L&T Construction: 21.07.20 A Issued For Approval

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 144

This document is the property of L&T Construction and must not be passed on to any third person or firm not

authorised by us, nor be copied/made use of in full or part by such person or firm

21.07.20 A Issued for Approval GS ASKP PLT


DATE REV. NO. DESCRIPTION Designed Checked Approved
REVISIONS

L&T Construction

CLIENT : CONSULTANT :

WATER RESOURCE DEPARTMENT,


without our prior permission writing

GOVERNMENT OF MADHYA PRADESH


TAVANINFRATECH LLP

PROJECT : COMPOSITE GRAVITY DAM-RUNJ MEDIUM PROJECT,


DISTRICT PANNA,MP
SUPPLIER / CONTRACTOR: L&T Construction
JOB No. G-O18006

TOTAL NO. OF PAGES TITLE :


NAME SIGN DATE
DSGN GS 18.07.20
CHKD ASKP 20.07.20
DESIGN CALCULATIONS OF CONTROL ROOM-2
APPD PLT 21.07.20
CODE REV.
DOC G- O 1 8 0 0 6 - C S - I R - D A - D C - 2 2 5 6
IS A
NO.

RELEASED FOR PRELIMINARY TENDER INFORMATION P APPROVAL CONSTRUCTION

# Sensitivity: Unclassified
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 1
INDEX

SL.NO CONTENTS PG.NO

1 DESIGN OF CONTROL ROOM-2 2


2 INTRODUCTION 3
3 GENERAL ARRANGEMENT 6
4 MASS MODEL 15
5 LOAD CALCULATIONS 17
6 STAAD MODEL ANALYSIS 26
7 DESIGN OF COLUMNS 39
(i) DESIGN OF COLUMN-C1 41
(ii) DESIGN OF COLUMN-C2 53
(iii) DESIGN OF STUB COLUMN 64
8 DESIGN OF BEAMS 75
(i) DESIGN OF PLINTH BEAMS 76
(ii) DESIGN OF TIE BEAM-1 AND 2 98
(iii) DESIGN OF TIE BEAM-3 108
(iv) DESIGN OF LINTEL BEAM 114
(v) DESIGN OF ROOF BEAM 124
9 DESIGN OF SLAB 134
(I)DESIGN OF ROOF SLAB 135
(II)DESIGN OF FLOOR SLAB 138
10 DESIGN OF SUNSHADE SLAB 141
11 DRAWINGS 143
NUM & R.C DETAILS OF COLUMN AND STUB COLUMN
12 144
(G-O18006-CS-IR-DA-NR-2034 SHEET 1 OF 1)
NUM & R.C DETAILS OF PLINTH BEAM
13 145
(G-O18006-CS-IR-DA-NR-2035 SHEET 1 OF 2)
R.C DETAILS OF FLOOR SLAB
14 146
(G-O18006-CS-IR-DA-NR-2035 SHEET 2 OF 2)
NUM & R.C DETAILS OF LINTEL BEAM
15 147
(G-O18006-CS-IR-DA-NR-2036 SHEET 1 OF 2)
NUM & R.C DETAILS OF ROOF SLAB
16 148
(G-O18006-CS-IR-DA-NR-2036 SHEET 2 OF 2)
NUM & R.C DETAILS OF TIE BEAM
17 149
(G-O18006-CS-IR-DA-NR-2037 SHEET 1 OF 1)
LAYOUT AND NUMERATION DETAILS
18 150
(G-O18006-CS-IR-DA-NR-2038 SHEET 1 OF 2)
LAYOUT AND NUMERATION DETAILS
19 151
(G-O18006-CS-IR-DA-NR-2038 SHEET 2 OF 2)
CONTROL ROOM-2 ARCHITECTURAL GA PLAN & ELEVATION
20 152
(G-O18006-CS-IR-DA-AR-2039 SHEET 1 OF 2)

CONTROL ROOM-2 ARCHITECTURAL GA PLAN & ELEVATION


21 153
(G-O18006-CS-IR-DA-AR-2039 SHEET 2 OF 2)

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 2

DESIGN OF CONTROL ROOM-2

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 3

INTRODUCTION

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 4
A INTRODUCTION

Electrical Control room consists of sinlgle floor.The building is RC framed structure with brick cladding
of 230mm thick wall is generally all around the building. The structure is analysed as three dimensional model in
STAAD-Pro. All major components such as Columns,Beams , slabs have been designed separately and presented
in this document. The design is done as per Limit state method (IS 456-2000)
B DESIGN PARAMETERS

(i) Structure
F.G.Level = F.G.L at +225.850M
Roof = RC slab at Roof level EL(+)229.800 M T.O.C
wall clading = 230mm thick wall all around the building

(ii) Material
Grade of concrete = M25
Reinforcement = Fe 500

(iii) Loads
Load considered for the design of structure are summarized as given below

(a) Dead Loads ( As Per IS 875 Part 1 )


Unit Weight are taken as below
3
Brick wall = 20 kN/m
3
Concrete = 25 kN/m
3
Sand = 18 kN/m
3
P.C.C = 24 kN/m
2
Roof water treatment = 3.08 kN/m

(b) Live Loads ( As Per Tender document & IS 875 part 2 )


2
Live load on roof slab = 2.00 kN/m
( Accessible roof)

(c) Wind Loads ( As Per Tender document & IS 875 part 3 )


Wind spead = 47.00 m/sec

(d) Seismic loads ( As Per Tender document)


Structure is designed for seismic forces adopting Zone -III
in accordance with IS1893(part-1)-2002
Importance Factor as per Table-2 of IS: 1893 (Part 4), I = 3
Response Reduction Factor as per Table-3 of IS: 1893 (Part 4), R = 5.0
Damping factor = 5%
Zone Factor = 0.16
C Analysis and Design Methodology.
This structure is analyzed using STAAD Pro.Loads are considered as per IS 875 part I, II & III , IS 1893
and Tender document. Selfweight of the Frame members are calculated using self weight command in the staad.
The slab loads are applied using floor load command.Wall loads are applied as uniform member load on
respective beams. The support condition of the structure is taken as fixed

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 5
D Cover to main reinforcement

slabs : 20 mm
Columns : 40 mm
Beams : 25 mm
Grade Beam : 50 mm
Footing : 50 mm

E REFERENCE DRAWINGS AND DOCUMENTS


(i) : Bidding Document Vol 3, Technical Specifications
(ii): G-O18006-EL-IR-DA-DD-3004: Electrical Equipment & Cable routing layout for Control Room-2(Sheet 1 of 2)
(iii): G-O18006-EL-IR-DA-DD-3004: Electrical Equipment & Cable routing layout for Control Room-2(Sheet 2 of 2)

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 6

GENERAL ARRANGEMENT

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 7

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 14-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 8

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 9

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 10

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 11

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 12

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 13

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 14

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 15

MASS MODEL

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 16

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 17

LOAD CALCULATIONS

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 18
DEAD LOAD CALCULATION

WALL LOAD
Thickness of full brickwall = 230 mm
Thickness of plaster for walls = 30 mm (18+12)
Unit weight of brick = 20 kN/m3
Unit weight of concrete = 25 kN/m3
Unit weight of plaster = 20.4 kN/m3
Unit weight of sand = 18 kN/m3
Unit weight of PCC = 24 kN/m3

DEAD LOAD DUE TO FULL BRICKWALL


(Ia) For plinth beams at EL(+)225.800 M (Lintel beam above at EL(+)228.350M)-Full Brick Load
Thickness of wall = 230 mm
Height of wall from top of beam to bottom of lintel beam = 3 m
Weight/meter run of wall [3x(230/1000)x20] = 13.8 kN/m
Weight/meter run of plaster [3x(30/1000)x20.4] = 1.84 kN/m
TOTAL = 15.64 kN/m
(Ib) For plinth beams at EL(+)225.800 M (Lintel beam above at EL(+)228.350M)-Half Brick Load
Thickness of wall = 115 mm
Height of wall from top of beam to bottom of lintel beam = 3 m
Weight/meter run of wall [3x(115/1000)x20] = 6.9 kN/m
Weight/meter run of plaster [3x(30/1000)x20.4] = 1.84 kN/m
TOTAL = 8.74 kN/m
(IIa)Lintel beam above at EL(+)228.350M-Full Brick Load
Thickness of wall = 230 mm
Height of wall from top of lintel to bottom of roof/floor beam = 0.7 m
Weight/meter run of wall [0.7x(230/1000)x20] = 3.22 kN/m
Weight/meter run of plaster [0.7x(30/1000)x20.4] = 0.43 kN/m
TOTAL = 3.65 kN/m
(IIb)Lintel beam above at EL(+)228.350M-Half Brick Load
Thickness of wall = 115 mm
Height of wall from top of lintel to bottom of roof/floor beam = 0.7 m
Weight/meter run of wall [0.7x(115/1000)x20] = 1.61 kN/m
Weight/meter run of plaster [0.7x(30/1000)x20.4] = 0.43 kN/m
TOTAL = 2.04 kN/m

(IIIa)WALL LOAD ON ROOF BEAMS ALONG GRID A-A, 1-1 and 3-3:
DEAD LOAD DUE TO PARAPET FULL BRICKWALL ( AT THE PERIPHERY OF THE BUILDING)

Parapet load
125 mm thick brick wall
0.125 m
H= 1m

0.45

0.25
Thickness of wall = 125 mm
Height of Parapet Wall = 1 m
Weight/meter run of wall [1x(125/1000)x20] = 2.5 kN/m
Weight/meter run of plaster [1x(30/1000)x20.4] = 0.612 kN/m
Weight due to projection of slab 0.45x(150/1000)x25 = 1.688 kN/m
TOTAL = 5 kN/m

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 19
Moment Roof Beam:
1.Due to slab Projection
Thickness of Slab = 0.15 mm
Self weight of Slab = 0.15 x 25 = 3.75 kN/m2
Total Load of Slab = 3.75 kN/m2

Moment on Roof Beam (3.75 x (0.45+0.25/2)^2] / 2 = 0.62 kN m/m


2.Due to Parapet
Weight of Parapet Wall = 2.5+0.612
= 3.11 kN/m
Then Moment due to Parapet wall on Roof Beam = 3.112x((0.45-0.125)+(0.25/2)+((0.125/(2)))
= 1.59
Then total Moment on Roof Beam = 2.2 kN m/m

(IIIb)WALL LOAD ON ROOF BEAMS ALONG GRID B-B:


DEAD LOAD DUE TO PARAPET FULL BRICKWALL ( AT THE PERIPHERY OF THE BUILDING)

Parapet load
125 mm thick brick wall
0.125 m
H= 1m

0.8

0.25

Thickness of wall = 125 mm


Height of Parapet Wall = 1 m
Weight/meter run of wall [1x(125/1000)x20] = 2.5 kN/m
Weight/meter run of plaster [1x(30/1000)x20.4] = 0.612 kN/m
Weight due to projection of slab 0.8x(150/1000)x25 = 3 kN/m
TOTAL = 6.11 kN/m
Moment Roof Beam:
1.Due to slab Projection
Thickness of Slab = 0.15 mm
Self weight of Slab = 0.15 x 25.00 = 3.75 kN/m2
Total Load of Slab = 3.75 kN/m2

Moment on Roof Beam (3.75 x (0.8+0.25/2)^2] / 2 = 1.6 kN m/m


2.Due to Parapet
Weight of Parapet Wall = 2.5+0.612
= 3.11 kN/m
Then Moment due to Parapet wall on Roof Beam = 3.112x((0.8-0.125)+(0.25/2)+((0.125/(2)))
= 2.68
Then total Moment on Roof Beam = 4.3 kN m/m
(IVa)LOAD AND MOMENT ON PLINTH BEAM ALONG GRID B-B DUE TO FLOOR SLAB PROJECTION FROM PLINTH BEAM TO DAM

0.15
0.45
0.35
0.25

Weight due to projection of slab 0.35x(0.15)x25 = 1.3125 kN/m


Moment on Plinth Beam (3.75 x (0.35+0.25/2)^2] / 2 = 0.4 kN m/m

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 20
(IVb)LOAD AND MOMENT ON PLINTH BEAM ALONG GRID 1-1 DUE TO FLOOR SLAB PROJECTION(1X1M) FOR LADDER ENTRY

0.15
0.45
1
0.25

Weight due to projection of slab 1x(0.15)x25 = 3.75 kN/m


Moment on Plinth Beam (3.75 x (1+0.25/2)^2] / 2 = 2.4 kN m/m
(V)SLAB LOAD CALCULATION

Grade of concrete = M25


Grade of steel = Fe500
Characteristic strength of concrete = 25 N/mm2
Characteristic strength of steel = 500 N/mm2

(V(i))ROOF SLAB(EL(+) 229.8M(T.O.C.))


(a)DEAD LOAD
Thickness of slab = 150 mm
Self weight of slab [0.15x25] = 3.75 kN/m2
Load due to weathering course = 3.08 kN/m2
TOTAL = 6.83 kN/m2
(b)Live Load
Live load on roof slab [1.5+0.50] = 2 kN/m2
(As per IS 875-part2)

(V(ii))FLOOR SLAB(EL(+) 225.35M(T.O.C.))


(a)DEAD LOAD
Thickness of slab = 150 mm
Self weight of slab [0.15x25] = 3.75 kN/m2
Weight of Sand fill [0.4 x 18] = 7 kN/m2
Weight of PCC [0.1 x 24] = 2
Total Dead Load on Office Room,Toilet and Verandah = 13.35 kN/m2
TOTAL Dead Load On LT panel & Control room = 3.75 kN/m2

(b)Live Load(As per IS 875-part2)


Live load on floor slab = 5 kN/m2

(VI)DEAD LOAD DUE TO SUNSHADE SLAB

0.125 m 0.075 m
0.25 m l= 0.6 m

Length of Sunshade slab = 0.6 m


Thickness of RCC wall = (0.075+0.125)/2
= 0.1 m
Self weight of Slab = 0.1 x 25 = 2.5 kN/m2
Total Load On Sunshade Slab = 2.5 kN/m2

Load on Lintel Beam (2.5 x 0.6) = 1.5 kN/m

Moment on Lintel Beam (2.5 x (0.6+0.25/2)^2] / 2 = 0.7 kN m/m

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA
L&T Construction PRADESH WATER RESOURCE
DEPARTMENT
COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 21
( A ) Calculation of Wind load -

Extreme condition
Basic Wind speed as per IS 875 Part 3 = 47 m/sec
K1 = 1.07 (As per IS 875 Part 3 table-1)
For Class-A & Terrain Category-1,
K2 = 1.158 (33.02 m height) (Refer Table-2 of IS:875 (III)-1987)
K3 = 1.0 (Refer Cl:5.3.3.1 of IS 875(III)-1987)
From Table 4 of IS:875 (Part 3) the external coefficients (Cpe) are as follows:
Cpe for surface
q
A B C D
0 0.7 -0.3 -0.7 -0.7
90 -0.5 -0.5 0.7 -0.1
As per clause 6.2.3.2 of IS:875 (Part 3) the internal pressure coefficient (Cpi) for
Basic
(i) For plinth Wind
beams speed
From (+) as per IS
38.0m to 875
(+) Part 3=
41.5m(ROLLER 47
SHUTTER m/sec
-GRIDS A-6 TO A-7 &A-3 TO A-4)
K1 = 1.07 (As per IS 875 Part 3 table-1)
For Class-A & Terrain Category-1,
K2 = 1.158 (33.02 m height) (Refer Table-2 of IS:875 (III)-1987)
K3 = 1.0 (Refer Cl:5.3.3.1 of IS 875(III)-1987)
Vz = K1 x K2 x K3 x Vb = 58.23582
2
Pz = 0.6 x Vz
= 2.035 kN/m2 (From 30 - 50m height)

l = 10 m
C
w = 5 m
h = 5.45 m
l/w = 2.0 q A B w
h/w = 1.09

D
l
For the cladded portion -
Frombeams
(i) For lintel Table 4 at
of (+)
IS:875 (Part
41.5 3) the
to (+) external
44.00 coefficients
(ROLLER SHUTTER(C-GRIDS
pe) are A-6
as follows:
TO A-7 &A-3 TO A-4)
Cpe for surface
q
A B C D
0 0.7 -0.3 -0.7 -0.7
90 -0.5 -0.5 0.7 -0.1

# Sensitivity: Unclassified Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA
L&T Construction PRADESH WATER RESOURCE
DEPARTMENT
COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 22
As per clause 6.2.3.2 of IS:875 (Part 3) the internal pressure coefficient (Cpi) for
openings between 5 to 20% = +0.5 or -0.5
The net wind pressure coefficient, Cf = Cpe - Cpi for different cases are
tabulated below:

STAAD Cf for surface


q Cpi
AXIS A B C D
-0.5 1.2 0.2 -0.2 -0.2
(+)X AXIS 0
0.5 0.2 -0.8 -1.2 -1.2
-0.5 0 0 1.2 0.4
(+) Z AXIS 90
0.5 -1 -1 0.2 -0.6
-0.5 -0.2 0.8 1.2 1.2
(-) X AXIS 180
0.5 -1.2 -0.2 0.2 0.2
-0.5 1 1 -0.2 0.6
(-) Z AXIS 270
0.5 0 0 -1.2 -0.4

