Professional Documents
Culture Documents
L&T Construction: 21.07.20 A Issued For Approval
L&T Construction: 21.07.20 A Issued For Approval
L&T Construction: 21.07.20 A Issued For Approval
authorised by us, nor be copied/made use of in full or part by such person or firm
L&T Construction
CLIENT : CONSULTANT :
# Sensitivity: Unclassified
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 1
INDEX
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 2
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 3
INTRODUCTION
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 4
A INTRODUCTION
Electrical Control room consists of sinlgle floor.The building is RC framed structure with brick cladding
of 230mm thick wall is generally all around the building. The structure is analysed as three dimensional model in
STAAD-Pro. All major components such as Columns,Beams , slabs have been designed separately and presented
in this document. The design is done as per Limit state method (IS 456-2000)
B DESIGN PARAMETERS
(i) Structure
F.G.Level = F.G.L at +225.850M
Roof = RC slab at Roof level EL(+)229.800 M T.O.C
wall clading = 230mm thick wall all around the building
(ii) Material
Grade of concrete = M25
Reinforcement = Fe 500
(iii) Loads
Load considered for the design of structure are summarized as given below
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 5
D Cover to main reinforcement
slabs : 20 mm
Columns : 40 mm
Beams : 25 mm
Grade Beam : 50 mm
Footing : 50 mm
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 6
GENERAL ARRANGEMENT
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 7
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 14-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 8
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 9
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 10
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 11
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 12
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 13
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 14
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 15
MASS MODEL
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 16
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 17
LOAD CALCULATIONS
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 18
DEAD LOAD CALCULATION
WALL LOAD
Thickness of full brickwall = 230 mm
Thickness of plaster for walls = 30 mm (18+12)
Unit weight of brick = 20 kN/m3
Unit weight of concrete = 25 kN/m3
Unit weight of plaster = 20.4 kN/m3
Unit weight of sand = 18 kN/m3
Unit weight of PCC = 24 kN/m3
(IIIa)WALL LOAD ON ROOF BEAMS ALONG GRID A-A, 1-1 and 3-3:
DEAD LOAD DUE TO PARAPET FULL BRICKWALL ( AT THE PERIPHERY OF THE BUILDING)
Parapet load
125 mm thick brick wall
0.125 m
H= 1m
0.45
0.25
Thickness of wall = 125 mm
Height of Parapet Wall = 1 m
Weight/meter run of wall [1x(125/1000)x20] = 2.5 kN/m
Weight/meter run of plaster [1x(30/1000)x20.4] = 0.612 kN/m
Weight due to projection of slab 0.45x(150/1000)x25 = 1.688 kN/m
TOTAL = 5 kN/m
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 19
Moment Roof Beam:
1.Due to slab Projection
Thickness of Slab = 0.15 mm
Self weight of Slab = 0.15 x 25 = 3.75 kN/m2
Total Load of Slab = 3.75 kN/m2
Parapet load
125 mm thick brick wall
0.125 m
H= 1m
0.8
0.25
0.15
0.45
0.35
0.25
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 20
(IVb)LOAD AND MOMENT ON PLINTH BEAM ALONG GRID 1-1 DUE TO FLOOR SLAB PROJECTION(1X1M) FOR LADDER ENTRY
0.15
0.45
1
0.25
0.125 m 0.075 m
0.25 m l= 0.6 m
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA
L&T Construction PRADESH WATER RESOURCE
DEPARTMENT
COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 21
( A ) Calculation of Wind load -
Extreme condition
Basic Wind speed as per IS 875 Part 3 = 47 m/sec
K1 = 1.07 (As per IS 875 Part 3 table-1)
For Class-A & Terrain Category-1,
K2 = 1.158 (33.02 m height) (Refer Table-2 of IS:875 (III)-1987)
K3 = 1.0 (Refer Cl:5.3.3.1 of IS 875(III)-1987)
From Table 4 of IS:875 (Part 3) the external coefficients (Cpe) are as follows:
Cpe for surface
q
A B C D
0 0.7 -0.3 -0.7 -0.7
90 -0.5 -0.5 0.7 -0.1
