LABOUR and MATERIAL RATES fot the Year 2019-20 Varanasi

as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Inflation: 0 %
Description Code RATE Unit
LABOUR
MISTRY 101 550.00 DAY
MASON/STONE MASON 102 500.00 DAY
BELDAR/MAZDOOR/DIGGER/DRESSER 103 450.00 DAY
COOLIE 104 450.00 DAY
BLACK SMITH 105 500.00 DAY
BHISTI 106 450.00 DAY
CARPENTER 107 500.00 DAY
HAMMER MAN 108 450.00 DAY
PAINTER 109 475.00 DAY
WHITE WASHER 110 450.00 DAY
MECHANIC 111 500.00 DAY
HELPER 112 450.00 DAY
WATCHMAN 113 450.00 DAY
FITTER/PLUMBER 114 550.00 DAY
JUNIOR FITTER 115 500.00 DAY
SPECIAL LABOUR FOR ROCK CUTTING 116 475.00 DAY
CHISELLERS 117 475.00 DAY
SPECIAL MAZDOOR/COOLIE(FOR RUBBING AND POLISHING) 118 450.00 DAY
MATE 119 450.00 DAY
PESHRAJ 120 450.00 DAY
TILE LAYER 121 500.00 DAY
THATCHER 122 500.00 DAY
MASON(JUNIOR) 123 450.00 DAY
WOMAN COOLIE 124 450.00 DAY
CHOWKIDAR 125 450.00 DAY
WORK AGENT 126 500.00 DAY
DRIVER FOR CONCRETE MIXER 127 550.00 DAY
CLEANER 128 450.00 DAY
WELL SINKER 130 500.00 DAY
WORK MISTRI 131 450.00 DAY
TAR BOILER MAN/FIRE MAN 132 450.00 DAY
STONE DRESSER 133 450.00 DAY
BORER(BORING MECHANIC) 134 550.00 DAY
DIVER 136 550.00 DAY
ASSISTANT BORER 137 500.00 DAY
MATERIAL
BRICKS IST CLASS 235 7000.00 1000NO.
BRICK TILES IST CLASS 236 7000.00 1000NOS
BRICKS OVER BURNT 240 5000.00 1000NOS
BRICKS SUNDRIED 241 5000.00 1000NOS
DIFFERENCE IN RATES OF IST CLASS & SPECIALLY MOULDED BRICKS 243 1000.00 1000NOS
BRICK BALLAST 40MM GAUGE 244 1600.00 CUM.
STONE BALLAST 40MM GAUGE 245 2900.00 CUM.
STONE BALLAST 20MM GAUGE 246 3400.00 CUM.
STONE GRIT 10-12MM 247 2400.00 CUM.
PEBBLES OR FINE GRAVEL 248 3500.00 CUM.
COARSE SAND(BADARPUR) 249 2500.00 CUM.
LOCAL SAND 250 950.00 CUM.
CEMENT 251 450.00 BAG
WHITE CEMENT 252 800.00 BAG
WHITE LIME(SLAKED) 253 3600.00 CUM
WHITE LIME(UNSLAKED) 254 1400.00 QTL
KANKAR LIME 255 2400.00 CUM
SURKHI 256 600.00 CUM
SHINGLE 257 700.00 CUM
EARTH 258 500.00 CUM
STONE 50MM THICK 259 300.00 SQM
STONE 40MM THICK 260 250.00 SQM
MARBLE DUST 261 400.00 CUM
MARBLE CHIPS 262 3600.00 CUM
WHITE MARBLE BAGS 263 450.00 BAG

25-Jul-19 116 Note: Rates of Cartage of different Pipes are for 8 Kms. Page 1 of 3
LABOUR and MATERIAL RATES fot the Year 2019-20 Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Inflation: 0 %
Description Code RATE Unit
FLAT TILES 264 400.00 100NOS
HALF ROUND TILES 265 600.00 100NOS
FLAT RIDGE 266 600.00 100NOS
LARGE COUNTRY TILES 267 1200.00 100NOS
SEGMENTAL TILES 268 500.00 100NOS
SMALL SIZE COUNTRY TILES 269 330.00 100NOS
SMALL SIZE SEGMENTAL TILES 270 330.00 100NOS
TILES 15*15CM GLAZED 271 50.00 NO.
STONE SLAB STANDARD 40MM THICK 272 1000.00 SQM
STONE SLAB NON STANDARD 40MM THICK 273 750.00 SQM
SPUN YARN 274 60.00 KG.
PIG LEAD 275 120.00 KG.
FUEL(WOOD) 276 900.00 QTL.
GUR 277 45.00 KG.
WATER PROOFING COMPOUND 278 200.00 KG.
STEEL 279 42.00 KG.
COAL TARRING 280 16.00 SQM.
LINSEED OIL 281 140.00 LTR.
COLOUR 282 110.00 KG.
PRIMER 283 220.00 LTR.
VARNISH 284 275.00 LTR.
PAINT(ENAMEL) 285 400.00 LTR.
WHITING 286 50.00 KG.
DISTEMPER OIL 287 165.00 LTR.
COAL TAR 288 45.00 LTR.
SOLIGNUM 289 175.00 LTR.
CAUSTIC SODA 290 90.00 KG.
WAX POLISH 291 300.00 KG.
ENAMEL(SYNTHETIC) 292 300.00 LTR.
COLOURING MATERIAL 293 100.00 KG.
DRY DISTEMPER 294 135.00 KG.
MUSTARD OIL 295 110.00 KG.
COTTON CORD 296 110.00 KG.
SAL BALLIES(EUCALYPTUS)100MM 297 150.00 RM.
SAL BALLIES(EUCALYPTUS)125MM 298 75.00 RM.
SAL BALLIES(EUCALYPTUS)150MM 299 75.00 RM.
SAL WOOD WALLERS 300 65000.00 CUM.
TEAK WOOD(C.P.) 301 65000.00 CUM.
SHISHAM WOOD 302 52000.00 CUM.
SAL WOOD 303 55000.00 CUM.
DEODAR WOOD 304 55000.00 CUM.
KAIL WOOD 305 48000.00 CUM.
COUNTRY WOOD 306 34000.00 CUM.
CHIR WOOD 307 40000.00 CUM.
PLY WOOD 9MM 308 2800.00 SQM.
PLANKS(COUNTRY WOOD) 309 35000.00 CUM.
C.P. TEAK WOOD CLEAT 310 25.00 NO.
TEAK WOOD BLOCK 75*75*120MM 311 40.00 NO.
TEAK WOOD PLATE 100*100*10MM 312 25.00 NO.
C.P. TEAK WOOD PEG RACK 313 30.00 NO.
BAMBOOS 25MM DIA. 314 200.00 NO.
CHATAI 315 15.00 SQM.
BAN 316 75.00 KG.
BASKETS 317 150.00 NO.
EMPTY BAGS 318 8.00 NO.
M.S.SHEETS 319 6000.00 QTL.
ANGLE IRON 320 6000.00 QTL.
SHEET IRON 1MM THICK 321 52.00 KG.
G.C. SHEETS 0.63MM 322 4500.00 QTL.
G.I. PLAIN SHEETS 2.5*1.0MM 323 5000.00 QTL.
MASONITE OR CALOTAX 6MM THICK 324 500.00 SQM.
EXPANDED METAL 325 125.00 SQM.
M.S. BARS 16MM DIA. 326 4200.00 QTL.
25-Jul-19 116 Note: Rates of Cartage of different Pipes are for 8 Kms. Page 2 of 3
LABOUR and MATERIAL RATES fot the Year 2019-20 Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Inflation: 0 %
Description Code RATE Unit
M.S. CLAMP 327 600.00 NO.
NAILS 328 80.00 KG.
IRON CLEAT 329 25.00 NO.
SCREW 30/40MM 330 50.00 100NO.
IRON SCREW 65*25MM. 331 75.00 100NO.
G.I. BOLTS 25*6MM. 332 50.00 10NO.
G.I. BOLTS 150MM. 333 50.00 10NO.
NUT WITH BOLT 16*65MM. 334 75.00 KG.
NUT WITH BOLT 20*65MM 335 75.00 KG.
NUT WITH BOLT 20*75MM 336 75.00 KG.
NUT WITH BOLT 20*90MM 337 75.00 KG.
NUT WITH BOLT 24*90MM. 338 75.00 KG.
NUT WITH BOLT 27*100MM 339 75.00 KG.
NUT WITH BOLT 27*110MM 340 75.00 KG.
NUT WITH BOLT 30*110MM 341 75.00 KG.
NUT WITH BOLT 33*120MM 342 75.00 KG.
G.I. WIRE GAUGE 2.5,2 OR 1.5MM MESH 343 75.00 SQM.
BRASS CLEAT 344 150.00 NO.
BRASS SCREW 345 50.00 100NO.
BRASS HINGES 50MM. 346 175.00 NO.
BRASS HAT PEG 347 75.00 NO.
C.I. FOOT STEPS 348 125.00 NO.
GLASS PANE 24*36CM(2.5MM THICK) 349 450.00 NO.
GLASS PANE(18*34CM)2.5MM THICK 350 450.00 NO.
GLASS PANE 2.5MM THICK 351 450.00 SQM.
C.I.DOWN PIPE 100MM DIA. 2M LONG 352 325.00 RM.
A.C.DOWN PIPE 100 MM DIA.2M LONG 353 456.00 RM.
LUMPET WASHER 354 125.00 10NO.
BITUMEN WASHER 355 15.00 10NO.
A.C.SHEET 6MM THICK 356 7.50 SQM.
STEAM COAL 357 750.00 QTL.
3MM THICK RUBBER INSERTION 358 150.00 KG.
ROSE BOWL 359 105.00 NO.
HEAD 360 100.00 NO.
SHOE SPLASH PROOF 361 100.00 NO.
BEND WITH EYE HOLE 362 75.00 NO.
HIRING OF ROAD ROLLER 363 8000.00 DAY
DIFFERENCE IN RATES OF IST & 2ND CLASS BRICKS 364 1000.00 1000NO.
DIFFERENCE IN RATES OF SHINGLE AND STONE GRIT 365 1600.00 CUM.
DIFFERENCE IN RATES OF IST & 3RD CLASS BRICKS 366 1500.00 1000NO.
CARTAGE OF C.I.PIPE 80-300MM DIA. 367 19.60 QTL.
CARTAGE OF C.I.PIPE 350-750MM DIA. 368 20.91 QTL.
CARTAGE OF C.I.PIPE 800-1000MM DIA. 369 25.84 QTL.
CARTAGE OF C.I.PIPE 1100-1200MM DIA. 370 27.15 QTL.
CARTAGE OF A.C.CLASSI&II PIPE 50-300MM DIA. 371 20.79 QTL.
CARTAGE OF A.C.CLASS I&II PIPE 350-600MM DIA. 372 32.97 QTL.
CARTAGE OF M.S.G.I.SCREWED/SOCKETED PIPE 15-150MM DIA. 373 2.08 QTL.
CARTAGE OF STONEWARE GLAZED PIPE 40-400MM DIA. 374 20.79 QTL.
CARTAGE OF R.C.C. P1 QUALITY PIPE 80-300MM DIA. 375 20.62 QTL.
CARTAGE OF R.C.C. P2 PIPE 80-300MM DIA. 376 19.60 QTL.
CARTAGE OF R.C.C.P2 PIPE 350-600MM DIA. 377 26.44 QTL.
CARTAGE OF R.C.C.P3 PIPE 200-300MM DIA. 378 19.90 QTL.
CARTAGE OF R.C.C.P3 PIPE 350-700MM DIA. 379 22.87 QTL.
CARTAGE OF R.C.C.P3 PIPE 900-1200MM DIA. 380 46.93 QTL.
CARTAGE OF R.C.C.NP2 PIPE 100-300MM DIA. 381 20.20 QTL.
CARTAGE OF R.C.C. NP2 PIPE 350-700MM DIA. 382 35.35 QTL.
CARTAGE OF R.C.C.NP2 PIPE 800-1800MM DIA. 383 62.37 QTL.
BITUMEN 384 20000.00 TONNE
BRICK BALLAST 25MM GAUGE 385 1700.00 CUM.
100MM DIA.A.C.BEND 386 150.00 NO.
CARTAGE OF R.C.C.NP3 PIPE 350-700MM DIA. 387 37.02 QTL.
CARTAGE OF R.C.C.NP3 PIPE 800-1200MM DIA. 388 64.90 QTL.
HOLDER FOR A.C. DOWN PIPE 100MM SIZE. 389 66.14 NO.
25-Jul-19 116 Note: Rates of Cartage of different Pipes are for 8 Kms. Page 3 of 3
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1001 EXCAVATION 0-1.5M. DEEP IN ORDINARY SOIL. 217.38 243.46 /CUM.

1002 EXCAVATION 0-1.5M. DEEP IN SOIL MIXED WITH MOORUM, SHINGLE, 254.13 284.62 /CUM.
KANKAR.

1003 BANKING WITH EXCAVATED EARTH. 80.27 89.91 /CUM

1004 SAND FILLING IN PLINTH. 1186.91 1329.34 /CUM

1005 FILLING, DRESSING AND RAMMING EARTH OR SAND OR BAJRI OR 141.70 158.71 /CUM
BALLAST OR KANKAR OR SHINGLE.

1006 EXTRA OVER ITEMS 1001 TO 1005 FOR ADDITIONAL LEAD & LIFT. 37.12 41.58 /CUM

1007 CONC. 40 MM BRICK BALLAST, WHITE LIME & SAND MORTAR (1:2) IN 3964.78 4440.56 /CUM
FOUNDATIONS AND FLOORS.

1008 CONC. 40 MM BRICK BALLAST, WHITE LIME & SURKHI IN FOUNDATIONS 3848.60 4310.43 /CUM
AND FLOORS(100:16:32).

1009 CONC. 40 MM BRICK BALLAST, LOCAL SAND AND CEMENT (12:6:1) IN 4670.00 5230.40 /CUM
FOUNDATIONS AND FLOORS.

1010 SAME AS ITEM 1009 BUT FOR 10:5:1. 4895.12 5482.53 /CUM

1011 SAME AS ITEM 1009 BUT FOR 8:4:1. 5234.74 5862.91 /CUM

1012 CONC.40 MM BRICK BALLAST, WHITE LIME AND SAND MORTAR (1:2) IN 4862.46 5445.96 /CUM
HAUNCH FILLING.

1013 CONC.40 MM BRICK BALLAST & KANKAR LIME IN ROOF TERRACING. 5588.35 6258.95 /CUM

1014 CONC. 25 MM BRICK BALLAST, WHITE LIME AND SURKHI (100:18:36) IN 5502.49 6162.78 /CUM
ROOF TERRACING.

1015 C.C. 20 MM STONE BALLAST, COARSE SAND AND CEMENT 4:2:1. 9746.35 10915.91 /CUM

1016 SAME AS ITEM 1015 BUT FOR 6:3:1. 8862.64 9926.16 /CUM

1017 SAME AS ITEM 1015 BUT FOR 8:4:1. 8498.58 9518.41 /CUM

1018 R.C.C. DOOR SILLS, CHAUKHATS ETC. WITH CEMENT, COARSE SAND AND 12627.32 14142.60 /CUM
20 MM STONE BALLAST 1:1.5:3

1019 R.C.C. WITH CEMENT, COARSE SAND AND 20 MM STONE BALLAST 1:1.5:3 12744.53 14273.87 /CUM
IN LINTELS OF DOORS AND WINDOWS.

1020 SAME AS ITEM 1019 BUT FOR SLABS. 13991.29 15670.24 /CUM

1021 SAME AS ITEM 1019 BUT IN LIGHTER BEAMS. 14418.75 16149.00 /CUM

1022 SAME AS ITEM 1019 BUT IN HEAVIER BEAMS. 16423.91 18394.78 /CUM

1023 R.C.C. WITH CEMENT, COARSE SAND AND 40 MM STONE BALLAST 1:1.5:3 11652.33 13050.61 /CUM
IN RAFT FOUNDATIONS & FOOTING.

1024 R.C.C. WITH CEMENT, COARSE SAND AND 20 MM STONE BALLAST 1:1.5:3 15197.83 17021.57 /CUM
IN T BEAMS, SLABS, COLUMNS.

1025 SAME AS ITEM 1024 BUT IN R.C.C. COLUMN 1:1.5:3. 14751.99 16522.22 /CUM

1026 SAME AS ITEMS 1018 TO 1024 BUT WITH SHINGLES (DEDUCT FROM ITEMS 1948.21 2182.00 /CUM
1018 TO 1024).

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 1 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1027 1ST CLASS BRICK-WORK IN KANKAR-LIME IN FOUNDATION & PLINTH. 5814.97 6512.76 /CUM

1028 1ST CLASS BRICK-WORK IN WHITE-LIME & SURKHI 1:2, IN FOUNDATION & 5661.57 6340.96 /CUM
PLINTH.

1029 1ST CLASS BRICK-WORK IN 1:6 CEMENT & LOCAL-SAND MORTAR IN 5959.12 6674.21 /CUM
FOUNDATION & PLINTH.

1030 SAME AS ITEM 1029 BUT IN 1:5 CEMENT & LOCAL-SAND MORTAR. 6012.13 6733.58 /CUM

1031 SAME AS ITEM 1029 BUT IN 1:4 CEMENT & LOCAL-SAND MORTAR. 6149.60 6887.55 /CUM

1032 SAME AS ITEM 1029 BUT IN 1:3 CEMENT & LOCAL-SAND MORTAR. 6355.71 7118.39 /CUM

1033 SAME AS ITEM 1029 BUT IN 1:3 CEMENT & COARSE-SAND MORTAR. 6737.59 7546.10 /CUM

1034 1ST CLASS BRICK-WORK IN MUD-MORTAR IN FOUNDATION & PLINTH. 5190.80 5813.69 /CUM

1035 SAME AS ITEMS 1027 TO 1034 BUT IN SUPERSTRUCTURE 1.5 BRICK THICK 368.75 413.00 /CUM
WALL (EXTRA ON ITEMS 1027 TO 1034).