# Sensitivity: Unclassified Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 23

WL - NET CF FOR CLAD 1.2

Net Cf along Z-dirn (On FACE-A) C


FOR θ=90, Cpi = -0.5
A B

0 0

D
0.4

Net Cf along Z-dirn (On FACE-A) 0.2


C
FOR θ=90, Cpi = +0.5
A B

-1 -1.00

D
-0.6

Net Cf along (+) X dirn (On FACE-C) -0.2


C
FOR θ=0, Cpi = -0.5
A B

1.2 0.2

D
-0.2

Net Cf along (+) X-dirn (On FACE-C) -1.2

FOR θ=0, Cpi = +0.5

0.2 -0.8

-1.2

-0.2

Net Cf along (-)Z-dirn (On FACE-B) C


FOR θ=270, Cpi = -0.5
A 1

1 1

D
0.6

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 24
Net Cf along (-)Z dirn (On FACE-B) -1.2
C
FOR θ=270, Cpi = +0.5
A B

0 0.00

D
-0.4

1.2
Net Cf along (-)X-dirn (On FACE-D) C
FOR θ=180, Cpi = -0.5
A B

-0.2 0.8

D
1.2

Net Cf along (-)X dirn (On FACE-D) 0.2


C
FOR θ=180, Cpi = +0.5
A B

-1.2 -0.2

D
0.2

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 25
Joint Nodal Forces due to Seismic Loads
Node Weight Fy kN
1 Weight 121.181
2 Weight 143.776
3 Weight -9.253
4 Weight 117.463
5 Weight 143.155
6 Weight 10.658
7 Weight 0
8 Weight 0
9 Weight 0
10 Weight 0
11 Weight 0
12 Weight 0
13 Weight 27.021
14 Weight 18.233
15 Weight 4.779
16 Weight 27.012
17 Weight 19.11
18 Weight 6.925
19 Weight 78.214
20 Weight 142.525
21 Weight 78.357
22 Weight 74.782
23 Weight 134.797
24 Weight 74.903
29 Weight 0.037
30 Weight -0.281
31 Weight 0.131
32 Weight 0.25
33 Weight -0.301
34 Weight 0.163
45 Weight -0.04
46 Weight 0.072
47 Weight -0.032
48 Weight 79.004
49 Weight -23.517
50 Weight 21.944
51 Weight 18.199
52 Weight 23.46
53 Weight 5.475
54 Weight 127.393
55 Weight 21.435
56 Weight 6.685
57 Weight 54.052
58 Weight 96.789
59 Weight 16.07
60 Weight 3.126
61 Weight 66.18
62 Weight 147.023

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 26

STAAD MODEL-ANALYSIS

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 27

Sensitivity: Unclassified
#
Consultant:- Tavan Infratech LLP
22 July 2020 15:19

PAGE NO. 28

****************************************************
* *
* STAAD.Pro CONNECT Edition *
* Version 22.03.00.24 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= JUL 22, 2020 *
* Time= 15:19:34 *
* *
* Licensed to: Larsen & Toubro Ltd. *
****************************************************

1. STAAD SPACE
INPUT FILE: C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.STD
2. START JOB INFORMATION
3. ENGINEER DATE 25­JUN­20
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT FEET KIP
7. JOINT COORDINATES
8. 1 0 ­1.47638 0; 2 16.8143 ­1.47638 0; 3 33.6286 ­1.47638 0
9. 4 0 ­1.47638 17.2244; 5 16.8143 ­1.47638 17.2244; 6 33.6286 ­1.47638 17.2244
10. 7 0 ­46.227 17.2244; 8 16.8143 ­46.227 17.2244; 9 33.6286 ­46.227 17.2244
11. 10 0 ­19.6588 0; 11 16.8143 ­19.6588 0; 12 33.6286 ­19.6588 0; 13 0 9.59646 0
12. 14 16.8143 9.59646 0; 15 33.6286 9.59646 0; 16 0 9.59646 17.2244
13. 17 16.8143 9.59646 17.2244; 18 33.6286 9.59646 17.2244; 19 0 13.1233 0
14. 20 16.8143 13.1233 0; 21 33.6286 13.1233 0; 22 0 13.1233 17.2244
15. 23 16.8143 13.1233 17.2244; 24 33.6286 13.1233 17.2244; 29 0 ­14.2225 0
16. 30 16.8143 ­14.2225 0; 31 33.6286 ­14.2225 0; 32 0 ­14.2225 17.2244
17. 33 16.8143 ­14.2225 17.2244; 34 33.6286 ­14.2225 17.2244
18. 45 0 ­30.2247 17.2244; 46 16.8143 ­30.2247 17.2244
19. 47 33.6286 ­30.2247 17.2244; 48 23.7861 ­1.47638 0
20. 49 23.7861 ­1.47638 17.2244; 50 23.7861 9.59646 0; 51 23.7861 9.59646 17.2244
21. 52 23.7861 ­1.47638 2.31299; 53 23.7861 9.59646 2.31299
22. 54 33.6286 ­1.47638 2.31299; 55 33.6286 9.59646 2.31299
23. 56 27.8871 9.59646 17.2244; 57 27.8871 ­1.47638 17.2244
24. 58 33.6286 ­1.47638 12.9101; 59 33.6286 9.59646 12.9101
25. 60 27.8871 9.59646 12.9101; 61 27.8871 ­1.47638 12.9101
26. 62 23.7861 ­1.47638 12.9101
27. MEMBER INCIDENCES
28. 1 1 2; 2 2 48; 3 4 5; 4 5 49; 9 13 14; 10 14 50; 11 16 17; 12 17 51; 13 19 20
29. 14 20 21; 15 22 23; 16 23 24; 17 10 29; 18 1 13; 19 13 19; 20 11 30; 21 2 14
30. 22 14 20; 23 12 31; 24 3 15; 25 15 21; 26 7 45; 27 4 16; 28 16 22; 29 8 46
31. 30 5 17; 31 17 23; 32 9 47; 33 6 18; 34 18 24; 35 1 4; 36 2 5; 37 3 54
32. 38 13 16; 40 15 55; 41 19 22; 42 20 23; 43 21 24; 50 29 1; 51 30 2; 52 31 3
33. 53 32 4; 54 33 5; 55 34 6; 56 29 30; 57 30 31; 58 32 33; 59 33 34; 60 29 32
34. 61 30 33; 62 31 34; 77 45 32; 78 46 33; 79 47 34; 80 45 46; 81 46 47; 82 48 3
35. 83 49 57; 84 50 15; 85 51 56; 86 48 62; 87 50 51; 88 54 58; 89 55 59; 90 54 52
36. 91 55 53; 92 56 18; 93 57 6; 94 58 6; 95 59 18; 96 58 61; 97 61 57; 98 59 60
37. 99 60 56; 100 61 60; 101 62 49; 102 61 62
38. DEFINE PMEMBER

C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.anl Page 1 of 11
22 July 2020 15:19

STAADSPACE PAGE NO. 29

39. 35 PMEMBER 1
40. UNIT METER KN
41. DEFINE MATERIAL START
42. ISOTROPIC CONCRETE
43. E 2.17185E+07
44. POISSON 0.17
45. DENSITY 23.5616
46. ALPHA 1E­05
47. DAMP 0.05
48. TYPE CONCRETE
49. STRENGTH FCU 27579
50. END DEFINE MATERIAL
51. MEMBER PROPERTY AMERICAN
52. 13 TO 16 41 TO 43 90 96 97 102 PRIS YD 0.45 ZD 0.25
53. 9 TO 12 38 40 56 TO 62 80 81 84 85 87 89 91 92 95 PRIS YD 0.3 ZD 0.25
54. MEMBER PROPERTY AMERICAN
55. 17 TO 25 50 TO 52 PRIS YD 0.6 ZD 0.3
56. MEMBER PROPERTY AMERICAN
57. 26 TO 34 53 TO 55 77 TO 79 PRIS YD 0.6 ZD 0.3
58. MEMBER PROPERTY AMERICAN
59. 100 PRIS YD 0.115 ZD 0.115
60. 98 99 PRIS YD 0.115 ZD 0.115
61. MEMBER PROPERTY AMERICAN
62. 1 TO 4 35 TO 37 82 83 86 88 93 94 101 PRIS YD 0.6 ZD 0.25
63. CONSTANTS
64. BETA 90 MEMB 17 TO 34 50 TO 55 77 TO 79
65. MATERIAL CONCRETE ALL
66. UNIT FEET KIP
67. SUPPORTS
68. 7 TO 12 FIXED
69. UNIT METER KN
70. MEMBER RELEASE
71. 86 87 90 91 96 98 TO 100 START MZ
72. 87 90 91 97 TO 99 101 102 END MZ
73. DEFINE 1893 LOAD
74. ZONE 0.16 RF 5 I 3 SS 1 ST 1 DM 0.05
75. SELFWEIGHT 1
76. JOINT WEIGHT
77. 1 WEIGHT 121.181
78. 2 WEIGHT 143.776
79. 3 WEIGHT ­9.253
80. 4 WEIGHT 117.463
81. 5 WEIGHT 143.155
82. 6 WEIGHT 10.658
83. 7 WEIGHT 0
84. 8 WEIGHT 0
85. 9 WEIGHT 0
86. 10 WEIGHT 0
87. 11 WEIGHT 0
88. 12 WEIGHT 0
89. 13 WEIGHT 27.021
90. 14 WEIGHT 18.233
91. 15 WEIGHT 4.779
92. 16 WEIGHT 27.012
93. 17 WEIGHT 19.11
94. 18 WEIGHT 6.925

C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.anl Page 2 of 11
22 July 2020 15:19

PAGE NO. 30

STAADSPACE
95. 19 WEIGHT 78.214
96. 20 WEIGHT 142.525
97. 21 WEIGHT 78.357
98. 22 WEIGHT 74.782
99. 23 WEIGHT 134.797
100. 24 WEIGHT 74.903
101. 29 WEIGHT 0.037
102. 30 WEIGHT ­0.281
103. 31 WEIGHT 0.131
104. 32 WEIGHT 0.25
105. 33 WEIGHT ­0.301
106. 34 WEIGHT 0.163
107. 45 WEIGHT ­0.04
108. 46 WEIGHT 0.072
109. 47 WEIGHT ­0.032
110. 48 WEIGHT 79.004
111. 49 WEIGHT ­23.517
112. 50 WEIGHT 21.944
113. 51 WEIGHT 18.199
114. 52 WEIGHT 23.46
115. 53 WEIGHT 5.475
116. 54 WEIGHT 127.393
117. 55 WEIGHT 21.435
118. 56 WEIGHT 6.685
119. 57 WEIGHT 54.052
120. 58 WEIGHT 96.789
121. 59 WEIGHT 16.07
122. 60 WEIGHT 3.126
123. 61 WEIGHT 66.18
124. 62 WEIGHT 147.023
125. DEFINE WIND LOAD

*** NOTE: If any floor diaphragm is present in the model Wind Load definition
should be defined after Floor Diaphragm definition. Otherwise wind
load generation may be unsuccessful during analysis.

126. TYPE 1 WIND 1


127. INT 2.035 HEIG 4.45
128. EXP 1 JOINT 1 TO 6 13 TO 24 48 TO 62
129. LOAD 11 LOADTYPE SEISMIC TITLE EQ­X
130. 1893 LOAD X 1
131. LOAD 12 LOADTYPE SEISMIC TITLE EQ­Z
132. 1893 LOAD Z 1
133. LOAD 1 LOADTYPE DEAD TITLE DEAD LOAD
134. SELFWEIGHT Y ­1
135. MEMBER LOAD
136. 1 TO 4 35 37 83 86 88 90 93 94 101 UNI GY ­15.64
137. 9 TO 12 38 40 84 85 87 89 91 92 95 UNI GY ­3.65
138. 15 16 41 43 UNI GY ­4.8
139. 15 16 UMOM GX 2.2

C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.anl Page 3 of 11
22 July 2020 15:19

PAGE NO.31

STAADSPACE
140. 13 14 UMOM GX ­4.3
141. 41 UMOM GZ 2.2
142. 43 UMOM GZ ­2.2
143. FLOOR LOAD
144. YRANGE 4 4 FLOAD ­6.83 GY
**NOTE** about Floor/OneWay Loads/Weights.
Please note that depending on the shape of the floor you may
have to break up the FLOOR/ONEWAY LOAD into multiple commands.
For details please refer to Technical Reference Manual
Section 5.32.4.2 Note d and/or "5.32.4.3 Note f.

145. MEMBER LOAD


146. 9 TO 12 38 40 84 85 89 92 95 UNI GY ­1.5
147. 11 12 85 92 UMOM GX 0.7
148. 9 10 84 UMOM GX ­0.7
149. 38 UMOM GZ 0.7
150. 40 89 95 UMOM GZ ­0.7
151. FLOOR LOAD
152. YRANGE ­0.45 ­0.45 FLOAD ­3.75 XRANGE 0 7.25 ZRANGE 0 5.25 GY
153. MEMBER LOAD
154. 1 2 82 UNI GY ­1.3125
155. 1 2 82 UMOM GX ­0.4
156. 96 97 UNI GY ­8.74
157. 98 99 UNI GY ­2.04
158. 13 14 UNI GY ­6.11
159. 37 UNI GY ­3.75
160. 37 UMOM GZ ­2.4
161. FLOOR LOAD
162. YRANGE ­0.45 ­0.45 FLOAD ­13.35 XRANGE 7.25 10.25 ZRANGE 0 5.25 GY
163. LOAD 2 LOADTYPE LIVE TITLE LIVE LOAD
164. FLOOR LOAD
165. YRANGE 4 4 FLOAD ­2 GY
166. YRANGE ­0.45 ­0.45 FLOAD ­5 GY
167. LOAD 3 LOADTYPE WIND TITLE WIND LOAD Z(­VE CP)
168. WIND LOAD Z 0 TYPE 1 YR ­0.45 4 ZR 0 5.25
169. WIND LOAD ­Z 0 TYPE 1 YR ­0.45 4 ZR 5 6
170. WIND LOAD ­X 1.2 TYPE 1 XR 10 11 YR ­0.45 4

C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.anl Page 4 of 11
22 July 2020 15:19

PAGE NO.32
STAADSPACE
171. WIND LOAD X ­0.4 TYPE 1 XR ­1 1 YR ­0.45 4
172. LOAD 4 LOADTYPE WIND TITLE WIND LOAD Z(+VE CP)
173. WIND LOAD Z 1 TYPE 1 YR ­0.45 4 ZR 0 1
174. WIND LOAD ­Z ­1 TYPE 1 YR ­0.45 4 ZR 5 6
175. WIND LOAD ­X 0.2 TYPE 1 XR 10 11 YR ­0.45 4
176. WIND LOAD X ­0.6 TYPE 1 XR 0 1 YR ­0.45 4
177. LOAD 5 LOADTYPE WIND TITLE WIND LOAD ­Z(­VE CP)
178. WIND LOAD Z ­1 TYPE 1 YR ­0.45 4 ZR 0 1
179. WIND LOAD ­Z 1 TYPE 1 YR ­0.45 4 ZR 5 6
180. WIND LOAD ­X ­0.2 TYPE 1 XR 10 11 YR ­0.45 4
181. WIND LOAD X ­0.6 TYPE 1 XR 0 1 YR ­0.45 4
182. LOAD 6 LOADTYPE WIND TITLE WIND LOAD ­Z(+VE CP)
183. WIND LOAD Z 0 TYPE 1 YR ­0.45 4 ZR 0 1
184. WIND LOAD ­Z 0 TYPE 1 YR ­0.45 4 ZR 5 6
185. WIND LOAD ­X ­1.2 TYPE 1 XR 10 11 YR ­0.45 4
186. WIND LOAD X 0.4 TYPE 1 XR 0 1 YR ­0.45 4

C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.anl Page 5 of 11
22 July 2020 15:19
PAGENO. 33

STAADSPACE
187. LOAD 7 LOADTYPE WIND TITLE WIND LOAD X(­VE CP)
188. WIND LOAD Z ­1.2 TYPE 1 YR ­0.45 4 ZR 0 1
189. WIND LOAD ­Z 0.2 TYPE 1 YR ­0.45 4 ZR 5 6
190. WIND LOAD ­X ­0.2 TYPE 1 XR 10 11 YR ­0.45 4
191. WIND LOAD X 0.2 TYPE 1 XR 0 1 YR ­0.45 4
192. LOAD 8 LOADTYPE WIND TITLE WIND LOAD X(+VE CP)
193. WIND LOAD Z ­0.2 TYPE 1 YR ­0.45 4 ZR 0 1
194. WIND LOAD ­Z ­0.8 TYPE 1 YR ­0.45 4 ZR 5 6
195. WIND LOAD ­X ­1.2 TYPE 1 XR 10 11 YR ­0.45 4
196. WIND LOAD X 1.2 TYPE 1 XR 0 1 YR ­0.45 4
197. LOAD 9 LOADTYPE WIND TITLE WIND LOAD ­X(­VE CP)
198. WIND LOAD Z 0.2 TYPE 1 YR ­0.45 4 ZR 0 1
199. WIND LOAD ­Z 0.8 TYPE 1 YR ­0.45 4 ZR 5 6
200. WIND LOAD ­X 1.2 TYPE 1 XR 10 11 YR ­0.45 4
201. WIND LOAD X ­1.2 TYPE 1 XR 0 1 YR ­0.45 4
202. LOAD 10 LOADTYPE WIND TITLE WIND LOAD ­X(+VE CP)
203. WIND LOAD Z 1.2 TYPE 1 YR ­0.45 4 ZR 0 1

C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.anl Page 6 of 11
22 July 2020 15:19
PAGENO.34