As per clause 6.2.3.2 of IS:875 (Part 3) the internal pressure coefficient (Cpi) for
Basic
(i) For plinth Wind
beams speed
From (+) as per IS
38.0m to 875
(+) Part 3=
41.5m(ROLLER 47
SHUTTER m/sec
-GRIDS A-6 TO A-7 &A-3 TO A-4)
K1 = 1.07 (As per IS 875 Part 3 table-1)
For Class-A & Terrain Category-1,
K2 = 1.158 (33.02 m height) (Refer Table-2 of IS:875 (III)-1987)
K3 = 1.0 (Refer Cl:5.3.3.1 of IS 875(III)-1987)
Vz = K1 x K2 x K3 x Vb = 58.23582
2
Pz = 0.6 x Vz
= 2.035 kN/m2 (From 30 - 50m height)
l = 10 m
C
w = 5 m
h = 5.45 m
l/w = 2.0 q A B w
h/w = 1.09
D
l
For the cladded portion -
Frombeams
(i) For lintel Table 4 at
of (+)
IS:875 (Part
41.5 3) the
to (+) external
44.00 coefficients
(ROLLER SHUTTER(C-GRIDS
pe) are A-6
as follows:
TO A-7 &A-3 TO A-4)
Cpe for surface
q
A B C D
0 0.7 -0.3 -0.7 -0.7
90 -0.5 -0.5 0.7 -0.1
0 0
D
0.4
-1 -1.00
D
-0.6
1.2 0.2
D
-0.2
0.2 -0.8
-1.2
-0.2
1 1
D
0.6
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT
0 0.00
D
-0.4
1.2
Net Cf along (-)X-dirn (On FACE-D) C
FOR θ=180, Cpi = -0.5
A B
-0.2 0.8
D
1.2
-1.2 -0.2
D
0.2
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 26
STAAD MODEL-ANALYSIS
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 27
Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
22 July 2020 15:19
PAGE NO. 28
****************************************************
* *
* STAAD.Pro CONNECT Edition *
* Version 22.03.00.24 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= JUL 22, 2020 *
* Time= 15:19:34 *
* *
* Licensed to: Larsen & Toubro Ltd. *
****************************************************
1. STAAD SPACE
INPUT FILE: C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.STD
2. START JOB INFORMATION
3. ENGINEER DATE 25JUN20
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT FEET KIP
7. JOINT COORDINATES
8. 1 0 1.47638 0; 2 16.8143 1.47638 0; 3 33.6286 1.47638 0
9. 4 0 1.47638 17.2244; 5 16.8143 1.47638 17.2244; 6 33.6286 1.47638 17.2244
10. 7 0 46.227 17.2244; 8 16.8143 46.227 17.2244; 9 33.6286 46.227 17.2244
11. 10 0 19.6588 0; 11 16.8143 19.6588 0; 12 33.6286 19.6588 0; 13 0 9.59646 0
12. 14 16.8143 9.59646 0; 15 33.6286 9.59646 0; 16 0 9.59646 17.2244
13. 17 16.8143 9.59646 17.2244; 18 33.6286 9.59646 17.2244; 19 0 13.1233 0
14. 20 16.8143 13.1233 0; 21 33.6286 13.1233 0; 22 0 13.1233 17.2244
15. 23 16.8143 13.1233 17.2244; 24 33.6286 13.1233 17.2244; 29 0 14.2225 0
16. 30 16.8143 14.2225 0; 31 33.6286 14.2225 0; 32 0 14.2225 17.2244
17. 33 16.8143 14.2225 17.2244; 34 33.6286 14.2225 17.2244
18. 45 0 30.2247 17.2244; 46 16.8143 30.2247 17.2244
19. 47 33.6286 30.2247 17.2244; 48 23.7861 1.47638 0
20. 49 23.7861 1.47638 17.2244; 50 23.7861 9.59646 0; 51 23.7861 9.59646 17.2244
21. 52 23.7861 1.47638 2.31299; 53 23.7861 9.59646 2.31299
22. 54 33.6286 1.47638 2.31299; 55 33.6286 9.59646 2.31299
23. 56 27.8871 9.59646 17.2244; 57 27.8871 1.47638 17.2244
24. 58 33.6286 1.47638 12.9101; 59 33.6286 9.59646 12.9101
25. 60 27.8871 9.59646 12.9101; 61 27.8871 1.47638 12.9101
26. 62 23.7861 1.47638 12.9101
27. MEMBER INCIDENCES
28. 1 1 2; 2 2 48; 3 4 5; 4 5 49; 9 13 14; 10 14 50; 11 16 17; 12 17 51; 13 19 20
29. 14 20 21; 15 22 23; 16 23 24; 17 10 29; 18 1 13; 19 13 19; 20 11 30; 21 2 14
30. 22 14 20; 23 12 31; 24 3 15; 25 15 21; 26 7 45; 27 4 16; 28 16 22; 29 8 46
31. 30 5 17; 31 17 23; 32 9 47; 33 6 18; 34 18 24; 35 1 4; 36 2 5; 37 3 54
32. 38 13 16; 40 15 55; 41 19 22; 42 20 23; 43 21 24; 50 29 1; 51 30 2; 52 31 3
33. 53 32 4; 54 33 5; 55 34 6; 56 29 30; 57 30 31; 58 32 33; 59 33 34; 60 29 32
34. 61 30 33; 62 31 34; 77 45 32; 78 46 33; 79 47 34; 80 45 46; 81 46 47; 82 48 3
35. 83 49 57; 84 50 15; 85 51 56; 86 48 62; 87 50 51; 88 54 58; 89 55 59; 90 54 52
36. 91 55 53; 92 56 18; 93 57 6; 94 58 6; 95 59 18; 96 58 61; 97 61 57; 98 59 60
37. 99 60 56; 100 61 60; 101 62 49; 102 61 62
38. DEFINE PMEMBER
C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.anl Page 1 of 11
22 July 2020 15:19
39. 35 PMEMBER 1
40. UNIT METER KN
41. DEFINE MATERIAL START
42. ISOTROPIC CONCRETE
43. E 2.17185E+07
44. POISSON 0.17
45. DENSITY 23.5616
46. ALPHA 1E05
47. DAMP 0.05
48. TYPE CONCRETE
49. STRENGTH FCU 27579
50. END DEFINE MATERIAL