1036 SAME AS ITEMS 1027 TO 1034 BUT FOR ONE-BRICK THICK WALL (EXTRA 368.75 413.00 /CUM
ON ITEMS 1027 TO 1034).

1037 SAME AS ITEMS 1027 TO 1034 BUT FOR HALF-BRICK THICK WALL (EXTRA 368.75 413.00 /CUM
ON ITEMS 1027 TO 1034).

1038 FOR II CLASS BRICK-WORK (DEDUCT FROM ITEMS 1027 TO 1036). 517.00 579.04 /CUM

1039 FOR III CLASS BRICK-WORK (DEDUCT FROM ITEMS 1034 TO 1036). 775.50 868.56 /CUM

1040 SUNDRIED BRICK-WORK IN MUD-MORTAR IN FOUNDATION & PLINTH. 3962.92 4438.47 /CUM

1041 1ST CLASS BRICK-WORK IN ARCHES (EXTRA ON ITEMS 1027 TO 1036). 908.46 1017.47 /CUM

1042 SAME AS ITEM 1041 BUT IN JACK-ARCHES (EXTRA ON ITEMS 1027 TO 1033). 1007.77 1128.70 /CUM

1043 SAME AS ITEM 1041 BUT IN WELL-STEINING WITH ORDINARY BRICKS 1191.92 1334.95 /CUM
(EXTRA ON ITEMS 1027 TO 1033).

1044 SAME AS ITEM 1043 BUT WITH SPECIALLY MOULDED BRICKS (EXTRA ON 973.50 1090.32 /CUM
ITEM 1043).

1045 11.5 CM STRING OR DRIP-COURSE OF 1ST CLASS-BRICK IN KANKAR-LIME. 441.17 494.11 /RM

1046 SAME AS ITEM 1045 BUT IN 1:6 CEMENT & LOCAL SAND. 414.26 463.97 /RM

1047 SAME AS ITEM 1045 BUT IN 23 CM CORNICE IN KANKAR-LIME WITH LIME- 301.17 337.31 /RM
PLASTER.

1048 SAME AS ITEM 1047 BUT IN 1:6 CEMENT & LOCAL-SAND WITH PLASTERING 317.48 355.58 /RM
1:6.

1049 EXTRA FOR CUTTING OF BRICK FOR MOULDING. 122.65 137.37 /RM

1050 MAKING OPENING THROUGH WALLS IN LIME OR CEMENT MORTAR. 2939.85 3292.63 /CUM

1051 R.B. WORK IN SUN-SHADE WITH 1ST CLASS BRICK, CEMENT & COARSE- 9630.73 10786.42 /CUM
SAND MORTAR 1:3.

1052 SAME AS ITEM 1051 BUT IN LINTELS. 8594.59 9625.94 /CUM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 2 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1053 ENCASING ROLLED STEEL SECTIONS IN 1:3 BRICK WORK IN CEMENT & 1354.28 1516.80 /RM
COARSE-SAND.

1054 20 MM THICK D.P.C. WITH CEMENT & COARSE-SAND 1:2. 382.87 428.81 /SQM

1055 SAME AS ITEM 1054 BUT 25 MM THICK C.C. WITH CEMENT, COARSE-SAND 441.80 494.82 /SQM
& 12 MM STONE GRIT 1:1.5:3.

1056 SUPPLY & FIX FINE-DRESSED STONE IN DOOR-SILLS WITH CEMENT & 35873.20 40177.98 /CUM
LOCAL-SAND 1:6.

1057 SUPPLY & FIX 40 MM THICK STONE-SLAB IN STEPS & SHELVES WITH 1176.49 1317.66 /SQM
CEMENT & LOCAL-SAND 1:6.

1058 SUPPLY & FIX 40 MM THICK STONE CHAJJAS WITH CEMENT & LOCAL- 1176.49 1317.66 /SQM
SAND 1:6.

1059 SUPPLY & FIX UPTO 40 MM THICK STONE SUN-SHADE OVER DOORS & 869.03 973.31 /SQM
WINDOWS WITH CEMENT & LOCAL-SAND 1:6.

1060 SUPPLY & FIX 50 MM TO 60 MM THICK STONE WITH CEMENT & COARSE- 6064.95 6792.74 /SQM
SAND 1:3.

1061 C.P. TEAK-WOOD WROUGHT, FRAMED & FIXED IN CHAUKHATS. 93974.40 105251.33 /CUM

1062 SAME AS ITEM 1061 BUT WITH SHEESHAM-WOOD. 78093.20 87464.38 /CUM

1063 SAME AS ITEM 1061 BUT WITH INDIAN-SAL-WOOD. 81758.20 91569.18 /CUM

1064 SAME AS ITEM 1061 BUT WITH DEODAR-WOOD. 81758.20 91569.18 /CUM

1065 SAME AS ITEM 1061 BUT WITH KAIL-WOOD. 73206.80 81991.62 /CUM

1066 SAME AS ITEM 1061 BUT WITH COUNTRY-WOOD. 56104.00 62836.48 /CUM

1067 SAME AS ITEM 1061 TO 1066 BUT FOR CURVED WORK (EXTRA ON ITEMS 25%
1061 TO 1066).

1068 WOOD-WORK WROUGHT, FRAMED & FIX IN ROOF-TRUSSES PURLINS, 225.50 252.56 /CUM
CEILINGS, JOINTS (DEDUCT FROM ITEMS 1061 TO 1066).

1069 SUPPLY & FIX 40 MM THICK C.P. TEAK WOOD PART PANNELLED & PART 5686.51 6368.89 /SQM
GLAZED IN DOOR & WINDOW SHUTTERS.

1070 ADDITIONAL COST FOR FIXING GLASS-PANES WITH C.P. TEAK-WOOD. 489.49 548.22 /SQM

1071 SAME AS ITEM 1069 BUT FOR C.P. TEAK WOOD FULLY PANELLED (40 MM 4837.82 5418.36 /SQM
THICK).

1072 SAME AS ITEM 1069 BUT FOR C.P. TEAK WOOD FULLY GLAZED (40 MM 8461.73 9477.14 /SQM
THICK).

1073 SAME AS ITEM 1069 BUT FOR C.P. TEAK WOOD 35 MM THICK. 5356.73 5999.54 /SQM

1074 SAME AS ITEM 1071 BUT FOR C.P. TEAK WOOD 35 MM THICK. 4507.52 5048.42 /SQM

1075 SAME AS ITEM 1072 BUT FOR C.P. TEAK WOOD 35 MM THICK. 8274.41 9267.34 /SQM

1076 SAME AS ITEM 1069 BUT FOR C.P. TEAK WOOD 25 MM THICK. 4830.82 5410.52 /SQM

1077 SAME AS ITEM 1071 BUT FOR C.P. TEAK WOOD 25 MM THICK. 3615.51 4049.38 /SQM

1078 SAME AS ITEM 1072 BUT FOR C.P. TEAK WOOD 25 MM THICK. 7854.81 8797.38 /SQM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 3 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1079 SAME AS ITEM 1069 BUT FOR SHEESHAM WOOD 40 MM THICK. 5228.37 5855.78 /SQM

1080 SAME AS ITEM 1071 BUT FOR SHEESHAM WOOD 40 MM THICK. 4179.44 4680.97 /SQM

1081 SAME AS ITEM 1072 BUT FOR SHEESHAM WOOD 40 MM THICK. 8139.81 9116.58 /SQM

1082 SAME AS ITEM 1079 BUT FOR SHEESHAM WOOD 35 MM THICK. 4965.51 5561.37 /SQM

1083 SAME AS ITEM 1080 BUT FOR SHEESHAM WOOD 35 MM THICK. 3914.94 4384.73 /SQM

1084 SAME AS ITEM 1081 BUT FOR SHEESHAM WOOD 35 MM THICK. 7990.47 8949.33 /SQM

1085 SAME AS ITEM 1069 BUT FOR SAL WOOL 40 MM THICK. 5341.22 5982.17 /SQM

1086 SAME AS ITEM 1071 BUT FOR SAL WOOD 40 MM THICK. 4337.67 4858.19 /SQM

1087 SAME AS ITEM 1072 BUT FOR SAL WOOD 40 MM THICK. 8228.16 9215.54 /SQM

1088 SAME AS ITEM 1085 BUT FOR SAL WOOD 35 MM THICK. 5062.78 5670.31 /SQM

1089 SAME AS ITEM 1076 BUT FOR SAL WOOD 35 MM THICK. 4057.98 4544.94 /SQM

1090 SAME AS ITEM 1087 BUT FOR SAL WOOD 35 MM THICK. 8069.77 9038.15 /SQM

1091 SAME AS ITEM 1069 BUT FOR DEODAR WOOD 40 MM THICK. 5333.27 5973.26 /SQM

1092 SAME AS ITEM 1071 BUT FOR DEODAR WOOD 40 MM THICK. 4330.77 4850.47 /SQM

1093 SAME AS ITEM 1072 BUT FOR DEODAR WOOD 40 MM THICK. 8212.70 9198.22 /SQM

1094 SAME AS ITEM 1091 BUT FOR DEODAR WOOD 35 MM THICK. 5054.75 5661.32 /SQM

1095 SAME AS ITEM 1092 BUT FOR DEODAR WOOD 35 MM THICK. 4051.12 4537.26 /SQM

1096 SAME AS ITEM 1093 BUT FOR DEODAR WOOD 35 MM THICK. 8045.05 9010.46 /SQM

1097 SAME AS ITEM 1091 BUT FOR DEODAR WOOD 25 MM THICK. 4609.96 5163.15 /SQM

1098 SAME AS ITEM 1092 BUT FOR DEODAR WOOD 25 MM THICK. 3296.66 3692.25 /SQM

1099 SAME AS ITEM 1093 BUT FOR DEODAR WOOD 25 MM THICK. 7692.52 8615.62 /SQM

1100 SAME AS ITEM 1069 BUT FOR CHIR WOOD 40 MM THICK. 4807.70 5384.63 /SQM

1101 SAME AS ITEM 1071 BUT FOR CHIR WOOD 40 MM THICK. 3573.27 4002.07 /SQM

1102 SAME AS ITEM 1072 BUT FOR CHIR WOOD 40 MM THICK. 7846.52 8788.10 /SQM

1103 SAME AS ITEM 1100 BUT FOR CHIR WOOD 35 MM THICK. 4605.18 5157.80 /SQM

1104 SAME AS ITEM 1101 BUT FOR CHIR WOOD 35 MM THICK. 3369.84 3774.22 /SQM

1105 SAME AS ITEM 1102 BUT FOR CHIR WOOD 35 MM THICK. 7701.02 8625.14 /SQM

1106 SAME AS ITEM 1100 BUT FOR CHIR WOOD 25 MM THICK. 4282.48 4796.38 /SQM

1107 SAME AS ITEM 1101 BUT FOR CHIR WOOD 25 MM THICK. 2821.37 3159.94 /SQM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 4 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1108 SAME AS ITEM 1102 BUT FOR CHIR WOOD 25 MM THICK. 7447.20 8340.86 /SQM

1109 SAME AS ITEM 1069 BUT FOR KAIL WOOD 40 MM THICK. 5328.50 5967.92 /SQM

1110 SAME AS ITEM 1071 BUT FOR KAIL WOOD 40 MM THICK. 3979.92 4457.51 /SQM

1111 SAME AS ITEM 1072 BUT FOR KAIL WOOD 40 MM THICK. 8047.24 9012.91 /SQM

1112 SAME AS ITEM 1109 BUT FOR KAIL WOOD 35 MM THICK. 4847.79 5429.53 /SQM

1113 SAME AS ITEM 1110 BUT FOR KAIL WOOD 35 MM THICK. 3735.87 4184.18 /SQM

1114 SAME AS ITEM 1111 BUT FOR KAIL WOOD 35 MM THICK. 7909.51 8858.65 /SQM

1115 SAME AS ITEM 1109 BUT FOR KAIL WOOD 25 MM THICK. 4459.94 4995.14 /SQM

1116 SAME AS ITEM 1110 BUT FOR KAIL WOOD 25 MM THICK. 6240.75 6989.64 /SQM

1117 SAME AS ITEM 1111 BUT FOR KAIL WOOD 25 MM THICK. 7601.62 8513.81 /SQM

1118 SUPPLY OF 1 MM THICK SHEET IRON PANNELLED DOOR & WINDOW 3271.67 3664.26 /SQM
SHUTTERS IN 40 MM THICK SALWOOD FRAME.

1119 SUPPLY & FIXING OF 40 MM THICK C.P. TEAK WOOD DOOR & WINDOW 3373.39 3778.20 /SQM
SHUTTERS.

1120 SAME AS ITEM 1119 BUT IN SHEESHAM WOOD 40 MM THICK. 2956.69 3311.50 /SQM

1121 SAME AS ITEM 1119 BUT IN SAL WOOD 40 MM THICK. 3052.85 3419.20 /SQM

1122 SAME AS ITEM 1119 BUT IN DEODAR WOOD 40 MM THICK. 3052.85 3419.20 /SQM

1123 SAME AS ITEM 1119 BUT IN CHIR WOOD 40 MM THICK. 2572.05 2880.69 /SQM

1124 SAME AS ITEM 1119 BUT IN KAIL WOOD 40 MM THICK. 2828.48 3167.90 /SQM

1125 SUPPLY OF GALVANIZED IRON WIRE OVER WINDOWS AND C.P. TEAK 531.18 594.92 /SQM
WOOD BATTENS 50 MM X 12 MM.

1126 SAME AS ITEM 1125 BUT WITH SHEESHAM WOOD BATTENS 50 MM X 12 MM. 490.08 548.89 /SQM

1127 SAME AS ITEM 1125 BUT WITH DEODAR WOOD BATTENS 50 MM X 12 MM. 499.19 559.09 /SQM

1128 SAME AS ITEM 1125 BUT WITH SAL WOOD BATTENS 50 MM X 12 MM. 504.63 565.18 /SQM

1129 SAME AS ITEM 1069 BUT BRACED & BATTENED 40 MM THICK SHEESHAM 5326.92 5966.15 /SQM
WOOD DOORS & WINDOWS.

1130 SAME AS ITEM 1129 BUT IN SAL WOOD 40 MM THICK. 5575.65 6244.73 /SQM

1131 SAME AS ITEM 1129 BUT IN COUNTRY WOOD 40 MM THICK. 3930.08 4401.68 /SQM

1132 SAME AS ITEM 1129 BUT IN DEODAR WOOD 40 MM THICK. 5559.72 6226.89 /SQM

1133 SAME AS ITEM 1129 BUT IN KAIL WOOD 40 MM THICK. 5016.51 5618.49 /SQM

1134 SAME AS ITEM 1129 BUT IN CHIR WOOD 40 MM THICK. 4395.69 4923.17 /SQM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 5 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1135 SUPPLY OF 40MM THICK C.P. TEAK WOOD DOOR & WINDOW SHUTTERS 4632.82 5188.76 /SQM
WITH 9MM THICK PLYWOOD OR PRESSED WOOD PANELS AND FIXING C.P.
TEAK WOOD CLEATS, STOPS, HINGES, LOCK, BOLTS, HANDLERS,
SPRINGS & OTHER FITTINGS (EXCLUDING SUPPLY OF FITTINGS).

1136 SAME AS ITEM 1135 BUT IN DEODAR WOOD 40 MM THICK. 4318.50 4836.72 /SQM

1137 SAME AS ITEM 1135 BUT IN SHEESHAM WOOD 40 MM THICK. 4226.04 4733.16 /SQM

1138 SAME AS ITEM 1135 BUT IN SAL WOOD 40 MM THICK. 4335.54 4855.81 /SQM

1139 SAME AS ITEM 1135 BUT IN KAIL WOOD 40 MM THICK. 4108.45 4601.46 /SQM

1140 SAME AS ITEM 1135 BUT IN CHIR WOOD 40 MM THICK. 3855.02 4317.62 /SQM

1141 SAME AS ITEM 1135 BUT IN COUNTRY WOOD 40 MM THICK. 3684.72 4126.89 /SQM

1142 APPROXIMATE COST OF IRON-FITTINGS FOR DOORS & WINDOWS. /LS

1143 APPROXIMATE COST OF OXIDIZED IRON-FITTINGS FOR DOORS & /LS


WINDOWS.

1144 APPROXIMATE COST OF BRASS-FITTINGS FOR DOORS & WINDOWS. /LS

1145 APPROXIMATE COST OF OXIDISED BRASS-FITTINGS FOR DOORS & /LS


WINDOWS.

1146 ROLLED STEEL JOISTS LIGHT SECTION 0.0 - 7.5M HIGH. 1693.02 1896.18 /QTL

1147 ROLLED STEEL JOISTS HEAVY SECTION 0.0 - 7.5M HIGH. 3329.48 3729.02 /QTL

1148 EXTRA ON ITEMS 1146 & 1147 FOR MORE THAN 7.5M HEIGHT. 1056.02 1182.74 /QTL

1149 MILD STEEL OR IRON WORK OF SMALL SIZE & SECTIONS. 7915.54 8865.40 /QTL

1150 MILD STEEL OR IRON WORK IN HEAVY SIZES. 8447.78 9461.51 /QTL

1151 MILD STEEL OR IRON IN PLAIN WORK. 6917.64 7747.76 /QTL

1152 CUTTING ROLLED STEEL JOISTS UPTO 225MM X 100MM. 298.61 334.44 /CUT

1153 CUTTING ROLLED STEEL JOISTS ABOVE 225MM X 100MM. 597.21 668.88 /CUT

1154 CUTTING OF PLATES & ANGLES UPTO 20MM THICK. 130.63 146.31 /SQM

1155 CUTTING ROUNDS UPTO 15MM DIA. 7.46 8.35 /CUT

1156 BORING HOLES IN MILD STEEL OR IRON UPTO 10MM DIA. & UPTO 6 MM 40.55 45.42 /HOLE
THICK PLATE.

1157 SAME AS ITEM 1156 BUT HOLES 10 - 20MM DIA. & 6.0 - 13.0 MM THICK 64.09 71.78 /HOLE
PLATE.

1158 PROVIDE & FIX 100MM DIA. C.I. DOWN PIPE. 849.84 951.82 / RM

1159 FIX BARBED IRON WIRE FENCING TO POSTS. 73.48 82.30 / RM

1160 SUPPLY & FIX SINGLE ALLAHABAD TILES FOR ROOF WORK. 693.92 777.19 /SQM

1161 SAME AS ITEM 1160 BUT FOR DOUBLE ALLAHABAD TILES ROOF. 1110.27 1243.50 /SQM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 6 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1162 SUPPLY & FIX LARGE COUNTRY TILES ROOFING ON BAMBOO FRAMES. 1455.85 1630.55 /SQM

1163 SAME AS ITEM 1162 BUT SMALL SIZE COUNTRY TILES. 1594.45 1785.78 /SQM

1164 LAYING OF R.B. SLAB WITH 1ST CLASS BRICKS LAID IN CEMENT MORTAR 11373.33 12738.13 /CUM
WITH APPROVED COARSE SAND (1:3).

