T&T Process Usage Importance

Bring together prequalified


stakeholders to learn about
Collect requirements their expectations and
attitudes about a proposed
product.

Generate and collect multiple


Identify stakeholders ideas related to project
stakeholders.

Bring together stakeholders


Focus groups and subject matter experts to M
learn about the perceived
Develop project charter project risk, success criteria,
and other topics in a more
conversational way than a
one-on-one interview.

Bring together stakeholders


to discuss the approach and
Develop project
the integration of the different
management plan
components of the project
management plan.

Learn about the project by


talking directly to obtain
Develop project charter
information about the project
charter.

Obtain specific information


Develop project
from stakeholders to develop
management plan
the project plan.
Interviews M
Identifying the features of the
Collect requirements
deliverables.

Identify quality needs and


expectations in an
Plan quality
environment of trust to
management
encourage honest and
unbiased contributions.

Help bring stakeholders into


Conflict alignment on the objectives
Develop project charter H
management and all elements of the
charter.

1 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Help bring stakeholders into


Develop project alignment on the objectives
management plan and all elements of the
project plan.

The project manager needs


to resolve conflicts promptly
Develop team and in a constructive way in
order to achieve a high-
performing team.

There are five general


techniques for resolving
conflict, withdraw/avoid,
Manage team smooth/accommodate,
compromise/reconcile,
force/direct, and
collaborate/problem solve.

Effectively guide a group


Develop project
event to a successful
management plan
decision

Focused sessions that bring


Collect requirements key stakeholders together to
define product requirements.
Faciliation L
A skilled facilitator can help
participants remain focused
on the task, agree on key
Plan risk management aspects of the risk approach,
identify and overcome
sources of bias, and resolve
any disagreements.
Provides access to
information technology (it)
Direct and manage software tools automated
project work gathering and reporting on
key performance indicators
(PMIS) (KPIs) M
Simplify the use of some cost
estimating techniques and
Estimate costs thereby facilitate rapid
consideration of cost
estimate alternatives

2 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Monitor the three EVM


dimensions (PV, EV, and
AC), to display graphical
Control costs
trends, and to forecast a
range of possible final project
results.
Include software help plan,
organize resource pools and
Estimate activity
develop resource estimates
resources
assist in optimizing resource
utilization
Monitor the resource
utilization helps ensure that
Control resources the right resources are
working on the right activities
at the right time and place
Ensure that stakeholders can
Manage quickly retrieve the
communications information they need in a
timely way
A set of standard tools to
capture, store, and distribute
information to stakeholders
Monitor communications
with the information they
need according to the
communications plan
Discuss and address
Manage project pertinent topics of the project
knowledge when directing and
managing project work.

Meetings Direct and manage Developed as part of the M


project work project kickoff meeting
Plans for conducting risk
Plan risk management management activities are
defined in these meetings
Useful for sharing pure,
Information Manage project
unambiguous, codified M
management knowledge
explicit knowledge.
Reduce misunderstandings
Manage project
Active listening and improves communication L
knowledge
and knowledge sharing.

3 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance
Communicate the vision and
inspire the project team to
Manage project
Leadership focus on the appropriate M
knowledge
expertise and knowledge
objectives.
Manage project Allows secure connections
knowledge and relations among project.
Interacting with others to
exchange information and
Networking L
Manage develop contacts.
communications access to informal
organizations to solve
problems
Helps the project manager to
plan communications based
Plan communication
on the project environment
management
as well as the organization’s
political environment
Political
Understand the strategies of M
awareness the organization,
Monitor stakeholder Understand who has the
engagement power to develop an ability to
communicate with these
stakeholders.
Identify the reasons for a
deviation and the areas the
Monitor and control
project manager should
project work
focus on to achieve the
objectives
Determine the fundamental
Manage quality underlying reason that
causes a variance.
Root cause
Discover the underlying H
analysis
Plan communications causes that lead to a
management problem and develop
preventive action.
Identify threats by starting
with a problem statement,
Identify risks find opportunities by
beginning with a benefit
statement.

