Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

8" PIPELINE

V-10 ZB-439
40°(40D)
ZB-187 COLD BEND

ZB-461

ZB-374
V-09
40°(40D) V-11 ENI - B.M. STATION RAFYDIE 38065
N 3381500.00 COLD BEND
15°(40D)
COLD BEND
N= 3351798.908
A SECTION A-A
E= 760627.979
Z= 25.629

A Note :
V-03
ZB-439 90°(5D)
HOT BEND

SP

V-08
40°(40D)
V-01
45°(5D)
COLD BEND
ZB-425
HOT BEND V-12 ZB-102
V-02 ELASTIC BEND
30°(40D)
COLD BEND
V-05 V-06 V-07 Legend :
ELASTIC BEND ELASTIC BEND ELASTIC BEND x.xxx
PIPE LINE x.xxx SURVEY POINT
ASPHALT ROAD
V-04 TRACK ROAD
REVISION CLOUD
90°(5D)
HOT BEND Vx Vertix point
OVERHEAD POWER LINE/ ELECTRICAL POLE LINE
Sp Start point
EXISTING CABLE
Ep End point
EXISTING FENCE
E 748500

E 749500
Kp kilometer point
EXISTING TREE FENCE
SBR SIDE BEND RIGHT
N 3380500.00 SAND BERM SBL SIDE BEND LEFT
SAND TRENCH TCP TEMPORARY CATHODIC PROTECTION - ANODE FEEDING POINT
ZB-370 ELECTRICAL POLE EPC EXISTING CROSS PIPE

V-19 28°(40D) EXISTING PIPELINE


EXISTING ABOVE GROUND PIPELINE

ELBOW 45° (5D)


INSOLATION JOINT V-13
22°(40D)
COLD BEND
V-14
2x32.5°(40D)
V-14 2x32.5°(40D) COLD BEND

Totally 65°
ZB-382
SP DETAIL ELBOW 45° (5D)

N 3379500.00
V-16 V-15
90°(5D)
HOT BEND 90°(5D)
HOT BEND
V-08 40°(40D)
V-09 V-18
90°(5D)
V-10 HOT BEND

V-20

V-19
28°(40D)
COLD BEND
V-13 22°(40D) V-17
90°(5D)
HOT BEND

North DGS V-20


40°(40D)
COLD BEND

V-21
V-11 15°(40D) ELASTIC BEND

N 3378500.00

HOLD
V-02 30°(40D)
DGSN
EP
E 750500

E 751500

V-22
90°(5D)
HOT BEND

You might also like