1165 SUPPLY & FIX GALVANISED CORRUGATED IRON ROOFING 0.63MM THICK. 594.81 666.19 /SQM

1166 SUPPLY & FIX 0.63MM THICK RIDGES, VALLEY & GUTTERS FOR G.C. IRON 899.65 1007.61 /SQM
ROOFING.

1167 SUPPLY & LAY 40MM THICK INSULATION LAYER OF SAND & CLAY OVER 61.22 68.56 /SQM
ROOF.

1168 SUPPLY & LAY 25MM THICK DEODAR WOOD PLANK CEILING. 2438.40 2731.01 /SQM

1169 SAME AS ITEM 1168 BUT FOR C.P. TEAK WOOD. 2854.31 3196.82 /SQM

1170 SAME AS ITEM 1168 BUT FOR KAIL WOOD. 2151.11 2409.25 /SQM

1171 SUPPLY & FIX 6MM THICK A.C. PLANE SHEETS CEILING WITH 25MM X 207.34 232.22 /SQM
40MM DEODAR WOOD BEADINGS.

1172 SAME AS ITEM 1171 BUT WITH C.P. TEAK WOOD BEADING. 229.46 256.99 /SQM

1173 SAME AS ITEM 1171 BUT OF MASONITE OR CELOTAX WITH DEODAR 751.44 841.61 /SQM
BEADING.

1174 SAME AS ITEM 1173 BUT WITH C.P. TEAK WOOD BEADING. 773.54 866.37 /SQM

1175 STRUCK POINTING WITH KANKAR LIME ON BRICK-WORK. 216.26 242.21 /SQM

1176 SAME AS ITEM 1175 BUT FOR FLUSH POINTING. 175.02 196.02 /SQM

1177 RUBBING WITH KANKAR LIME OR WITH WHITE LIME & SURKHI ON BRICK- 90.95 101.86 /SQM
WORK.

1178 SAME AS ITEM 1175 BUT WITH CEMENT & LOCAL SAND (1:2) MORTAR. 241.80 270.82 /SQM

1179 SAME AS ITEM 1178 BUT FLUSH POINTING (DEDUCT FROM ITEM 1178). 34.49 38.62 /SQM

1180 SAME AS ITEM 1178 & 1179 BUT IN FLOORS (DEDUCT FROM ITEMS 1178 & 42.31 47.39 /SQM
1179).

1181 RAISED POINTING WITH CEMENT & LOCAL SAND MORTAR (1:2) ON BRICK 269.47 301.80 /SQM
WORK.

1182 STRUCK CEMENT POINTING IN CEMENT MORTAR (1:2) WITH COLOURING 258.38 289.38 /SQM
MATERIALS.

1183 12MM THICK PLASTER WITH KANKAR LIME OVER BRICK-WORK. 144.50 161.84 /SQM

1184 SAME AS ITEM 1183 BUT WITH CEMENT & LOCAL SAND (1:2) MORTAR. 238.13 266.71 /SQM

1185 SAME AS ITEM 1183 BUT WITH CEMENT & COARSE SAND (1:2) MORTAR. 269.82 302.20 /SQM

1186 SAME AS ITEM 1183 BUT WITH CEMENT & LOCAL SAND (1:3) MORTAR. 211.12 236.45 /SQM

1187 SAME AS ITEM 1183 BUT WITH CEMENT & COARSE-SAND MORTAR (1:3). 236.47 264.85 /SQM

1188 SAME AS ITEM 1183 BUT WITH CEMENT & LOCAL SAND MORTAR (1:4). 199.79 223.76 /SQM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 7 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1189 SAME AS ITEM 1183 BUT WITH CEMENT AND LOCAL SAND MORTAR (1:5). 195.57 219.04 /SQM

1190 SAME AS ITEM 1183 BUT WITH CEMENT & LOCAL SAND MORTAR (1:6). 187.22 209.69 /SQM

1191 EXTRA ON ALL ITEM OF PLASTER IF DONE ON CEILING. 24.75 27.72 /SQM

1192 SAME AS ITEM 1183 BUT WITH CEMENT, WHITE LIME & LOCAL SAND (1:1:6). 199.00 222.88 /SQM

1193 MUD-PLASTER OVER BRICK WALL. 89.11 99.81 /SQM

1194 20 MM THICK STUCCO PLASTER RESEMBLING MARBLE FINISH. 919.60 1029.95 /SQM

1195 20MM THICK PLASTER ON WALLS, STEPS ETC. FINISHED WITH 5MM THICK 1163.92 1303.59 /SQM
CEMENT & MARBLE CHIPS (1:2).

1196 SAME AS ITEM 1195 BUT FINISHED WITH 5MM THICK WHITE CEMENT & 1051.82 1178.04 /SQM
MARBLE CHIPS.

1197 SAME AS ITEM 1196 BUT WITH 5MM THICK TOP COAT COLOURED. 1097.20 1228.86 /SQM

1198 20MM THICK PEBBLE-DASH PLASTER. 484.97 543.16 /SQM

1199 ROUGH CAST FINISH TO PLASTER OF DIFFERENT MORTARS (EXTRA TO 100.15 112.16 /SQM
PLASTER ITEMS).

1200 PLASTER OVER ROUGH FACE OF ONE BRICK WALL (EXTRA TO PLASTER 33.33 37.33 /SQM
ITEMS).

1201 20MM THICK CEMENT PLASTER IN DADO OR SKIRTING. 598.26 670.05 /SQM

1202 25MM THICK 1:2:4 P.C.C. FLOOR WITH CEMENT, COARSE SAND AND 20MM 732.56 820.47 /SQM
GAUGE STONE BALLAST WITH BASE CONCRETE (75MM THICK) 1:4:8
CEMENT, LOCAL SAND & BRICK BALLAST 40MM GAUGE.

1203 SAME AS ITEM 1202 BUT WITH BASE CONCRETE CONSISTING OF BRICK 628.15 703.53 /SQM
BALLAST, WHITE LIME & SURKHI 100:16:32.

1204 SAME AS ITEM 1202 BUT WITH BASE CONCRETE CONSISTING OF BRICK 637.74 714.27 /SQM
BALLAST, WHITE LIME & SAND MORTAR (1:2).

1205 SAME AS ITEM 1202 BUT WITH 50MM THICK 1:1.5:3 P.C.C. FLOOR. 1065.97 1193.89 /SQM

1206 SAME AS ITEM 1202 BUT WITH 40MM THICK FLOOR & WITHOUT BASE 515.12 576.93 /SQM
CONCERETE.

1207 EXTRA ON ITEMS 1202, 1205 & 1206 WHEN FLOORS ARE POLISHED. 459.00 514.08 /SQM

1208 EXTRA ON ITEMS 1202, 1205 & 1206 WHEN COLOURED, POLISHED FLOORS 465.19 521.01 /SQM
ARE LAID.

1209 STONE FLOORS 40MM THICK OF MIRZAPUR OR OTHER APPROVED STONE 1955.54 2190.20 /SQM
FLAGS, SET IN WHITE LIME & SAND.

1210 SAME AS ITEM 1209 BUT STONE FLAGS LAID IN (1:4) CEMENT & LOCAL 2030.32 2273.96 /SQM
SAND MORTAR.

1211 SAME AS ITEM 1209 BUT STONE FLAGS LAID IN WHITE LIME & SURKHI 1:2 1896.07 2123.59 /SQM
& BASE CONCRETE WITH BRICK BALLAST, WHITE LIME & SURKHI (1:2).

1212 SAME AS ITEMS 1209, 1210, 1211 BUT UPPER SURFACE & EDGES CHIESEL 1697.47 1901.17 /SQM
DRESSED & JOINT UPTO 6MM THICK IN WHITE LIME & SAND.

1213 SAME AS ITEM 1212 BUT IN CEMENT & SAND. 1804.11 2020.60 /SQM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 8 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1214 SAME AS ITEM 1212 BUT BASE CONCRETE IN WHITE LIME & SURKHI. 1639.47 1836.21 /SQM

1215 1ST CLASS BRICK FLOOR LAID IN CEMENT & LOCAL SAND MORTAR (1:6) & 1121.92 1256.54 /SQM
POINTED WITH (1:2) CEMENT MORTAR OVER 75MM THICK BASE
CONCRETE WITH KANKAR LIME.

1216 SAME AS ITEM 1215 BUT WITH 75MM BASE CONCRETE WITH (1:2) WHITE 1099.07 1230.95 /SQM
LIME & SURKHI.

1217 SAME AS ITEM 1215 BUT WITH 75MM BASE CONCRETE IN (1:4:8) CEMENT, 1202.09 1346.35 /SQM
LOCAL SAND & BRICK BALLAST.

1218 1ST CLASS BRICKS FLOOR LAID DRY, JOINTS SAND FILLED. 573.49 642.30 /SQM

1219 GRANOLYTHIC MARBLE FLOORING 25MM THICK WITH 20MM THICK LAYER 1534.39 1718.52 /SQM
OF CEMENT & COARSE SAND & 12 MM GAUGE STONE CHIPS WITH
SURFACE COAT OF ORDINARY CEMENT INCLUDING 75MM THICK BASE
CONCRETE WITH WHITE LIME & SAND.

1220 SAME AS ITEM 1219 BUT WITH WHITE CEMENT IN TOP LAYER. 1560.32 1747.56 /SQM

1221 SAME AS ITEM 1219 BUT WITH COLOURED FLOOR. 1568.60 1756.83 /SQM

1222 SAME AS ITEM 1219 BUT BASE CONCRETE IN (1:4:8) CEMENT, LOCAL SAND 1618.59 1812.82 /SQM
AND BRICK BALLAST.

1223 SAME AS ITEM 1220 BUT BASE CONCRETE IN (1:4:8) CEMENT, LOCAL SAND 1657.48 1856.38 /SQM
AND BRICK BALLAST.

1224 SAME AS ITEM 1221 BUT BASE CONCRETE IN (1:4:8) CEMENT, LOCAL SAND 1667.28 1867.35 /SQM
AND BRICK BALLAST.

1225 SAME AS ITEM 1219 BUT BASE CONCRETE IN WHITE LIME & SURKHI (1:2) 1515.93 1697.84 /SQM
(EXTRA ON ITEM 1219).

1226 SAME AS ITEM 1220 BUT BASE CONCRETE IN WHITE LIME & SURKHI (1:2) 1537.21 1721.67 /SQM
(EXTRA ON ITEM 1220).

1227 SAME AS ITEM 1221 BUT BASE CONCRETE IN WHITE LIME & SURKHI (1:2) 1546.57 1732.16 /SQM
(EXTRA ON ITEM 1221).

1228 GRANOLYTHIC MARBLE DADO 20MM THICK WITH 14MM THICK LAYER OF 1321.25 1479.80 /SQM
CEMENT & COARSE SAND (1:2) WITH 6MM THICK SURFACE COAT OF
ORDINARY CEMENT.

1229 SAME AS ITEM 1228 BUT WITH WHITE CEMENT IN TOP COAT. 1363.76 1527.41 /SQM

1230 SAME AS ITEM 1228 BUT WITH COLOURED DADO. 1373.65 1538.48 /SQM

1231 SUPPLY AND FIXING OF 15X15CM CHINA WHITE GLAZED TILES 6MM THICK 3107.20 3480.07 /SQM
IN FLOORING OR IN SKIRTING OR DADO LAID WITH (1:3) CEMENT &
COARSE SAND.

1232 PAINTING OR VARNISHING ON NEW IRON WORK IN SMALL AREAS OR NEW 117.50 131.60 /SQM
WOOD WORK WITH ONE COAT PRIMING & ONE COAT PAINT OR VARNISH.

1233 SAME AS ITEM 1232 BUT FOR EVERY COAT AFTER FIRST COAT. 80.85 90.55 /SQM

1234 SAME AS ITEM 1233 BUT FOR EVERY COAT ON PREVIOUSLY PAINTED 85.95 96.26 /SQM
SURFACE.

1235 PAINTING ROOF OR OTHER IRON WORK IN LARGE AREA WITH ONE COAT 131.16 146.90 /SQM
PRIMING & ONE COAT PAINT OR VARNISH.

1236 SAME AS ITEM 1235 BUT FOR EVERY COAT AFTER FIRST COAT. 80.85 90.55 /SQM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 9 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1237 SAME AS ITEM 1236 BUT FOR EVERY COAT OVER PREVIOUSLY PAINTED 80.85 90.55 /SQM
SURFACE.

1238 PAINTING OR VARNISHING WITH VALSPER OR HIGH GRADE ENAMEL OR 96.64 108.23 /SQM
VARNISH ONE COAT OVER PREVIOUSLY PAINTED SURFACE.

1239 SAME AS ITEM 1238 BUT FOR EVERY SUBSEQUENT COAT ON PREVIOUSLY 82.07 91.92 /SQM
TREATED SURFACE WITH ENAMEL OR VARNISH.

1240 ONE PRIMING & ONE OIL DISTEMPER COAT ON NEW WORK. 95.51 106.97 /SQM

1241 SAME AS ITEM 1240 BUT FOR EVERY COAT AFTER 1ST COAT. 52.54 58.85 /SQM

1242 SAME AS ITEM 1241 BUT FOR EVERY COAT ON PREVIOUSLY 57.38 64.27 /SQM
DISTEMPERED SURFACE.

1243 ONE COAT OF HOT COALTAR ON NEW SURFACE. 33.45 37.46 /SQM

1244 SAME AS ITEM 1243 BUT FOR EVERY COAT AFTER 1ST COAT. 20.16 22.58 /SQM

1245 ONE COAT SOLIGNUM OR OTHER PRESERVATIVE ON NEW WOOD WORK. 41.70 46.70 /SQM

1246 SAME AS ITEM 1245 BUT FOR EVERY COAT AFTER FIRST COAT ON 26.89 30.12 /SQM
PREVIOUSLY TREATED SURFACE.

1247 OILING WOOD WORK WITH DOUBLE BOILED LINSED OIL. 16.25 18.20 /SQM

1248 REMOVING PAINT OR VARNISHING WITH PAINT REMOVER OR CAUSTIC 40.50 45.35 /SQM
SODA.

1249 WAX POLISHING OVER NEW WOOD WORK WUTH READY MADE POLISH 47.45 53.14 /SQM
AFTER RUBBING DOWN WITH SAND PAPER.

1250 SAME AS ITEM 1249 BUT REPOLISHING WOOD WORK ALREADY WAX 29.08 32.57 /SQM
POLISHED WITH READY MADE WAX POLISH.

1251 WHITE WASHING ONE COAT. 11.67 13.07 /SQM

1252 SAME AS ITEM 1251 BUT TWO COATS. 18.05 20.22 /SQM

1253 SAME AS ITEM 1251 BUT THREE COATS. 28.00 31.36 /SQM

1254 COLOUR WASHING ONE COAT USING COLORING MATERIALS OF BUFF 13.00 14.56 /SQM
BLUE, BROWN SHADE.

1255 SAME AS ITEM 1254 BUT TWO COATS. 22.85 25.59 /SQM

1256 SAME AS ITEM 1254 BUT USING COLOURING MATERIALS OF PINK, GREEN 14.96 16.75 /SQM
OR YELLOW SHADE.

1257 SAME AS ITEM 1256 BUT TWO COATS. 25.77 28.86 /SQM

1258 COLOUR WASHING ONE COAT USING COPPER OR IRON SULPHATE. 15.49 17.35 /SQM

1259 SAME AS ITEM 1258 BUT TWO COATS. 30.45 34.11 /SQM

1260 CEMENT WASHING. 14.96 16.76 /SQM

1261 ONE PRIMING COAT & ONE COAT OF DRY DISTEMPER ON NEW WORK. 55.90 62.60 /SQM

1262 SAME AS ITEM 1261 BUT FOR EACH COAT OF DISTEMPER AFTER FIRST 29.82 33.40 /SQM
COAT.

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 10 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1263 DISMANTLING SUNDRIED BRICK WORK. 148.50 166.32 /CUM

1264 DISMANTLING BRICK WORK OR STONE WORK IN LIME OR CEMENT 693.00 776.16 /CUM
MORTAR.

1265 SAME AS ITEM 1264 BUT IN MUD MORTAR. 396.00 443.52 /CUM

1266 DISMANTLING R.C.C. OR R.B. WORK. 1569.15 1757.45 /CUM

1267 DISMANTLING JACK ARCHED OR WOODEN BEAM & BARJA ROOFS 693.00 776.16 /CUM
INCLUDING BEAMS & ROOF CONCRETE.

1268 SAME AS ITEM 1269 BUT ONLY ROOF CONCRETE. 495.00 554.40 /CUM

1269 DISMANTLING CEMENT CONCRETE OR BRICKS OR GRANOLYTHIC FLOORS 99.00 110.88 /SQM
INCLUDING BASE CONCRETE.

1270 SAME AS ITEM 1269 BUT STONE FLAG OR TILED FLOOR. 99.00 110.88 /SQM

1271 DISMANTLING SINGLE TILED ROOF INCLUDING PURLINES & BATTENS. 105.05 117.66 /SQM

1272 SAME AS ITEM 1271 BUT DOUBLE TILED ROOF. 179.30 200.82 /SQM

1273 DISMANTLING CORRUGATED IRON ROOFS, WALLS OR PARTITIONS 78.38 87.78 /SQM
INCLUDING PURLINS, BATTENS & VERTICAL SUPPORTS.

1274 DISMANTLING OF GIRDERS, TRUSSES & OTHER STEEL WORK. 2395.47 2682.93 /QTL

1275 DISMANTLING DOORS & WINDOWS INCLUDING CHAUKHATS WITH 82.50 92.40 /SQM
HOLDFASTS.

1276 DISMANTLING DOORS & WINDOWS LEAVES. 41.38 46.35 /SQM

1277 DISMANTLING DOORS & WINDOWS INCLUDING CHAUKHATS BUT 73.73 82.58 /SQM
EXCLUDING HOLDFASTS.

1278 DISMANTLING EXISTING PLASTER. 99.00 110.88 /SQM

1279 RACKING OUT JOINTS OF BRICK WORK IN CEMENT & LIME MORTAR TO A 49.50 55.44 /SQM
DEPTH OF 10MM.

1280 SCRAPING OLD WHITE OR COLOUR WASHING. 24.75 27.72 /SQM

1281 SUPPLY & FIX BLOCK OF C.P. TEAK WOOD 75X75X120MM IN WALL WITH 102.30 114.58 /NO.
(1:3) (CEMENT & COARSE SAND MORTAR.

1282 SUPPLY & FIX BRASS CLEATS FOR CLERESTORY WINDOW CORDS TO 222.18 248.84 /NO.
TEAK WOOD PLATE 100X100X10MM OVER BLOCKS OF C.P. TEAK WOOD.

1283 SAME AS ITEM 1282 BUT WITH OXIDISED IRON CLEATS. 82.30 92.18 /NO.

1284 SUPPLY & FIX COTTON CORD FOR CLERESTORY WINDOW. 136.13 152.47 /KG

1285 SUPPLY & FIX C.P. TEAK WOOD CLEATS 100X75X50 MM TO C.P. TEAK 238.15 266.73 /NO.
DOORS & WINDOWS WITH BRASS HINGS 50MM.

1286 SUPPLY & FIX 100MM DIA. A.C. DOWN PIPES COMPLETE WITH ROSE, 1145.47 1282.93 /RM
HEADS, BENDS & GRATINGS WITH M.S. CLAMP 25X3MM FIXED TO WALLS &
SUPPLY OF 150MM LONG, 6MM DIA. NAILS, REPAIRS OF PLASTER,
PAINTING ETC. COMPLETE.

1287 SUPPLY & FIX C.P. TEAK WOOD PAG RACK 900X75X25MM WITH THREE 865.79 969.68 /NO.
BRASS PEGS ON 75X75X120MM TEAK WOOD BLOCK.

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 11 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1288 SUPPLY & FIX 40MM THICK C.P. TEAK WOOD PANNELLED PARTITION WITH 5389.85 6036.63 /SQM
TEAK WOOD FRAMES 100X80MM TOP, BOTTOM & SIDE VERTICALS AT 1.5M
APART.

1289 SUPPLY & FIX PLAIN ASBESTOS SHEET PARTITION WITH 50X10MM 1686.04 1888.36 /SQM
DEODAR OR SHEESHAM WOOD BEADING, ERECTION & FIXING.