4 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Determine the primary


underlying reason that
Monitor stakeholder
stakeholder engagement is
engagement
not having the planned
effect.
Identifies underlying reasons
for the level of support of
Plan stakeholder project stakeholders to select
engagement the appropriate strategy to
improve their level of
engagement.

Monitor and control Forecast future performance


project work based on past results.

M
Validate the models used in
the organization and to
Close project or phase
implement adjustments for
future projects.
Validate the models
Examines project
used in the organization
Trend analysis performance over time to
and to implement
determine if performance is
adjustments for future
improving or deteriorating.
projects.
Examines project
performance over time to M
Control costs
determine if performance is
improving or deteriorating.

Determine the resources


Control resources
needed at upcoming stages.

Reviews the differences (or


Monitor and control
variance) between planned
project work
and actual results.

Compare the baseline to the


Variance analysis actual results and determine M
if the variance is within the
Control scope
threshold amount or if
corrective or preventive
action is appropriate.

5 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Assess the requested


changes and decide which
are accepted, rejected, or
Control scope
deferred or need to be
modified to be finally
approved.
Compare various levels of
resource capability or skills;
scheduling compression
Estimate activity
techniques different tools.
durations
This allows the team to
weigh resource, cost, and
duration variables.

Alternatives
Reviewing strategic funding H
analysis Plan cost management options and ways to acquire
the project.

Evaluate options to select


Estimate costs one to use to execute the
work.

Evaluate identified options to


select which different quality
Manage quality
options are most appropriate
to use.

Estimate the strengths and


weaknesses of alternatives
Plan quality to determine the best option
management provided and if the planned
quality activities are cost-
effective
H
Estimate the strengths and
weaknesses of alternatives
Plan quality to determine the best option
management provided and if the planned
quality activities are cost-
effective

6 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Determine the best corrective


Control resources action in terms of cost in
case of project deviations.
Assessing available
documentation will allow
Document analysis Close project or phase identifying lessons learned H
and knowledge sharing for
future projects.
Analyzes the
interrelationships between
different project variables
Regression
Close project or phase that contributed to the project M
analysis outcomes to improve
performance on future
projects.
Quickly accumulate
information from a large
Collect requirements number of respondents when
a quick turnaround is
Questionnaires needed. M
and surveys
Gather data about customer
satisfaction after the
Control quality
deployment of the product or
service.
Identify best practices,
generate ideas for
Collect requirements improvement, and provide a
basis for measuring
Benchmarking performance. H
Provide a basis for
Plan quality measuring performance,
management gather data to develop the
quality management plan.
Decision-making technique
and an assessment process
Collect requirements can be used to generate,
classify, and prioritize
product requirements.
Voting M
Useful for engaging team
members to improve
Estimate costs estimate accuracy and
commitment to the emerging
estimates.

7 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Allow large numbers of ideas


Collect requirements to be classified into groups
for review and analysis.

Affinity diagrams Organize potential causes of H


defects into groups showing
Manage quality areas that should be focused
on the most quality
management team attention.
Individual brainstorming
sessions into a single map to
Collect requirements reflect commonality and
differences in understanding
and to generate new ideas.
Visually organizing
Mind mapping Plan quality information and rapid H
management gathering of project quality
requirements.
Visually organize information
Plan stakeholder about stakeholders and their
engagement relationship to each other
and the organization.
Rank the most useful ideas
Nominal group
Collect requirements for further brainstorming or M
technique for prioritization.
A direct way of viewing
individuals in their
Collect requirements environment and how they
Observation/conve perform tasks and carry out
processes. H
rsation.
stay in touch within the work
Manage stakeholder
and attitudes of
engagement
stakeholders.
Visually depict the product
scope by showing a business
Context diagram Collect requirements H
system and how people and
other systems interact with it.
Obtaining early feedback on
requirements by providing a
Prototypes Collect requirements model of the expected H
product before actually
building it.

8 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Can be used to define


products and services. It
includes asking questions
Product analysis Define scope H
about a product or service and
forming answers to describe
the use.

Dividing and subdividing the


project scope and project
Create WBS
deliverables into smaller, more
manageable parts
Decomposition H
Dividing and subdividing the
project scope and project
Define activities
deliverables into smaller, more
manageable parts (activities).