STAADSPACE
204. WIND LOAD ­Z ­0.2 TYPE 1 YR ­0.45 4 ZR 5 6
205. WIND LOAD ­X 0.2 TYPE 1 XR 10 11 YR ­0.45 4
206. WIND LOAD X ­0.2 TYPE 1 XR 0 1 YR ­0.45 4
207. **IS 456:2000 LIMIT STATE OF SERVICEABILITY
208. LOAD COMB 1000 DL+LL
209. 1 1.0 2 1.0
210. LOAD COMB 1001 DL+WL +Z(­VE CP)
211. 1 1.0
212. LOAD COMB 1002 DL+WL +Z(+VE CP)
213. 1 1.0
214. LOAD COMB 1003 DL+WL ­Z(­VE CP)
215. 1 1.0
216. LOAD COMB 1004 DL+WL ­Z(+VE CP)
217. 1 1.0
218. LOAD COMB 1005 DL+WL +X(­VE CP)
219. 1 1.0
220. LOAD COMB 1006 DL+WL +X(+VE CP)
221. 1 1.0
222. LOAD COMB 1007 DL+WL ­X(­VE CP)
223. 1 1.0
224. LOAD COMB 1008 DL+WL ­X(+VE CP)
225. 1 1.0
226. LOAD COMB 1009 1 DL + 1 EL +X
227. 1 1.0 11 1.0
228. LOAD COMB 1010 1 DL + 1 EL ­X
229. 1 1.0 11 ­1.0
230. LOAD COMB 1011 1 DL + 1 EL +Z
231. 1 1.0 12 1.0
232. LOAD COMB 1012 1 DL + 1 EL ­Z
233. 1 1.0 12 ­1.0
234. LOAD COMB 1013 DL+0.8LL+0.8 WL +Z(­VE CP)
235. 1 1.0 2 0.8
236. LOAD COMB 1014 DL+0.8LL+0.8 WL +Z(+VE CP)
237. 1 1.0 2 0.8
238. LOAD COMB 1015 DL+0.8LL+0.8 WL ­Z(­VE CP)
239. 1 1.0 2 0.8
240. LOAD COMB 1016 DL+0.8LL+0.8 WL ­Z(+VE CP)
241. 1 1.0 2 0.8
242. LOAD COMB 1017 DL+0.8LL+0.8 WL +X(­VE CP)
243. 1 1.0 2 0.8
244. LOAD COMB 1018 DL+0.8LL+0.8 WL +X(+VE CP)
245. 1 1.0 2 0.8
246. LOAD COMB 1019 DL+0.8LL+0.8 WL ­X(­VE CP)
247. 1 1.0 2 0.8

C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.anl Page 7 of 11
22 July 2020 15:19
PAGENO. 35

STAADSPACE
248. LOAD COMB 1020 DL+0.8LL+0.8 WL ­X(+VE CP)
249. 1 1.0 2 0.8
250. LOAD COMB 1021 1 DL + 0.8 LL + 0.8 EL +X
251. 1 1.0 2 0.8 11 0.8
252. LOAD COMB 1022 1 DL + 0.8 LL + 0.8 EL ­X
253. 1 1.0 2 0.8 11 ­0.8
254. LOAD COMB 1023 1 DL + 0.8 LL + 0.8 EL +Z
255. 1 1.0 2 0.8 12 0.8
256. LOAD COMB 1024 1 DL + 0.8 LL + 0.8 EL ­Z
257. 1 1.0 2 0.8 12 ­0.8
258. ***************************************
259. **LIMIT STATE OF COLLAPSE
260. LOAD COMB 2000 1.5DL+1.5LL
261. 1 1.5 2 1.5
262. LOAD COMB 2001 1.5DL+1.5WL +Z(­VE CP)
263. 1 1.5
264. LOAD COMB 2002 1.5DL+1.5WL +Z(+VE CP)
265. 1 1.5
266. LOAD COMB 2003 1.5DL+1.5WL ­Z(­VE CP)
267. 1 1.5
268. LOAD COMB 2004 1.5DL+1.5WL ­Z(+VE CP)
269. 1 1.5
270. LOAD COMB 2005 1.5DL+1.5WL +X(­VE CP)
271. 1 1.5
272. LOAD COMB 2006 1.5DL+1.5WL +X(+VE CP)
273. 1 1.5
274. LOAD COMB 2007 1.5DL+1.5WL ­X(­VE CP)
275. 1 1.5
276. LOAD COMB 2008 1.5DL+1.5WL ­X(+VE CP)
277. 1 1.5
278. LOAD COMB 2009 1.5 DL + 1.5 EL +X
279. 1 1.5 11 1.5
280. LOAD COMB 2010 1.5 DL + 1.5 EL ­X
281. 1 1.5 11 ­1.5
282. LOAD COMB 2011 1.5 DL + 1.5 EL +Z
283. 1 1.5 12 1.5
284. LOAD COMB 2012 1.5 DL + 1.5 EL ­Z
285. 1 1.5 12 ­1.5
286. LOAD COMB 2013 1.2DL+1.2LL+1.2 WL +Z(­VE CP)
287. 1 1.2 2 1.2
288. LOAD COMB 2014 1.2DL+1.2LL+1.2 WL +Z(+VE CP)
289. 1 1.2 2 1.2
290. LOAD COMB 2015 1.2DL+1.2LL+1.2 WL ­Z(­VE CP)
291. 1 1.2 2 1.2
292. LOAD COMB 2016 1.2DL+1.2LL+1.2 WL ­Z(+VE CP)
293. 1 1.2 2 1.2
294. LOAD COMB 2017 1.2DL+1.2LL+1.2 WL +X(­VE CP)
295. 1 1.2 2 1.2
296. LOAD COMB 2018 1.2DL+1.2LL+1.2 WL +X(+VE CP)
297. 1 1.2 2 1.2
298. LOAD COMB 2019 1.2DL+1.2LL+1.2 WL ­X(­VE CP)
299. 1 1.2 2 1.2
300. LOAD COMB 2020 1.2DL+1.2LL+1.2 WL ­X(+VE CP)
301. 1 1.2 2 1.2
302. LOAD COMB 2021 1.2 DL + 1.2 LL + 1.2 EL +X
303. 1 1.2 2 1.2 11 1.2

C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.anl Page 8 of 11
22 July 2020 15:19

PAGENO. 36

STAADSPACE
304. LOAD COMB 2022 1.2 DL + 1.2 LL + 1.2 EL ­X
305. 1 1.2 2 1.2 11 ­1.2
306. LOAD COMB 2023 1.2 DL + 1.2 LL + 1.2 EL +Z
307. 1 1.2 2 1.2 12 1.2
308. LOAD COMB 2024 1.2 DL + 1.2 LL + 1.2 EL ­Z
309. 1 1.2 2 1.2 12 ­1.2
310. LOAD COMB 2025 0.9DL+1.5WL +Z(­VE CP)
311. 1 0.9
312. LOAD COMB 2026 0.9DL+1.5WL +Z(+VE CP)
313. 1 0.9
314. LOAD COMB 2027 0.9DL+1.5WL ­Z(­VE CP)
315. 1 0.9
316. LOAD COMB 2028 0.9DL+1.5WL ­Z(+VE CP)
317. 1 0.9
318. LOAD COMB 2029 0.9DL+1.5WL +X(­VE CP)
319. 1 0.9
320. LOAD COMB 2030 0.9DL+1.5WL +X(+VE CP)
321. 1 0.9
322. LOAD COMB 2031 0.9DL+1.5WL ­X(­VE CP)
323. 1 0.9
324. LOAD COMB 2032 0.9DL+1.5WL ­X(+VE CP)
325. 1 0.9
326. LOAD COMB 2033 0.9 DL + 1.5 EL +X
327. 1 0.9 11 1.5
328. LOAD COMB 2034 0.9 DL + 1.5 EL ­X
329. 1 0.9 11 ­1.5
330. LOAD COMB 2035 0.9 DL + 1.5 EL +Z
331. 1 0.9 12 1.5
332. LOAD COMB 2036 0.9 DL + 1.5 EL ­Z
333. 1 0.9 12 ­1.5
334. PERFORM ANALYSIS

P R O B L E M S T A T I S T I C S
­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­­

NUMBER OF JOINTS 48 NUMBER OF MEMBERS 77


NUMBER OF PLATES 0 NUMBER OF SOLIDS 0
NUMBER OF SURFACES 0 NUMBER OF SUPPORTS 6

Using 64­bit analysis engine.

SOLVER USED IS THE IN­CORE ADVANCED MATH SOLVER

TOTAL PRIMARY LOAD CASES = 12, TOTAL DEGREES OF FREEDOM = 252


TOTAL LOAD COMBINATION CASES = 62 SO FAR.

C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.anl Page 9 of 11
22 July 2020 15:19
PAGENO. 37

STAADSPACE
**WARNING: IF THIS UBC/IBC ANALYSIS HAS TENSION/COMPRESSION
OR REPEAT LOAD OR RE­ANALYSIS OR SELECT OPTIMIZE, THEN EACH
UBC/IBC CASE SHOULD BE FOLLOWED BY PERFORM ANALYSIS & CHANGE.

*WARNING ZERO STIFFNESS IN DIRECTION 2 AT JOINT 52 EQN.NO. 188


LOADS APPLIED OR DISTRIBUTED HERE FROM ELEMENTS WILL BE IGNORED.
THIS MAY BE DUE TO ALL MEMBERS AT THIS JOINT BEING RELEASED OR
EFFECTIVELY RELEASED IN THIS DIRECTION.
*WARNING ZERO STIFFNESS IN DIRECTION 6 AT JOINT 52 EQN.NO. 192
*WARNING ZERO STIFFNESS IN DIRECTION 2 AT JOINT 53 EQN.NO. 194
*WARNING ZERO STIFFNESS IN DIRECTION 6 AT JOINT 53 EQN.NO. 198

*********************************************************
* UNITS ­ KN METE *
* TIME PERIOD FOR X 1893 LOADING = 0.65787 SEC *
* SA/G PER 1893= 1.520, LOAD FACTOR= 1.000 *
* VB PER 1893= 0.0730 X 2716.78= 198.22 KN *
* *
*********************************************************

*********************************************************
* UNITS ­ KN METE *
* TIME PERIOD FOR Z 1893 LOADING = 0.65787 SEC *
* SA/G PER 1893= 1.520, LOAD FACTOR= 1.000 *
* VB PER 1893= 0.0730 X 2716.78= 198.22 KN *
* *
*********************************************************

335. FINISH

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= JUL 22,2020 TIME= 15:19:37 ****

C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.anl Page 10 of 11
22 July 2020 15:19

STAAD SPACE PAGENO. 38

************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://www.bentley.com/en/support/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help­>Technical Support *
* *
* Copyright (c) 1997­2017 Bentley Systems, Inc. *
* http://www.bentley.com *
************************************************************

C:\Users\SWAMYG~1\Desktop\CR­2\21­07­~1\UPDATI~1\CR­2.STD.STD­Updating.anl Page 11 of 11
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 39

DESIGN OF COLUMNS

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 40
Design of Columns:

For Design of column, the columns are being grouped into two groups.

The groups are as listed below:

Columns marked

GROUP 1: A1,A2 and A3

GROUP 2: B1,B2 and B3

GROUP 3: Stub Column

From these groups, the columns are designed for Maximum Axial Force, Maximum My and

Maximum Mz for each group.

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH WATER
L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 41

COLUMN DESIGN-C1

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 42

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 43
COLUMN GRID: A-1,A-2 AND A-3 GROUP-1 3 COLUMNS

Column-1 Forces

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 44

COLUMN DESIGN-MAX P

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
n

L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 45
DESIGN OF SUPER STRUCTURE. COLUMN -MAX P

BEAM NO : 29 L/C 2000 F.S. = 1.2


DATA
Length of column D = 600 mm
Breadth of column b = 300 mm
Unsupported length (longer direction) Lz = 9755 mm
Unsupported length (shorter direction) Ly = 4878 mm
Eff. length (longer direction) 1.2xLz L ez = 11706 mm
Eff. length (shorter direction) 1.2xLy L ey = 5853.6 mm
Braced/Unbraced Unbraced
Factored axial load Pu = 932 kN
*
Factored moment (longer direction) M iz = 4 kNm
Factored moment (shorter direction) M iy * = 1 kNm
Charac. comp strength of concrete f ck = 25 N/mm2
Yield stress of steel fy = 500 N/mm2
cover = 40 mm
(* The factored moment is inclusive of eccentric moment)
Check for slenderness
Longer Direction
Slenderness ratio L ez/D = 19.51 slender
Additional moment due to slenderness Pu x (Lez/D) M az = 106.459 kN-m
Shorter Direction
Slenderness ratio L ey/b = 19.51 slender
Additional moment due to slenderness Pu x (Ley/D) M ay = 53.2404 kN-m
Calculation of P uz
Assumed percentage of reinforcement pt = 1.500 %
2
Area of concrete Ag = 180000 mm
Ultimate axial load (without moments) P uz = 3007 kN
Calculation of P b:
Longer Direction
d '/D = 0.067
Coefficient k 1(from TABLE 60 of SP 16:1980) k1z = 0.215
Coefficient k 2(from TABLE 60 of SP 16:1980) k2z = 0.2
Axial load corresponding to balanced failure P bz = 1022 kN
Reduction factor for additional moments kz = 1.000
Moment due to slenderness M az = 106.46 kN-m
Shorter Direction
d '/b = 0.133
Coefficient k 1(from TABLE 60 of SP:1980) k1y = 0.2
Coefficient k 2(from TABLE 60 of SP:1980) k2y = 0.127
Axial load corresponding to balanced failure P by = 934 kN
Reduction factor for additional moments ky = 1.000
Moment due to slenderness M ax = 53.240 kN-m

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
n

L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 46
Check for moments due to min. eccentricity
Longer Direction
Minimum eccentricity ez = 39.51 mm
Moment due to min. eccentricity Mz = 36.83 kN-m
Moment in longer direction M uz = 36.8344 kNm
Shorter direction
Minimum eccentricity ey = 19.76 mm
Moment due to min. eccentricity My = 18.42 kN-m
Moment in shorter direction M uy = 18.4181 kNm

Final design moments


Moment in longer direction M uz = 143.29 kNm
Moment in shorter direction M uy = 71.66 kNm

Check for interaction


p /f ck p /f ck = 0.060
P u/f ckbD value P u/f ckbD = 0.207
M ux1/fckbD2 value (from SP 16:1980 chart-36) M uz1/fckbD 2 = 0.15
Uniaxial moment capacity (longer direction) M uz1 = 405 kNm
M uy1/fckb2D value (from SP 16:1980 chart-37) M uy1/fckb 2 D = 0.14
Uniaxial moment capacity (shorter direction) M uy1 = 189 kNm
P u/P uz ratio P u/P uz = 0.310
Value of exponent = 1.184
Interaction ratio = 0.61 < 1.00 safe

Area of steel required = 2700 mm2


Dia of steel provided (At corners) = 25 mm
No of steel provided (At corners) = 4
Dia of steel provided (At faces) = 20 mm
No of steel provided (At faces) = 4
Area of steel provided = 3220 mm2

Design of Ties: For cross section refer page 000


Dia of tie bar shall be the greater of the following,
(i) 6 mm
(ii) f/4 mm

Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 300 mm
(ii) 16 times the smallest dia of the longitudinal bar = 320 mm
(iii) 300 mm = 300 mm

Provide 10 mm dia ties @ 250mm c/c

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 47

COLUMN DESIGN-MAX MY

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH WATER
n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 48
DESIGN OF SUPER STRUCTURE. COLUMN -MAX MY

BEAM NO : 54 L/C 2010 F.S. = 1.2


DATA
Length of column D = 600 mm
Breadth of column b = 300 mm
Unsupported length (longer direction) Lz = 3885 mm
Unsupported length (shorter direction) Ly = 3885 mm
Eff. length (longer direction) 1.2xLz L ez = 4662 mm
Eff. length (shorter direction) 1.2xLy L ey = 4662 mm
Braced/Unbraced Unbraced
Factored axial load Pu = 665 kN
*
Factored moment (longer direction) M iz = 11 kNm
*
Factored moment (shorter direction) M iy = 111 kNm
Charac. comp strength of concrete f ck = 25 N/mm2
Yield stress of steel fy = 500 N/mm2
cover = 40 mm
(* The factored moment is inclusive of eccentric moment)
Check for slenderness
Longer Direction
Slenderness ratio L ez/D = 7.77 short
Additional moment due to slenderness Pu x (Lez/D) M az = 0 kN-m
Shorter Direction
Slenderness ratio L ey/b = 15.54 slender
Additional moment due to slenderness Pu x (Ley/D) M ay = 24.082231 kN-m
Calculation of P uz
Assumed percentage of reinforcement pt = 1.500 %
Area of concrete Ag = 180000 mm2
Ultimate axial load (without moments) P uz = 3007 kN
Calculation of P b:
Longer Direction
d '/D = 0.067
Coefficient k 1(from TABLE 60 of SP 16:1980) k1z = 0.215
Coefficient k 2(from TABLE 60 of SP 16:1980) k2z = 0.2
Axial load corresponding to balanced failure P bz = 1022 kN
Reduction factor for additional moments kz = 1.000
Moment due to slenderness M az = 0.00 kN-m
Shorter Direction
d '/b = 0.133
Coefficient k 1(from TABLE 60 of SP:1980) k1y = 0.2
Coefficient k 2(from TABLE 60 of SP:1980) k2y = 0.127
Axial load corresponding to balanced failure P by = 934 kN
Reduction factor for additional moments ky = 1.000
Moment due to slenderness M ax = 24.08 kN-m

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH WATER
n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 49
Check for moments due to min. eccentricity