1290 SAME AS ITEM 1289 BUT WITH MASONITE PARTITIONS. 1740.64 1949.51 /SQM

1291 CONSOLIDATION OF 30 TO 40MM GUAGE KANKAR BY HAND RAMMER, 669.51 749.85 /CUM
SORTING KANKAR INTO THREE SIZES REPAIRING PATCHES IN EXISTING
ROAD SURFACE WITH KANKAR, PICKING UP OLD SURFACE, SPREADING
KANKAR, MAKING MEDIS TO RETAIN WATER & RAMMING WITH CARRIAGE
OF MATEL
& WATER AND MAINTENANCE OF BARRIERS, CAUTION POSTS, LIGHTS
ETC. (EXCLUDING SUPPLY OF KANKAR).
1292 SAME AS ITEM 1291 BUT FOR CONSOLIDATION BY ROAD ROLLER. 872.94 977.69 /CUM

1293 SAME AS ITEM 1291 BUT FOR 120MM THICK COAT OF BRICK BALLAST. 669.51 749.85 /CUM

1294 SAME AS ITEM 1292 BUT FOR 80MM THICK COAT OF BRICK BALLAST. 872.94 977.69 /CUM

1295 SAME AS ITEM 1292 BUT FOR 12MM THICK COAT OF BRICK BALLAST. 979.36 1096.89 /CUM

1296 SAME AS ITEM 1292 BUT 80MM THICK STONE BALLAST OVER EXISTING 1173.24 1314.03 /CUM
KANKAR ROAD SURFACE.

1297 WATER ALLOWANCE ON ITEM 1291 TO 1296. 123.75 138.60 /CUM

1298 DIGGING KANKAR INCLUDING BREAKING, CLEANING & ROLLING AND THE 1613.30 1806.90 /CUM
COST OF BORING TO FIND KANKAR STRATA.

1299 MAKING MUD TREE GUARDS IM (I.D) & 1M HIGH ABOVE G.L. 886.73 993.14 /NO.

1300 DUG BELLING 150MM DEEP IN ONE LINE ALIGNED WITH FLAGS & 3217.50 3603.60 /KM
JHANDIES.

1301 PAINTING WHITE TRAFFIC LINES 75MM WIDE IN THREE COATS WITH 711.35 796.71 /SQM
APPROVED WHITE PAINT.

1302 BRICK SOLING WITH STRAIGHT OVER BURNT BRICKS & DRY WITH BRICK 401.48 449.65 /SQM
EDGING LAID VERTICAL ON EITHER SIDE, FILLING THE JOINTS WITH
LOCAL EARTH.

1303 RENEWING PARTIES 3M WIDE, DRESSING SURFACE, FILLING UP TO 8 CM 72.54 81.25 /RM
DEPTH & MAKING PROFILES OF EVERY 15M APART.

1304 BRICK EDGING OF 1ST CLASS BRICKS LAID VERTICAL WITH MUD MORTAR. 210.96 236.27 /RM

1305 STACKING OF ROAD METAL TO THE REQUIRED TEMPLATE AFTER 178.66 200.09 /CUM
SCREENING AT ROAD SIDE.

1306 BITUMEN PAINTING (LABOUR ONLY) OVER WATER BOUND SURFACE (1ST 53.74 60.19 /SQM
COAT) EXCLUDING SUPPLY OF PAINT & GRIT.

1307 SAME AS ITEM 1306 BUT SUBSEQUENT COATS OF PAINTING OVER 26.87 30.09 /SQM
PREVIOUSLY PAINTED SURFACE.

1308 SAME AS ITEM 1306 BUT WITH COLD EMULSION IN 2ND COAT. 47.79 53.52 /SQM

1309 SAME AS ITEM 1306 BUT WITH TAR IN ONE COAT. 46.95 52.59 /SQM

1310 SAME AS ITEM 1306 BUT WITH TAR IN 2ND COAT OR OTHER SUBSEQUENT 23.48 26.29 /SQM
COATS OF PAINTING OVER PREVIOUSLY PAINTED SURFACE.

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 12 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1311 SCRAPPING OF OLD PAINTED SURFACE (ROAD SURFACE). 107.91 120.86 /SQM

1312 LAYING C.C. ROAD SLAB 100MM THICK IN (1:2:4) CEMENT, COARSE SAND & 14236.31 15944.66 /CUM
STONE BALLAST OVER PREPARED SURFACE.

1313 SAME AS ITEM 1312 BUT EXCLUDING SUPPLY OF CEMENT, COARSE SAND 7071.31 7919.87 /CUM
& STONE BALLAST.

1314 BLENDING OF WATER BOUND STONE OR KANKAR ROAD SURFACE WITH 17.00 19.04 /RM
LOCAL EARTH OR SAND IN 15MM DEEP LAYERS.

1315 EARTH WORK IN EDGING OF THE PAINTED OR C.C. ROAD IN A WIDTH OF 32.39 36.27 /RM
0.5M ON EITHER SIDE & 100MM DEEP.

1316 JOINT FILLING IN C.C. ROADS & REMOVING THE OLD TAR OR OTHER 2.48 2.77 /RM
MATERIALS (LABOUR ONLY).

1317 CONSOLIDATION OF KANKAR IN PATCH REPAIRING BY HAND RAMMER, 1606.00 1798.72 /CUM
PICKING OUT OLD SURFACE UPTO 100MM DEPTH IN A RECTANGULAR
FORM MAKING 50MM WIDE DRAIN AROUND THE PATCH.

1318 PATCH REPAIR OF SURFACE PAINTED WITH BITUMEN INCLUDING 5568.75 6237.00 /CUM
HEATING THE PAINT ETC. (LABOUR ONLY).

1319 CLEANING OF THE EXISTING PAINTED SURFACE & LAYING PREMIX 20MM 67.49 75.59 /SQM
THICK OVER A TACK COAT WITH GRADED GRIT & BITUMEN (LABIUR ONLY).

1320 SAME AS ITEM 1319 BUT IN PATCHES. 2735.31 3063.55 /CUM

1321 CLEANING THE PREMIX SURFACE & LAYING SEAL COAT WITH 6MM 19.79 22.17 /SQM
GRADED GRIT & BITUMEN INCLUDING HEATING OF PAINT (LABOUR ONLY).

1322 SAME AS ITEM 1319 BUT ON WATER BOUND SURFACE. 82.18 92.05 /SQM

1323 PROVIDE ALL MATERIALS, LABOUR,T & P ETC. & CONSTRUCT 100MM 2673.21 2993.99 /SQM
THICK (1:2:4:) CEMENT CONCRETE ROAD FOR REINSTATEMENT OF PATCH
& TRENCH CUTS IN CEMENT CONCRETE ROAD.

1324 SAME AS ITEM 1323 BUT TWO COATS OF BITUMEN PAINTING INSTEAD OF 1449.58 1623.53 /SQM
100MM THICK CEMENT CONCRETE CONCRETE LAYER.

1325 SAME AS ITEM 1323 BUT TWO EXCLUDING THE CEMENT CONCRETE SLAB. 1047.03 1172.67 /SQM

1326 MAINTENANCE OF TERRACED ROOFS, FILLING UP CRACKS BEFORE RAINS 114.35 128.07 /SQM
WITH BITUMINOUS FILLER.

1327 REPAIR OF PLASTER OR POINTING IN PATCHES INCLUDING REMOVAL OF 25%


OLD PLASTER.

1328 REPAIRS OF FLOORING IN PATCHES INCLUDING DIGGING UPTO EXISTING 25%


THICKNESS OF FLOORS, RENEWING THE SAME.

1329 CLEANING OF WELL & THROWING OUT THE SILT TO THE PLACE AS 1885.66 2111.94 /RM
DIRECTD BY THE ENGINEER IN CHARGE.

1330 BLENDING PANES OF GLASS. 146.88 164.50 /SQM

1331 RENEWING PANES OF GLASS 2.5MM THICK WITH PUTTY & BEADS. 697.97 781.73 /SQM

1332 CLEANING DOORS & WINDOWS WITH ORDINARY OIL & WATER. 16.24 18.19 /SQM

1333 FIXING PANES & GLASS INCLUDING PUTTY & BEADS (EXCLUDING COST OF 283.38 317.38 /SQM
GLASS).

1334 CLEANING PANES OF GLASS WITH SPRIT OR CAUSTIC SODA. 95.68 107.16 /SQM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 13 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Building Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
1335 LABOUR FOR FIXING DOOR BOLTS OR HINGES OR TOWER BOLTS OR 22.00 24.64 /EACH
HASP & STRAPLES OR HANDLES ETC. TO DOORS & WINDOWS.

1336 OPENING & REFIXING 100MM DIA. RAIN WATER DOWN PIPE AFTER 87.58 98.08 /RM
CLEANING.

1337 VARNISHING OR POLISHING FURNITURE WITH HIGH GRADE VARNISH OR 145.64 163.12 /NO.
POLISH AFTER SAND PAPERING.

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 14 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2001 EXCAVATION FOR PIPE LINE 0-1.5 M DEEP IN ORDINARY SOIL (LOAM, 268.55 300.77 /CUM
CLAY, SAND).

2002 SAME AS ITEM 2001 BUT IN SOIL MIXED WITH MOORUM/SHINGLE/KANKAR. 312.26 349.73 /CUM

2003 EXTRA ON ITEMS 2001 AND 2002 FOR ADDITIONAL LEAD AND LIFT. 65.34 73.18 /CUM

2004 CARTING FROM STORE, LAYING, JOINTING, FIXING & TESTING OF 15MM 113.48 127.09 /RM
DIA. (NOMINAL) M.S. GALVANIZED SCREWED & SOCKETTED PIPES (LIGHT
& MEDIUM QUALITY), SPECIALS & FITTINGS (INSIDE HOUSES).

2005 SAME AS ITEM 2004 BUT FOR 20MM DIA. 125.48 140.53 /RM

2006 SAME AS ITEM 2004 BUT FOR 25MM DIA. 164.36 184.08 /RM

2007 SAME AS ITEM 2004 BUT FOR 32MM DIA. 192.17 215.22 /RM

2008 SAME AS ITEM 2004 BUT FOR 40MM DIA. 230.93 258.64 /RM

2009 CARTING FROM STORE, LAYING, JOINTING, FIXING & TESTING OF 15MM 28.31 31.71 /RM
DIA. (NOMINAL) M.S. GALVANIZED SCREWED & SOCKETTED PIPES
(MEDIUM QUALITY),SPECIALS & FITTINGS (IN TRENCHES OUTSIDE
HOUSES).

2010 SAME AS ITEM 2009 BUT FOR 20MM DIA. 41.12 46.06 /RM

2011 SAME AS ITEM 2009 BUT FOR 25MM DIA. 56.39 63.15 /RM

2012 SAME AS ITEM 2009 BUT FOR 32MM DIA. 68.14 76.31 /RM

2013 SAME AS ITEM 2009 BUT FOR 40MM DIA. 75.28 84.31 /RM

2014 SAME AS ITEM 2009 BUT FOR 50MM DIA. 86.90 97.33 /RM

2015 SAME AS ITEM 2009 BUT FOR 65MM DIA. 103.51 115.93 /RM

2016 SAME AS ITEM 2009 BUT FOR 80MM DIA. 125.41 140.46 /RM

2017 SAME AS ITEM 2009 BUT FOR 100MM DIA. 146.40 163.96 /RM

2018 SAME AS ITEM 2009 BUT FOR 125MM DIA. 158.35 177.35 /RM

2019 SAME AS ITEM 2009 BUT FOR 150MM DIA. 178.46 199.87 /RM

2020 CARTING FROM STORE, LAYING, JOINTING & TESTING 50MM DIA. CLASS I 27.46 30.75 /RM
& II A.C. PRESURE PIPE WITH FITTING ETC.

2021 SAME AS ITEM 2020 BUT 65 MM DIA. 33.89 37.95 /RM

2022 SAME AS ITEM 2020 BUT 80 MM DIA. 35.60 39.88 /RM

2023 SAME AS ITEM 2020 BUT 100MM DIA. 43.11 48.29 /RM

2024 SAME AS ITEM 2020 BUT 125MM DIA. 54.57 61.12 /RM

2025 SAME AS ITEM 2020 BUT 150MM DIA. 61.71 69.11 /RM

2026 SAME AS ITEM 2020 BUT 200MM DIA. 72.62 81.33 /RM

2027 SAME AS ITEM 2020 BUT 250MM DIA. 86.32 96.68 /RM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 15 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2028 SAME AS ITEM 2020 BUT 300MM DIA. 99.13 111.03 /RM

2029 SAME AS ITEM 2020 BUT 350MM DIA. 139.62 156.37 /RM

2030 SAME AS ITEM 2020 BUT 400MM DIA. 174.24 195.15 /RM

2031 SAME AS ITEM 2020 BUT 450MM DIA. 209.54 234.69 /RM

2032 SAME AS ITEM 2020 BUT 500MM DIA. 258.97 290.05 /RM

2033 SAME AS ITEM 2020 BUT 600MM DIA. 361.54 404.92 /RM

2034 SAME AS ITEM 2020 TO 2033 BUT CLASS III A.C. PIPE (EXTRA ON ITEMS 5%
2020 TO 2033).

2035 CARTING FROM STORE, LAYING, JOINTING, FIXING & TESTING 15 MM DIA. 8.83 9.89 /RM
(I.D.) P.V.C. PIPES & SPECIALS.

2036 SAME AS ITEM 2035 BUT 20MM DIA. 10.77 12.06 /RM

2037 SAME AS ITEM 2035 BUT 25MM DIA. 11.77 13.18 /RM

2038 SAME AS ITEM 2035 BUT 32MM DIA. 14.25 15.95 /RM

2039 SAME AS ITEM 2035 BUT 40MM DIA. 16.21 18.15 /RM

2040 SAME AS ITEM 2035 BUT 50MM DIA. 24.42 27.35 /RM

2041 SAME AS ITEM 2035 BUT 65MM DIA. 33.10 37.07 /RM

2042 SAME AS ITEM 2035 BUT 80MM DIA. 40.86 45.76 /RM

2043 SAME AS ITEM 2035 BUT 100 MM DIA. 45.34 50.78 /RM

2044 SAME AS ITEM 2035 BUT 125 MM DIA. 49.38 55.31 /RM

2045 SAME AS ITEM 2035 BUT 150 MM DIA. 63.53 71.15 /RM

2046 SAME AS ITEM 2035 BUT 180 MM DIA. 70.97 79.49 /RM

2047 SAME AS ITEM 2035 BUT 200 MM DIA. 73.46 82.27 /RM

2048 CARTING FROM STORE P1 QUALITY R.C.C. PRESSURE PIPES & SPECIALS 125.52 140.58 /RM
80MM DIA., LAYING JOINTING, & TESTING WITH (1:1.5) CEMENT & SAND
MORTAR JOINTS.

2049 SAME AS ITEM 2048 BUT 100 MM DIA. 151.02 169.15 /RM

2050 SAME AS ITEM 2048 BUT 150 MM DIA. 182.40 204.29 /RM

2051 SAME AS ITEM 2048 BUT 250 MM DIA. 225.02 252.02 /RM

2052 SAME AS ITEM 2048 BUT 300 MM DIA. 248.00 277.76 /RM

2053 SAME AS ITEM 2048 BUT P2 QUALITY 80 MM DIA. PIPES. 125.52 140.58 /RM

2054 SAME AS ITEM 2049 BUT P2 QUALITY 100MM DIA. PIPES. 151.08 169.21 /RM

2055 SAME AS ITEM 2050 BUT P2 QUALITY 150MM DIA. PIPES. 182.40 204.29 /RM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 16 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2056 SAME AS ITEM 2055 BUT P2 QUALITY 250MM DIA. PIPES. 229.19 256.69 /RM

2057 SAME AS ITEM 2055 BUT P2 QUALITY 300MM DIA. PIPES. 258.49 289.51 /RM

2058 SAME AS ITEM 2055 BUT P2 QUALITY 350MM DIA. PIPES. 324.92 363.92 /RM

2059 SAME AS ITEM 2055 BUT P2 QUALITY 400MM DIA. PIPES. 369.70 414.06 /RM

2060 SAME AS ITEM 2055 BUT P2 QUALITY 450MM DIA. PIPES. 410.75 460.04 /RM

2061 SAME AS ITEM 2055 BUT P2 QUALITY 500MM DIA. PIPES. 482.70 540.63 /RM

2062 SAME AS ITEM 2055 BUT P2 QUALITY 600MM DIA. PIPES. 583.66 653.70 /RM

2063 SAME AS ITEM 2048 BUT P3 QUALITY 80 MM DIA. PIPES. 125.52 140.58 /RM

2064 SAME AS ITEM 2049 BUT P3 QUALITY 100MM DIA. PIPES. 151.02 169.15 /RM

2065 SAME AS ITEM 2050 BUT P3 QUALITY 150MM DIA. PIPES. 182.40 204.29 /RM

2066 SAME AS ITEM 2065 BUT 250MM DIA. PIPES. 235.25 263.48 /RM

2067 SAME AS ITEM 2065 BUT 300MM DIA. PIPES. 265.77 297.67 /RM

2068 SAME AS ITEM 2065 BUT 350MM DIA. PIPES. 338.00 378.56 /RM

2069 SAME AS ITEM 2065 BUT 400MM DIA. PIPES. 382.73 428.65 /RM

2070 CARTING OF C.I.S & S AND FLANGED (CLASS `LA' AND `A') PIPES & 34.30 38.42 /RM
SPECIALS FROM STORE, LAYING, JOINTING & TESTING ETC. 80MM DIA.