Determine whether work and


deliverables meet
Validate scope
requirements and product
acceptance criteria.

Examination of a work product


Inspection to determine if it conforms to H
Control quality
documented standards and
verifies defect repairs.

A structured review of the


Perform qualitative risk
work being performed by the
analysis
contractor.

An iterative technique the work


in the near term is planned in
Rolling wave
Define activities detail, while work further in the H
planning future is planned at a higher
level.

Activities are represented by


Precedence nodes and are graphically
diagramming Sequence activities linked by one or more logical H
method relationships to show the
sequence of project activities.

Legally or contractually
Mandatory
Sequence activities required or inherent like the H
dependencies. work.

Preferred logic or soft logic are


Discretionary
Sequence activities established based on H
dependencies. knowledge of best

9 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

The relationship between


External project activities and non-
Sequence activities H
dependencies. project activities outside of
the project team’s control.

Sequence activities The relationship between


Internal project activities and are
generally inside the project
H
dependencies.
team's control.

Sequence activities The amount of time a


successor activity can be
Lead advanced concerning a
H
predecessor activity.

Sequence activities The amount of time a


successor activity will be
Lag delayed concerning the
H
predecessor activity.

Estimate activity Calculate duration based on


Parametric
durations historical data and project H
estimating. parameters.

Estimate activity By considering estimation


Three-point durations uncertainty and risk. Helps
define an approximate range
H
estimating
for an activity’s duration.

Estimate activity Aggregating the estimates of


durations the lower level components
Bottom-up
of the WBS. The work within H
estimating the activity is decomposed
into more detail.

Estimate activity Determine the amount of


durations contingency and
management reserve
needed for the project.

Control costs To monitor the status of


Reserve analysis contingency and H
management reserves to
determine if these reserves
are still needed or if
additional reserves need to
be requested.

10 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Compares the amount of the


contingency reserves
remaining to the amount of
Monitor risks H
uncertainty remaining to
determine if the remaining
reserve is adequate.

Critical path Develop schedule Estimate the minimum project


method duration and determine the
amount of schedule flexibility H
on the logical network paths.

Resource leveling Develop schedule Start and finish dates are


adjusted based on resource
constraints to balance the
demand for resources with the H
available supply (completion
date may be delayed).

Resource Develop schedule The requirements for


smoothing resources on the project do
not exceed certain predefined
H
resource limits (completion
date may not be delayed).

Simulation Develop schedule Combined effects of individual


project risks and other sources
of uncertainty to evaluate their
potential impact on achieving
project objectives.

Perform quantitative Evaluate the potential impact


risk analysis on achieving project H
objectives.

Perform quantitative Iterate the quantitative risk


risk analysis analysis model several
thousand times representing
the probability of achieving an
outcome or less.

Crashing Develop schedule Shorten the schedule duration


for the least incremental cost
H
by adding resources.

11 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Shorten the schedule duration


Crashing Develop schedule for the least incremental cost H
by adding resources.

Provides a high-level summary


timeline of the release
Agile release schedule based on the product
Develop schedule M
planning roadmap and the product
vision for the product’s
evolution.

Fast-tracking Activities or phases generally


done in a sequence are
Fast-tracking performed in parallel for at H
least a portion of their
duration.

Iteration burn Control schedule Tracks the work that remains


down chart to be completed in the iteration
backlog to analyze the M
variance concerning an ideal
burn down.

Cost of quality Estimate costs Evaluating the cost impact of


additional investment in
H
conformance versus the cost
of nonconformance.

Cost aggregation Determine budget Work package cost estimates


are then aggregated for the
higher component levels of the H
WBS.

Historical Determine budget Developing parametric


information review estimates or analogous
estimates to create H
mathematical models to
predict total project costs.

Funding limit Determine budget The expenditure of funds


reconciliation should be reconciled with any
funding limits on the H
commitment of funds for the
project.

Financing Determine budget Financing entails acquiring


funding for projects. It is
typical for long-term H
infrastructure projects to seek
external sources of funds.