51. MEMBER PROPERTY AMERICAN
52. 13 TO 16 41 TO 43 90 96 97 102 PRIS YD 0.45 ZD 0.25
53. 9 TO 12 38 40 56 TO 62 80 81 84 85 87 89 91 92 95 PRIS YD 0.3 ZD 0.25
54. MEMBER PROPERTY AMERICAN
55. 17 TO 25 50 TO 52 PRIS YD 0.6 ZD 0.3
56. MEMBER PROPERTY AMERICAN
57. 26 TO 34 53 TO 55 77 TO 79 PRIS YD 0.6 ZD 0.3
58. MEMBER PROPERTY AMERICAN
59. 100 PRIS YD 0.115 ZD 0.115
60. 98 99 PRIS YD 0.115 ZD 0.115
61. MEMBER PROPERTY AMERICAN
62. 1 TO 4 35 TO 37 82 83 86 88 93 94 101 PRIS YD 0.6 ZD 0.25
63. CONSTANTS
64. BETA 90 MEMB 17 TO 34 50 TO 55 77 TO 79
65. MATERIAL CONCRETE ALL
66. UNIT FEET KIP
67. SUPPORTS
68. 7 TO 12 FIXED
69. UNIT METER KN
70. MEMBER RELEASE
71. 86 87 90 91 96 98 TO 100 START MZ
72. 87 90 91 97 TO 99 101 102 END MZ
73. DEFINE 1893 LOAD
74. ZONE 0.16 RF 5 I 3 SS 1 ST 1 DM 0.05
75. SELFWEIGHT 1
76. JOINT WEIGHT
77. 1 WEIGHT 121.181
78. 2 WEIGHT 143.776
79. 3 WEIGHT 9.253
80. 4 WEIGHT 117.463
81. 5 WEIGHT 143.155
82. 6 WEIGHT 10.658
83. 7 WEIGHT 0
84. 8 WEIGHT 0
85. 9 WEIGHT 0
86. 10 WEIGHT 0
87. 11 WEIGHT 0
88. 12 WEIGHT 0
89. 13 WEIGHT 27.021
90. 14 WEIGHT 18.233
91. 15 WEIGHT 4.779
92. 16 WEIGHT 27.012
93. 17 WEIGHT 19.11
94. 18 WEIGHT 6.925
C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.anl Page 2 of 11
22 July 2020 15:19
PAGE NO. 30
STAADSPACE
95. 19 WEIGHT 78.214
96. 20 WEIGHT 142.525
97. 21 WEIGHT 78.357
98. 22 WEIGHT 74.782
99. 23 WEIGHT 134.797
100. 24 WEIGHT 74.903
101. 29 WEIGHT 0.037
102. 30 WEIGHT 0.281
103. 31 WEIGHT 0.131
104. 32 WEIGHT 0.25
105. 33 WEIGHT 0.301
106. 34 WEIGHT 0.163
107. 45 WEIGHT 0.04
108. 46 WEIGHT 0.072
109. 47 WEIGHT 0.032
110. 48 WEIGHT 79.004
111. 49 WEIGHT 23.517
112. 50 WEIGHT 21.944
113. 51 WEIGHT 18.199
114. 52 WEIGHT 23.46
115. 53 WEIGHT 5.475
116. 54 WEIGHT 127.393
117. 55 WEIGHT 21.435
118. 56 WEIGHT 6.685
119. 57 WEIGHT 54.052
120. 58 WEIGHT 96.789
121. 59 WEIGHT 16.07
122. 60 WEIGHT 3.126
123. 61 WEIGHT 66.18
124. 62 WEIGHT 147.023
125. DEFINE WIND LOAD
*** NOTE: If any floor diaphragm is present in the model Wind Load definition
should be defined after Floor Diaphragm definition. Otherwise wind
load generation may be unsuccessful during analysis.
C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.anl Page 3 of 11
22 July 2020 15:19
PAGE NO.31
STAADSPACE
140. 13 14 UMOM GX 4.3
141. 41 UMOM GZ 2.2
142. 43 UMOM GZ 2.2
143. FLOOR LOAD
144. YRANGE 4 4 FLOAD 6.83 GY
**NOTE** about Floor/OneWay Loads/Weights.
Please note that depending on the shape of the floor you may
have to break up the FLOOR/ONEWAY LOAD into multiple commands.
For details please refer to Technical Reference Manual
Section 5.32.4.2 Note d and/or "5.32.4.3 Note f.
C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.anl Page 4 of 11
22 July 2020 15:19
PAGE NO.32
STAADSPACE
171. WIND LOAD X 0.4 TYPE 1 XR 1 1 YR 0.45 4
172. LOAD 4 LOADTYPE WIND TITLE WIND LOAD Z(+VE CP)
173. WIND LOAD Z 1 TYPE 1 YR 0.45 4 ZR 0 1
174. WIND LOAD Z 1 TYPE 1 YR 0.45 4 ZR 5 6
175. WIND LOAD X 0.2 TYPE 1 XR 10 11 YR 0.45 4
176. WIND LOAD X 0.6 TYPE 1 XR 0 1 YR 0.45 4
177. LOAD 5 LOADTYPE WIND TITLE WIND LOAD Z(VE CP)
178. WIND LOAD Z 1 TYPE 1 YR 0.45 4 ZR 0 1
179. WIND LOAD Z 1 TYPE 1 YR 0.45 4 ZR 5 6
180. WIND LOAD X 0.2 TYPE 1 XR 10 11 YR 0.45 4
181. WIND LOAD X 0.6 TYPE 1 XR 0 1 YR 0.45 4
182. LOAD 6 LOADTYPE WIND TITLE WIND LOAD Z(+VE CP)
183. WIND LOAD Z 0 TYPE 1 YR 0.45 4 ZR 0 1
184. WIND LOAD Z 0 TYPE 1 YR 0.45 4 ZR 5 6
185. WIND LOAD X 1.2 TYPE 1 XR 10 11 YR 0.45 4
186. WIND LOAD X 0.4 TYPE 1 XR 0 1 YR 0.45 4
C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.anl Page 5 of 11
22 July 2020 15:19
PAGENO. 33
STAADSPACE
187. LOAD 7 LOADTYPE WIND TITLE WIND LOAD X(VE CP)
188. WIND LOAD Z 1.2 TYPE 1 YR 0.45 4 ZR 0 1
189. WIND LOAD Z 0.2 TYPE 1 YR 0.45 4 ZR 5 6
190. WIND LOAD X 0.2 TYPE 1 XR 10 11 YR 0.45 4
191. WIND LOAD X 0.2 TYPE 1 XR 0 1 YR 0.45 4
192. LOAD 8 LOADTYPE WIND TITLE WIND LOAD X(+VE CP)
193. WIND LOAD Z 0.2 TYPE 1 YR 0.45 4 ZR 0 1
194. WIND LOAD Z 0.8 TYPE 1 YR 0.45 4 ZR 5 6
195. WIND LOAD X 1.2 TYPE 1 XR 10 11 YR 0.45 4
196. WIND LOAD X 1.2 TYPE 1 XR 0 1 YR 0.45 4
197. LOAD 9 LOADTYPE WIND TITLE WIND LOAD X(VE CP)
198. WIND LOAD Z 0.2 TYPE 1 YR 0.45 4 ZR 0 1