2071 SAME AS 2070 BUT 100MM DIA. PIPES. 43.56 48.78 /RM

2072 SAME AS 2070 BUT 125MM DIA. PIPES. 56.29 63.04 /RM

2073 SAME AS 2070 BUT 150MM DIA. PIPES. 70.26 78.69 /RM

2074 SAME AS 2070 BUT 200MM DIA. PIPES. 102.74 115.06 /RM

2075 SAME AS 2070 BUT 250MM DIA. PIPES. 138.27 154.87 /RM

2076 SAME AS 2070 BUT 300MM DIA. PIPES. 178.76 200.22 /RM

2077 SAME AS 2070 BUT C.I. SCREWED FLANGED PIPES (CLASS 'A') 80 MM DIA. 38.85 43.51 /RM

2078 SAME AS 2077 BUT 100 MM DIA. 49.10 54.99 /RM

2079 SAME AS 2077 BUT 125 MM DIA. 63.48 71.10 /RM

2080 SAME AS 2077 BUT 150 MM DIA. 79.51 89.05 /RM

2081 SAME AS 2077 BUT 200 MM DIA. 114.64 128.40 /RM

2082 SAME AS 2077 BUT 250 MM DIA. 153.89 172.36 /RM

2083 SAME AS 2077 BUT 300 MM DIA. 197.86 221.60 /RM

2084 C.I. FLANGED PIPES VERTICALLY CAST CLASS (A) - SAME RATES AS FOR /RM
ITEMS 2077 TO 2083.

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 17 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2085 SAME AS ITEM 2070 BUT 350 MM DIA. 213.08 238.65 /RM

2086 SAME AS ITEM 2070 BUT 400 MM DIA. 259.10 290.19 /RM

2087 SAME AS ITEM 2070 BUT 450 MM DIA. 312.27 349.74 /RM

2088 SAME AS ITEM 2070 BUT 500 MM DIA. 366.27 410.22 /RM

2089 SAME AS ITEM 2070 BUT 600 MM DIA. 487.66 546.18 /RM

2090 SAME AS ITEM 2070 BUT 700 MM DIA. 629.60 705.15 /RM

2091 SAME AS ITEM 2070 BUT 750 MM DIA. 705.15 789.77 /RM

2092 SAME AS ITEM 2085 BUT C.I. FLANGED PIPES (VERTICALLY CAST CLASS - 236.94 265.37 /RM
A) 350 MM DIA.

2093 SAME AS ITEM 2085 BUT FOR 400 MM DIA. 290.74 325.63 /RM

2094 SAME AS ITEM 2085 BUT FOR 450 MM DIA. 349.76 391.73 /RM

2095 SAME AS ITEM 2085 BUT FOR 500 MM DIA. 407.73 456.65 /RM

2096 SAME AS ITEM 2085 BUT FOR 600 MM DIA. 545.45 610.91 /RM

2097 SAME AS ITEM 2085 BUT FOR 700 MM DIA. 707.85 792.79 /RM

2098 SAME AS ITEM 2085 BUT FOR 750 MM DIA. 796.62 892.21 /RM

2099 SAME AS ITEM 2070 BUT C.I.S. & S PIPES (VERTICALLY CAST CLASS A) 800 754.98 845.57 /RM
MM DIA.

2100 SAME AS ITEM 2070 BUT C.I.S. & S PIPES (VERTICALLY CAST CLASS A) 900 921.22 1031.77 /RM
MM DIA.

2101 SAME AS ITEM 2070 BUT C.I.S. & S PIPES (VERTICALLY CAST CLASS A) 1108.11 1241.08 /RM
1000MM DIA.

2102 SAME AS ITEM 2099 BUT C.I.S. & S PIPES (VERTICALLY CAST CLASS A) 800 798.83 894.69 /RM
MM DIA.

2103 SAME AS ITEM 2099 BUT C.I.S. & S PIPES (VERTICALLY CAST CLASS A) 900 969.04 1085.32 /RM
MM DIA.

2104 SAME AS ITEM 2099 BUT C.I.S. & S PIPES (VERTICALLY CAST CLASS A) 1172.14 1312.80 /RM
1000MM DIA.

2105 SAME AS ITEM 2070 BUT C.I.S. & S PIPES (VERTICALLY CAST CLASS A) 1171.27 1311.82 /RM
1100MM DIA.

2106 SAME AS ITEM 2070 BUT C.I.S. & S PIPES (VERTICALLY CAST CLASS A) 1365.14 1528.96 /RM
1200MM DIA.

2107 CARTING FROM STORE CLASS 'A' C.I. SEREWED FLANGED SPUN PIPES & 152.64 170.96 /RM
CLASS 'A' VERTICALLY CAST PIPES, SPECIALS & FITTINGS, HOISTING &
ERECTING IN VERTICAL POSITION (UPTO 8 M HIGHT) 80 MM DIA.

2108 SAME AS ITEM 2107 BUT 100 DIA. 189.46 212.20 /RM

2109 SAME AS ITEM 2107 BUT 125 DIA. 248.63 278.46 /RM

2110 SAME AS IETM 2107 BUT 150 DIA. 311.66 349.06 /RM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 18 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2111 SAME AS IETM 2107 BUT 200 DIA. 448.98 502.86 /RM

2112 SAME AS ITEM 2107 BUT 250 DIA. 603.38 675.78 /RM

2113 SAME AS IETM 2107 BUT 300 DIA. 779.47 873.00 /RM

2114 SAME AS IETM 2107 BUT 8.0 - 16.0 HIGH 80 MM DIA. 261.09 292.42 /RM

2115 SAME AS ITEM 2107 BUT 8.0 - 16.0 HIGH 100MM DIA. 329.28 368.79 /RM

2116 SAME AS ITEM 2107 BUT 8.0 - 16.0 HIGH 125MM DIA. 424.23 475.14 /RM

2117 SAME AS ITEM 2107 BUT 8.0 - 16.0 HIGH 150MM DIA. 531.73 595.54 /RM

2118 SAME AS ITEM 2107 BUT 8.0 - 16.0 HIGH 200MM DIA. 767.94 860.09 /RM

2119 SAME AS ITEM 2107 BUT 8.0 - 16.0 HIGH 250MM DIA. 1030.91 1154.62 /RM

2120 SAME AS ITEM 2107 BUT 8.0 - 16.0 HIGH 300MM DIA. 1331.33 1491.08 /RM

2121 SAME AS ITEM 2107 BUT 16.0 - 24.0 HIGH 80 MM DIA. 425.27 476.31 /RM

2122 SAME AS ITEM 2107 BUT 16.0 - 24.0 HIGH 100MM DIA. 530.60 594.27 /RM

2123 SAME AS ITEM 2107 BUT 16.0 - 24.0 HIGH 125MM DIA. 693.21 776.40 /RM

2124 SAME AS ITEM 2107 BUT 16.0 - 24.0 HIGH 150MM DIA. 867.35 971.43 /RM

2125 SAME AS ITEM 2107 BUT 16.0 - 24.0 HIGH 200MM DIA. 1250.83 1400.93 /RM

2126 SAME AS ITEM 2107 BUT 16.0 - 24.0 HIGH 250MM DIA. 1681.38 1883.14 /RM

2127 SAME AS ITEM 2107 BUT 16.0 - 24.0 HIGH 300MM DIA. 2170.19 2430.61 /RM

2128 SAME AS ITEM 2107 BUT VERTICALLY CAST PIPES 350 MM DIA. 1034.13 1158.22 /RM

2129 SAME AS ITEM 2107 BUT VERTICALLY CAST PIPES 400 MM DIA. 1271.29 1423.84 /RM

2130 SAME AS ITEM 2107 BUT VERTICALLY CAST PIPES 450 MM DIA. 1528.48 1711.90 /RM

2131 SAME AS ITEM 2107 BUT VERTICALLY CAST PIPES 500 MM DIA. 1781.11 1994.84 /RM

2132 SAME AS ITEM 2107 BUT VERTICALLY CAST PIPES 600 MM DIA. 2379.93 2665.52 /RM

2133 SAME AS ITEM 2107 BUT VERTICALLY CAST PIPES 700 MM DIA. 3090.23 3461.06 /RM

2134 SAME AS ITEM 2107 BUT VERTICALLY CAST PIPES 750 MM DIA. 3478.80 3896.25 /RM

2135 SAME AS ITEM 2128 BUT 8.0 - 16.0 HIGH FOR 350 MM DIA. 1424.16 1595.06 /RM

2136 SAME AS ITEM 2128 BUT 8.0 - 16.0 HIGH FOR 400 MM DIA. 1749.25 1959.16 /RM

2137 SAME AS ITEM 2128 BUT 8.0 - 16.0 HIGH FOR 450 MM DIA. 2104.05 2356.54 /RM

2138 SAME AS ITEM 2128 BUT 8.0 - 16.0 HIGH FOR 500 MM DIA. 2452.73 2747.06 /RM

2139 SAME AS ITEM 2128 BUT 8.0 - 16.0 HIGH FOR 600 MM DIA. 3279.89 3673.47 /RM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 19 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2140 SAME AS ITEM 2128 BUT 8.0 - 16.0 HIGH FOR 700 MM DIA. 4257.21 4768.07 /RM

2141 SAME AS ITEM 2128 BUT 8.0 - 16.0 HIGH FOR 750 MM DIA. 4790.88 5365.78 /RM

2142 SAME AS ITEM 2128 BUT 16.0 - 24.0 HIGH FOR 350 MM DIA. 2279.64 2553.20 /RM

2143 SAME AS ITEM 2128 BUT 16.0 - 24.0 HIGH FOR 400 MM DIA. 2781.57 3115.36 /RM

2144 SAME AS ITEM 2128 BUT 16.0 - 24.0 HIGH FOR 450 MM DIA. 3346.40 3747.97 /RM

2145 SAME AS ITEM 2128 BUT 16.0 - 24.0 HIGH FOR 500 MM DIA. 3902.52 4370.82 /RM

2146 SAME AS ITEM 2128 BUT 16.0 - 24.0 HIGH FOR 600 MM DIA. 5215.25 5841.08 /RM

2147 SAME AS ITEM 2128 BUT 16.0 - 24.0 HIGH FOR 700 MM DIA. 6770.88 7583.39 /RM

2148 SAME AS ITEM 2128 BUT 16.0 - 24.0 HIGH FOR 750 MM DIA. 7619.67 8534.03 /RM

2149 CARTING, LAYING & TESTING OF STEEL CYLENDER REINFORCED 137.94 154.49 /RM
CONCRETE PIPES CLASS 3 AND SPECIALS 200 MM DIA.

2150 SAME AS ITEM 2149 BUT 250 MM DIA. 183.43 205.44 /RM

2151 SAME AS ITEM 2149 BUT 300 MM DIA. 212.07 237.52 /RM

2152 SAME AS ITEM 2149 BUT 350 MM DIA. 249.22 279.12 /RM

2153 SAME AS ITEM 2149 BUT 400 MM DIA. 292.39 327.47 /RM

2154 SAME AS ITEM 2149 BUT 450 MM DIA. 353.32 395.72 /RM

2155 SAME AS ITEM 2149 BUT 500 MM DIA. 394.99 442.38 /RM

2156 SAME AS ITEM 2149 BUT 600 MM DIA. 489.88 548.66 /RM

2157 SAME AS ITEM 2149 BUT 700 MM DIA. 615.11 688.92 /RM

2158 SAME AS ITEM 2149 BUT 900 MM DIA. 894.57 1001.92 /RM

2159 SAME AS ITEM 2149 BUT 1100 MM DIA. 1133.65 1269.69 /RM

2160 SAME AS ITEM 2149 BUT 1200 MM DIA. 1322.27 1480.94 /RM

2161 MAKING LEAD & SPUN YARN JOINTS OF C.I.S & S PIPES & SPECIALS 80 MM 505.58 566.25 /JNT
DIA.

2162 SAME AS ITEM 2161 BUT 100 MM DIA. 635.93 712.24 /JNT

2163 SAME AS ITEM 2161 BUT 125 MM DIA. 746.94 836.58 /JNT

2164 SAME AS ITEM 2161 BUT 150 MM DIA. 926.88 1038.10 /JNT

2165 SAME AS ITEM 2161 BUT 200 MM DIA. 1315.66 1473.54 /JNT

2166 SAME AS ITEM 2161 BUT 250 MM DIA. 1585.71 1775.99 /JNT

2167 SAME AS ITEM 2161 BUT 300 MM DIA. 1785.67 1999.95 /JNT

2168 SAME AS ITEM 2161 BUT 350 MM DIA. 2103.42 2355.83 /JNT

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 20 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2169 SAME AS ITEM 2161 BUT 400 MM DIA. 2512.46 2813.96 /JNT

2170 SAME AS ITEM 2161 BUT 450 MM DIA. 3296.44 3692.01 /JNT

2171 SAME AS ITEM 2161 BUT 500 MM DIA. 3579.00 4008.47 /JNT

2172 SAME AS ITEM 2161 BUT 600 MM DIA. 4544.35 5089.67 /JNT

2173 SAME AS ITEM 2161 BUT 700 MM DIA. 5368.91 6013.18 /JNT

2174 SAME AS ITEM 2161 BUT 750 MM DIA. 6191.21 6934.16 /JNT

2175 SAME AS ITEM 2161 BUT 800 MM DIA. 7605.76 8518.45 /JNT

2176 SAME AS ITEM 2161 BUT 900 MM DIA. 8604.75 9637.32 /JNT

2177 SAME AS ITEM 2161 BUT 1000MM DIA. 9884.42 11070.54 /JNT

2178 SAME AS ITEM 2161 BUT 1100MM DIA. 11117.69 12451.82 /JNT

2179 SAME AS ITEM 2161 BUT 1200MM DIA. 12177.69 13639.01 /JNT

2180 MAKING JOINTS OF 80MM DIA. FLANGED PIPES & SPECIALS. 270.78 303.27 /JNT

2181 SAME AS ITEM 2180 BUT 100 MM DIA. 362.76 406.29 /JNT

2182 SAME AS ITEM 2180 BUT 125 MM DIA. 426.29 477.45 /JNT

2183 SAME AS ITEM 2180 BUT 150 MM DIA. 541.03 605.95 /JNT

2184 SAME AS ITEM 2180 BUT 200 MM DIA. 624.47 699.40 /JNT

2185 SAME AS ITEM 2180 BUT 250 MM DIA. 849.15 951.05 /JNT

2186 SAME AS ITEM 2180 BUT 300 MM DIA. 970.66 1087.14 /JNT

2187 SAME AS ITEM 2180 BUT 350 MM DIA. 1271.13 1423.66 /JNT

2188 SAME AS ITEM 2180 BUT 400 MM DIA. 1613.79 1807.44 /JNT

2189 SAME AS ITEM 2180 BUT 450 MM DIA. 1996.41 2235.98 /JNT

2190 SAME AS ITEM 2180 BUT 500 MM DIA. 2240.35 2509.19 /JNT

2191 SAME AS ITEM 2180 BUT 600 MM DIA. 2816.44 3154.41 /JNT

2192 SAME AS ITEM 2180 BUT 700 MM DIA. 3441.54 3854.52 /JNT

2193 SAME AS ITEM 2180 BUT 750 MM DIA. 3682.25 4124.12 /JNT

2194 SAME AS ITEM 2180 BUT 800 MM DIA. 5010.38 5611.62 /JNT

2195 SAME AS ITEM 2180 BUT 900 MM DIA. 5735.47 6423.73 /JNT

2196 SAME AS ITEM 2180 BUT 1000MM DIA. 6743.43 7552.64 /JNT

2197 CARTING, LAYING & TESTING OF C.I.S & S CLASS 'LA' TYTON JOINT & LEAD 26.81 30.03 /RM
JOINT PIPES & SPECIALS 80 MM DIA.

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 21 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2198 SAME AS ITEM 2097 BUT 100 MM DIA. 34.34 38.46 /RM

2199 SAME AS ITEM 2097 BUT 125 MM DIA. 44.51 49.85 /RM

2200 SAME AS ITEM 2097 BUT 150 MM DIA. 55.59 62.26 /RM

2201 SAME AS ITEM 2097 BUT 200 MM DIA. 81.06 90.78 /RM

2202 SAME AS ITEM 2097 BUT 250 MM DIA. 109.40 122.53 /RM

2203 SAME AS ITEM 2097 BUT 300 MM DIA. 141.29 158.25 /RM

2204 SAME AS ITEM 2097 BUT 350 MM DIA. 158.25 177.24 /RM

2205 SAME AS ITEM 2097 BUT 400 MM DIA. 192.00 215.04 /RM

2206 SAME AS ITEM 2097 BUT 450 MM DIA. 232.09 259.94 /RM

2207 SAME AS ITEM 2097 BUT 500 MM DIA. 272.00 304.64 /RM

2208 SAME AS ITEM 2097 BUT 600 MM DIA. 361.75 405.15 /RM

2209 SAME AS ITEM 2097 BUT 700 MM DIA. 467.53 523.63 /RM

2210 SAME AS ITEM 2097 BUT 750 MM DIA. 523.71 586.55 /RM

2211 MAKE SPECIAL RUBBER GASKET TYTON JOINT C.I.S. & S PIPES & 39.53 44.27 /JNT
SPECIALS ALL CLASSES 80 MM OR 100 MM DIA.

2212 SAME AS ITEM 2211 BUT 125 OR 150 MM DIA. 55.19 61.82 /JNT

2213 SAME AS ITEM 2211 BUT 200 MM DIA. 66.78 74.79 /JNT

2214 SAME AS ITEM 2211 BUT 250 MM DIA. 84.45 94.58 /JNT

2215 SAME AS ITEM 2211 BUT 300 MM DIA. 113.09 126.66 /JNT

2216 SAME AS ITEM 2211 BUT 350 MM DIA. 142.12 159.17 /JNT

2217 SAME AS ITEM 2211 BUT 400 MM DIA. 170.67 191.15 /JNT

2218 SAME AS ITEM 2211 BUT 450 MM DIA. 193.77 217.02 /JNT

2219 SAME AS ITEM 2211 BUT 500 MM DIA. 224.17 251.07 /JNT

2220 SAME AS ITEM 2211 BUT 600 MM DIA. 245.23 274.66 /JNT

2221 SAME AS ITEM 2211 BUT 700 MM DIA. 297.93 333.68 /JNT

2222 SAME AS ITEM 2211 BUT 750 MM DIA. 351.12 393.25 /JNT

2223 MAKING RUBBER RING FLANGED JOINTS (USING C.I. DETACHABLE 39.53 44.27 /JNT
JOINTS) A.C.PRESURE PIPES & C.I. PLAIN ENDED SPECIALS ALL CLASSES
50, 80 OR 100 MM DIA.

2224 SAME AS ITEM 2223 BUT 125 OR 150 MM DIA. 55.19 61.82 /JNT

2225 SAME AS ITEM 2223 BUT 200 MM DIA. 66.78 74.79 /JNT

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 22 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2226 SAME AS ITEM 2223 BUT 250 MM DIA. 84.45 94.58 /JNT

2227 SAME AS ITEM 2223 BUT 300 MM DIA. 113.09 126.66 /JNT

2228 MAKING JOINTS OF STEEL CYLINDER REINFORCED CONCRET PIPES OF 1350.09 1512.10 /JNT
CLASS III & SPECIAL 200 MM DIA.

2229 SAME AS ITEM 2228 BUT 250 MM DIA. 1828.24 2047.62 /JNT

2230 SAME AS ITEM 2228 BUT 300 MM DIA. 2127.18 2382.44 /JNT

2231 SAME AS ITEM 2228 BUT 350 MM DIA. 2691.31 3014.26 /JNT

2232 SAME AS ITEM 2228 BUT 400 MM DIA. 3083.95 3454.02 /JNT

2233 SAME AS ITEM 2228 BUT 450 MM DIA. 3615.35 4049.19 /JNT

2234 SAME AS ITEM 2228 BUT 500 MM DIA. 4056.78 4543.59 /JNT

2235 SAME AS ITEM 2228 BUT 600 MM DIA. 4727.26 5294.54 /JNT

2236 SAME AS ITEM 2228 BUT 700 MM DIA. 6015.98 6737.90 /JNT

2237 SAME AS ITEM 2228 BUT 900 MM DIA. 8069.42 9037.75 /JNT

2238 SAME AS ITEM 2228 BUT 1100MM DIA. 9162.48 10261.98 /JNT

2239 SAME AS ITEM 2228 BUT 1200MM DIA. 10480.67 11738.35 /JNT

2240 RATE TO REGULATE PAYMENT OF EXCESS NO. 1:1.5 CEMENT MORTAR 154.64 173.20 /JNT
JOINTS IN 80 MM SIZE P1 QUALITY R.C.C. PRESURE PIPE.