12 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Compares the performance


Earned value measurement baseline to the
Control costs H
analysis (EVA) actual schedule and cost
performance.

A measure of the cost


performance that is required to
To complete be achieved with the
Control costs H
performance index remaining resources in order
to finish the outstanding work
to the remaining budget

Identify the key issues and


Plan quality suitable alternatives to be
management prioritized as a set of decisions
for implementation
Multicriteria
Select resources using M
decision analysis
multicriteria decision analysis
Acquire resources to rate potential resources
according to availability, cost
and ability

Estimate the expected


monetary value for the
conformance and
Plan quality nonconformance work
Flowcharts M
management
For process improvement as
well as identifying where
quality defects

Visual representation of an
Logical data Plan quality
organization’s data to identify L
model. management
where quality issues can arise

Find the strength of


Plan quality
relationships among different
management
factors.

Matrix diagrams Show the strength of H


relationships among causes
Manage quality and objectives that exist
between the rows and
columns that form the matrix.

Cause and effect Breaks down the causes of the


diagrams problem statement identified
Manage quality into discrete branches, helping H
to identify the root causes.

13 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Show the number of defects


per deliverable, a ranking of
Histograms Manage quality the cause of defects, the H
number of times each
process is noncompliant.
Gathering attributes data
while performing inspections
Check sheets Control quality H
to identify defects.

Choosing a part of a
Statistical population of interest for
Control quality H
sampling inspection to measure
controls and verify quality.
Show positions and
Plan resource relationships in a graphical,
Hierarchical charts H
management top-down format.

Illustrate the connections


Plan resource between activities, and
Assignment matrix H
management project team members.

Detailed descriptions in text-


oriented formats provide
Text-oriented Plan resource information such as
M
formats management responsibilities, authority,
competencies, and
qualifications
Information regarding how
teams behave can shorten
Organizational Plan resource time and effort to create the
L
theory management plan resource management
plan and improve planning
efficiency.
Groups of people with a
shared goal who fulfill their
Virtual teams Acquire resources H
roles with little time spent
meeting face to face.
Placing team members in the
same physical location to
Colocation Develop team H
enhance their ability to
perform as a team.

14 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Addressing the team


development issues and helps
build a harmonious
Communication
Develop team environment for the colocated M
technology team and a better
understanding of the virtual
team.

Give insight into areas of


strengths and weaknesses
Individual and help project managers assess
Develop team H
team assessments team members’ in organizing
information making decisions
and interacting with people.

Identify the personal emotions


Emotional of oneself and other people to
Manage team M
intelligence reduce tension and increase
cooperation.

Select the best resolution for


Control resources correcting variances in
resource utilization.
Alternatives
Evaluate options to respond to M
analysis
Monitor stakeholder variances in the desired
engagement results of stakeholder
engagement.

The measure, compare and


analyze the quality metrics
Performance reviews defined by the plan quality
management process against
the actual results.

The measure, compare and


Control schedule analyze schedule performance
Performance against the schedule baseline.
H
reviews
The measure, compare and
analyze quality, resource,
Control procurements schedule, and cost
performance against the
agreement.

Measure planned resource


Control resources utilization to actual resource
utilization.

15 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Brainstorming can be used to


gather data and solutions or
ideas from stakeholders,
Develop project charter subject matter experts, and

team members when


Brainstorming developing the project L
charter.

A general data gathering and


creativity technique that
Identify stakeholders
elicits input from groups such
as team members.

List of items, actions, or


points to be considered used
as a reminder based on
Manage quality historical information and
knowledge that has been
accumulated from similar
projects.
As a reminder developed
based on historical
Checklists information obtain a H
Identify risks comprehensive list of
individual project risks and
sources of overall project
risk.

Used from the industry to


develop the plan or verify
Develop project
that all the required
management plan
information is included in the
project management plan.

Assumption and Identify risks Explores the validity of


constraint analysis assumptions and constraints
to determine which pose a H
risk.

Communication Plan communications Assess communication


styles assessment management styles and identify the
preferred communication M
method, format used with
unsupportive stakeholders.