199. WIND LOAD Z 0.8 TYPE 1 YR 0.45 4 ZR 5 6
200. WIND LOAD X 1.2 TYPE 1 XR 10 11 YR 0.45 4
201. WIND LOAD X 1.2 TYPE 1 XR 0 1 YR 0.45 4
202. LOAD 10 LOADTYPE WIND TITLE WIND LOAD X(+VE CP)
203. WIND LOAD Z 1.2 TYPE 1 YR 0.45 4 ZR 0 1
C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.anl Page 6 of 11
22 July 2020 15:19
PAGENO.34
STAADSPACE
204. WIND LOAD Z 0.2 TYPE 1 YR 0.45 4 ZR 5 6
205. WIND LOAD X 0.2 TYPE 1 XR 10 11 YR 0.45 4
206. WIND LOAD X 0.2 TYPE 1 XR 0 1 YR 0.45 4
207. **IS 456:2000 LIMIT STATE OF SERVICEABILITY
208. LOAD COMB 1000 DL+LL
209. 1 1.0 2 1.0
210. LOAD COMB 1001 DL+WL +Z(VE CP)
211. 1 1.0
212. LOAD COMB 1002 DL+WL +Z(+VE CP)
213. 1 1.0
214. LOAD COMB 1003 DL+WL Z(VE CP)
215. 1 1.0
216. LOAD COMB 1004 DL+WL Z(+VE CP)
217. 1 1.0
218. LOAD COMB 1005 DL+WL +X(VE CP)
219. 1 1.0
220. LOAD COMB 1006 DL+WL +X(+VE CP)
221. 1 1.0
222. LOAD COMB 1007 DL+WL X(VE CP)
223. 1 1.0
224. LOAD COMB 1008 DL+WL X(+VE CP)
225. 1 1.0
226. LOAD COMB 1009 1 DL + 1 EL +X
227. 1 1.0 11 1.0
228. LOAD COMB 1010 1 DL + 1 EL X
229. 1 1.0 11 1.0
230. LOAD COMB 1011 1 DL + 1 EL +Z
231. 1 1.0 12 1.0
232. LOAD COMB 1012 1 DL + 1 EL Z
233. 1 1.0 12 1.0
234. LOAD COMB 1013 DL+0.8LL+0.8 WL +Z(VE CP)
235. 1 1.0 2 0.8
236. LOAD COMB 1014 DL+0.8LL+0.8 WL +Z(+VE CP)
237. 1 1.0 2 0.8
238. LOAD COMB 1015 DL+0.8LL+0.8 WL Z(VE CP)
239. 1 1.0 2 0.8
240. LOAD COMB 1016 DL+0.8LL+0.8 WL Z(+VE CP)
241. 1 1.0 2 0.8
242. LOAD COMB 1017 DL+0.8LL+0.8 WL +X(VE CP)
243. 1 1.0 2 0.8
244. LOAD COMB 1018 DL+0.8LL+0.8 WL +X(+VE CP)
245. 1 1.0 2 0.8
246. LOAD COMB 1019 DL+0.8LL+0.8 WL X(VE CP)
247. 1 1.0 2 0.8
C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.anl Page 7 of 11
22 July 2020 15:19
PAGENO. 35
STAADSPACE
248. LOAD COMB 1020 DL+0.8LL+0.8 WL X(+VE CP)
249. 1 1.0 2 0.8
250. LOAD COMB 1021 1 DL + 0.8 LL + 0.8 EL +X
251. 1 1.0 2 0.8 11 0.8
252. LOAD COMB 1022 1 DL + 0.8 LL + 0.8 EL X
253. 1 1.0 2 0.8 11 0.8
254. LOAD COMB 1023 1 DL + 0.8 LL + 0.8 EL +Z
255. 1 1.0 2 0.8 12 0.8
256. LOAD COMB 1024 1 DL + 0.8 LL + 0.8 EL Z
257. 1 1.0 2 0.8 12 0.8
258. ***************************************
259. **LIMIT STATE OF COLLAPSE
260. LOAD COMB 2000 1.5DL+1.5LL
261. 1 1.5 2 1.5
262. LOAD COMB 2001 1.5DL+1.5WL +Z(VE CP)
263. 1 1.5
264. LOAD COMB 2002 1.5DL+1.5WL +Z(+VE CP)
265. 1 1.5
266. LOAD COMB 2003 1.5DL+1.5WL Z(VE CP)
267. 1 1.5
268. LOAD COMB 2004 1.5DL+1.5WL Z(+VE CP)
269. 1 1.5
270. LOAD COMB 2005 1.5DL+1.5WL +X(VE CP)
271. 1 1.5
272. LOAD COMB 2006 1.5DL+1.5WL +X(+VE CP)
273. 1 1.5
274. LOAD COMB 2007 1.5DL+1.5WL X(VE CP)
275. 1 1.5
276. LOAD COMB 2008 1.5DL+1.5WL X(+VE CP)
277. 1 1.5
278. LOAD COMB 2009 1.5 DL + 1.5 EL +X
279. 1 1.5 11 1.5
280. LOAD COMB 2010 1.5 DL + 1.5 EL X
281. 1 1.5 11 1.5
282. LOAD COMB 2011 1.5 DL + 1.5 EL +Z
283. 1 1.5 12 1.5
284. LOAD COMB 2012 1.5 DL + 1.5 EL Z
285. 1 1.5 12 1.5
286. LOAD COMB 2013 1.2DL+1.2LL+1.2 WL +Z(VE CP)
287. 1 1.2 2 1.2
288. LOAD COMB 2014 1.2DL+1.2LL+1.2 WL +Z(+VE CP)
289. 1 1.2 2 1.2
290. LOAD COMB 2015 1.2DL+1.2LL+1.2 WL Z(VE CP)
291. 1 1.2 2 1.2
292. LOAD COMB 2016 1.2DL+1.2LL+1.2 WL Z(+VE CP)
293. 1 1.2 2 1.2
294. LOAD COMB 2017 1.2DL+1.2LL+1.2 WL +X(VE CP)
295. 1 1.2 2 1.2
296. LOAD COMB 2018 1.2DL+1.2LL+1.2 WL +X(+VE CP)
297. 1 1.2 2 1.2
298. LOAD COMB 2019 1.2DL+1.2LL+1.2 WL X(VE CP)
299. 1 1.2 2 1.2
300. LOAD COMB 2020 1.2DL+1.2LL+1.2 WL X(+VE CP)
301. 1 1.2 2 1.2
302. LOAD COMB 2021 1.2 DL + 1.2 LL + 1.2 EL +X
303. 1 1.2 2 1.2 11 1.2
C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.anl Page 8 of 11
22 July 2020 15:19
PAGENO. 36
STAADSPACE
304. LOAD COMB 2022 1.2 DL + 1.2 LL + 1.2 EL X
305. 1 1.2 2 1.2 11 1.2
306. LOAD COMB 2023 1.2 DL + 1.2 LL + 1.2 EL +Z
307. 1 1.2 2 1.2 12 1.2
308. LOAD COMB 2024 1.2 DL + 1.2 LL + 1.2 EL Z
309. 1 1.2 2 1.2 12 1.2
310. LOAD COMB 2025 0.9DL+1.5WL +Z(VE CP)
311. 1 0.9
312. LOAD COMB 2026 0.9DL+1.5WL +Z(+VE CP)
313. 1 0.9
314. LOAD COMB 2027 0.9DL+1.5WL Z(VE CP)
315. 1 0.9
316. LOAD COMB 2028 0.9DL+1.5WL Z(+VE CP)
317. 1 0.9
318. LOAD COMB 2029 0.9DL+1.5WL +X(VE CP)
319. 1 0.9
320. LOAD COMB 2030 0.9DL+1.5WL +X(+VE CP)
321. 1 0.9
322. LOAD COMB 2031 0.9DL+1.5WL X(VE CP)
323. 1 0.9
324. LOAD COMB 2032 0.9DL+1.5WL X(+VE CP)