2241 SAME AS ITEM 2240 BUT FOR 100 MM DIA. 182.64 204.55 /JNT

2242 SAME AS ITEM 2240 BUT FOR 150 MM DIA. 207.75 232.68 /JNT

2243 SAME AS ITEM 2240 BUT FOR 250 MM DIA. 242.22 271.29 /JNT

2244 SAME AS ITEM 2240 BUT FOR 300 MM DIA. 321.66 360.25 /JNT

2245 SAME AS ITEM 2240 BUT P2 QUALITY PIPES 80 MM DIA. 154.64 173.20 /JNT

2246 SAME AS ITEM 2241 BUT P2 QUALITY PIPES 100 MM DIA. 182.64 204.55 /JNT

2247 SAME AS ITEM 2242 BUT P2 QUALITY PIPES 150 MM DIA. 207.75 232.68 /JNT

2248 SAME AS ITEM 2247 BUT 250 MM DIA. 247.28 276.95 /JNT

2249 SAME AS ITEM 2247 BUT 300 MM DIA. 336.48 376.85 /JNT

2250 SAME AS ITEM 2247 BUT 350 MM DIA. 386.27 432.62 /JNT

2251 SAME AS ITEM 2247 BUT 400 MM DIA. 442.89 496.04 /JNT

2252 SAME AS ITEM 2247 BUT 450 MM DIA. 537.25 601.71 /JNT

2253 SAME AS ITEM 2247 BUT 500 MM DIA. 590.18 661.00 /JNT

2254 SAME AS ITEM 2247 BUT 600 MM DIA. 703.62 788.05 /JNT

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 23 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2255 SAME AS ITEM 2240 BUT FOR P3 QUALITY PIPES 80 MM DIA. 154.64 173.20 /JNT

2256 SAME AS ITEM 2241 BUT FOR P3 QUALITY PIPES 100MM DIA. 182.64 204.55 /JNT

2257 SAME AS ITEM 2242 BUT FOR P3 QUALITY PIPES 150MM DIA. 207.75 232.68 /JNT

2258 SAME AS ITEM 2257 BUT FOR 250 MM DIA. 252.67 282.99 /JNT

2259 SAME AS ITEM 2257 BUT FOR 300 MM DIA. 346.21 387.76 /JNT

2260 SAME AS ITEM 2257 BUT FOR 350 MM DIA. 411.77 461.18 /JNT

2261 SAME AS ITEM 2257 BUT FOR 400 MM DIA. 471.90 528.52 /JNT

2262 RATE TO REGULATE PAYMENT FOR MAKING LEAD & SPUN YARN JOINTS 657.26 736.13 /JNT
IN R.C.C. P1 QUALITY PIPES 80 MM DIA.

2263 SAME AS ITEM 2262 BUT 100 MM DIA. 794.98 890.37 /JNT

2264 SAME AS ITEM 2262 BUT 150 MM DIA. 1084.75 1214.92 /JNT

2265 SAME AS ITEM 2262 BUT 250 MM DIA. 1775.99 1989.11 /JNT

2266 SAME AS ITEM 2262 BUT 300 MM DIA. 1964.24 2199.95 /JNT

2267 SAME AS ITEM 2262 BUT PC QUALITY PIPES 80 MM DIA. 657.26 736.13 /JNT

2268 SAME AS ITEM 2263 BUT 100 MM DIA. 794.98 890.37 /JNT

2269 SAME AS ITEM 2264 BUT 150 MM DIA. 1084.75 1214.92 /JNT

2270 SAME AS ITEM 2264 BUT 250 MM DIA. 1791.97 2007.00 /JNT

2271 SAME AS ITEM 2264 BUT 300 MM DIA. 2071.38 2319.94 /JNT

2272 SAME AS ITEM 2264 BUT 350 MM DIA. 2418.99 2709.27 /JNT

2273 SAME AS ITEM 2264 BUT 400 MM DIA. 2914.46 3264.19 /JNT

2274 SAME AS ITEM 2264 BUT 450 MM DIA. 3758.29 4209.28 /JNT

2275 SAME AS ITEM 2264 BUT 500 MM DIA. 4080.21 4569.84 /JNT

2276 SAME AS ITEM 2264 BUT 600 MM DIA. 5226.00 5853.12 /JNT

2277 SAME AS ITEM 2262 BUT P3 QUALITY PIPES 80 MM DIA. 657.26 736.13 /JNT

2278 SAME AS ITEM 2263 BUT 100 MM DIA. 794.98 890.37 /JNT

2279 SAME AS ITEM 2264 BUT 150 MM DIA. 1084.75 1214.92 /JNT

2280 SAME AS ITEM 2264 BUT 250 MM DIA. 1839.35 2060.07 /JNT

2281 SAME AS ITEM 2264 BUT 300 MM DIA. 2142.81 2399.94 /JNT

2282 SAME AS ITEM 2264 BUT 350 MM DIA. 2545.20 2850.62 /JNT

2283 SAME AS ITEM 2264 BUT 400 MM DIA. 3090.33 3461.17 /JNT

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 24 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2284 CUTTING 15 - 25 MM DIA. M.M. GALVANISED PIPES INCLUDING THREADING, 27.78 31.11 /CUT
SHAPING & FINISHING THE ENDS.

2285 SAME AS ITEM 2284 BUT 32 TO 50 MM DIA. 41.32 46.28 /CUT

2286 SAME AS ITEM 2284 BUT 65 TO 80 MM DIA. 55.23 61.86 /CUT

2287 SAME AS ITEM 2284 BUT 100 TO 150 MM DIA. 111.96 125.40 /CUT

2288 CUTTING 50-100 MM DIA A.C. PIPE INCLUDING SHAPING & FINISHING THE 88.08 98.65 /CUT
ENDS.

2289 SAME AS ITEM 2288 BUT 125 OR 150 MM DIA. 117.34 131.42 /CUT

2290 SAME AS ITEM 2288 BUT 200 OR 250 MM DIA. 176.01 197.13 /CUT

2291 SAME AS ITEM 2288 BUT 300 MM DIA. 234.67 262.83 /CUT

2292 CUTTING C.I. (SPUN) PIPES (CLASS LA AND A) OR SPECIALS INCLUDING 293.92 329.19 /CUT
SHAPING & FINISHING THE ENDS 80 TO 300 MM DIA.

2293 SAME AS ITEM 2292 BUT 350 TO 750 MM DIA. 957.00 1071.84 /CUT

2294 SAME AS ITEM 2292 BUT 800 TO 1000 MM DIA. 2217.60 2483.71 /CUT

2295 SAME AS ITEM 2292 BUT 1100 TO 1200 MM DIA. 3579.18 4008.68 /CUT

2296 CUTTING 200 TO 400 MMD DIA. STEEL CYLINDER R.C.C. PIPES & SPECIALS 806.69 903.49 /CUT
INCLUDING SHAPING & FINISHING THE ENDS.

2297 SAME AS 2296 BUT 450 TO 600 MM DIA. 1686.63 1889.03 /CUT

2298 SAME AS 2296 BUT 700 TO 900 MM DIA. 3446.74 3860.35 /CUT

2299 SAME AS 2296 BUT 1100 TO 1200 MM DIA. 5133.15 5749.13 /CUT

2300 MAKING CONNECTION WITH EXISTING M.S. GALVANISED MAINS UPTO 25 880.00 985.60 /CONN
MM DIA.

2301 SAME AS ITEM 2300 BUT 32 TO 40 MM DIA. 1174.38 1315.31 /CONN

2302 SAME AS ITEM 2300 BUT 50 TO 80 MM DIA. 1540.00 1724.80 /CONN

2303 SAME AS ITEM 2300 BUT 100 TO 150 MM DIA. 2859.95 3203.14 /CONN

2304 CUTTING EXISTING A.C. MAINS 50 TO 125 MM DIA., MAKING CONNECTION, 2440.79 2733.68 /CONN
BAILING OUT OF WATER ETC.

2305 SAME AS ITEM 2304 BUT 150 TO 300 MM DIA. 4022.92 4505.67 /CONN

2306 CUTTING OF EXISTING 80 TO 150 MM DIA. S & S OR FLANGED C.I. RUNNING 1914.00 2143.68 /CONN
MAINS, MAKING CONNECTION, BAILING OUT OF WATER ETC.

2307 SAME AS ITEM 2306 BUT 200 TO 300 MM DIA. 4598.67 5150.51 /CONN

2308 SAME AS ITEM 2306 BUT 350 TO 450 MM DIA. 7909.61 8858.76 /CONN

2309 SAME AS ITEM 2306 BUT 500 TO 600 MM DIA. 9900.10 11088.11 /CONN

2310 SAME AS ITEM 2306 BUT 700 TO 750 MM DIA. 13233.15 14821.13 /CONN

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 25 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2311 SAME AS ITEM 2306 BUT 800 TO 1000 MM DIA. 19517.30 21859.38 /CONN

2312 SAME AS ITEM 2306 BUT 1100 TO 12000 MM DIA. 23198.31 25982.11 /CONN

2313 DISMANTLING 15 MM DIA. SCREWED & SOCKETED M.S. GALVANISED 63.07 70.64 /RM
PIPES, SPECIALS & FITTINGS INCLUDING TAKEN OUT FROM INTERNAL
WORKS.

2314 SAME AS ITEM 2313 BUT 20 MM DIA. 88.78 99.43 /RM

2315 SAME AS ITEM 2313 BUT 25 MM DIA. 133.17 149.15 /RM

2316 SAME AS ITEM 2313 BUT 32 MM DIA. 168.47 188.69 /RM

2317 SAME AS ITEM 2313 BUT 40 MM DIA. 186.65 209.05 /RM

2318 SAME AS ITEM 2313 BUT TAKEN OUT FROM TRENCHES 15 MM DIA. 22.95 25.70 /RM

2319 SAME AS ITEM 2318 BUT 20 MM DIA. 31.90 35.72 /RM

2320 SAME AS ITEM 2318 BUT 25 MM DIA. 44.91 50.30 /RM

2321 SAME AS ITEM 2318 BUT 32 MM DIA. 58.37 65.37 /RM

2322 SAME AS ITEM 2318 BUT 40 MM DIA. 63.08 70.65 /RM

2323 SAME AS ITEM 2318 BUT 50 MM DIA. 84.34 94.46 /RM

2324 SAME AS ITEM 2318 BUT 65 MM DIA. 108.07 121.04 /RM

2325 SAME AS ITEM 2318 BUT 80 MM DIA. 133.74 149.78 /RM

2326 SAME AS ITEM 2318 BUT 100 MM DIA. 177.37 198.66 /RM

2327 SAME AS ITEM 2318 BUT 125 MM DIA. 221.00 247.52 /RM

2328 SAME AS ITEM 2318 BUT 150 MM DIA. 263.24 294.83 /RM

2329 TAKING OUT 50 OR 80 MM DIA. A.C. PR. PIPES, SPECIALS & FITTINGS 23.63 26.47 /RM
(EXCLUDING DISMANTLING & REMOVAL OF DETACHABLE JOINTS.)

2330 SAME AS ITEM 2329 BUT 100 MM DIA. 28.86 32.32 /RM

2331 SAME AS ITEM 2329 BUT 125 MM DIA. 34.07 38.16 /RM

2332 SAME AS ITEM 2329 BUT 150 MM DIA. 39.94 44.73 /RM

2333 SAME AS ITEM 2329 BUT 200 MM DIA. 46.03 51.56 /RM

2334 SAME AS ITEM 2329 BUT 250 MM DIA. 57.41 64.30 /RM

2335 SAME AS ITEM 2329 BUT 300 MM DIA. 69.13 77.43 /RM

2336 DISANMTLING OF LEAD CAULKED JOINTS OF 80 - 300 MM DIA. C.I. PIPES, 576.86 646.08 /JNT
SPECIALS AND FITTINGS.

2337 SAME AS ITEM 2336 BUT 350 - 600 MM DIA. 1313.41 1471.02 /JNT

2338 SAME AS ITEM 2336 BUT 700 - 900 MM DIA. 2439.49 2732.23 /JNT

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 26 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2339 SAME AS ITEM 2336 BUT 1000 - 1200 MM DIA. 4131.06 4626.79 /JNT

2340 DISMANTLING FLANGED JOINTS OF 80 MM DIA. C.I. PIPES, SPECIALS & 180.30 201.93 /JNT
FITTINGS.

2341 SAME AS ITEM 2340 BUT 100 - 200 MM DIA. 353.68 396.12 /JNT

2342 SAME AS ITEM 2340 BUT 250 - 300 MM DIA. 520.13 582.54 /JNT

2343 SAME AS ITEM 2340 BUT 350 - 400 MM DIA. 686.55 768.94 /JNT

2344 SAME AS ITEM 2340 BUT 450 - 600 MM DIA. 859.94 963.14 /JNT

2345 SAME AS ITEM 2340 BUT 700 - 800 MM DIA. 1033.27 1157.27 /JNT

2346 SAME AS ITEM 2340 BUT 900 - 1000 MM DIA. 1213.64 1359.27 /JNT

2347 DISMANTLING OF CEMENT & LEAD CAULKED JOINTS OF 200 MM DIA. 574.61 643.56 /JNT
STEEL CYLINDER R.C.C. PIPES & SPECIALS.

2348 SAME AS ITEM 2347 BUT 250 MM DIA. 691.41 774.38 /JNT

2349 SAME AS ITEM 2347 BUT 300 MM DIA. 768.24 860.42 /JNT

2350 SAME AS ITEM 2347 BUT 350 MM DIA. 947.19 1060.85 /JNT

2351 SAME AS ITEM 2347 BUT 400 MM DIA. 996.50 1116.08 /JNT

2352 SAME AS ITEM 2347 BUT 450 MM DIA. 1240.29 1389.12 /JNT

2353 SAME AS ITEM 2347 BUT 500 MM DIA. 1425.54 1596.60 /JNT

2354 SAME AS ITEM 2347 BUT 600 MM DIA. 1673.12 1873.89 /JNT

2355 SAME AS ITEM 2347 BUT 700 MM DIA. 2085.04 2335.25 /JNT

2356 SAME AS ITEM 2347 BUT 900 MM DIA. 2799.34 3135.26 /JNT

2357 SAME AS ITEM 2347 BUT 1100 MM DIA. 3454.30 3868.82 /JNT

2358 SAME AS ITEM 2347 BUT 1200 MM DIA. 3985.61 4463.88 /JNT

2359 TAKING OUT OF C.I. S & S PIPES (SPUN CLASS LA LEAD & SPUNYARN 29.15 32.65 /RM
JOINTED OR RUBBER RING GASKET TYTON JOINTED) 80 MM DIA.

2360 SAME AS ITEM 2359 BUT 100 MM DIA. 37.11 41.56 /RM

2361 SAME AS ITEM 2359 BUT 125 MM DIA. 47.99 53.74 /RM

2362 SAME AS ITEM 2359 BUT 150 MM DIA. 59.84 67.03 /RM

2363 SAME AS ITEM 2359 BUT 200 MM DIA. 87.44 97.93 /RM

2364 SAME AS ITEM 2359 BUT 250 MM DIA. 117.75 131.88 /RM

2365 SAME AS ITEM 2359 BUT 300 MM DIA. 152.34 170.62 /RM

2366 SAME AS ITEM 2359 BUT C.I. FLANGED PIPE (CLASS A) 80 MM DIA. 33.04 37.00 /RM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 27 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2367 SAME AS ITEM 2366 BUT 100 MM DIA. 41.78 46.79 /RM

2368 SAME AS ITEM 2366 BUT 125 MM DIA. 54.02 60.50 /RM

2369 SAME AS ITEM 2366 BUT 150 MM DIA. 67.63 75.74 /RM

2370 SAME AS ITEM 2366 BUT 200 MM DIA. 97.55 109.26 /RM

2371 SAME AS ITEM 2366 BUT 250 MM DIA. 130.59 146.26 /RM

2372 SAME AS ITEM 2366 BUT 300 MM DIA. 169.06 189.35 /RM

2373 SAME AS ITEM 2359 BUT STEEL CYLINDER R.C.C. PIPES (CLASS III) 200 MM 139.52 156.27 /RM
DIA.

2374 SAME AS ITEM 2373 BUT 250 MM DIA. 211.99 237.43 /RM

2375 SAME AS ITEM 2373 BUT 300 MM DIA. 248.33 278.13 /RM

2376 SAME AS ITEM 2359 BUT C.I. S & S PIPES (SPUN CLASS LA LEAD YARN 197.79 221.52 /RM
JOINTED OR RUBBER RING GASKET TYTON JOINTED) 350 MM DIA.

2377 SAME AS ITEM 2376 BUT 400 MM DIA. 240.45 269.30 /RM

2378 SAME AS ITEM 2376 BUT 450 MM DIA. 289.89 324.67 /RM

2379 SAME AS ITEM 2376 BUT 500 MM DIA. 340.07 380.88 /RM

2380 SAME AS ITEM 2376 BUT 600 MM DIA. 452.76 507.09 /RM

2381 SAME AS ITEM 2376 BUT 700 MM DIA. 584.74 654.91 /RM

2382 SAME AS ITEM 2376 BUT 750 MM DIA. 654.77 733.34 /RM

2383 SAME AS ITEM 2376 BUT FOR C.I. FLANGED PIPE (VERTICALLY CAST 220.22 246.65 /RM
CLASS A) 350 MM DIA.

2384 SAME AS ITEM 2383 BUT 400 MM DIA. 270.23 302.65 /RM

2385 SAME AS ITEM 2383 BUT 450 MM DIA. 325.00 364.00 /RM

2386 SAME AS ITEM 2383 BUT 500 MM DIA. 378.49 423.91 /RM

2387 SAME AS ITEM 2383 BUT 600 MM DIA. 506.43 567.20 /RM

2388 SAME AS ITEM 2383 BUT 700 MM DIA. 658.35 737.36 /RM

2389 SAME AS ITEM 2383 BUT 750 MM DIA. 739.71 828.47 /RM

2390 SAME AS ITEM 2376 BUT STEEL CYLINDER REINFORCED PIPE (CLAS III) 293.75 329.00 /RM
350 MM DIA.

2391 SAME AS ITEM 2390 BUT 400 MM DIA. 331.06 370.79 /RM

2392 SAME AS ITEM 2390 BUT 450 MM DIA. 443.38 496.59 /RM

2393 SAME AS ITEM 2390 BUT 500 MM DIA. 529.41 592.94 /RM

2394 SAME AS ITEM 2390 BUT 600 MM DIA. 621.97 696.61 /RM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 28 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2395 SAME AS ITEM 2390 BUT 700 MM DIA. 716.73 802.74 /RM

2396 SAME AS ITEM 2376 BUT 800 MM DIA. 816.91 914.94 /RM

2397 SAME AS ITEM 2376 BUT 900 MM DIA. 997.36 1117.04 /RM

2398 SAME AS ITEM 2376 BUT 1000 MM DIA. 1199.78 1343.76 /RM

2399 SAME AS ITEM 2383 BUT 800 MM DIA. 864.02 967.70 /RM

2400 SAME AS ITEM 2383 BUT 900 MM DIA. 1048.71 1174.56 /RM

2401 SAME AS ITEM 2383 BUT 1000 MM DIA. 1268.88 1421.14 /RM

2402 SAME AS ITEM 2390 BUT 900 MM DIA. 950.44 1064.50 /RM

2403 SAME AS ITEM 2376 BUT 1100 MM DIA. 1499.19 1679.10 /RM

2404 SAME AS ITEM 2376 BUT 1200 MM DIA. 1748.39 1958.20 /RM

2405 SAME AS ITEM 2390 BUT 1100 MM DIA. 1446.95 1620.58 /RM

2406 SAME AS ITEM 2390 BUT 1200 MM DIA. 1860.59 2083.86 /RM

2407 DISMANTLING OF SPECIAL RUBBER GASKET TYTON JOINTS OF C.I. S & S 40.19 45.01 /JNT
ALL CLASS OF PIPES, SPECIALS & FITTINGS 80 - 100 MM DIA.

