCHEDULE
PROPOSED MEDIUM
ROOF SLAB LEVEL
WELL COMPACTED
VOLTAGE
500
NETWORK-JEDDAH
AS PER REINF. SCEDULE 100MM LEAN CONCRETE
SHEET CONTENTS:
2 LAYERS OF WATER
PROOFING
FOR RC SLAB REINF.
SEE SCHEDULE
DISTRIBUTION CONTROL ROOM
100MM LEAN CONCRETE
2 LAYERS OF BWATER
TYPE-2 (DC 1+DC 2) & (DC 5+DC 6)
PROOFING FOUNDATION, COLUMN, ROOF
WELL COMPACTED SUBGRADE
(SEE SPECIFICATION)
B CABLE TRENCH DETAIL C GRADE BEAM/SLAB ON GRADE DETAIL D SECTIONAL DETAIL A FRAMING LAYOUT, SCHEDULE &
A TYPICAL FOOTING DETAIL APPROVED:
SECTION DETAILS
DATE: CADD: SCALE:
ALBERT AS SHOWN
CHECKED: DATE: DRAWING NO:
DESIGNED: DATE:
K.H MAR-30-2020 20 08 KKH S02