Longer Direction
Minimum eccentricity ez = 27.77 mm
Moment due to min. eccentricity Mz = 18.46 kN-m
Moment in longer direction M uz = 18.462024 kNm
Shorter direction
Minimum eccentricity ey = 17.77 mm
Moment due to min. eccentricity My = 11.81 kN-m
Moment in shorter direction M uy = 110.591 kNm

Final design moments


Moment in longer direction M uz = 18.46 kNm
Moment in shorter direction M uy = 134.67 kNm

Check for interaction


p /f ck p /f ck = 0.060
P u/f ckbD value P u/f ckbD = 0.148
2 2
M ux1/fckbD value (from SP 16:1980 chart-36) M uz1/fckbD = 0.15
Uniaxial moment capacity (longer direction) M uz1 = 405 kNm
M uy1/fckb2D value (from SP 16:1980 chart-37) M uy1/fckb D 2
= 0.13
Uniaxial moment capacity (shorter direction) M uy1 = 175.5 kNm
P u/P uz ratio P u/P uz = 0.221
Value of exponent = 1.036
Interaction ratio = 0.80 < 1.00 safe

Area of steel required = 2700 mm2


Dia of steel provided (At corners) = 25 mm
No of steel provided (At corners) = 4
Dia of steel provided (At faces) = 20 mm
No of steel provided (At faces) = 4
Area of steel provided = 3220 mm2

Design of Ties: For cross section refer page 000


Dia of tie bar shall be the greater of the following,
(i) 6 mm
(ii) f/4 mm

Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 300 mm
(ii) 16 times the smallest dia of the longitudinal bar = 320 mm
(iii) 300 mm = 300 mm

Provide 10 mm dia ties @ 250mm c/c

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 50

COLUMN DESIGN-MAX MZ

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 51
DESIGN OF SUPER STRUCTURE. COLUMN -MAX MZ

BEAM NO : 55 L/C 2011 F.S. = 1.2


DATA
Length of column D = 600 mm
Breadth of column b = 300 mm
Unsupported length (longer direction) Lz = 3885 mm
Unsupported length (shorter direction) Ly = 3885 mm
Eff. length (longer direction) 1.2xLz L ez = 4662 mm
Eff. length (shorter direction) 1.2xLy L ey = 4662 mm
Braced/Unbraced Unbraced
Factored axial load Pu = 624 kN
*
Factored moment (longer direction) M iz = 172 kNm
*
Factored moment (shorter direction) M iy = 43 kNm
Charac. comp strength of concrete f ck = 25 N/mm2
Yield stress of steel fy = 500 N/mm2
cover = 40 mm
(* The factored moment is inclusive of eccentric moment)
Check for slenderness
Longer Direction
Slenderness ratio L ez/D = 7.77 short
Additional moment due to slenderness Pu x (Lez/D) M az = 0 kN-m
Shorter Direction
Slenderness ratio L ey/b = 15.54 slender
Additional moment due to slenderness Pu x (Ley/D) M ay = 22.6216 kN-m
Calculation of P uz
Assumed percentage of reinforcement pt = 1.500 %
2
Area of concrete Ag = 180000 mm
Ultimate axial load (without moments) P uz = 3007 kN
Calculation of P b:
Longer Direction
d '/D = 0.067
Coefficient k 1(from TABLE 60 of SP 16:1980) k1z = 0.215
Coefficient k 2(from TABLE 60 of SP 16:1980) k2z = 0.2
Axial load corresponding to balanced failure P bz = 1022 kN
Reduction factor for additional moments kz = 1.000
Moment due to slenderness M az = 0.00 kN-m
Shorter Direction
d '/b = 0.133
Coefficient k 1(from TABLE 60 of SP:1980) k1y = 0.2
Coefficient k 2(from TABLE 60 of SP:1980) k2y = 0.127
Axial load corresponding to balanced failure P by = 934 kN
Reduction factor for additional moments ky = 1.000
Moment due to slenderness M ax = 22.62 kN-m

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 52
Check for moments due to min. eccentricity
Longer Direction
Minimum eccentricity ez = 27.77 mm
Moment due to min. eccentricity Mz = 17.34 kN-m
Moment in longer direction M uz = 172.299 kNm
Shorter direction
Minimum eccentricity ey = 17.77 mm
Moment due to min. eccentricity My = 11.10 kN-m
Moment in shorter direction M uy = 42.881 kNm

Final design moments


Moment in longer direction M uz = 172.30 kNm
Moment in shorter direction M uy = 65.50 kNm

Check for interaction


p /f ck p /f ck = 0.060
P u/f ckbD value P u/f ckbD = 0.139
2 2
M ux1/fckbD value (from SP 16:1980 chart-36) M uz1/fckbD = 0.15
Uniaxial moment capacity (longer direction) M uz1 = 405 kNm
M uy1/fckb2D value (from SP 16:1980 chart-37) M uy1/fckb D 2
= 0.14
Uniaxial moment capacity (shorter direction) M uy1 = 189 kNm
P u/P uz ratio P u/P uz = 0.208
Value of exponent = 1.013
Interaction ratio = 0.76 < 1.00 safe

Area of steel required = 2700 mm2


Dia of steel provided (At corners) = 25 mm
No of steel provided (At corners) = 4
Dia of steel provided (At faces) = 20 mm
No of steel provided (At faces) = 4
Area of steel provided = 3220 mm2

Design of Ties: For cross section refer page 000


Dia of tie bar shall be the greater of the following,
(i) 6 mm
(ii) f/4 mm

Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 300 mm
(ii) 16 times the smallest dia of the longitudinal bar = 320 mm
(iii) 300 mm = 300 mm

Provide 10 mm dia ties @ 250mm c/c

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 53

COLUMN DESIGN-C2

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 54
COLUMN GRID: B-1,B-2 AND B-3 GROUP-2 3 COLUMNS

Column-2 Forces

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 55

COLUMN DESIGN-MAX P

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 56
DESIGN OF SUPER STRUCTURE. COLUMN -MAX P
BEAM NO : 20 L/C 2000 F.S. = 1.2
DATA
Length of column D = 600 mm
Breadth of column b = 300 mm
Unsupported length (longer direction) Lz = 1657 mm
Unsupported length (shorter direction) Ly = 1657 mm
Eff. length (longer direction) 1.2xLz L ez = 1988.4 mm
Eff. length (shorter direction) 1.2xLy L ey = 1988.4 mm
Braced/Unbraced Unbraced
Factored axial load Pu = 876 kN
*
Factored moment (longer direction) M iz = 4 kNm
*
Factored moment (shorter direction) M iy = 2 kNm
Charac. comp strength of concrete f ck = 25 N/mm2
Yield stress of steel fy = 500 N/mm2
cover = 40 mm
(* The factored moment is inclusive of eccentric moment)
Check for slenderness
Longer Direction
Slenderness ratio L ez/D = 3.31 short
Additional moment due to slenderness Pu x (Lez/D) M az = 0 kN-m
Shorter Direction
Slenderness ratio L ey/b = 6.63 short
Additional moment due to slenderness Pu x (Ley/D) M ay = 0 kN-m
Calculation of P uz
Assumed percentage of reinforcement pt = 2.400 %
2
Area of concrete Ag = 180000 mm
Ultimate axial load (without moments) P uz = 3596 kN
Calculation of P b:
Longer Direction
d '/D = 0.067
Coefficient k 1(from TABLE 60 of SP 16:1980) k1z = 0.215
Coefficient k 2(from TABLE 60 of SP 16:1980) k2z = 0.2
Axial load corresponding to balanced failure P bz = 1054 kN
Reduction factor for additional moments kz = 1.000
Moment due to slenderness M az = 0.00 kN-m
Shorter Direction
d '/b = 0.133
Coefficient k 1(from TABLE 60 of SP:1980) k1y = 0.2
Coefficient k 2(from TABLE 60 of SP:1980) k2y = 0.127
Axial load corresponding to balanced failure P by = 955 kN
Reduction factor for additional moments ky = 1.000
Moment due to slenderness M ax = 0.00 kN-m

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 57
Check for moments due to min. eccentricity
Longer Direction
Minimum eccentricity ez = 23.31 mm
Moment due to min. eccentricity Mz = 20.43 kN-m
Moment in longer direction M uz = 20.4296 kNm
Shorter direction
Minimum eccentricity ey = 13.31 mm
Moment due to min. eccentricity My = 11.67 kN-m
Moment in shorter direction M uy = 11.6668 kNm

Final design moments


Moment in longer direction M uz = 20.43 kNm
Moment in shorter direction M uy = 11.67 kNm

Check for interaction


p /f ck p /f ck = 0.096
P u/f ckbD value P u/f ckbD = 0.195
2 2
M ux1/fckbD value (from SP 16:1980 chart-48) M uz1/fckbD = 0.16
Uniaxial moment capacity (longer direction) M uz1 = 432 kNm
M uy1/fckb2D value (from SP 16:1980 chart-49) M uy1/fckb D 2
= 0.17
Uniaxial moment capacity (shorter direction) M uy1 = 229.5 kNm
P u/P uz ratio P u/P uz = 0.244
Value of exponent = 1.073
Interaction ratio = 0.08 < 1.00 safe

Area of steel required = 4320 mm2


Dia of steel provided (At corners) = 25 mm
No of steel provided (At corners) = 4
Dia of steel provided (At faces) = 20 mm
No of steel provided (At faces) = 8
Area of steel provided = 4476 mm2

Design of Ties: For cross section refer page 000


Dia of tie bar shall be the greater of the following,
(i) 6 mm
(ii) f/4 mm
Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 300 mm
(ii) 16 times the smallest dia of the longitudinal bar = 320 mm
(iii) 300 mm = 300 mm

Provide 10 mm dia ties @ 250mm c/c

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 58

COLUMN DESIGN-MAX MY

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 59
DESIGN OF SUPER STRUCTURE. COLUMN -MAX MY

BEAM NO : 51 L/C 2010 F.S. = 1.2


DATA
Length of column D = 600 mm
Breadth of column b = 300 mm
Unsupported length (longer direction) Lz = 3885 mm
Unsupported length (shorter direction) Ly = 3885 mm
Eff. length (longer direction) 1.2xLz L ez = 4662 mm
Eff. length (shorter direction) 1.2xLy L ey = 4662 mm
Braced/Unbraced Unbraced
Factored axial load Pu = 671 kN
*
Factored moment (longer direction) M iz = 35 kNm
*
Factored moment (shorter direction) M iy = 206 kNm
Charac. comp strength of concrete f ck = 25 N/mm2
Yield stress of steel fy = 500 N/mm2
cover = 40 mm
(* The factored moment is inclusive of eccentric moment)
Check for slenderness
Longer Direction
Slenderness ratio L ez/D = 7.77 short
Additional moment due to slenderness Pu x (Lez/D) M az = 0 kN-m
Shorter Direction
Slenderness ratio L ey/b = 15.54 slender
Additional moment due to slenderness Pu x (Ley/D) M ay = 24.29515 kN-m
Calculation of P uz
Assumed percentage of reinforcement pt = 2.150 %
Area of concrete Ag = 180000 mm2
Ultimate axial load (without moments) P uz = 3433 kN
Calculation of P b:
Longer Direction
d '/D = 0.067
Coefficient k 1(from TABLE 60 of SP 16:1980) k1z = 0.215
Coefficient k 2(from TABLE 60 of SP 16:1980) k2z = 0.2
Axial load corresponding to balanced failure P bz = 1045 kN
Reduction factor for additional moments kz = 1.000
Moment due to slenderness M az = 0.00 kN-m
Shorter Direction
d '/b = 0.133
Coefficient k 1(from TABLE 60 of SP:1980) k1y = 0.2
Coefficient k 2(from TABLE 60 of SP:1980) k2y = 0.127
Axial load corresponding to balanced failure P by = 949 kN
Reduction factor for additional moments ky = 1.000
Moment due to slenderness M ax = 24.30 kN-m

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 60
Check for moments due to min. eccentricity
Longer Direction
Minimum eccentricity ez = 27.77 mm
Moment due to min. eccentricity Mz = 18.63 kN-m
Moment in longer direction M uz = 35.4 kNm
Shorter direction
Minimum eccentricity ey = 17.77 mm
Moment due to min. eccentricity My = 11.92 kN-m
Moment in shorter direction M uy = 205.879 kNm

Final design moments


Moment in longer direction M uz = 35.40 kNm
Moment in shorter direction M uy = 230.17 kNm

Check for interaction


p /f ck p /f ck = 0.086
P u/f ckbD value P u/f ckbD = 0.149
2 2
M ux1/fckbD value (from SP 16:1980 chart-36) M uz1/fckbD = 0.2
Uniaxial moment capacity (longer direction) M uz1 = 540 kNm
M uy1/fckb2D value (from SP 16:1980 chart-37) M uy1/fckb D 2
= 0.19
Uniaxial moment capacity (shorter direction) M uy1 = 256.5 kNm
P u/P uz ratio P u/P uz = 0.195
Value of exponent = 1.000
Interaction ratio = 0.96 < 1.00 safe

Area of steel required = 3870 mm2


Dia of steel provided (At corners) = 25 mm
No of steel provided (At corners) = 4
Dia of steel provided (At faces) = 25 mm
No of steel provided (At faces) = 4
Area of steel provided = 3926 mm2

Design of Ties: For cross section refer page 000


Dia of tie bar shall be the greater of the following,
(i) 6 mm
(ii) f/4 mm

Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 300 mm
(ii) 16 times the smallest dia of the longitudinal bar = 400 mm
(iii) 300 mm = 300 mm

Provide 10 mm dia ties @ 250mm c/c

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 61

COLUMN DESIGN-MAX MZ

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 62
DESIGN OF SUPER STRUCTURE. COLUMN -MAX MZ

BEAM NO : 23 L/C 2036 F.S. = 1.2


DATA
Length of column D = 600 mm
Breadth of column b = 300 mm
Unsupported length (longer direction) Lz = 1657 mm
Unsupported length (shorter direction) Ly = 1657 mm
Eff. length (longer direction) 1.2xLz L ez = 1988.4 mm
Eff. length (shorter direction) 1.2xLy L ey = 1988.4 mm
Braced/Unbraced Unbraced
Factored axial load Pu = 436 kN
*
Factored moment (longer direction) M iz = 246 kNm
*
Factored moment (shorter direction) M iy = 1 kNm
Charac. comp strength of concrete f ck = 25 N/mm2
Yield stress of steel fy = 500 N/mm2
cover = 40 mm
(* The factored moment is inclusive of eccentric moment)
Check for slenderness
Longer Direction
Slenderness ratio L ez/D = 3.31 short
Additional moment due to slenderness Pu x (Lez/D) M az = 0 kN-m
Shorter Direction
Slenderness ratio L ey/b = 6.63 short
Additional moment due to slenderness Pu x (Ley/D) M ay = 0 kN-m
Calculation of P uz
Assumed percentage of reinforcement pt = 2.100 %
2
Area of concrete Ag = 180000 mm
Ultimate axial load (without moments) P uz = 3400 kN
Calculation of P b:
Longer Direction
d '/D = 0.067
Coefficient k 1(from TABLE 60 of SP 16:1980) k1z = 0.215
Coefficient k 2(from TABLE 60 of SP 16:1980) k2z = 0.2
Axial load corresponding to balanced failure P bz = 1043 kN
Reduction factor for additional moments kz = 1.000
Moment due to slenderness M az = 0.00 kN-m
Shorter Direction
d '/b = 0.133
Coefficient k 1(from TABLE 60 of SP:1980) k1y = 0.2
Coefficient k 2(from TABLE 60 of SP:1980) k2y = 0.127
Axial load corresponding to balanced failure P by = 948 kN
Reduction factor for additional moments ky = 1.000
Moment due to slenderness M ax = 0.00 kN-m

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 63
Check for moments due to min. eccentricity
Longer Direction
Minimum eccentricity ez = 23.31 mm
Moment due to min. eccentricity Mz = 10.16 kN-m
Moment in longer direction M uz = 245.983 kNm
Shorter direction
Minimum eccentricity ey = 13.31 mm
Moment due to min. eccentricity My = 5.80 kN-m
Moment in shorter direction M uy = 5.8015 kNm

Final design moments


Moment in longer direction M uz = 245.98 kNm
Moment in shorter direction M uy = 5.80 kNm

Check for interaction


p /f ck p /f ck = 0.084
P u/f ckbD value P u/f ckbD = 0.097
2 2
M ux1/fckbD value (from SP 16:1980 chart-36) M uz1/fckbD = 0.16
Uniaxial moment capacity (longer direction) M uz1 = 432 kNm
M uy1/fckb2D value (from SP 16:1980 chart-37) M uy1/fckb D 2
= 0.16
Uniaxial moment capacity (shorter direction) M uy1 = 216 kNm
P u/P uz ratio P u/P uz = 0.128
Value of exponent = 1.000
Interaction ratio = 0.60 < 1.00 safe

Area of steel required = 3780 mm2


Dia of steel provided (At corners) = 25 mm
No of steel provided (At corners) = 4
Dia of steel provided (At faces) = 25 mm
No of steel provided (At faces) = 4
Area of steel provided = 3926 mm2

Design of Ties: For cross section refer page 000


Dia of tie bar shall be the greater of the following,
(i) 6 mm
(ii) f/4 mm

Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 300 mm
(ii) 16 times the smallest dia of the longitudinal bar = 400 mm
(iii) 300 mm = 300 mm

Provide 10 mm dia ties @ 250mm c/c

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 64

STUB COLUMN DESIGN

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 65
STUB COLUMN GROUP-3 1 COLUMN