2408 SAME AS ITEM 2407 BUT 125 - 150 MM DIA. 61.04 68.36 /JNT

2409 SAME AS ITEM 2407 BUT 200 MM DIA. 76.31 85.47 /JNT

2410 SAME AS ITEM 2407 BUT 250 MM DIA. 89.11 99.80 /JNT

2411 SAME AS ITEM 2407 BUT 300 MM DIA. 107.84 120.78 /JNT

2412 SAME AS ITEM 2407 BUT 350 MM DIA. 131.43 147.20 /JNT

2413 SAME AS ITEM 2407 BUT 400 MM DIA. 154.83 173.41 /JNT

2414 SAME AS ITEM 2407 BUT 450 MM DIA. 169.07 189.36 /JNT

2415 SAME AS ITEM 2407 BUT 500 MM DIA. 196.51 220.09 /JNT

2416 SAME AS ITEM 2407 BUT 600 MM DIA. 217.60 243.71 /JNT

2417 SAME AS ITEM 2407 BUT 700 MM DIA. 241.85 270.87 /JNT

2418 SAME AS ITEM 2407 BUT 750 MM DIA. 262.86 294.40 /JNT

2419 DISMANTLING OF C.I. DETACHABLE JOINTS OF A.C. PRESSURE MAIN 50 - 40.19 45.01 /JNT
100 MM DIA.

2420 SAME AS ITEM 2419 BUT 125 - 150 MM DIA. 61.04 68.36 /JNT

2421 SAME AS ITEM 2419 BUT 200 MM DIA. 76.31 85.47 /JNT

2422 SAME AS ITEM 2419 BUT 250 MM DIA. 89.11 99.80 /JNT

2423 SAME AS ITEM 2419 BUT 300 MM DIA. 107.84 120.78 /JNT

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 29 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2424 DISMANTLING OF C.I. M.H. COVER WITH FRAMES 455 - 610 MM CLEAR SIZE. 1114.70 1248.46 /NO.

2425 DISMANTLING OF C.I. SURFACE BOX 200 - 350 MM SIZE. 382.79 428.72 /NO.

2426 SAME AS ITEM 2425 BUT UPTO 150 MM SIZE. 195.46 218.92 /NO.

2427 DISMANTLING SCREWED TYPE AIR VALUE. 671.78 752.39 /NO.

2428 MAKING FERRULE CONNECTION IN 50 - 300 MM DIA. A.C. EXISTING MAINS 1036.75 1161.16 /CONN
WITH 10 OR 15 MM SIZE FERRULE.

2429 INSERTING & FIXING WATER METER OR FITTING SUCH AS STOP COCKS, 718.69 804.93 /CONN
WHEEL VALVE ETC. UPTO 25 MM DIA. IN EXISTING M.S. GALVANISED
PIPES.

2430 SAME AS ITEM 2429 BUT 32 - 40 MM DIA. 1055.10 1181.71 /CONN

2431 SAME AS ITEM 2429 BUT 50 - 80 MM DIA. 1466.63 1642.63 /CONN

2432 SAME AS ITEM 2429 BUT 100-150 MM DIA. 2640.00 2956.80 /CONN

2433 FIXING OF 10 - 15 MM SIZE BRASS FERRULE IN EXISTING C.I. OR M.S. 880.00 985.60 /CONN
GALVANISED PIPE (50 MM & ABOVE).

2434 SAME AS ITEM 2433 20 - 25 MM . 1245.59 1395.06 /CONN

2435 SAME AS ITEM 2433 32 - 50 MM . 1613.37 1806.97 /CONN

2436 CARTING & PLACING OF C.I. M.H. HEAVY DUTTY 500 - 560 MM (CLEAR 1012.00 1133.44 /NO.
OPENING) SIZE.

2437 SAME AS ITEM 2346 BUT MEDIUM DUTY (SIZE 610 X 445 MM ). 662.20 741.66 /NO.

2438 SAME AS ITEM 2346 BUT LIGHT DUTTY RECTANGULAR. 405.49 454.15 /NO.

2439 SAME AS ITEM 2436 BUT MEDIUM OR LIGHT DUTY FOR STANDARD SIZE 341.11 382.04 /NO.
(250 - 455 MM).

2440 CARTAGE & FIXING OF C.I. OR M.S. SURFACE BOX UPTO 200 MM DIA. 248.75 278.60 /NO.

2441 MAKING I.S.S. THREADS IN 15 - 25 MM DIA. GALVANISED M.S. PIPES. 41.72 46.73 /END

2442 SAME AS ITEM 2441 BUT 32 - 50 MM DIA. 70.24 78.67 /END

2443 SAME AS ITEM 2441 BUT 65 - 80 MM DIA. 111.96 125.40 /END

2444 SAME AS ITEM 2441 BUT 100 - 150 MM DIA. 219.45 245.78 /END

2445 CARTAGE & FIXING OF SLUICE VALVE OR REFLUX VALVE 50 - 125 MM DIA. 477.95 535.30 /NO.

2446 SAME AS ITEM BUT 150 - 200 MM DIA. 777.31 870.59 /NO.

2447 SAME AS ITEM BUT 250 - 300 MM DIA. 1515.17 1696.99 /NO.

2448 SAME AS ITEM BUT 350 - 400 MM DIA. 2073.50 2322.32 /NO.

2449 SAME AS ITEM BUT 450 - 600 MM DIA. 2950.67 3304.75 /NO.

2450 CARTING & FIXING OF 20 - 25 SCREWED DOWN AIR VALVE IN C.I. MAINS. 806.69 903.49 /NO.

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 30 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Water Supply Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
2451 SAME AS ITEM 2450 BUT 65 - 80 MM DIA. FLANGED AIR VALVE OR FIRE 351.73 393.94 /NO.
HYDRANT OVER EXISTING FLANGED TEE.

2452 BORING OF 150 MM DIA. BY PALM & PRESSURE METHOD 0-30 M. DEEP. 616.00 689.92 /RM

2453 SAME AS ITEM 2452 BUT 31-50 M. DEEP. 682.00 763.84 /RM

2454 BORING OF 150 MM DIA. BY CASING METHOD 0-30 M. DEEP INCLUDING 924.00 1034.88 /RM
EXTRACTION OF CASING PIPE.

2455 SAME AS ITEM 2454 BUT 31-50 M. DEEP. 1023.00 1145.76 /RM

2456 LOWERING OF HAND PUMP ASSEMBLY 0-45 M. DEEP. 23.22 26.01 /RM

2457 INSTALLATION & DEVELOPMENT OF HAND PUMP. 3245.04 3634.44 /NO.

2458 HIRE CHARGES OF BORING T & P AND CARTAGE OF HAND PUMP /L.S.
MATERIAL BY TRACTOR TROLLEY.

2459 FILLING COARSE SAND ROUND THE HAND PUMP ASSEMBLY (EXCLUDE 330.00 369.60 /CUM
COST OF SAND).

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 31 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Sewerage Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
3001 EXCAVATION 0.0 - 1.5M DEEP IN ORDINARY SOIL. 282.64 316.56 /CUM

3002 EXCAVATION 1.5 - 3.0M DEEP IN ORDINARY SOIL. 355.73 398.42 /CUM

3003 EXCAVATION 3.0 - 4.5M DEEP IN ORDINARY SOIL. 446.94 500.57 /CUM

3004 EXCAVATION 4.5 - 6.0M DEEP IN ORDINARY SOIL. 521.00 583.51 /CUM

3005 EXCAVATION 6.0 - 7.5M DEEP IN ORDINARY SOIL. 681.44 763.21 /CUM

3006 EXCAVATION 7.5 - 9.0M DEEP IN ORDINARY SOIL. 894.04 1001.32 /CUM

3007 EXCAVATION 0.0 - 1.5M DEEP IN SOIL MIXED WITH MOORUM, SHINGLE, 42.08 47.12 /CUM
KANKAR ETC.(EXTRA OVER ITEM 3001).

3008 EXCAVATION 1.5 - 3.0M DEEP IN SOIL MIXED WITH MOORUM, SHINGLE, 68.64 76.88 /CUM
KANKAR ETC.(EXTRA OVER ITEM 3002).

3009 EXCAVATION 3.0 - 4.5M DEEP IN SOIL MIXED WITH MOORUM, SHINGLE, 96.25 107.80 /CUM
KANKAR ETC.(EXTRA OVER ITEM 3003).

3010 EXCAVATION 4.5 - 6.0M DEEP IN SOIL MIXED WITH MOORUM, SHINGLE, 122.79 137.52 /CUM
KANKAR ETC.(EXTRA OVER ITEM 3004).

3011 EXCAVATION 6.0 - 7.5M DEEP IN SOIL MIXED WITH MOORUM, SHINGLE, 149.38 167.31 /CUM
KANKAR ETC.(EXTRA OVER ITEM 3005).

3012 EXCAVATION 7.5 - 9.0M DEEP IN SOIL MIXED WITH MOORUM, SHINGLE, 184.88 207.07 /CUM
KANKAR ETC.(EXTRA OVER ITEM 3006).

3013 EXCAVATION 0.0 - 1.5M DEEP IN HARD ROCK BY CHISELLING. 1652.88 1851.23 /CUM

3014 EXCAVATION 1.5 - 3.0M DEEP IN HARD ROCK BY CHISELLING. 1807.57 2024.48 /CUM

3015 EXCAVATION 3.0 - 4.5M DEEP IN HARD ROCK BY CHISELLING. 1991.75 2230.76 /CUM

3016 EXCAVATION 4.5 - 6.0M DEEP IN HARD ROCK BY CHISELLING. 2201.31 2465.47 /CUM

3017 EXCAVATION 6.0 - 7.5M DEEP IN HARD ROCK BY CHISELLING. 2494.51 2793.85 /CUM

3018 EXCAVATION 7.5 - 9.0M DEEP IN HARD ROCK BY CHISELLING. 2801.74 3137.95 /CUM

3019 EXCAVATION 0.0 - 1.5 DEEP IN MEDIUM ROCK BY CHISELLING OR BY MILD 1346.18 1507.72 /CUM
BLASTING.

3020 EXCAVATION 1.5 - 3.0 DEEP IN MEDIUM ROCK BY CHISELLING OR BY MILD 1461.86 1637.28 /CUM
BLASTING.

3021 EXCAVATION 3.0 - 4.5M DEEP IN MEDIUM ROCK BY CHISELLING OR BY 1620.19 1814.61 /CUM
MILD BLASTING.

3022 EXCAVATION 4.5 - 6.0M DEEP IN MEDIUM ROCK BY CHISELLING OR BY 1794.94 2010.33 /CUM
MILD BLASTING.

3023 EXCAVATION 6.0 - 7.5M DEEP IN MEDIUM ROCK BY CHISELLING OR BY 1966.20 2202.15 /CUM
MILD BLASTING.

3024 EXCAVATION 7.5 - 9.0M DEEP IN MEDIUM ROCK BY CHISELLING OR BY 2195.45 2458.90 /CUM
MILD BLASTING.

3025 EXCAVATION 0.0 - 1.5M DEEP IN DECOMPOSED OR SOFT ROCK BY 1233.15 1381.13 /CUM
CHISELLING.

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 32 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Sewerage Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
3026 EXCAVATION 1.5 - 3.0M DEEP IN DECOMPOSED OR SOFT ROCK BY 1418.88 1589.14 /CUM
CHISELLING.

3027 EXCAVATION 3.0 - 4.5M DEEP IN DECOMPOSED OR SOFT ROCK BY 1628.04 1823.40 /CUM
CHISELLING.

3028 EXCAVATION 4.5 - 6.0M DEEP IN DECOMPOSED OR SOFT ROCK BY 1886.69 2113.09 /CUM
CHISELLING.

3029 EXCAVATION 6.0 - 7.5M DEEP IN DECOMPOSED OR SOFT ROCK BY 2287.36 2561.85 /CUM
CHISELLING.

3030 EXCAVATION 7.5 - 9.0M DEEP IN DECOMPOSED OR SOFT ROCK BY 2817.70 3155.82 /CUM
CHISELLING.

3031 BAILING OUT OR PUMPING OUT SUBSOIL WATER. 125.71 140.79 /CUM

3032 CLOSE TIMBERING IN TRENCHES 0.0 - 3.0M DEEP. 821.18 919.72 /SQM

3033 CLOSE TIMBERING IN TRENCHES 3.0 - 6.0M DEEP. 1036.02 1160.34 /SQM

3034 CLOSE TIMBERING IN TRENCHES 6.0 - 9.0M DEEP. 1185.52 1327.78 /SQM

3035 CLOSE TIMBERING LEFT IN TRENCHES (UNUSED TIMBERING) 0.0 - 3.0M 4647.59 5205.30 /SQM
DEEP.

3036 CLOSE TIMBERING LEFT IN TRENCHES (UNUSED TIMBERING) 3.0 - 6.0M 5663.82 6343.48 /SQM
DEEP.

3037 CLOSE TIMBERING LEFT IN TRENCHES (UNUSED TIMBERING) 6.0 - 9.0M 6247.07 6996.72 /SQM
DEEP.

3038 CLOSE TIMBERING LEFT IN TRENCHES (USED TIMBERING) 0.0 - 3.0M DEEP. 1914.65 2144.41 /SQM

3039 CLOSE TIMBERING LEFT IN TRENCHES (USED TIMBERING) 3.0 - 6.0M DEEP. 2348.76 2630.61 /SQM

3040 CLOSE TIMBERING LEFT IN TRENCHES (USED TIMBERING) 6.0 - 9.0M DEEP. 2608.75 2921.80 /SQM

3041 OPEN TIMBERING IN TRENCHES 0.0 - 3.0M DEEP. 484.38 542.50 /SQM

3042 OPEN TIMBERING IN TRENCHES 3.0 - 6.0M DEEP. 608.49 681.51 /SQM

3043 OPEN TIMBERING IN TRENCHES 6.0 - 9.0M DEEP. 742.03 831.07 /SQM

3044 OPEN TIMBERING LEFT IN TRENCHES (UNUSED TIMBERING) 0.0 - 3.0M 2573.58 2882.41 /SQM
DEEP.

3045 OPEN TIMBERING LEFT IN TRENCHES (UNUSED TIMBERING) 3.0 - 6.0M 3066.57 3434.55 /SQM
DEEP.

3046 OPEN TIMBERING LEFT IN TRENCHES (UNUSED TIMBERING) 6.0 - 9.0M 3638.12 4074.70 /SQM
DEEP.

3047 OPEN TIMBERING LEFT IN TRENCHES (USED TIMBERING) 0.0 - 3.0M DEEP. 1072.70 1201.42 /SQM

3048 OPEN TIMBERING LEFT IN TRENCHES (USED TIMBERING) 3.0 - 6.0M DEEP. 1291.82 1446.83 /SQM

3049 OPEN TIMBERING LEFT IN TRENCHES (USED TIMBERING) 6.0 - 9.0M DEEP. 1541.68 1726.68 /SQM

3050 SHEET PILING IN TRENCHES 0.0 - 3.0M DEEP (SCRAP VALUE OF SHEETS & 2745.52 3074.98 /SQM
ANGLES & SALVAGE VALUE OF TIMBER WILL BE DEDUCTED).

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 33 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Sewerage Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
3051 SHEET PILING IN TRENCHES 3.0 - 6.0M DEEP (SCRAP VALUE OF SHEETS & 3807.78 4264.72 /SQM
ANGLES & SALVAGE VALUE OF TIMBER WILL BE DEDUCTED).

3052 SHEET PILING IN TRENCHES 6.0 - 9.0M DEEP (SCRAP VALUE OF SHEETS & 4965.95 5561.86 /SQM
ANGLES & SALVAGE VALUE OF TIMBER WILL BE DEDUCTED).

3053 LAYING, JOINTING 100MM DIA. STONE WARE GLAZED PIPE 0.0 - 1.5M DEEP. 340.17 380.99 /RM

3054 LAYING, JOINTING 150MM DIA. STONE WARE GLAZED PIPE 0.0 - 1.5M DEEP. 437.56 490.06 /RM

3055 LAYING, JOINTING 200MM DIA. STONE WARE GLAZED PIPE 0.0 - 1.5M DEEP. 508.17 569.16 /RM

3056 LAYING, JOINTING 250MM DIA. STONE WARE GLAZED PIPE 0.0 - 1.5M DEEP. 608.76 681.81 /RM

3057 LAYING, JOINTING 300MM DIA. STONE WARE GLAZED PIPE 0.0 - 1.5M DEEP. 743.73 832.97 /RM

3058 LAYING, JOINTING 350MM DIA. STONE WARE GLAZED PIPE 0.0 - 1.5M DEEP. 833.98 934.06 /RM

3059 LAYING, JOINTING 400MM DIA. STONE WARE GLAZED PIPE 0.0 - 1.5M DEEP. 925.36 1036.40 /RM

3060 LAYING, JOINTING 200MM DIA. SEV PIPE 0.0 - 1.5M DEEP. 432.52 484.42 /RM

3061 LAYING, JOINTING 250MM DIA. SEV PIPE 0.0 - 1.5M DEEP. 511.40 572.77 /RM

3062 LAYING, JOINTING 300MM DIA. SEV PIPE 0.0 - 1.5M DEEP. 615.94 689.85 /RM

3063 LAYING, JOINTING OF STONE WARE OR SEV PIPE 1.5 - 3.0M DEEP (EXTRA 5.85%
OVER ITEMS 3053 TO 3062).

3064 LAYING, JOINTING OF STONE WARE OR SEV PIPE 3.0 - 4.5M DEEP (EXTRA 12.7%
OVER ITEMS 3053 TO 3062).

3065 LAYING, JOINTING OF STONE WARE OR SEV PIPE 4.5 - 6.0M DEEP (EXTRA 21.3%
OVER ITEMS 3053 TO 3062).

3066 LAYING, JOINTING OF STONE WARE OR SEV PIPE 6.0 - 7.5M DEEP (EXTRA 30.6%
OVER ITEMS 3053 TO 3062).

3067 LAYING, JOINTING OF STONE WARE OR SEV PIPE 7.5 - 9.0M DEEP (EXTRA 41.4%
OVER ITEMS 3053 TO 3062).

3068 LAYING, JOINTING 100MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 247.96 277.71 /RM

3069 LAYING, JOINTING 150MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 311.69 349.10 /RM

3070 LAYING, JOINTING 250MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 413.98 463.66 /RM

3071 LAYING, JOINTING 300MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 507.88 568.82 /RM

3072 LAYING, JOINTING 350MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 576.14 645.28 /RM

3073 LAYING, JOINTING 400MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 626.19 701.33 /RM

3074 LAYING, JOINTING 450MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 740.36 829.21 /RM

3075 LAYING, JOINTING 500MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 826.82 926.03 /RM

3076 LAYING, JOINTING 600MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 925.71 1036.80 /RM

3077 LAYING, JOINTING 700MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 1020.76 1143.25 /RM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 34 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Sewerage Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
3078 LAYING, JOINTING 800MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 1405.03 1573.63 /RM

3079 LAYING, JOINTING 900MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 1565.89 1753.80 /RM

3080 LAYING, JOINTING 1000MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 1751.89 1962.12 /RM

3081 LAYING, JOINTING 1100MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 2040.98 2285.89 /RM

3082 LAYING, JOINTING 1200MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 2317.74 2595.87 /RM

3083 LAYING, JOINTING 1400MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 2809.20 3146.31 /RM

3084 LAYING, JOINTING 1600MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 3488.20 3906.78 /RM

3085 LAYING, JOINTING 1800MM DIA. RCC NP2 HUME PIPE 0.0 - 1.5M DEEP. 4293.35 4808.56 /RM

3086 LAYING, JOINTING RCC NP2 HUME PIPE 1.5 - 3.0M DEEP (EXTRA OVER 6.45%
ITEMS 3068 TO 3085).

3087 LAYING, JOINTING RCC NP2 HUME PIPE 3.0 - 4.5M DEEP (EXTRA OVER 13.05%
ITEMS 3068 TO 3085).

3088 LAYING, JOINTING RCC NP2 HUME PIPE 4.5 - 6.0M DEEP (EXTRA OVER 20.75%
ITEMS 3068 TO 3085).

3089 LAYING, JOINTING RCC NP2 HUME PIPE 6.0 - 7.5M DEEP (EXTRA OVER 31.55%
ITEMS 3068 TO 3085).

3090 LAYING, JOINTING RCC NP2 HUME PIPE 7.5 - 9.0M DEEP (EXTRA OVER 46.15%
ITEMS 3068 TO 3085).

3091 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 100MM DIA. HUME PIPE. 130.04 145.64 /NO.