325. 1 0.9
326. LOAD COMB 2033 0.9 DL + 1.5 EL +X
327. 1 0.9 11 1.5
328. LOAD COMB 2034 0.9 DL + 1.5 EL X
329. 1 0.9 11 1.5
330. LOAD COMB 2035 0.9 DL + 1.5 EL +Z
331. 1 0.9 12 1.5
332. LOAD COMB 2036 0.9 DL + 1.5 EL Z
333. 1 0.9 12 1.5
334. PERFORM ANALYSIS
P R O B L E M S T A T I S T I C S
C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.anl Page 9 of 11
22 July 2020 15:19
PAGENO. 37
STAADSPACE
**WARNING: IF THIS UBC/IBC ANALYSIS HAS TENSION/COMPRESSION
OR REPEAT LOAD OR REANALYSIS OR SELECT OPTIMIZE, THEN EACH
UBC/IBC CASE SHOULD BE FOLLOWED BY PERFORM ANALYSIS & CHANGE.
*********************************************************
* UNITS KN METE *
* TIME PERIOD FOR X 1893 LOADING = 0.65787 SEC *
* SA/G PER 1893= 1.520, LOAD FACTOR= 1.000 *
* VB PER 1893= 0.0730 X 2716.78= 198.22 KN *
* *
*********************************************************
*********************************************************
* UNITS KN METE *
* TIME PERIOD FOR Z 1893 LOADING = 0.65787 SEC *
* SA/G PER 1893= 1.520, LOAD FACTOR= 1.000 *
* VB PER 1893= 0.0730 X 2716.78= 198.22 KN *
* *
*********************************************************
335. FINISH
C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.anl Page 10 of 11
22 July 2020 15:19
************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://www.bentley.com/en/support/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help>Technical Support *
* *
* Copyright (c) 19972017 Bentley Systems, Inc. *
* http://www.bentley.com *
************************************************************
C:\Users\SWAMYG~1\Desktop\CR2\2107~1\UPDATI~1\CR2.STD.STDUpdating.anl Page 11 of 11
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT
DESIGN OF COLUMNS
For Design of column, the columns are being grouped into two groups.
Columns marked
From these groups, the columns are designed for Maximum Axial Force, Maximum My and
COLUMN DESIGN-C1
Column-1 Forces
COLUMN DESIGN-MAX P
Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 300 mm
(ii) 16 times the smallest dia of the longitudinal bar = 320 mm
(iii) 300 mm = 300 mm
COLUMN DESIGN-MAX MY
Longer Direction
Minimum eccentricity ez = 27.77 mm
Moment due to min. eccentricity Mz = 18.46 kN-m
Moment in longer direction M uz = 18.462024 kNm
Shorter direction
Minimum eccentricity ey = 17.77 mm
Moment due to min. eccentricity My = 11.81 kN-m
Moment in shorter direction M uy = 110.591 kNm
Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 300 mm
(ii) 16 times the smallest dia of the longitudinal bar = 320 mm
(iii) 300 mm = 300 mm
COLUMN DESIGN-MAX MZ
Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 300 mm
(ii) 16 times the smallest dia of the longitudinal bar = 320 mm
(iii) 300 mm = 300 mm
COLUMN DESIGN-C2
Column-2 Forces
COLUMN DESIGN-MAX P
COLUMN DESIGN-MAX MY
Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 300 mm
(ii) 16 times the smallest dia of the longitudinal bar = 400 mm
(iii) 300 mm = 300 mm
COLUMN DESIGN-MAX MZ
Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 300 mm
(ii) 16 times the smallest dia of the longitudinal bar = 400 mm
(iii) 300 mm = 300 mm
COLUMN DESIGN-MAX P
COLUMN DESIGN-MAX MY
Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 115 mm
(ii) 16 times the smallest dia of the longitudinal bar = 192 mm
(iii) 300 mm = 300 mm
COLUMN DESIGN-MAX MZ
Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 115 mm
(ii) 16 times the smallest dia of the longitudinal bar = 192 mm
(iii) 300 mm = 300 mm
DESIGN OF BEAMS
DESIGN OF BEAMS
PLINTH BEAM
By Date25-Jun-20 Chd
-138.46
Print Time/Date: 21/07/2020 17:51 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
79
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
248.107
172.172
Print Time/Date: 21/07/2020 17:33 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 80
PLINTH BEAM: Plinth Beam has been designed for Maximum forces of PB1 and PB-2
FACTORED FORCE
Max. span Moment ,Mu Span = 214 kN-m. B.No: 4 L/C : 2000
Max. Support Moment ,Mu Supp = 268 kN-m. B.No: 2 L/C : 2010
Max. Torsion,Tu = 5.62 kN-m. B.No: 82 L/C : 2010
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 5.62 x (1+ 600/250 )
1.70
= 11.24 kN-m.