Stub Column Forces

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 66

COLUMN DESIGN-MAX P

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 67
DESIGN OF SUPER STRUCTURE. COLUMN -MAX P
BEAM NO : 100 L/C 2000 F.S. = 1.2
DATA
Length of column D = 115 mm
Breadth of column b = 115 mm
Unsupported length (longer direction) Lz = 3375 mm
Unsupported length (shorter direction) Ly = 3375 mm
Eff. length (longer direction) 1.2xLz L ez = 4050 mm
Eff. length (shorter direction) 1.2xLy L ey = 4050 mm
Braced/Unbraced Unbraced
Factored axial load Pu = 7 kN
*
Factored moment (longer direction) M iz = 1 kNm
*
Factored moment (shorter direction) M iy = 1 kNm
Charac. comp strength of concrete f ck = 25 N/mm2
Yield stress of steel fy = 500 N/mm2
cover = 25 mm
(* The factored moment is inclusive of eccentric moment)
Check for slenderness
Longer Direction
Slenderness ratio L ez/D = 35.22 slender
Additional moment due to slenderness Pu x (Lez/D) M az = 0.49799 kN-m
Shorter Direction
Slenderness ratio L ey/b = 35.22 slender
Additional moment due to slenderness Pu x (Ley/D) M ay = 0.49799 kN-m
Calculation of P uz
Assumed percentage of reinforcement pt = 2.400 %
Area of concrete Ag = 13225 mm2
Ultimate axial load (without moments) P uz = 264 kN
Calculation of P b:
Longer Direction
d '/D = 0.217
Coefficient k 1(from TABLE 60 of SP 16:1980) k1z = 0.184
Coefficient k 2(from TABLE 60 of SP 16:1980) k2z = 0.04
Axial load corresponding to balanced failure P bz = 62 kN
Reduction factor for additional moments kz = 1.000
Moment due to slenderness M az = 0.50 kN-m
Shorter Direction
d '/b = 0.217
Coefficient k 1(from TABLE 60 of SP:1980) k1y = 0.184
Coefficient k 2(from TABLE 60 of SP:1980) k2y = 0.04
Axial load corresponding to balanced failure P by = 62 kN
Reduction factor for additional moments ky = 1.000
Moment due to slenderness M ax = 0.50 kN-m

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 68
Check for moments due to min. eccentricity
Longer Direction
Minimum eccentricity ez = 10.58 mm
Moment due to min. eccentricity Mz = 0.07 kN-m
Moment in longer direction M uz = 1 kNm
Shorter direction
Minimum eccentricity ey = 10.58 mm
Moment due to min. eccentricity My = 0.07 kN-m
Moment in shorter direction M uy = 0.983 kNm

Final design moments


Moment in longer direction M uz = 1.50 kNm
Moment in shorter direction M uy = 1.48 kNm

Check for interaction


p /f ck p /f ck = 0.096
P u/f ckbD value P u/f ckbD = 0.021
2 2
M ux1/fckbD value (from SP 16:1980 chart-47) M uz1/fckbD = 0.17
Uniaxial moment capacity (longer direction) M uz1 = 6.46372 kNm
M uy1/fckb2D value (from SP 16:1980 chart-47) M uy1/fckb D 2
= 0.17
Uniaxial moment capacity (shorter direction) M uy1 = 6.46372 kNm
P u/P uz ratio P u/P uz = 0.026
Value of exponent = 1.000
Interaction ratio = 0.46 < 1.00 safe

Area of steel required = 317.4 mm2


Dia of steel provided (At corners) = 12 mm
No of steel provided (At corners) = 4
Dia of steel provided (At faces) = 20 mm
No of steel provided (At faces) = 0
Area of steel provided = 452 mm2

Design of Ties: For cross section refer page 000


Dia of tie bar shall be the greater of the following,
(i) 6 mm
(ii) f/4 mm
Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 115 mm
(ii) 16 times the smallest dia of the longitudinal bar = 192 mm
(iii) 300 mm = 300 mm

Provide 10 mm dia ties @ 100mm c/c

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 69

COLUMN DESIGN-MAX MY

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 70
DESIGN OF SUPER STRUCTURE. COLUMN -MAX MY

BEAM NO : 100 L/C 2011 F.S. = 1.2


DATA
Length of column D = 115 mm
Breadth of column b = 115 mm
Unsupported length (longer direction) Lz = 3375 mm
Unsupported length (shorter direction) Ly = 3375 mm
Eff. length (longer direction) 1.2xLz L ez = 4050 mm
Eff. length (shorter direction) 1.2xLy L ey = 4050 mm
Braced/Unbraced Unbraced
Factored axial load Pu = 7 kN
*
Factored moment (longer direction) M iz = 1 kNm
*
Factored moment (shorter direction) M iy = 1 kNm
Charac. comp strength of concrete f ck = 25 N/mm2
Yield stress of steel fy = 500 N/mm2
cover = 25 mm
(* The factored moment is inclusive of eccentric moment)
Check for slenderness
Longer Direction
Slenderness ratio L ez/D = 35.22 slender
Additional moment due to slenderness Pu x (Lez/D) M az = 0.497994 kN-m
Shorter Direction
Slenderness ratio L ey/b = 35.22 slender
Additional moment due to slenderness Pu x (Ley/D) M ay = 0.497994 kN-m
Calculation of P uz
Assumed percentage of reinforcement pt = 2.400 %
Area of concrete Ag = 13225 mm2
Ultimate axial load (without moments) P uz = 264 kN
Calculation of P b:
Longer Direction
d '/D = 0.217
Coefficient k 1(from TABLE 60 of SP 16:1980) k1z = 0.184
Coefficient k 2(from TABLE 60 of SP 16:1980) k2z = 0.04
Axial load corresponding to balanced failure P bz = 62 kN
Reduction factor for additional moments kz = 1.000
Moment due to slenderness M az = 0.50 kN-m
Shorter Direction
d '/b = 0.217
Coefficient k 1(from TABLE 60 of SP:1980) k1y = 0.184
Coefficient k 2(from TABLE 60 of SP:1980) k2y = 0.04
Axial load corresponding to balanced failure P by = 62 kN
Reduction factor for additional moments ky = 1.000
Moment due to slenderness M ax = 0.50 kN-m

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 71
Check for moments due to min. eccentricity
Longer Direction
Minimum eccentricity ez = 10.58 mm
Moment due to min. eccentricity Mz = 0.07 kN-m
Moment in longer direction M uz = 1 kNm
Shorter direction
Minimum eccentricity ey = 10.58 mm
Moment due to min. eccentricity My = 0.07 kN-m
Moment in shorter direction M uy = 1.349 kNm

Final design moments


Moment in longer direction M uz = 1.50 kNm
Moment in shorter direction M uy = 1.85 kNm

Check for interaction


p /f ck p /f ck = 0.096
P u/f ckbD value P u/f ckbD = 0.021
2 2
M ux1/fckbD value (from SP 16:1980 chart-47) M uz1/fckbD = 0.17
Uniaxial moment capacity (longer direction) M uz1 = 6.463719 kNm
M uy1/fckb2D value (from SP 16:1980 chart-47) M uy1/fckb D 2
= 0.17
Uniaxial moment capacity (shorter direction) M uy1 = 6.463719 kNm
P u/P uz ratio P u/P uz = 0.026
Value of exponent = 1.000
Interaction ratio = 0.52 < 1.00 safe

Area of steel required = 317.4 mm2


Dia of steel provided (At corners) = 12 mm
No of steel provided (At corners) = 4
Dia of steel provided (At faces) = 20 mm
No of steel provided (At faces) = 0
Area of steel provided = 452 mm2

Design of Ties: For cross section refer page 000


Dia of tie bar shall be the greater of the following,
(i) 6 mm
(ii) f/4 mm

Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 115 mm
(ii) 16 times the smallest dia of the longitudinal bar = 192 mm
(iii) 300 mm = 300 mm

Provide 10 mm dia ties @ 100mm c/c

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 72

COLUMN DESIGN-MAX MZ

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 73
DESIGN OF SUPER STRUCTURE. COLUMN -MAX MZ

BEAM NO : 100 L/C 2009 F.S. = 1.2


DATA
Length of column D = 115 mm
Breadth of column b = 115 mm
Unsupported length (longer direction) Lz = 3375 mm
Unsupported length (shorter direction) Ly = 3375 mm
Eff. length (longer direction) 1.2xLz L ez = 4050 mm
Eff. length (shorter direction) 1.2xLy L ey = 4050 mm
Braced/Unbraced Unbraced
Factored axial load Pu = 5 kN
*
Factored moment (longer direction) M iz = 1 kNm
*
Factored moment (shorter direction) M iy = 1 kNm
Charac. comp strength of concrete f ck = 25 N/mm2
Yield stress of steel fy = 500 N/mm2
cover = 25 mm
(* The factored moment is inclusive of eccentric moment)
Check for slenderness
Longer Direction
Slenderness ratio L ez/D = 35.22 slender
Additional moment due to slenderness Pu x (Lez/D) M az = 0.38553 kN-m
Shorter Direction
Slenderness ratio L ey/b = 35.22 slender
Additional moment due to slenderness Pu x (Ley/D) M ay = 0.38553 kN-m
Calculation of P uz
Assumed percentage of reinforcement pt = 2.400 %
Area of concrete Ag = 13225 mm2
Ultimate axial load (without moments) P uz = 264 kN
Calculation of P b:
Longer Direction
d '/D = 0.217
Coefficient k 1(from TABLE 60 of SP 16:1980) k1z = 0.184
Coefficient k 2(from TABLE 60 of SP 16:1980) k2z = 0.04
Axial load corresponding to balanced failure P bz = 62 kN
Reduction factor for additional moments kz = 1.000
Moment due to slenderness M az = 0.39 kN-m
Shorter Direction
d '/b = 0.217
Coefficient k 1(from TABLE 60 of SP:1980) k1y = 0.184
Coefficient k 2(from TABLE 60 of SP:1980) k2y = 0.04
Axial load corresponding to balanced failure P by = 62 kN
Reduction factor for additional moments ky = 1.000
Moment due to slenderness M ax = 0.39 kN-m

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


n

GOVERNMENT OF MADHYA PRADESH WATER


n

L&T Construction RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 74
Check for moments due to min. eccentricity
Longer Direction
Minimum eccentricity ez = 10.58 mm
Moment due to min. eccentricity Mz = 0.06 kN-m
Moment in longer direction M uz = 1 kNm
Shorter direction
Minimum eccentricity ey = 10.58 mm
Moment due to min. eccentricity My = 0.06 kN-m
Moment in shorter direction M uy = 1 kNm

Final design moments


Moment in longer direction M uz = 1.39 kNm
Moment in shorter direction M uy = 1.39 kNm

Check for interaction


p /f ck p /f ck = 0.096
P u/f ckbD value P u/f ckbD = 0.016
2 2
M ux1/fckbD value (from SP 16:1980 chart-47) M uz1/fckbD = 0.17
Uniaxial moment capacity (longer direction) M uz1 = 6.46372 kNm
M uy1/fckb2D value (from SP 16:1980 chart-47) M uy1/fckb D 2
= 0.17
Uniaxial moment capacity (shorter direction) M uy1 = 6.46372 kNm
P u/P uz ratio P u/P uz = 0.020
Value of exponent = 1.000
Interaction ratio = 0.43 < 1.00 safe

Area of steel required = 317.4 mm2


Dia of steel provided (At corners) = 12 mm
No of steel provided (At corners) = 4
Dia of steel provided (At faces) = 20 mm
No of steel provided (At faces) = 0
Area of steel provided = 452 mm2

Design of Ties: For cross section refer page 000


Dia of tie bar shall be the greater of the following,
(i) 6 mm
(ii) f/4 mm

Choosing 8 mmdia of ties and the pitch is taken as the minimum of the following,
(i) Least lateral dimension of the column = 115 mm
(ii) 16 times the smallest dia of the longitudinal bar = 192 mm
(iii) 300 mm = 300 mm

Provide 10 mm dia ties @ 100mm c/c

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 75

DESIGN OF BEAMS

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 76

DESIGN OF BEAMS
PLINTH BEAM

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 77

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
Job No Sheet No Rev
78
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 16:56


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Bending about Z for Beam 2


304.45 Load Case: 2010:1.5 DL + 1.5 EL -X

-138.46

Dist.m Fy(kN) Mz(kN-m)


0.000000 244.2504 304.4464
0.177084 238.7204 261.6807
0.354167 233.0140 219.9099
0.531251 227.1312 179.1651
0.708335 221.0721 139.4778
0.885419 214.8365 100.8790
1.062502 208.4245 63.4001
1.239586 202.0126 27.0618
1.416670 195.7770 -8.1566
1.593754 189.7178 -42.2864
1.770837 183.8350 -75.3589
1.947921 178.1287 -107.4052
2.125005 172.5987 -138.4567

Print Time/Date: 21/07/2020 17:51 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
79
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 16:56


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 4

Load Case: 2000:1.5DL+1.5LL

248.107
172.172

Dist.m Fy(kN) Mz(kN-m)


0.000000 248.1071 232.2953
0.177084 242.8081 188.8227
0.354167 237.0976 146.3249
0.531251 230.9754 104.8748
0.708335 224.4417 64.5452
0.885419 217.4964 25.4091
1.062502 210.1396 -12.4606
1.239586 202.7827 -49.0155
1.416670 195.8374 -84.3040
1.593754 189.3037 -118.3990
1.770837 183.1816 -151.3735
1.947921 177.4710 -183.3003
2.125005 172.1721 -214.2522

Print Time/Date: 21/07/2020 17:33 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 80
PLINTH BEAM: Plinth Beam has been designed for Maximum forces of PB1 and PB-2

Breadth of the beam = 250 mm


Depth of the beam = 600 mm
Concrete Grade = 25 N/mm2
Steel Grade = 500 N/mm2
Cover = 50 mm

FACTORED FORCE
Max. span Moment ,Mu Span = 214 kN-m. B.No: 4 L/C : 2000
Max. Support Moment ,Mu Supp = 268 kN-m. B.No: 2 L/C : 2010
Max. Torsion,Tu = 5.62 kN-m. B.No: 82 L/C : 2010
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 5.62 x (1+ 600/250 )
1.70
= 11.24 kN-m.
Total Moment Me = = 268.158 + 11.24
= 279.40 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 279.40 kN-m.
b = 250 mm
D = 600 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 72.5 mm 1st layer= = 25 mm
Eff Depth,d = 527.5 mm Spacer bar = 25 mm
2nd layer = 16 mm
Mu/bd2 = 279.40 x 106
250 x 527.5^2
= 4.02 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 1.224 %
Ast reqd. = 1614.150 mm2
Provide 3 - 25 Y + 0 - 0 Y
2 - 16 Y + 0 - 0 Y
Ast provided. = 1874.750 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x527.5)/500
= 224.188 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 214 kN-m.
b = 250 mm

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 81
PLINTH BEAM: Plinth Beam has been
D designed
= 600 for Maximum
mmforces of PB1
Shear Linkand
Dia=PB-210 mm
1 Layer Reinf. d' = 72.5 1st layer= = 25
Eff Depth,d = 527.5 Spacer bar = 25
2nd layer = 0
Mu/bd2 = 214.252 x 106
250 x 527.5^2
= 3.08 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Span Pt , reqd. = 0.854 %
Ast reqd. = 1126.213 mm2
Provide 3 - 25 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 1472.630 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 224.188 mm2

SHEAR REINFORCEMENT FOR SHEAR


Factored Shear Vu = 225.61 kN B: 4 L/C: 2000
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
5.62 X 103
= 225.609 +1.6 ( 250 )
= 261.59 KN
3
Ve 261.59 X10
Tv = =
bd 250x527.5
= 1.98 N/mm2

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x1874.75/(250 x 527.5)


= 1.420 %
IS 456-2000 Tc, = 0.7270 N/mm2
TABLE 19 - M25 Tv > Tc
Vus = (Tv - Tc) bd
= (1.98 - 0.727 ) x 250 x 527.5
= 165239.375 N
= 165.24 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 415 x 2 x79 x527.5 ) / (165.24 x1000) 2 legged stirrups
= 182.109 mm Min i) 0.75d = 396 mm
ii) Sv = 182.109 mm
Provide 2 legged 10mm dia. Stirrups @ 175mm c/c iii) b= 250 mm

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


Job No Sheet No Rev
82
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 16:56


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Bending about Z for Beam 37

Load Case: 2012:1.5 DL + 1.5 EL -Z

295.96 135.35

Dist.m Fy(kN) Mz(kN-m)


0.000000 241.5915 295.9572
0.058750 239.5367 281.8237
0.117500 237.4128 267.8130
0.176250 235.2199 253.9291
0.235000 232.9578 240.1761
0.293750 230.6265 226.5580
0.352500 228.2262 213.0788
0.411250 225.7567 199.7428
0.470000 223.2181 186.5538
0.528749 220.6105 173.5160
0.587499 217.9336 160.6335
0.646249 215.1877 147.9102
0.704999 212.3727 135.3503

Print Time/Date: 21/07/2020 17:46 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
83
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 16:56


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 37

Load Case: 2012:1.5 DL + 1.5 EL -Z

241.591 212.373

Dist.m Fy(kN) Mz(kN-m)


0.000000 241.5915 295.9572
0.058750 239.5367 281.8237
0.117500 237.4128 267.8130
0.176250 235.2199 253.9291
0.235000 232.9578 240.1761
0.293750 230.6265 226.5580
0.352500 228.2262 213.0788
0.411250 225.7567 199.7428
0.470000 223.2181 186.5538
0.528749 220.6105 173.5160
0.587499 217.9336 160.6335
0.646249 215.1877 147.9102
0.704999 212.3727 135.3503