3092 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 150MM DIA. HUME PIPE. 191.34 214.30 /NO.

3093 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 250MM DIA. HUME PIPE. 294.48 329.82 /NO.

3094 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 300MM DIA. HUME PIPE. 428.69 480.13 /NO.

3095 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 350MM DIA. HUME PIPE. 484.56 542.71 /NO.

3096 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 400MM DIA. HUME PIPE. 546.50 612.07 /NO.

3097 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 450MM DIA. HUME PIPE. 587.38 657.86 /NO.

3098 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 500MM DIA. HUME PIPE. 777.34 870.62 /NO.

3099 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 600MM DIA. HUME PIPE. 920.87 1031.37 /NO.

3100 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 700MM DIA. HUME PIPE. 1049.07 1174.96 /NO.

3101 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 800MM DIA. HUME PIPE. 1595.37 1786.81 /NO.

3102 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 900MM DIA. HUME PIPE. 1994.50 2233.84 /NO.

3103 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 1000MM DIA. HUME 2431.56 2723.35 /NO.
PIPE.

3104 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 1100MM DIA. HUME 3189.14 3571.84 /NO.
PIPE.

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 35 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Sewerage Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
3105 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 1200MM DIA. HUME 3783.41 4237.42 /NO.
PIPE.

3106 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 1400MM DIA. HUME 4691.59 5254.58 /NO.
PIPE.

3107 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 1600MM DIA. HUME 5447.90 6101.65 /NO.
PIPE.

3108 PRECAST CEMENT CONCRETE (1:3:6) SADDLE FOR 1800MM DIA. HUME 6237.07 6985.52 /NO.
PIPE.

3109 DISMANTLING 100MM DIA. OLD S.W. PIPE SEWERS. 80.08 89.69 /RM

3110 DISMANTLING 150MM DIA. OLD S.W. PIPE SEWERS. 108.83 121.89 /RM

3111 DISMANTLING 200MM DIA. OLD S.W. PIPE SEWERS. 151.15 169.29 /RM

3112 DISMANTLING 250MM DIA. OLD S.W. PIPE SEWERS. 191.99 215.03 /RM

3113 DISMANTLING 300MM DIA. OLD S.W. PIPE SEWERS. 223.30 250.10 /RM

3114 DISMANTLING 400MM DIA. OLD S.W. PIPE SEWERS. 287.47 321.96 /RM

3115 DISMANTLING 100MM DIA. RCC NP2 HUME PIPE SEWERS. 89.83 100.60 /RM

3116 DISMANTLING 150MM DIA. RCC NP2 HUME PIPE SEWERS. 134.75 150.92 /RM

3117 DISMANTLING 250MM DIA. RCC NP2 HUME PIPE SEWERS. 224.58 251.52 /RM

3118 DISMANTLING 300MM DIA. RCC NP2 HUME PIPE SEWERS. 269.50 301.84 /RM

3119 DISMANTLING 400MM DIA. RCC NP2 HUME PIPE SEWERS. 419.59 469.94 /RM

3120 DISMANTLING 450MM DIA. RCC NP2 HUME PIPE SEWERS. 472.12 528.77 /RM

3121 DISMANTLING 500MM DIA. RCC NP2 HUME PIPE SEWERS. 524.65 587.61 /RM

3122 DISMANTLING 600MM DIA. RCC NP2 HUME PIPE SEWERS. 629.49 705.03 /RM

3123 DISMANTLING 700MM DIA. RCC NP2 HUME PIPE SEWERS. 944.24 1057.55 /RM

3124 DISMANTLING 800MM DIA. RCC NP2 HUME PIPE SEWERS. 1078.99 1208.46 /RM

3125 DISMANTLING 900MM DIA. RCC NP2 HUME PIPE SEWERS. 1214.14 1359.83 /RM

3126 DISMANTLING 1000MM DIA. RCC NP2 HUME PIPE SEWERS. 1287.51 1442.01 /RM

3127 DISMANTLING 1100MM DIA. RCC NP2 HUME PIPE SEWERS. 1416.36 1586.32 /RM

3128 DISMANTLING 1200MM DIA. RCC NP2 HUME PIPE SEWERS. 1545.21 1730.64 /RM

3129 FIXING IND. TYPE WHITE GLAZED EARTHENWARE CLOSET & FOOTRESTS. 1539.12 1723.81 /NO.

3130 FIXING EUR. TYPE WHITE GLAZED EARTHENWARE CLOSET & FOOTRESTS. 1347.50 1509.20 /NO.

3131 FIXING 15 LITRES C.I. FLUSHING CISTERN. 2853.13 3195.51 /NO.

3132 FIXING 10 LITRES C.I. FLUSHING CISTERN. 2633.13 2949.11 /NO.

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 36 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Sewerage Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
3133 FIXING 5 LITRES C.I. FLUSHING CISTERN. 2404.34 2692.86 /NO.

3134 FIXING LOW LEVEL FLUSHING CISTERN. 1716.00 1921.92 /NO.

3135 FIXING WHITE GLAZED EARTHENWARE URINALS & WASTE PIPE. 1214.30 1360.02 /NO.

3136 FIXING IND. URINAL SQUATTING OF WHITE GLAZED FIRECLAY. 3038.82 3403.48 /NO.

3137 FIXING 400X400 MM SIZE WASH BASIN OF WHITE GLAZED EARTHENWARE. 943.80 1057.06 /NO.

3138 FIXING 450X300 MM OR 550X400 MM SIZE WASH BASIN OF WHITE GLAZED 1136.79 1273.20 /NO.
EARTHENWARE.

3139 FIXING 600X480 MM OR 630X450 MM SIZE WASH BASIN OF WHITE GLAZED 1313.82 1471.48 /NO.
EARTHENWARE.

3140 FIXING 600X450X150 MM OR 600X400X200 MM OR 600X450X250 MM OR 1251.23 1401.38 /NO.


750X450X250 MM SIZE SINK.

3141 FIXING 400X250X150 MM OR 450X300X150 MM OR 500X350X150 MM SIZE 1015.28 1137.11 /NO.


SINK.

3142 FIXING TEAKWOOD. PLASTIC OR ANY OTHER TYPE OF SEAT IN 320.65 359.13 /NO.
EUROPEAN TYPE WATER CLOSET.

3143 MAKING 15 MM DIA. LEAD CONNECTION. 166.44 186.41 /NO.

3144 FIXING G.I. CHAIN WITH G.I. PLUG. /L.S.

3145 FIXING BRASS CHAIN AND RUBBER PLUG FOR SINK OR LAVATORY BASIN. /L.S.

3146 FIXING 750X450X40 MM THICK WOOD DRAINING BOARD WITH SKIRTING /L.S.
AND HEADING.

3147 FIXING 550X450 MM OR 450X300 MM SIZE BEVELLED ON PLAIN EDGE 702.66 786.98 /NO.
MIRROR.

3148 FIXING GLASS SHELF WITH SHELF WITH C.P. BRASS BRACKETS AND 379.27 424.78 /NO.
GUARD RAIL.

3149 FIXING 750X20 MM OR 600X20 MM OR 450X20 MM SIZE BRASS TOWEL RAIL. 282.29 316.16 /NO.

3150 FIXING C.P. BRASS WOODEN OR GLAZED OR VITROUS CHINA "TOILET 433.57 485.60 /NO.
PAPER HOLDER".

3151 FIXING 80 MM DIA. H.C.I. SOIL OR VENT PIPE AND SPECIALS. 730.17 817.79 /RM

3152 FIXING 100 MM DIA. H.C.I. SOIL OR VENT PIPE AND SPECIALS. 787.77 882.30 /RM

3153 FIXING 150 MM DIA. H.C.I. SOIL OR VENT PIPE AND SPECIALS. 944.19 1057.50 /RM

3154 MAKING LEAD JOINTS OF 80 MM DIA. H.C.I. PIPES AND SPECIALS. 318.91 357.18 /JNT

3155 MAKING LEAD JOINTS OF 100 MM DIA. H.C.I. PIPES AND SPECIALS. 412.34 461.82 /JNT

3156 MAKING LEAD JOINTS OF 150 MM DIA. H.C.I. PIPES AND SPECIALS. 611.14 684.47 /JNT

3157 FIXING 50 MM DIA. A.C. SOIL OR VENT PIPE WITH SPECIALS. 288.43 323.05 /RM

3158 FIXING 80 MM DIA. A.C. SOIL OR VENT PIPE WITH SPECIALS. 356.47 399.25 /RM

3159 FIXING 100 MM DIA. A.C. SOIL OR VENT PIPE WITH SPECIALS. 420.26 470.70 /RM

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 37 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Sewerage Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
3160 MAKING 1:1 CEMENT AND COARSE SAND JOINT OF 50MM DIA. A.C. SOIL 193.05 216.21 /JNT
OR VENT PIPE & SPECIALS.

3161 MAKING 1:1 CEMENT AND COARSE SAND JOINT OF 80MM DIA. A.C. SOIL 272.01 304.65 /JNT
OR VENT PIPE & SPECIALS.

3162 MAKING 1:1 CEMENT AND COARSE SAND JOINT OF 100MM DIA. A.C. SOIL 350.87 392.98 /JNT
OR VENT PIPE & SPECIALS.

3163 SINKING OF WELL 2.5M DIA. (EXTERNAL) IN ORDINARY SOIL 0.0 - 1.5M 11361.15 12724.49 /RM
DEEP.

3164 SINKING OF WELL 2.5M DIA. (EXTERNAL) IN ORDINARY SOIL 1.5 - 3.0M 15482.65 17340.57 /RM
DEEP.

3165 SINKING OF WELL 2.5M DIA. (EXTERNAL) IN ORDINARY SOIL 3.0 - 6.0M 21266.07 23818.00 /RM
DEEP.

3166 SINKING OF WELL 2.5M DIA. (EXTERNAL) IN ORDINARY SOIL 6.0 - 9.0M 29395.33 32922.77 /RM
DEEP.

3167 SINKING OF WELL 2.5M DIA. (EXTERNAL) IN ORDINARY SOIL 9.0 - 12.0M 35359.81 39602.99 /RM
DEEP.

3168 SINKING OF WELL 2.5M DIA. (EXTERNAL) IN ORDINARY SOIL 12.0 - 15.0M 39449.56 44183.51 /RM
DEEP.

3169 SAME AS ITEM 3163 TO 3168 BUT FOR OTHER DIAMETERS (THE RATES /RM
SHALL BE PROPORTIONAL TO THEIR AREAS).

3170 SAME AS ITEM 3163 TO 3169 BUT FOR SOFT CLAY (EXTRA OVER ITEMS 25%
3163 TO 3169).

3171 SAME AS ITEM 3163 TO 3169 BUT FOR HARD CLAY (EXTRA OVER ITEMS 50%
3163 TO 3169).

3172 SAME AS ITEM 3163 TO 3169 BUT FOR KANKAR, SHINGLES (EXTRA OVER 75%
ITEMS 3163 TO 3169).

3173 KERB & CHANNEL (K&C) DRAINS (ORDINARY) NO. I. 502.79 563.12 /RM

3174 KERB & CHANNEL (K&C) DRAINS (ORDINARY) NO. II. 580.07 649.67 /RM

3175 KERB & CHANNEL (K&C) DRAINS (ORDINARY) NO. III. 650.08 728.09 /RM

3176 KERB & CHANNEL (K&C) DRAINS (ORDINARY) NO. IV. 825.69 924.78 /RM

3177 100MM DIA. C.C. SEMI CIRCULAR DRAIN. 1120.45 1254.91 /RM

3178 150MM DIA. C.C. SEMI CIRCULAR DRAIN. 1218.38 1364.59 /RM

3179 250MM DIA. C.C. SEMI CIRCULAR DRAIN. 1543.92 1729.19 /RM

3180 300MM DIA. C.C. SEMI CIRCULAR DRAIN. 1702.98 1907.34 /RM

3181 400MM DIA. C.C. SEMI CIRCULAR DRAIN. 2000.92 2241.04 /RM

3182 450MM DIA. C.C. SEMI CIRCULAR DRAIN. 2365.36 2649.20 /RM

3183 DISMANTLING & MAKING CONNECTION OF 100MM OR 150MM DIA. DRAIN 468.17 524.34 /CONN
PIPE WITH C.C. 1:2:4.

3184 DISMANTLING & MAKING CONNECTION OF 200,250 & 300MM DIA. DRAIN 765.93 857.84 /CONN
PIPE WITH C.C. 1:2:4.

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 38 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Sewerage Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
3185 DISMANTLING & MAKING CONNECTION OF 350,400 & 450MM DIA. DRAIN 1170.31 1310.75 /CONN
PIPE WITH C.C. 1:2:4.

3186 FIXING R.C.C. SPUN VENTILATING COLUMN 9.0M LONG. 13205.47 14790.12 /NO.

3187 FIXING C.I. FOOTSTEPS IN THE WALLS. 257.56 288.47 /NO.

3188 FIXING 375X175X40MM (SECTION) R.C.C. FOOTSTEPS WITH 16MM DIA. BAR. 345.80 387.30 /NO.

3189 EXTRA OVER ITEMS OF CONCRETE, BRICK WORK, D.P.C., PLASTER, 3%


POINTING, FLOORING, DEMOLITION & DISMANTLING WORKS OF
SCHEDULE OF RATES FOR BUILDING, ROADS & W/S IF EXECUTED FROM
1.5 - 3.0M DEEP.

3190 EXTRA OVER ITEMS OF CONCRETE, BRICK WORK, D.P.C., PLASTER, 7%


POINTING, FLOORING, DEMOLITION & DISMANTLING WORKS OF
SCHEDULE OF RATES FOR BUILDING, ROADS & W/S IF EXECUTED FROM
3.0 - 4.5M DEEP.

3191 EXTRA OVER ITEMS OF CONCRETE, BRICK WORK, D.P.C., PLASTER, 12%
POINTING, FLOORING, DEMOLITION & DISMANTLING WORKS OF
SCHEDULE OF RATES FOR BUILDING, ROADS & W/S IF EXECUTED FROM
4.5 - 6.0M DEEP.

3192 EXTRA OVER ITEMS OF CONCRETE, BRICK WORK, D.P.C., PLASTER, 20%
POINTING, FLOORING, DEMOLITION & DISMANTLING WORKS OF
SCHEDULE OF RATES FOR BUILDING, ROADS & W/S IF EXECUTED FROM
6.0 - 7.5M DEEP.

3193 EXTRA OVER ITEMS OF CONCRETE, BRICK WORK, D.P.C., PLASTER, 30%
POINTING, FLOORING, DEMOLITION & DISMANTLING WORKS OF
SCHEDULE OF RATES FOR BUILDING, ROADS & W/S IF EXECUTED FROM
7.5 - 9.0M DEEP.

3194 LAYING, JOINTING 350MM DIA. R.C.C. NP3 HUME PIPE 0.0 - 1.5M DEEP. 918.87 1029.13 /RM

3195 LAYING, JOINTING 400MM DIA. R.C.C. NP3 HUME PIPE 0.0 - 1.5M DEEP. 1001.32 1121.48 /RM

3196 LAYING, JOINTING 450MM DIA. R.C.C. NP3 HUME PIPE 0.0 - 1.5M DEEP. 1253.10 1403.47 /RM

3197 LAYING, JOINTING 500MM DIA. R.C.C. NP3 HUME PIPE 0.0 - 1.5M DEEP. 1356.87 1519.69 /RM

3198 LAYING, JOINTING 600MM DIA. R.C.C. NP3 HUME PIPE 0.0 - 1.5M DEEP. 1461.62 1637.02 /RM

3199 LAYING, JOINTING 700MM DIA. R.C.C. NP3 HUME PIPE 0.0 - 1.5M DEEP. 1727.07 1934.32 /RM

3200 LAYING, JOINTING 800MM DIA. R.C.C. NP3 HUME PIPE 0.0 - 1.5M DEEP. 2225.58 2492.65 /RM

3201 LAYING, JOINTING 900MM DIA. R.C.C. NP3 HUME PIPE 0.0 - 1.5M DEEP. 2595.34 2906.79 /RM

3202 LAYING, JOINTING 1000MM DIA. R.C.C. NP3 HUME PIPE 0.0 - 1.5M DEEP. 3110.00 3483.20 /RM

3203 LAYING, JOINTING 1100MM DIA. R.C.C. NP3 HUME PIPE 0.0 - 1.5M DEEP. 3775.30 4228.33 /RM

3204 LAYING, JOINTING 1200MM DIA. R.C.C. NP3 HUME PIPE 0.0 - 1.5M DEEP. 4336.51 4856.89 /RM

3205 LAYING, JOINTING R.C.C. NP3 HUME PIPE 1.5 - 3.0M DEEP (EXTRA OVER 6.45%
ITEMS 3194 TO 3204).

3206 LAYING, JOINTING R.C.C. NP3 HUME PIPE 3.0 - 4.5M DEEP (EXTRA OVER 13.05%
ITEMS 3194 TO 3204).

3207 LAYING, JOINTING R.C.C. NP3 HUME PIPE 4.5 - 6.0M DEEP (EXTRA OVER 20.75%
ITEMS 3194 TO 3204).

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 39 of 40
Contractor's profit is given on cement and steel
Schedule of Rates (2019-20) for Sewerage Works Varanasi
as per Labour/Material Rates Sanctioned by SE, VII Circle, U P Jal Nigam, Varanasi Inflation: 0 %
vide order no. 1101/M-23/06 dtd 27-05-2019 for urban Area (DPR PREPARATION) Item Rate Item Rate
with with Contr's
Item Contractor's Profit and
Code Description Profit GST 12% Unit
3208 LAYING, JOINTING R.C.C. NP3 HUME PIPE 6.0 - 7.5M DEEP (EXTRA OVER 31.55%
ITEMS 3194 TO 3204).

3209 LAYING, JOINTING R.C.C. NP3 HUME PIPE 7.5 - 9.0M DEEP (EXTRA OVER 46.15%
ITEMS 3194 TO 3204).

25-Jul-19 116 Note: Item Rates are based on attached Labour/ Material Rate List. Page 40 of 40
Contractor's profit is given on cement and steel

You might also like