Total Moment Me = = 268.158 + 11.24
= 279.40 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 279.40 kN-m.
b = 250 mm
D = 600 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 72.5 mm 1st layer= = 25 mm
Eff Depth,d = 527.5 mm Spacer bar = 25 mm
2nd layer = 16 mm
Mu/bd2 = 279.40 x 106
250 x 527.5^2
= 4.02 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 1.224 %
Ast reqd. = 1614.150 mm2
Provide 3 - 25 Y + 0 - 0 Y
2 - 16 Y + 0 - 0 Y
Ast provided. = 1874.750 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x527.5)/500
= 224.188 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 214 kN-m.
b = 250 mm
By Date25-Jun-20 Chd
295.96 135.35
Print Time/Date: 21/07/2020 17:46 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
83
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
241.591 212.373
Print Time/Date: 21/07/2020 17:49 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 84
PLINTH BEAM: Plinth Beam has been designed for Maximum forces of PB-5 and PB7
FACTORED FORCE
Max. span Moment ,Mu Span = 144 kN-m. B.No: 36 L/C : 2036
Max. Support Moment ,Mu Supp = 225 kN-m. B.No: 37 L/C : 2012
Max. Torsion,Tu = 6.45 kN-m. B.No: 88 L/C : 2009
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 6.45 x (1+ 600/250 )
1.70
= 12.89 kN-m.
Total Moment Me = = 225.117 + 12.89
= 238.01 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 238.01 kN-m.
b = 250 mm
D = 600 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 72.5 mm 1st layer= = 25 mm
Eff Depth,d = 527.5 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 238.01 x 106
250 x 527.5^2
= 3.42 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.977 %
Ast reqd. = 1288.419 mm2
Provide 3 - 25 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 1472.630 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x527.5)/500
= 224.188 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 144 kN-m.
b = 250 mm
By Date25-Jun-20 Chd
2.673
-227.37
-279.860
Print Time/Date: 21/07/2020 18:15 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
87
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
-141.814 -202.435
Print Time/Date: 22/07/2020 18:35 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 88
PLINTH BEAM: Plinth Beam has been designed for Maximum forces of PB-6
FACTORED FORCE
Max. span Moment ,Mu Span = 280 kN-m. B.No: 86 L/C : 2000
Max. Support Moment ,Mu Supp = 1 kN-m. B.No: 86 L/C : 2000
Max. Torsion,Tu = 2.1 kN-m. B.No: 86 L/C : 2009
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 2.10 x (1+ 600/250 )
1.70
= 4.19 kN-m.
Total Moment Me = = 1 + 4.19
= 5.19 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 5.19 kN-m.
b = 250 mm
D = 600 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 66 mm 1st layer= = 12 mm
Eff Depth,d = 534 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 5.19 x 106
250 x 534^2
= 0.07 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.17 %
Ast reqd. = 226.950 mm2
Provide 3 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 339.300 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x534)/500
= 226.95 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 280 kN-m.
b = 250 mm
By Date25-Jun-20 Chd
1.500
-0.00
-30.865
Print Time/Date: 21/07/2020 18:23 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
91
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
80.260
-9.841
Print Time/Date: 21/07/2020 18:24 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 92
PLINTH BEAM: Plinth Beam has been designed for Maximum forces of PB-3 and PB-4
FACTORED FORCE
Max. span Moment ,Mu Span = 73.4 kN-m. B.No: 96 L/C : 2000
Max. Support Moment ,Mu Supp = 1 kN-m. B.No: 90 L/C : 2000
Max. Torsion,Tu = 15 kN-m. B.No: 96 L/C : 2000
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 14.96 x (1+ 450/250 )
1.70
= 24.64 kN-m.
Total Moment Me = = 1 + 24.64
= 25.64 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 25.64 kN-m.
b = 250 mm
D = 450 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 66 mm 1st layer= = 12 mm
Eff Depth,d = 384 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 25.64 x 106
250 x 384^2
= 0.70 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.17 %
Ast reqd. = 163.200 mm2
Provide 3 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 339.300 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x384)/500
= 163.2 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 73 kN-m.
b = 250 mm
By Date25-Jun-20 Chd
0.314
-0.00
-9.91 -10.657
Print Time/Date: 21/07/2020 18:32 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
95
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
11.922
Print Time/Date: 21/07/2020 18:35 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 96
PLINTH BEAM: Plinth Beam has been designed for Maximum forces of PB-8
FACTORED FORCE
Max. span Moment ,Mu Span = 18.2 kN-m. B.No: 97 L/C : 2009
Max. Support Moment ,Mu Supp = 1 kN-m. B.No: 97 L/C : 2036
Max. Torsion,Tu = 9.26 kN-m. B.No: 97 L/C : 2022
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 9.26 x (1+ 450/250 )
1.70
= 15.26 kN-m.