Print Time/Date: 21/07/2020 17:49 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 84
PLINTH BEAM: Plinth Beam has been designed for Maximum forces of PB-5 and PB7

Breadth of the beam = 250 mm


Depth of the beam = 600 mm
Concrete Grade = 25 N/mm2
Steel Grade = 500 N/mm2
Cover = 50 mm

FACTORED FORCE
Max. span Moment ,Mu Span = 144 kN-m. B.No: 36 L/C : 2036
Max. Support Moment ,Mu Supp = 225 kN-m. B.No: 37 L/C : 2012
Max. Torsion,Tu = 6.45 kN-m. B.No: 88 L/C : 2009
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 6.45 x (1+ 600/250 )
1.70
= 12.89 kN-m.
Total Moment Me = = 225.117 + 12.89
= 238.01 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 238.01 kN-m.
b = 250 mm
D = 600 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 72.5 mm 1st layer= = 25 mm
Eff Depth,d = 527.5 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 238.01 x 106
250 x 527.5^2
= 3.42 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.977 %
Ast reqd. = 1288.419 mm2
Provide 3 - 25 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 1472.630 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x527.5)/500
= 224.188 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 144 kN-m.
b = 250 mm

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 85
PLINTH BEAM: Plinth Beam has been
D designed
= 600 for Maximum
mmforces of PB-5
Shear Link and
Dia=PB710 mm
1 Layer Reinf. d' = 72.5 1st layer= = 25
Eff Depth,d = 527.5 Spacer bar = 25
2nd layer = 0
Mu/bd2 = 143.517 x 106
250 x 527.5^2
= 2.06 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Span Pt , reqd. = 0.53 %
Ast reqd. = 698.938 mm2
Provide 3 - 20 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 942.480 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 224.188 mm2

SHEAR REINFORCEMENT FOR SHEAR


Factored Shear Vu = 212.37 kN B: 37 L/C: 2012
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
6.45 X 103
= 212.373 +1.6 ( 250 )
= 253.634 KN
3
Ve 253.634 X10
Tv = =
bd 250x527.5
= 1.92 N/mm2

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x1472.63/(250 x 527.5)


= 1.120 %
IS 456-2000 Tc, = 0.6790 N/mm2
TABLE 19 - M25 Tv > Tc
Vus = (Tv - Tc) bd
= (1.92 - 0.679 ) x 250 x 527.5
= 163656.875 N
= 163.66 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 415 x 2 x79 x527.5 ) / (163.66 x1000) 2 legged stirrups
= 183.867 mm Min i) 0.75d = 396 mm
ii) Sv = 183.867 mm
Provide 2 legged 10mm dia. Stirrups @ 175mm c/c iii) b= 250 mm

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


Job No Sheet No Rev
86
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 16:56


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Bending about Z for Beam 86

Load Case: 2000:1.5DL+1.5LL

2.673

-227.37
-279.860

Dist.m Fy(kN) Mz(kN-m)


0.000000 185.3337 -0.0000
0.327917 173.7169 -58.9888
0.655833 157.7289 -113.4515
0.983750 137.3699 -161.9548
1.311666 113.0473 -203.0993
1.639583 85.9924 -235.7829
1.967499 58.4493 -259.4653
2.295416 30.9063 -274.1159
2.623332 3.8513 -279.7653
2.951249 -20.5120 -276.9527
3.279165 -41.9156 -266.6363
3.607082 -60.3594 -249.7866
3.934999 -75.8436 -227.3741

Print Time/Date: 21/07/2020 18:15 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
87
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 22-Jul-2020 15:18


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 101

Load Case: 2000:1.5DL+1.5LL

-141.814 -202.435

Dist.m Fy(kN) Mz(kN-m)


0.000000 -141.8143 -228.5909
0.109583 -146.6595 -212.7880
0.219166 -151.8352 -196.4360
0.328750 -157.3033 -179.4997
0.438333 -162.9516 -161.9540
0.547916 -168.7729 -143.7799
0.657499 -174.7525 -124.9585
0.767083 -180.5745 -105.4857
0.876666 -185.9229 -85.4003
0.986249 -190.7832 -64.7555
1.095832 -195.1553 -43.6048
1.205415 -199.0393 -22.0018
1.314999 -202.4352 0.0000

Print Time/Date: 22/07/2020 18:35 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 88
PLINTH BEAM: Plinth Beam has been designed for Maximum forces of PB-6

Breadth of the beam = 250 mm


Depth of the beam = 600 mm
Concrete Grade = 25 N/mm2
Steel Grade = 500 N/mm2
Cover = 50 mm

FACTORED FORCE
Max. span Moment ,Mu Span = 280 kN-m. B.No: 86 L/C : 2000
Max. Support Moment ,Mu Supp = 1 kN-m. B.No: 86 L/C : 2000
Max. Torsion,Tu = 2.1 kN-m. B.No: 86 L/C : 2009
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 2.10 x (1+ 600/250 )
1.70
= 4.19 kN-m.
Total Moment Me = = 1 + 4.19
= 5.19 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 5.19 kN-m.
b = 250 mm
D = 600 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 66 mm 1st layer= = 12 mm
Eff Depth,d = 534 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 5.19 x 106
250 x 534^2
= 0.07 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.17 %
Ast reqd. = 226.950 mm2
Provide 3 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 339.300 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x534)/500
= 226.95 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 280 kN-m.
b = 250 mm

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 89
PLINTH BEAM: Plinth Beam has been
D designed
= 600 for Maximum
mmforces of PB-6
Shear Link Dia= 10 mm
1 Layer Reinf. d' = 72.5 1st layer= = 25
Eff Depth,d = 527.5 Spacer bar = 25
2nd layer = 12
Mu/bd2 = 279.765 x 106
250 x 527.5^2
= 4.02 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Span Pt , reqd. = 1.224 %
Ast reqd. = 1614.150 mm2
Provide 3 - 25 Y + 0 - 0 Y
2 - 12 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 1698.820 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 226.95 mm2

SHEAR REINFORCEMENT FOR SHEAR


Factored Shear Vu = 180.01 kN B: 101 L/C: 2000
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
2.1 X 103
= 180.006 +1.6 ( 250 )
= 193.414 KN
3
Ve 193.414 X10
Tv = =
bd 250x534
= 1.45 N/mm2

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x339.3/(250 x 534)


= 0.250 %
IS 456-2000 Tc, = 0.3600 N/mm2
TABLE 19 - M25 Tv > Tc
Vus = (Tv - Tc) bd
= (1.45 - 0.36 ) x 250 x 534
= 145515 N
= 145.52 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 415 x 2 x79 x534 ) / (145.52 x1000) 2 legged stirrups
= 209.336 mm Min i) 0.75d = 401 mm
ii) Sv = 209.336 mm
Provide 2 legged 10mm dia. Stirrups @ 200mm c/c iii) b= 250 mm

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


Job No Sheet No Rev
90
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 16:56


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Bending about Z for Beam 90

Load Case: 2000:1.5DL+1.5LL

1.500
-0.00

-30.865

Dist.m Fy(kN) Mz(kN-m)


0.000000 41.1540 -0.0000
0.249999 34.2950 -9.4311
0.499999 27.4360 -17.1474
0.749998 20.5770 -23.1491
0.999998 13.7180 -27.4359
1.249997 6.8590 -30.0080
1.499997 0.0000 -30.8654
1.749996 -6.8590 -30.0081
1.999996 -13.7180 -27.4359
2.249995 -20.5770 -23.1491
2.499995 -27.4359 -17.1475
2.749994 -34.2949 -9.4311
2.999994 -41.1539 -0.0000

Print Time/Date: 21/07/2020 18:23 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
91
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 16:56


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 96

Load Case: 2000:1.5DL+1.5LL

80.260

-9.841

Dist.m Fy(kN) Mz(kN-m)


0.000000 80.2596 -0.0000
0.145834 77.1825 -11.4944
0.291668 72.9346 -22.4548
0.437502 67.5159 -32.7102
0.583336 60.9265 -42.0901
0.729170 53.2369 -50.4253
0.875004 44.8863 -57.5873
1.020838 35.9503 -63.4888
1.166672 26.5046 -68.0463
1.312506 16.9882 -71.2176
1.458340 7.4718 -73.0012
1.604174 -1.7459 -73.4073
1.750009 -9.8405 -72.5482

Print Time/Date: 21/07/2020 18:24 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 92
PLINTH BEAM: Plinth Beam has been designed for Maximum forces of PB-3 and PB-4

Breadth of the beam = 250 mm


Depth of the beam = 450 mm
Concrete Grade = 25 N/mm2
Steel Grade = 500 N/mm2
Cover = 50 mm

FACTORED FORCE
Max. span Moment ,Mu Span = 73.4 kN-m. B.No: 96 L/C : 2000
Max. Support Moment ,Mu Supp = 1 kN-m. B.No: 90 L/C : 2000
Max. Torsion,Tu = 15 kN-m. B.No: 96 L/C : 2000
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 14.96 x (1+ 450/250 )
1.70
= 24.64 kN-m.
Total Moment Me = = 1 + 24.64
= 25.64 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 25.64 kN-m.
b = 250 mm
D = 450 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 66 mm 1st layer= = 12 mm
Eff Depth,d = 384 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 25.64 x 106
250 x 384^2
= 0.70 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.17 %
Ast reqd. = 163.200 mm2
Provide 3 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 339.300 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x384)/500
= 163.2 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 73 kN-m.
b = 250 mm

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 93
PLINTH BEAM: Plinth Beam has been
D designed
= 450 for Maximum
mmforces of PB-3
Shear Link and
Dia=PB-410 mm
1 Layer Reinf. d' = 72.5 1st layer= = 25
Eff Depth,d = 377.5 Spacer bar = 25
2nd layer = 0
Mu/bd2 = 73.41 x 106
250 x 377.5^2
= 2.06 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Span Pt , reqd. = 0.53 %
Ast reqd. = 500.188 mm2
Provide 3 - 16 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 603.190 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 163.2 mm2

SHEAR REINFORCEMENT FOR SHEAR


Factored Shear Vu = 64.432 kN B: 96 L/C: 2000
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
15 X 103
= 64.432 +1.6 ( 250 )
= 160.163 KN
3
Ve 160.163 X10
Tv = =
bd 250x384
= 1.67 N/mm2

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x339.3/(250 x 384)


= 0.350 %
IS 456-2000 Tc, = 0.4120 N/mm2
TABLE 19 - M25 Tv > Tc
Vus = (Tv - Tc) bd
= (1.67 - 0.412 ) x 250 x 384
= 120768 N
= 120.77 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 415 x 2 x79 x384 ) / (120.77 x1000) 2 legged stirrups
= 181.383 mm Min i) 0.75d = 288 mm
ii) Sv = 181.383 mm
Provide 2 legged 10mm dia. Stirrups @ 175mm c/c iii) b= 250 mm

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


Job No Sheet No Rev
94
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 16:56


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Bending about Z for Beam 97

Load Case: 2036:0.9 DL + 1.5 EL -Z

0.314
-0.00

-9.91 -10.657

Dist.m Fy(kN) Mz(kN-m)


0.000000 4.3951 -9.9060
0.109583 3.1275 -10.3208
0.219166 1.5712 -10.5809
0.328750 -0.2736 -10.6546
0.438333 -2.4070 -10.5104
0.547916 -4.8289 -10.1166
0.657499 -7.5331 -9.4416
0.767083 -10.2372 -8.4656
0.876666 -12.6592 -7.2084
0.986249 -14.7926 -5.7016
1.095832 -16.6374 -3.9769
1.205415 -18.1936 -2.0658
1.314999 -19.4613 -0.0000

Print Time/Date: 21/07/2020 18:32 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev
95
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 16:56


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 97

Load Case: 2000:1.5DL+1.5LL

11.922

Dist.m Fy(kN) Mz(kN-m)


0.000000 11.9217 -14.7240 -34.316
0.109583 9.7189 -15.9158
0.219166 6.8549 -16.8299
0.328750 3.3299 -17.3940
0.438333 -0.8562 -17.5356
0.547916 -5.7033 -17.1822
0.657499 -11.1970 -16.2616
0.767083 -16.6906 -14.7282
0.876666 -21.5378 -12.6276
0.986249 -25.7238 -10.0320
1.095832 -29.2489 -7.0139
1.205415 -32.1128 -3.6458
1.314999 -34.3157 -0.0000

Print Time/Date: 21/07/2020 18:35 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 96
PLINTH BEAM: Plinth Beam has been designed for Maximum forces of PB-8

Breadth of the beam = 250 mm


Depth of the beam = 450 mm
Concrete Grade = 25 N/mm2
Steel Grade = 500 N/mm2
Cover = 50 mm

FACTORED FORCE
Max. span Moment ,Mu Span = 18.2 kN-m. B.No: 97 L/C : 2009
Max. Support Moment ,Mu Supp = 1 kN-m. B.No: 97 L/C : 2036
Max. Torsion,Tu = 9.26 kN-m. B.No: 97 L/C : 2022
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 9.26 x (1+ 450/250 )
1.70
= 15.26 kN-m.
Total Moment Me = = 1 + 15.26
= 16.26 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 16.26 kN-m.
b = 250 mm
D = 450 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 66 mm 1st layer= = 12 mm
Eff Depth,d = 384 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 16.26 x 106
250 x 384^2
= 0.44 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.17 %
Ast reqd. = 163.200 mm2
Provide 3 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 339.300 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x384)/500
= 163.2 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 18 kN-m.
b = 250 mm

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 97
PLINTH BEAM: Plinth Beam has been
D designed
= 450 for Maximum
mmforces of PB-8
Shear Link Dia= 10 mm
1 Layer Reinf. d' = 72.5 1st layer= = 25
Eff Depth,d = 377.5 Spacer bar = 25
2nd layer = 0
Mu/bd2 = 18.247 x 106
250 x 377.5^2
= 0.51 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Span Pt , reqd. = 0.17 %
Ast reqd. = 160.438 mm2
Provide 3 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 339.300 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 163.2 mm2

SHEAR REINFORCEMENT FOR SHEAR


Factored Shear Vu = 18.488 kN B: 97 L/C: 2000
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
9.26 X 103
= 18.488 +1.6 ( 250 )
= 77.7776 KN
3
Ve 77.7776 X10
Tv = =
bd 250x384
= 0.81 N/mm2

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x339.3/(250 x 384)


= 0.350 %
IS 456-2000 Tc, = 0.4120 N/mm2
TABLE 19 - M25 Tv > Tc
Vus = (Tv - Tc) bd
= (0.81 - 0.412 ) x 250 x 384
= 38208 N
= 38.21 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 415 x 2 x79 x384 ) / (38.21 x1000) 2 legged stirrups
= 573.296 mm Min i) 0.75d = 288 mm
ii) Sv = 573.296 mm
Provide 2 legged 10mm dia. Stirrups @ 250mm c/c iii) b= 250 mm

# Sensitivity: LNT Construction Internal Use Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 98

DESIGN OF BEAMS
TIE BEAM-1 AND 2

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 99

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
Job No Sheet No Rev

100
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Bending about Z for Beam 57

Load Case: 2009:1.5 DL + 1.5 EL +X

77.16

-62.23

Dist.m Fy(kN) Mz(kN-m)


0.000000 -20.4049 -62.2296
0.427083 -21.5370 -53.2733
0.854166 -22.6691 -43.8334
1.281250 -23.8011 -33.9101
1.708333 -24.9332 -23.5033
2.135416 -26.0653 -12.6130
2.562499 -27.1973 -1.2392
2.989583 -28.3294 10.6180
3.416666 -29.4614 22.9588
3.843749 -30.5935 35.7830
4.270832 -31.7256 49.0907
4.697916 -32.8576 62.8819
5.124999 -33.9897 77.1566

Print Time/Date: 21/07/2020 19:16 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev

101
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 56

Load Case: 2010:1.5 DL + 1.5 EL -X

34.187
20.602

Dist.m Fy(kN) Mz(kN-m)


0.000000 34.1866 77.0612
0.427083 33.0545 62.7024
0.854166 31.9225 48.8271
1.281250 30.7904 35.4353
1.708333 29.6584 22.5270
2.135416 28.5263 10.1022
2.562499 27.3942 -1.8392
2.989583 26.2622 -13.2971
3.416666 25.1301 -24.2715
3.843749 23.9980 -34.7624
4.270832 22.8660 -44.7698
4.697916 21.7339 -54.2937
5.124999 20.6019 -63.3342

Print Time/Date: 21/07/2020 19:16 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 102
TIE BEAM-1: Tie Beam-1 has been designed for Maximum forces of TB-1

Breadth of the beam = 250 mm


Depth of the beam = 300 mm
Concrete Grade = 25 N/mm
2

Steel Grade = 500 N/mm


2

Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 66.245 kN-m. B.No: 56 L/C : 2033
Max. Support Moment ,Mu Supp = 72.088 kN-m. B.No: 57 L/C : 2009
Max. Torsion,Tu = 1.644 kN-m. B.No: 57 L/C : 2009
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 1.64 x (1+ 300/250 )
1.70
= 2.13 kN-m.
Total Moment Me = = 72.088 + 2.13
= 74.22 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 74.22 kN-m.
b = 250 mm
D = 300 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 mm 1st layer= = 20 mm
Eff Depth,d = 255 mm Spacer bar = 25 mm
2nd layer = 0 mm
2
Mu/bd = 74.22 x 106
250 x 255^2
2
= 4.57 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Support Pt reqd. = 1.502 %
Ast reqd. = 957.525 mm2
Provide 3 - 25 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 1472.630 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x255)/500
= 108.375 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 66 kN-m.
b = 250 mm

Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 103
TIE BEAM-1: Tie Beam-1 has been
D designed
= 300 for Maximum
mmforces Shear
of TB-1Link Dia= 10 mm
1 Layer Reinf. d' = 45 1st layer= = 20
Eff Depth,d = 255 Spacer bar = 25
2nd layer = 0
Mu/bd2 = 66.245 x 106
250 x 255^2
2
= 4.08 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Span Pt , reqd. = 1.251 %
Ast reqd. = 797.513 mm2
Provide 3 - 20 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 942.480 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 108.375 mm2
SHEAR REINFORCEMENT FOR SHEAR
Factored Shear Vu = 33.113 kN B: 56 L/C: 2010
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
1.644 X 103
= 33.113 +1.6 ( 250 )
= 43.6346 KN
3
Ve 43.6346 X10
Tv = =
bd 250x255
2
= 0.68 N/mm

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x1472.63/(250 x 255)


= 2.310 %
2
IS 456-2000 Tc, = 1.0070 N/mm
TABLE 19 - M25 As Tv < Tc Provide min Shear reinforcement, However
Vus = (Tv - Tc) bd
= (0.68 - 1.007 ) x 250 x 255
= -20846.25 N
= -20.85 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 415 x 2 x79 x255 ) / (-20.85 x1000) 2 legged stirrups
= -697.684 mm Min i) 0.75d = 191 mm
ii) Sv = -697.68 mm
Provide 2 legged 10mm dia. Stirrups @ 175mm c/c iii) b= 250 mm

Consultant:- Tavan Infratech LLP


Job No Sheet No Rev

104
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Bending about Z for Beam 61

Load Case: 2012:1.5 DL + 1.5 EL -Z


35.94

-22.54

Dist.m Fy(kN) Mz(kN-m)


0.000000 18.0974 35.9436
0.437500 16.9377 28.2797
0.875000 15.7780 21.1231
1.312499 14.6183 14.4739
1.749999 13.4587 8.3321
2.187499 12.2990 2.6976
2.624999 11.1393 -2.4295
3.062498 9.9797 -7.0493
3.499998 8.8200 -11.1617
3.937498 7.6603 -14.7668
4.374998 6.5006 -17.8645
4.812497 5.3410 -20.4549
5.249997 4.1813 -22.5379

Print Time/Date: 21/07/2020 21:02 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev

105
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 61

Load Case: 2012:1.5 DL + 1.5 EL -Z

18.097

4.181

Dist.m Fy(kN) Mz(kN-m)


0.000000 18.0974 35.9436
0.437500 16.9377 28.2797
0.875000 15.7780 21.1231
1.312499 14.6183 14.4739
1.749999 13.4587 8.3321
2.187499 12.2990 2.6976
2.624999 11.1393 -2.4295
3.062498 9.9797 -7.0493
3.499998 8.8200 -11.1617
3.937498 7.6603 -14.7668
4.374998 6.5006 -17.8645
4.812497 5.3410 -20.4549
5.249997 4.1813 -22.5379

Print Time/Date: 21/07/2020 21:29 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 106
TIE BEAM-1: Tie Beam-2 has been designed for Maximum forces of TB-2

Breadth of the beam = 250 mm


Depth of the beam = 300 mm
Concrete Grade = 25 N/mm
2

Steel Grade = 500 N/mm


2

Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 23.904 kN-m. B.No: 61 L/C : 2036
Max. Support Moment ,Mu Supp = 30.634 kN-m. B.No: 61 L/C : 2012
Max. Torsion,Tu = 2.28 kN-m. B.No: 62 L/C : 2010
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 2.28 x (1+ 300/250 )
1.70
= 2.95 kN-m.
Total Moment Me = = 30.634 + 2.95
= 33.58 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 33.58 kN-m.
b = 250 mm
D = 300 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 mm 1st layer= = 20 mm
Eff Depth,d = 255 mm Spacer bar = 25 mm
2nd layer = 0 mm
2
Mu/bd = 33.58 x 106
250 x 255^2
2
= 2.07 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Support Pt reqd. = 0.533 %
Ast reqd. = 339.788 mm2
Provide 3 - 16 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 603.190 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x255)/500
= 108.375 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 24 kN-m.
b = 250 mm

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 107
TIE BEAM-1: Tie Beam-2 has been
D designed
= 300 for Maximum
mmforces Shear
of TB-2Link Dia= 10 mm
1 Layer Reinf. d' = 45 1st layer= = 20
Eff Depth,d = 255 Spacer bar = 25
2nd layer = 0
Mu/bd2 = 23.904 x 106
250 x 255^2
2
= 1.47 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Span Pt , reqd. = 0.365 %
Ast reqd. = 232.688 mm2
Provide 3 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 339.300 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 108.375 mm2
SHEAR REINFORCEMENT FOR SHEAR
Factored Shear Vu = 16.626 kN B: 61 L/C: 2012
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
3
2.28 X 10
= 16.626 +1.6 ( 250 )
= 31.218 KN
3
Ve 31.218 X10
Tv = =
bd 250x255
2
= 0.49 N/mm

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x603.19/(250 x 255)


= 0.950 %
2
IS 456-2000 Tc, = 0.6260 N/mm
TABLE 19 - M25 As Tv < Tc Provide min Shear reinforcement, However
Vus = (Tv - Tc) bd
= (0.49 - 0.626 ) x 250 x 255
= -8670 N
= -8.67 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 415 x 2 x79 x255 ) / (-8.67 x1000) 2 legged stirrups
= -1677.82 mm Min i) 0.75d = 191 mm
ii) Sv = -1677.8 mm
Provide 2 legged 10mm dia. Stirrups @ 175mm c/c iii) b= 250 mm

Sensitivity: LNT Construction Internal Use


#
Consultant:- Tavan Infratech LLP
GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 108

DESIGN OF BEAMS
TIE BEAM-3

Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 109

Consultant:- Tavan Infratech LLP


Job No Sheet No Rev

110
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Bending about Z for Beam 80

Load Case: 2010:1.5 DL + 1.5 EL -X

47.39

-33.15

Dist.m Fy(kN) Mz(kN-m)


0.000000 22.5066 47.3905
0.427083 21.3746 38.0200
0.854166 20.2425 29.1330
1.281250 19.1104 20.7296
1.708333 17.9784 12.8096
2.135416 16.8463 5.3730
2.562499 15.7143 -1.5800
2.989583 14.5822 -8.0496
3.416666 13.4501 -14.0356
3.843749 12.3181 -19.5382
4.270832 11.1860 -24.5573
4.697916 10.0539 -29.0929
5.124999 8.9219 -33.1450

Print Time/Date: 21/07/2020 19:12 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev

111
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 81

Load Case: 2010:1.5 DL + 1.5 EL -X

22.717

9.132

Dist.m Fy(kN) Mz(kN-m)


0.000000 22.7167 44.6036
0.427083 21.5846 35.1434
0.854166 20.4526 26.1667
1.281250 19.3205 17.6735
1.708333 18.1884 9.6638
2.135416 17.0564 2.1376
2.562499 15.9243 -4.9052
2.989583 14.7923 -11.4644
3.416666 13.6602 -17.5402
3.843749 12.5281 -23.1325
4.270832 11.3961 -28.2413
4.697916 10.2640 -32.8667
5.124999 9.1320 -37.0085

Print Time/Date: 21/07/2020 19:14 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 112
TIE BEAM-2: Tie Beam-3 has been designed for Maximum forces of TB-3
Breadth of the beam = 250 mm
Depth of the beam = 300 mm
Concrete Grade = 25 N/mm
2

Steel Grade = 500 N/mm


2

Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 38.998 kN-m. B.No: 81 L/C : 2034
Max. Support Moment ,Mu Supp = 44.044 kN-m. B.No: 80 L/C : 2010
Max. Torsion,Tu = 1 kN-m. B.No: 81 L/C : 2010
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 1.00 x (1+ 300/250 )
1.70
= 1.29 kN-m.
Total Moment Me = = 44.044 + 1.29
= 45.33 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 45.33 kN-m.
b = 250 mm
D = 300 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 43 mm 1st layer= = 16 mm
Eff Depth,d = 257 mm Spacer bar = 25 mm
2nd layer = 0 mm
2
Mu/bd = 45.33 x 106
250 x 257^2
2
= 2.75 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Support Pt reqd. = 0.742 %
Ast reqd. = 476.735 mm2
Provide 3 - 16 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 603.190 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x257)/500
= 109.225 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 39 kN-m.
b = 250 mm

Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 113
TIE BEAM-2: Tie Beam-3 has been
D designed
= 300 for Maximum
mmforces Shear
of TB-3Link Dia= 10 mm
1 Layer Reinf. d' = 45 1st layer= = 20
Eff Depth,d = 255 Spacer bar = 25
2nd layer = 0
Mu/bd2 = 38.998 x 106
250 x 255^2
2
= 2.4 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Span Pt , reqd. = 0.632 %
Ast reqd. = 402.900 mm2
Provide 3 - 16 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 603.190 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 109.225 mm2
SHEAR REINFORCEMENT FOR SHEAR
Factored Shear Vu = 21.638 kN B: 81 L/C: 2010
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
3
1 X 10
= 21.638 +1.6 ( 250 )
= 28.038 KN
3
Ve 28.038 X10
Tv = =
bd 250x257
2
= 0.44 N/mm

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x603.19/(250 x 257)


= 0.940 %
2
IS 456-2000 Tc, = 0.6230 N/mm
TABLE 19 - M25 As Tv < Tc Provide min Shear reinforcement, However
Vus = (Tv - Tc) bd
= (0.44 - 0.623 ) x 250 x 257
= -11757.75 N
= -11.76 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 415 x 2 x79 x257 ) / (-11.76 x1000) 2 legged stirrups
= -1246.67 mm Min i) 0.75d = 193 mm
ii) Sv = -1246.7 mm
Provide 2 legged 10mm dia. Stirrups @ 175mm c/c iii) b= 250 mm

Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 114

DESIGN OF BEAM
LINTEL BEAM

Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 115

DESIGN OF BEAM
LINTEL BEAM

Consultant:- Tavan Infratech LLP


Job No Sheet No Rev

116
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results


62.72
Bending about Z for Beam 10

Load Case: 2010:1.5 DL + 1.5 EL -X

-19.40

Dist.m Fy(kN) Mz(kN-m)


0.000000 49.6656 62.7170
0.177084 47.8282 54.0847
0.354167 45.9908 45.7778
0.531251 44.1535 37.7962
0.708335 42.3161 30.1400
0.885419 40.4787 22.8092
1.062502 38.6414 15.8038
1.239586 36.8040 9.1237
1.416670 34.9666 2.7690
1.593754 33.1293 -3.2603
1.770837 31.2919 -8.9643
1.947921 29.4546 -14.3429
2.125005 27.6172 -19.3961

Print Time/Date: 21/07/2020 19:44 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev

117
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 10

Load Case: 2010:1.5 DL + 1.5 EL -X

49.666
27.617

Dist.m Fy(kN) Mz(kN-m)


0.000000 49.6656 62.7170
0.177084 47.8282 54.0847
0.354167 45.9908 45.7778
0.531251 44.1535 37.7962
0.708335 42.3161 30.1400
0.885419 40.4787 22.8092
1.062502 38.6414 15.8038
1.239586 36.8040 9.1237
1.416670 34.9666 2.7690
1.593754 33.1293 -3.2603
1.770837 31.2919 -8.9643
1.947921 29.4546 -14.3429
2.125005 27.6172 -19.3961

Print Time/Date: 21/07/2020 19:46 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 118
LINTEL BEAMS: Lintel Beam has been designed for Maximum forces of LB-2 and LB-5 and same has
been adopted for Lintel Beams LB-1, LB-2, LB-4, LB-6 and LB-7)
Breadth of the beam = 250 mm
Depth of the beam = 300 mm
Concrete Grade = 25 N/mm
2

Steel Grade = 500 N/mm


2

Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 28.38 kN-m. B.No: 84 L/C : 2009
Max. Support Moment ,Mu Supp = 55.384 kN-m. B.No: 10 L/C : 2010
Max. Torsion,Tu = 3.704 kN-m. B.No: 40 L/C : 2010
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 3.70 x (1+ 300/250 )
1.70
= 4.79 kN-m.
Total Moment Me = = 55.384 + 4.79
= 60.17 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 60.17 kN-m.
b = 250 mm
D = 300 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 mm 1st layer= = 20 mm
Eff Depth,d = 255 mm Spacer bar = 25 mm
2nd layer = 0 mm
2
Mu/bd = 60.17 x 106
250 x 255^2
2
= 3.70 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Support Pt reqd. = 1.087 %
Ast reqd. = 692.963 mm2
Provide 3 - 20 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 942.480 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x255)/500
= 108.375 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 28 kN-m.
b = 250 mm

Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 119
D = 300 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 43 1st layer= = 16
Eff Depth,d = 257 Spacer bar = 25
2nd layer = 0
Mu/bd2 = 28.38 x 106
250 x 257^2
2
= 1.72 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Span Pt , reqd. = 0.433 %
Ast reqd. = 278.203 mm2
Provide 3 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 339.300 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 108.375 mm2
SHEAR REINFORCEMENT FOR SHEAR
Factored Shear Vu = 43.453 kN B: 10 L/C: 2010
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
3.704 X 103
= 43.453 +1.6 ( 250 )
= 67.1586 KN
3
Ve 67.1586 X10
Tv = =
bd 250x255
2
= 1.05 N/mm

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x942.48/(250 x 255)


= 1.480 %
2
IS 456-2000 Tc, = 0.7370 N/mm
TABLE 19 - M25 Tv > Tc
Vus = (Tv - Tc) bd
= (1.05 - 0.737 ) x 250 x 255
= 19953.75 N
= 19.95 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 415 x 2 x79 x255 ) / (19.95 x1000) 2 legged stirrups
= 729.158 mm Min i) 0.75d = 191 mm
ii) Sv = 729.158 mm
Provide 2 legged 10mm dia. Stirrups @ 175mm c/c iii) b= 250 mm

Consultant:- Tavan Infratech LLP


Job No Sheet No Rev

120
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Bending about Z for Beam 98

Load Case: 2000:1.5DL+1.5LL

0.875
-0.00

-1.350

Dist.m Fy(kN) Mz(kN-m)


0.000000 3.0865 -0.0000
0.145834 2.5721 -0.4126
0.291668 2.0577 -0.7502
0.437502 1.5432 -1.0128
0.583336 1.0288 -1.2003
0.729170 0.5144 -1.3128
0.875004 0.0000 -1.3503
1.020838 -0.5144 -1.3128
1.166672 -1.0288 -1.2003
1.312506 -1.5432 -1.0128
1.458340 -2.0577 -0.7502
1.604174 -2.5721 -0.4126
1.750009 -3.0865 -0.0000

Print Time/Date: 21/07/2020 19:51 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev

121
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 22-Jul-2020 15:18


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 98

Load Case: 2000:1.5DL+1.5LL

3.086

-3.086

Dist.m Fy(kN) Mz(kN-m)


0.000000 3.0865 -0.0000
0.145834 2.5721 -0.4126
0.291668 2.0577 -0.7502
0.437502 1.5432 -1.0128
0.583336 1.0288 -1.2003
0.729170 0.5144 -1.3128
0.875004 0.0000 -1.3503
1.020838 -0.5144 -1.3128
1.166672 -1.0288 -1.2003
1.312506 -1.5432 -1.0128
1.458340 -2.0577 -0.7502
1.604174 -2.5721 -0.4126
1.750009 -3.0865 -0.0000

Print Time/Date: 22/07/2020 17:54 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 122
LINTEL BEAMS: Lintel Beam has been designed for Maximum forces of LB-3 and same has been
adopted for Lintel Beam LB-8
Breadth of the beam = 115 mm
Depth of the beam = 115 mm
Concrete Grade = 25 N/mm
2

Steel Grade = 500 N/mm


2

Cover = 25 mm
FACTORED FORCE
Max. span Moment ,Mu Span = 1.35 kN-m. B.No: 98 L/C : 2000
Max. Support Moment ,Mu Supp = 1 kN-m. B.No: 98 L/C : 2000
Max. Torsion,Tu = 1 kN-m. B.No: 98 L/C : 2011
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 1.00 x (1+ 115/115 )
1.70
= 1.18 kN-m.
Total Moment Me = = 1 + 1.18
= 2.18 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 2.18 kN-m.
b = 115 mm
D = 115 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 41 mm 1st layer= = 12 mm
Eff Depth,d = 74 mm Spacer bar = 25 mm
2nd layer = 0 mm
2
Mu/bd = 2.18 x 106
115 x 74^2
2
= 3.46 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Support Pt reqd. = 0.992 %
Ast reqd. = 84.419 mm2
Provide 2 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 226.200 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x115x74)/500
= 14.467 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 1.4 kN-m.
b = 115 mm

Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 123
D = 115 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 43 1st layer= = 16
Eff Depth,d = 72 Spacer bar = 25
2nd layer = 0
Mu/bd2 = 1.35 x 106
115 x 72^2
2
= 2.26 N/mm
2 2
For fck = 25 N/mm & Fy = 500 N/mm
At Span Pt , reqd. = 0.589 %
Ast reqd. = 48.769 mm2
Provide 2 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 226.200 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 14.467 mm2
SHEAR REINFORCEMENT FOR SHEAR
Factored Shear Vu = 2.385 kN B: 98 L/C: 2000
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
3
1 X 10
= 2.385 +1.6 ( 115 )
= 16.298 KN
3
Ve 16.298 X10
Tv = =
bd 115x74
2
= 1.92 N/mm

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x226.2/(115 x 74)