16 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Minimize misunderstandings
Plan communications that may result from cultural
management differences within the project’s
stakeholder community.
Cultural
M
awareness
plan communications based
Plan communications on the cultural differences and
management requirements of stakeholders
and team members.

Distributed to many groups of


stakeholders to provide
Manage
Project reporting information at an appropriate H
communications
level, format, and detail for
each type of stakeholder.

The breadth of identified risks


by including internally
generated risks examines the
Swot analysis Identify risks degree to which organizational H
strengths may offset threats
and determines if weaknesses
might hinder opportunities.

Used as a framework to aid


the project team in idea
Prompt lists Identify risks H
generation when using risk
identification techniques.

To assess the quality of


Risk data quality identified risk before the
H
assessment. subsequent qualitative risk
analysis.

They are assessed in


meetings with participants
Risk probability selected for familiarity with the
and impact Perform qualitative risk types of risk recorded in the H
assessment analysis risk register, determined using
the definitions given in the risk
management plan.

Lead to the development of


Risk more effective risk responses
H
categorization by focusing attention on the
areas of highest risk exposure.

17 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Determine which individual


project risks or other sources
Sensitivity
of uncertainty have the most H
analysis potential impact on project
Perform quantitative risk outcomes.
analysis
Support selection of the best
Decision tree
of several alternative courses H
analysis of action.

Exercise influencing to
Implement risk encourage nominated risk
Influencing L
responses owners to take necessary
action.

Compare technical
accomplishments during
Technical project execution to the
performance Monitor risks schedule of technical M
analysis achievement deviation can
indicate the potential impact
of threats or opportunities.

Consider the effectiveness of


Monitor risks the risk management
process.

Determine if project activities


Audits Manage quality comply with organizational H
and project policies.

A structured review of the


procurement process to
Control procurement
check effectiveness and
compliance.

Determine whether work or


deliverables can best be
Make or buy Plan procurement
accomplished by the project H
analysis management
team or should be purchased
from outside sources

18 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Review the prioritization of the


Source selection Plan procurement competing demands for the
H
analysis management project before deciding on the
selection method

Placing advertisements in
general circulation
publications, most government
Advertising H
jurisdictions require public
advertising of pending
Conduct Procurements government contracts.

Ensure that all prospective


bidders have a clear and
Bidder
shared understanding of the H
conferences procurement and no bidders
receive preferential treatment

achieve agreement supports


Manage stakeholder
the work of the project, resolve
engagement
conflicts with stakeholders.

Negotiation Clarifies the structure, rights, M


and obligations of the parties
Conduct Procurements and other terms of the
purchases so that mutual
agreement can be reached.
Documented, processed,
monitored, and managed
throughout the contract life
Claims
Control procurements cycle accordance with the H
administration terms of the contract
negotiation is the preferred
method.
Allows individual participants
time to consider the
Brainwriting. question(s) individually before L
the group creativity session is
held.

Power/interest Identify stakeholders Useful for small projects or


grid, projects with simple
power/influence relationships between
H
grid, or stakeholders and the project,
impact/influence or within the stakeholder
community itself.
grid

19 PMP Tools and Techniques in summary Alsenosy Alsenosy


T&T Process Usage Importance

Placing advertisements in
general circulation
publications, most
government jurisdictions H
require public advertising of
pending government
Stakeholder cube contracts.
Ensure that all prospective
Identify stakeholders bidders have a clear and
shared understanding of the H
procurement and no bidders
receive preferential treatment

Useful for large complex


communities of stakeholders,
Salience model helpful in determining the M
relative importance of the
identified stakeholders.

To analyze stakeholder
relevant information such as
Identify stakeholders H
positions, interests,
influence, and impact.

To determine the risk


Stakeholder
Plan risk management appetite of project
analysis stakeholders.

H
Helps to determine the
Monitor stakeholder position of stakeholder
engagement groups and individuals at any
particular time in the project.

20 PMP Tools and Techniques in summary Alsenosy Alsenosy


www.linkedin.com/in/alsenosy

www.facebook.com/alsenosy

www.twitter.com/dralsenosy

PMP Tools and Techniques in summary Alsenosy Alsenosy

You might also like