Total Moment Me = = 1 + 15.26
= 16.26 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 16.26 kN-m.
b = 250 mm
D = 450 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 66 mm 1st layer= = 12 mm
Eff Depth,d = 384 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 16.26 x 106
250 x 384^2
= 0.44 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.17 %
Ast reqd. = 163.200 mm2
Provide 3 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 339.300 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x384)/500
= 163.2 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 18 kN-m.
b = 250 mm
DESIGN OF BEAMS
TIE BEAM-1 AND 2
100
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
77.16
-62.23
Print Time/Date: 21/07/2020 19:16 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
101
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
34.187
20.602
Print Time/Date: 21/07/2020 19:16 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 102
TIE BEAM-1: Tie Beam-1 has been designed for Maximum forces of TB-1
Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 66.245 kN-m. B.No: 56 L/C : 2033
Max. Support Moment ,Mu Supp = 72.088 kN-m. B.No: 57 L/C : 2009
Max. Torsion,Tu = 1.644 kN-m. B.No: 57 L/C : 2009
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 1.64 x (1+ 300/250 )
1.70
= 2.13 kN-m.
Total Moment Me = = 72.088 + 2.13
= 74.22 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 74.22 kN-m.
b = 250 mm
D = 300 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 mm 1st layer= = 20 mm
Eff Depth,d = 255 mm Spacer bar = 25 mm
2nd layer = 0 mm
2
Mu/bd = 74.22 x 106
250 x 255^2
2
= 4.57 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Support Pt reqd. = 1.502 %
Ast reqd. = 957.525 mm2
Provide 3 - 25 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 1472.630 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x255)/500
= 108.375 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 66 kN-m.
b = 250 mm
104
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
-22.54
Print Time/Date: 21/07/2020 21:02 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
105
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
18.097
4.181
Print Time/Date: 21/07/2020 21:29 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 106
TIE BEAM-1: Tie Beam-2 has been designed for Maximum forces of TB-2
Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 23.904 kN-m. B.No: 61 L/C : 2036
Max. Support Moment ,Mu Supp = 30.634 kN-m. B.No: 61 L/C : 2012
Max. Torsion,Tu = 2.28 kN-m. B.No: 62 L/C : 2010
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 2.28 x (1+ 300/250 )
1.70
= 2.95 kN-m.
Total Moment Me = = 30.634 + 2.95
= 33.58 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 33.58 kN-m.
b = 250 mm
D = 300 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 mm 1st layer= = 20 mm
Eff Depth,d = 255 mm Spacer bar = 25 mm
2nd layer = 0 mm
2
Mu/bd = 33.58 x 106
250 x 255^2
2
= 2.07 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Support Pt reqd. = 0.533 %
Ast reqd. = 339.788 mm2
Provide 3 - 16 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 603.190 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x255)/500
= 108.375 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 24 kN-m.
b = 250 mm
DESIGN OF BEAMS
TIE BEAM-3
110
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
47.39
-33.15
Print Time/Date: 21/07/2020 19:12 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
111
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
22.717
9.132
Print Time/Date: 21/07/2020 19:14 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 112
TIE BEAM-2: Tie Beam-3 has been designed for Maximum forces of TB-3
Breadth of the beam = 250 mm
Depth of the beam = 300 mm
Concrete Grade = 25 N/mm
2
Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 38.998 kN-m. B.No: 81 L/C : 2034
Max. Support Moment ,Mu Supp = 44.044 kN-m. B.No: 80 L/C : 2010
Max. Torsion,Tu = 1 kN-m. B.No: 81 L/C : 2010
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 1.00 x (1+ 300/250 )
1.70
= 1.29 kN-m.
Total Moment Me = = 44.044 + 1.29
= 45.33 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 45.33 kN-m.
b = 250 mm
D = 300 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 43 mm 1st layer= = 16 mm
Eff Depth,d = 257 mm Spacer bar = 25 mm
2nd layer = 0 mm
2
Mu/bd = 45.33 x 106
250 x 257^2
2
= 2.75 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Support Pt reqd. = 0.742 %
Ast reqd. = 476.735 mm2
Provide 3 - 16 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 603.190 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x257)/500
= 109.225 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 39 kN-m.
b = 250 mm
DESIGN OF BEAM
LINTEL BEAM
DESIGN OF BEAM
LINTEL BEAM
116
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
-19.40
Print Time/Date: 21/07/2020 19:44 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
117
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
49.666
27.617
Print Time/Date: 21/07/2020 19:46 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 118
LINTEL BEAMS: Lintel Beam has been designed for Maximum forces of LB-2 and LB-5 and same has
been adopted for Lintel Beams LB-1, LB-2, LB-4, LB-6 and LB-7)
Breadth of the beam = 250 mm
Depth of the beam = 300 mm
Concrete Grade = 25 N/mm
2
Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 28.38 kN-m. B.No: 84 L/C : 2009
Max. Support Moment ,Mu Supp = 55.384 kN-m. B.No: 10 L/C : 2010
Max. Torsion,Tu = 3.704 kN-m. B.No: 40 L/C : 2010
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 3.70 x (1+ 300/250 )
1.70
= 4.79 kN-m.
Total Moment Me = = 55.384 + 4.79
= 60.17 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 60.17 kN-m.
b = 250 mm
D = 300 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 mm 1st layer= = 20 mm
Eff Depth,d = 255 mm Spacer bar = 25 mm
2nd layer = 0 mm
2
Mu/bd = 60.17 x 106
250 x 255^2
2
= 3.70 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Support Pt reqd. = 1.087 %
Ast reqd. = 692.963 mm2
Provide 3 - 20 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 942.480 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x255)/500
= 108.375 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 28 kN-m.
b = 250 mm
120
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
0.875
-0.00
-1.350
Print Time/Date: 21/07/2020 19:51 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
121
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
3.086
-3.086
Print Time/Date: 22/07/2020 17:54 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 122
LINTEL BEAMS: Lintel Beam has been designed for Maximum forces of LB-3 and same has been
adopted for Lintel Beam LB-8
Breadth of the beam = 115 mm
Depth of the beam = 115 mm
Concrete Grade = 25 N/mm
2
Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 1.35 kN-m. B.No: 98 L/C : 2000
Max. Support Moment ,Mu Supp = 1 kN-m. B.No: 98 L/C : 2000
Max. Torsion,Tu = 1 kN-m. B.No: 98 L/C : 2011
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 1.00 x (1+ 115/115 )
1.70
= 1.18 kN-m.
Total Moment Me = = 1 + 1.18
= 2.18 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 2.18 kN-m.
b = 115 mm
D = 115 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 41 mm 1st layer= = 12 mm
Eff Depth,d = 74 mm Spacer bar = 25 mm
2nd layer = 0 mm
2
Mu/bd = 2.18 x 106
115 x 74^2
2
= 3.46 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Support Pt reqd. = 0.992 %
Ast reqd. = 84.419 mm2
Provide 2 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 226.200 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x115x74)/500
= 14.467 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 1.4 kN-m.
b = 115 mm
DESIGN OF BEAMS
ROOF BEAM
126
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
14.24
2.113
-47.291
Print Time/Date: 21/07/2020 21:32 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
127
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
83.646
-50.974
Print Time/Date: 21/07/2020 21:34 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 128
ROOF BEAMS: Roof Beam has been designed for Maximum forces of RB-6 and same has been
adopted for remaing Lintel Beams(RB-1,RB-2,RB-3,RB-4, RB-5, and RB-7)
Breadth of the beam = 250 mm
Depth of the beam = 450 mm
Concrete Grade = 25 N/mm2
Steel Grade = 500 N/mm2
Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 48.557 kN-m. B.No: 13 L/C : 2000
Max. Support Moment ,Mu Supp = 87.907 kN-m. B.No: 13 L/C : 2009
Max. Torsion,Tu = 18.097 kN-m. B.No: 13 L/C : 2011
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 18.10 x (1+ 450/250 )
1.70
= 29.81 kN-m.
Total Moment Me = = 87.907 + 29.81
= 117.72 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 117.72 kN-m.
b = 250 mm
D = 450 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 mm 1st layer= = 20 mm
Eff Depth,d = 405 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 117.72 x 106
250 x 405^2
= 2.87 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.782 %
Ast reqd. = 791.775 mm2
Provide 3 - 20 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 942.480 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x405)/500
= 172.125 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 49 kN-m.
b = 250 mm
130
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
3.099 13.51
-63.646
Print Time/Date: 21/07/2020 21:39 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
131
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref
By Date25-Jun-20 Chd
106.034
-55.949
Print Time/Date: 21/07/2020 21:39 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 132
ROOF BEAMS: Roof Beam has been designed for Maximum forces of RB-6 and same has been
adopted for remaing Lintel Beams(RB-1,RB-2,RB-3,RB-4, RB-5, and RB-7)
Breadth of the beam = 250 mm
Depth of the beam = 450 mm
Concrete Grade = 25 N/mm2
Steel Grade = 500 N/mm2
Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 73.385 kN-m. B.No: 42 L/C : 2000
Max. Support Moment ,Mu Supp = 113.45 kN-m. B.No: 42 L/C : 2012
Max. Torsion,Tu = 9.488 kN-m. B.No: 43 L/C : 2010
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 9.49 x (1+ 450/250 )
1.70
= 15.63 kN-m.
Total Moment Me = = 113.449 + 15.63
= 129.08 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 129.08 kN-m.
b = 250 mm
D = 450 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 mm 1st layer= = 20 mm
Eff Depth,d = 405 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 129.08 x 106
250 x 405^2
= 3.15 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.879 %
Ast reqd. = 889.988 mm2
Provide 3 - 20 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 942.480 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x405)/500
= 172.125 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 73 kN-m.
b = 250 mm
SLAB DESIGN
Considering moment co-efficient from IS456-2000 Table-26 for two adjacent edges discontinues
discontinous
Case 7 in table 26
SHORT SPAN
(-)ve moment coefficient αx = 0.0584
(+) ve moment co efficient αx = 0.044
LONG SPAN
(-)ve moment coefficient αy = 0.0584
(+) ve moment co efficient αy = 0.044
long span
(+)ve span moment αyx wxxlx2
0.044X13.245x5.125x5.125 = 15.31 kN-m
(-)ve span moment αyx wxxlx2
0.0584X13.245x5.125x5.125 = 20.32 kN-m
Ast Required :
Mu = 0.87 fy Ast d [1-(Ast fy/b d fck)]
= 0.87x500xAstx106[1-(Astx500/1000x106x40)]
8.7Ast2- 54.375x103 Ast + moment = 0
solving the prabolic equation
short span moment(kN-m) Ast req dia Spacing mm Ast prov pt provided
(-)ve span moment 20.32 399.2 12 175 646.19 0.52
(+)ve span moment 15.31 295.48 12 175 646.19 0.52
long span
(-)ve span moment 20.32 399.13 12 175 646.19 0.52
(+)ve span moment 15.31 295.48 12 175 646.19 0.52
Considering moment co-efficient from IS456-2000 Table-26 for one long edge discontinuous
ge continues
Case 7 in table 26
SHORT SPAN
(-)ve moment coefficient αx = 0.0584
(+) ve moment co efficient αx = 0.044
LONG SPAN
(-)ve moment coefficient αy = 0.0584
(+) ve moment co efficient αy = 0.044
long span
(+)ve span moment αyx wxxlx2
0.044X13.125x5.125x5.125 = 15.17 kN-m
(-)ve span moment αyx wxxlx2
0.0584X13.125x5.125x5.125 = 20.13 kN-m
Ast Required :
Mu = 0.87 fy Ast d [1-(Ast fy/b d fck)]
= 0.87x500xAstx106[1-(Astx500/1000x106x40)]
2 3
8.7Ast - 54.375x10 Ast + moment = 0
solving the prabolic equation
short span moment(kN-m) Ast req dia Spacing mm Ast prov pt provided
(-)ve span moment 20.14 395.41 12 175 646.19 0.52
(+)ve span moment 15.17 292.67 12 175 646.19 0.52
125
75
250
600 mm
Dead load of sunshade = (0.125+0.075) /2 x 25
= 2.5 kN/m2
Considering the sunshade as an accessible roof
Live load = 1.5 kN/m2 + 0.5 kN/m2 (Dust load)
2
= 2 kN/m
2
Total load = 4.5 kN/m
DRAWINGS