= 2.660 %
2
IS 456-2000 Tc, = 0.8930 N/mm
TABLE 19 - M25 Tv > Tc
Vus = (Tv - Tc) bd
= (1.92 - 0.893 ) x 115 x 74
= 8739.77 N
= 8.74 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 415 x 2 x79 x74 ) / (8.74 x1000) 2 legged stirrups
= 482.997 mm Min i) 0.75d = 55.5 mm
ii) Sv = 482.997 mm
Provide 2 legged 10mm dia. Stirrups @ 50mm c/c iii) b= 115 mm

Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 124

DESIGN OF BEAMS
ROOF BEAM

Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 125

Consultant:- Tavan Infratech LLP


Job No Sheet No Rev

126
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Bending about Z for Beam 13

Load Case: 2009:1.5 DL + 1.5 EL +X 99.74

14.24
2.113

-47.291

Dist.m Fy(kN) Mz(kN-m)


0.000000 50.6267 14.2391
0.427083 44.0800 -6.0512
0.854166 35.6647 -23.1465
1.281250 25.3807 -36.2487
1.708333 13.2279 -44.5598
2.135416 -0.7935 -47.2816
2.562499 -16.6836 -43.6160
2.989583 -32.5737 -33.0310
3.416666 -46.5951 -16.0587
3.843749 -58.7478 6.5029
4.270832 -69.0318 33.8556
4.697916 -77.4472 65.2015
5.124999 -83.9938 99.7424

Print Time/Date: 21/07/2020 21:32 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev

127
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 14

Load Case: 2010:1.5 DL + 1.5 EL -X

83.646

-50.974

Dist.m Fy(kN) Mz(kN-m)


0.000000 83.6462 99.3367
0.427083 77.0996 64.9443
0.854166 68.6842 33.7468
1.281250 58.4002 6.5425
1.708333 46.2475 -15.8706
2.135416 32.2261 -32.6945
2.562499 16.3360 -43.1310
2.989583 0.4459 -46.6481
3.416666 -13.5755 -43.7779
3.843749 -25.7283 -35.3184
4.270832 -36.0123 -22.0677
4.697916 -44.4276 -4.8239
5.124999 -50.9743 15.6149

Print Time/Date: 21/07/2020 21:34 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 128
ROOF BEAMS: Roof Beam has been designed for Maximum forces of RB-6 and same has been
adopted for remaing Lintel Beams(RB-1,RB-2,RB-3,RB-4, RB-5, and RB-7)
Breadth of the beam = 250 mm
Depth of the beam = 450 mm
Concrete Grade = 25 N/mm2
Steel Grade = 500 N/mm2
Cover = 25 mm

FACTORED FORCE
Max. span Moment ,Mu Span = 48.557 kN-m. B.No: 13 L/C : 2000
Max. Support Moment ,Mu Supp = 87.907 kN-m. B.No: 13 L/C : 2009
Max. Torsion,Tu = 18.097 kN-m. B.No: 13 L/C : 2011
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 18.10 x (1+ 450/250 )
1.70
= 29.81 kN-m.
Total Moment Me = = 87.907 + 29.81
= 117.72 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 117.72 kN-m.
b = 250 mm
D = 450 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 mm 1st layer= = 20 mm
Eff Depth,d = 405 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 117.72 x 106
250 x 405^2
= 2.87 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.782 %
Ast reqd. = 791.775 mm2
Provide 3 - 20 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 942.480 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x405)/500
= 172.125 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 49 kN-m.
b = 250 mm

Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 129
D = 450 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 1st layer= = 20
Eff Depth,d = 405 Spacer bar = 25
2nd layer = 0
Mu/bd2 = 48.557 x 106
250 x 405^2
= 1.18 N/mm2
2
For fck = 25 N/mm & Fy = 500 N/mm2
At Span Pt , reqd. = 0.288 %
Ast reqd. = 291.600 mm2
Provide 3 - 12 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 339.300 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 172.125 mm2
SHEAR REINFORCEMENT FOR SHEAR
Factored Shear Vu = 74.775 kN B: 14 L/C: 2010
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
18.097 X 103
= 74.775 +1.6 ( 250 )
= 190.596 KN
3
Ve 190.596 X10
Tv = =
bd 250x405
= 1.88 N/mm2

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x942.48/(250 x 405)


= 0.930 %
IS 456-2000 Tc, = 0.6200 N/mm2
TABLE 19 - M25 Tv > Tc
Vus = (Tv - Tc) bd
= (1.88 - 0.62 ) x 250 x 405
= 127575 N
= 127.58 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 500 x 2 x79 x405 ) / (127.58 x1000) 2 legged stirrups
= 218.182 mm Min i) 0.75d = 304 mm
ii) Sv = 218.182 mm
Provide 2 legged 10mm dia. Stirrups @ 200mm c/c iii) b= 250 mm

Consultant:- Tavan Infratech LLP


Job No Sheet No Rev

130
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Bending about Z for Beam 42


144.99
Load Case: 2012:1.5 DL + 1.5 EL -Z

3.099 13.51

-63.646

Dist.m Fy(kN) Mz(kN-m)


0.000000 106.0341 144.9886
0.437500 102.3336 99.2652
0.875000 94.7112 56.0186
1.312499 83.1670 16.9648
1.749999 67.7008 -16.1805
2.187499 48.3127 -41.7014
2.624999 25.0427 -57.8829
3.062498 1.7727 -63.6137
3.499998 -17.6154 -60.0051
3.937498 -33.0816 -48.7722
4.374998 -44.6259 -31.6307
4.812497 -52.2483 -10.2965
5.249997 -55.9487 13.5146

Print Time/Date: 21/07/2020 21:39 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
Job No Sheet No Rev

131
Part
Software licensed to STAAD.Pro Advanced
Job Title Ref

By Date25-Jun-20 Chd

Client File Date/Time 21-Jul-2020 18:42


CR-2.STD.STD-Updating.STD

STAAD.Pro Query Bending and Shear Results

Shear along Y for Beam 42

Load Case: 2012:1.5 DL + 1.5 EL -Z

106.034

-55.949

Dist.m Fy(kN) Mz(kN-m)


0.000000 106.0341 144.9886
0.437500 102.3336 99.2652
0.875000 94.7112 56.0186
1.312499 83.1670 16.9648
1.749999 67.7008 -16.1805
2.187499 48.3127 -41.7014
2.624999 25.0427 -57.8829
3.062498 1.7727 -63.6137
3.499998 -17.6154 -60.0051
3.937498 -33.0816 -48.7722
4.374998 -44.6259 -31.6307
4.812497 -52.2483 -10.2965
5.249997 -55.9487 13.5146

Print Time/Date: 21/07/2020 21:39 STAAD.Pro CONNECT Edition 22.03.00.24 Print Run 1 of 1
GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 132
ROOF BEAMS: Roof Beam has been designed for Maximum forces of RB-6 and same has been
adopted for remaing Lintel Beams(RB-1,RB-2,RB-3,RB-4, RB-5, and RB-7)
Breadth of the beam = 250 mm
Depth of the beam = 450 mm
Concrete Grade = 25 N/mm2
Steel Grade = 500 N/mm2
Cover = 25 mm

FACTORED FORCE
Max. span Moment ,Mu Span = 73.385 kN-m. B.No: 42 L/C : 2000
Max. Support Moment ,Mu Supp = 113.45 kN-m. B.No: 42 L/C : 2012
Max. Torsion,Tu = 9.488 kN-m. B.No: 43 L/C : 2010
EQUIVALENT MOMENT
IS 456-2000 Equivalent Moment due to Torsion Mt = Tu x (1+(D/b)
[Cl.41.4.2] 1.7
= 9.49 x (1+ 450/250 )
1.70
= 15.63 kN-m.
Total Moment Me = = 113.449 + 15.63
= 129.08 kN-m.
SUPPORT REINFORCEMENT (AT TOP)
Equivalent Bending Moment, Mu Supp = 129.08 kN-m.
b = 250 mm
D = 450 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 mm 1st layer= = 20 mm
Eff Depth,d = 405 mm Spacer bar = 25 mm
2nd layer = 0 mm
Mu/bd2 = 129.08 x 106
250 x 405^2
= 3.15 N/mm2
For fck = 25 N/mm2 & Fy = 500 N/mm2
At Support Pt reqd. = 0.879 %
Ast reqd. = 889.988 mm2
Provide 3 - 20 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
Ast provided. = 942.480 mm2 Ast Prov >Ast min
CHECK FOR MINIMUM STEEL
IS 456 Cl.26.5.1 Ast,min = (0.85xbxd)/fy
= (0.85x250x405)/500
= 172.125 mm2
SPAN REINFORCEMENT (AT BOTTOM)
Mu span = 73 kN-m.
b = 250 mm

Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 133
D = 450 mm Shear Link Dia= 10 mm
1 Layer Reinf. d' = 45 1st layer= = 20
Eff Depth,d = 405 Spacer bar = 25
2nd layer = 0
Mu/bd2 = 73.385 x 106
250 x 405^2
= 1.79 N/mm2
2
For fck = 25 N/mm & Fy = 500 N/mm2
At Span Pt , reqd. = 0.452 %
Ast reqd. = 457.650 mm2
Provide 3 - 16 Y + 0 - 0 Y
2 - 0 Y + 0 - 0 Y
SP-16 Table 4 Ast provided. = 603.190 mm2 Ast Prov >Ast min
Pg 50 Ast Min = 172.125 mm2
SHEAR REINFORCEMENT FOR SHEAR
Factored Shear Vu = 98.139 kN B: 42 L/C: 2012
EQUIVALENT SHEAR
Vu + 1.6 Tu
Ve =
( b
)
9.488 X 103
= 98.139 +1.6 ( 250 )
= 158.862 KN
3
Ve 158.862 X10
Tv = =
bd 250x405
= 1.57 N/mm2

IS 456-2000 Tc,max = 3.1 N/mm2


TABLE 20 - M25 Tv < Tc,max

Actual pt = 100 x942.48/(250 x 405)


= 0.930 %
IS 456-2000 Tc, = 0.6200 N/mm2
TABLE 19 - M25 Tv > Tc
Vus = (Tv - Tc) bd
= (1.57 - 0.62 ) x 250 x 405
= 96187.5 N
= 96.19 kN
Sv = (0.87 fy Asv d) / Vus Assume 10 mm dia
= (0.87 x 500 x 2 x79 x405 ) / (96.19 x1000) 2 legged stirrups
= 289.382 mm Min i) 0.75d = 304 mm
ii) Sv = 289.382 mm
Provide 2 legged 10mm dia. Stirrups @ 250mm c/c iii) b= 250 mm

Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 134

SLAB DESIGN

Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 135

ROOF SLAB DESIGN

Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 136
DESIGN OF ROOF SLAB
Length in shorter direction, Lx = 5.125 m
Length in longer direction, Ly = 5.25 m
Ly/Lx = 5.25/5.125
= 1.02 < 2.0 Hence two way action
Depth of slab = 150 mm
Clear cover = 20 mm
Dia of bar = 10 mm
Effective cover 20+10/2 = 25 mm
Effective depth of slab 150-25 = 125 mm
Effective span of slab = 5.125 m
Unit weight of concrete = 25 kN/m3
Characteristic strength of concrete = 25 N/mm2
Yiled strength of steel = 500 N/mm2
Loads
Self weight of slab 0.15x25 = 3.75 kN/m2
Live load on slab = 2 kN/m2
Floor Finish load = 3.08 kN/m2
Total Working load = 8.83 kN/m2
Design factor load 1.5X8.83 = 13.245 kN/m2

Considering moment co-efficient from IS456-2000 Table-26 for two adjacent edges discontinues
discontinous
Case 7 in table 26
SHORT SPAN
(-)ve moment coefficient αx = 0.0584
(+) ve moment co efficient αx = 0.044
LONG SPAN
(-)ve moment coefficient αy = 0.0584
(+) ve moment co efficient αy = 0.044

Moment per unit width on slab


short span
(+)ve span moment αxx wxxlx2
0.044X13.245x5.125x5.125 = 15.31 kN-m
(-)ve span moment αxx wxxlx2
0.0584X13.245x5.125x5.125 = 20.32 kN-m

long span
(+)ve span moment αyx wxxlx2
0.044X13.245x5.125x5.125 = 15.31 kN-m
(-)ve span moment αyx wxxlx2
0.0584X13.245x5.125x5.125 = 20.32 kN-m

CHECK FOR dmin FROM MOMENT CRITERIA


Min depth for Mu
Q = 3.33 For M35 & Fe500
Mu = 20.320 kN m
b = 1000 mm
dmin = dreq = 78.12 mm < dprovided HENCE SAFE

Ast Required :
Mu = 0.87 fy Ast d [1-(Ast fy/b d fck)]
= 0.87x500xAstx106[1-(Astx500/1000x106x40)]
8.7Ast2- 54.375x103 Ast + moment = 0
solving the prabolic equation

Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 137

short span moment(kN-m) Ast req dia Spacing mm Ast prov pt provided
(-)ve span moment 20.32 399.2 12 175 646.19 0.52
(+)ve span moment 15.31 295.48 12 175 646.19 0.52
long span
(-)ve span moment 20.32 399.13 12 175 646.19 0.52
(+)ve span moment 15.31 295.48 12 175 646.19 0.52

Adopting 12mm dia @175 mm spacing along both directions


Minimum Ast = 0.12%
= 150 mm2

Check for defelction


0.58 x fy x Area of cross section of steel required = 179.12 MPa
fs = Area of cross section of steel provided

From figure 4 IS456-2000


Modification factor = 1.7
l/d basic value = 26
l/d limiting value = 44.2
l/d acutal = 41
Hence ok

Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 138

FLOOR SLAB DESIGN

Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 139
DESIGN OF ROOF SLAB
Length in shorter direction, Lx = 5.125 m
Length in longer direction, Ly = 5.25 m
Ly/Lx = 5.25/5.125
= 1.02 < 2.0 Hence two way action
Depth of slab = 150 mm
Clear cover = 20 mm
Dia of bar = 10 mm
Effective cover 20+10/2 = 25 mm
Effective depth of slab 150-25 = 125 mm
Effective span of slab = 5.125 m
3
Unit weight of concrete = 25 kN/m
2
Characteristic strength of concrete = 25 N/mm
Yiled strength of steel = 500 N/mm2
Loads
2
Self weight of slab 0.15x25 = 3.75 kN/m
2
Live load on slab = 5 kN/m
Total Working load = 8.75 kN/m2
2
Design factor load 1.5X8.75 = 13.125 kN/m

Considering moment co-efficient from IS456-2000 Table-26 for one long edge discontinuous
ge continues
Case 7 in table 26
SHORT SPAN
(-)ve moment coefficient αx = 0.0584
(+) ve moment co efficient αx = 0.044
LONG SPAN
(-)ve moment coefficient αy = 0.0584
(+) ve moment co efficient αy = 0.044

Moment per unit width on slab


short span
(+)ve span moment αxx wxxlx2
0.044X13.125x5.125x5.125 = 15.17 kN-m
(-)ve span moment αxx wxxlx2
0.0584X13.125x5.125x5.125 = 20.14 kN-m

long span
(+)ve span moment αyx wxxlx2
0.044X13.125x5.125x5.125 = 15.17 kN-m
(-)ve span moment αyx wxxlx2
0.0584X13.125x5.125x5.125 = 20.13 kN-m

CHECK FOR dmin FROM MOMENT CRITERIA


Min depth for Mu
Q = 4.7 For M35 & Fe500
Mu = 20.140 kN m
b = 1000 mm
dmin = dreq = 65.47 mm < dprovided HENCE SAFE

Ast Required :
Mu = 0.87 fy Ast d [1-(Ast fy/b d fck)]
= 0.87x500xAstx106[1-(Astx500/1000x106x40)]
2 3
8.7Ast - 54.375x10 Ast + moment = 0
solving the prabolic equation

short span moment(kN-m) Ast req dia Spacing mm Ast prov pt provided
(-)ve span moment 20.14 395.41 12 175 646.19 0.52
(+)ve span moment 15.17 292.67 12 175 646.19 0.52

Consultant:- Tavan Infratech LLP


GOVERNMENT OF
L&T Construction MADHYA PRADESH WATER
RESOURCE DEPARTMENT
POSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 140
long span
(-)ve span moment 20.13 395.26 12 175 646.19 0.52
(+)ve span moment 15.17 292.67 12 175 646.19 0.52

Adopting 12mm dia @175 mm spacing along both directions


Minimum Ast = 0.12%
= 150 mm2

Check for defelction


0.58 x fy x Area of cross section of steel required = 177.39 MPa
fs = Area of cross section of steel provided

From figure 4 IS456-2000


Modification factor = 1.7
l/d basic value = 26
l/d limiting value = 44.2
l/d acutal = 41
Hence ok

Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA
L&T Construction PRADESH WATER RESOURCE
DEPARTMENT
COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 141

DESIGN OF SUNSHADE SLAB

Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA PRADESH
L&T Construction WATER RESOURCE DEPARTMENT

COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE


PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 142

Design of Sunshade slab

125

75
250
600 mm
Dead load of sunshade = (0.125+0.075) /2 x 25
= 2.5 kN/m2
Considering the sunshade as an accessible roof
Live load = 1.5 kN/m2 + 0.5 kN/m2 (Dust load)
2
= 2 kN/m
2
Total load = 4.5 kN/m

Max. moment at face of the beam = 4.5 * 0.6 *(250+0.6) / 2


= 1.1 kN-m/ m
Max. shear at face of the beam = 4.5 * 0.6
= 2.7 kN/ m
Factored moment = 1.5*1.15
= 1.73 kN-m/ m
Dia of the bar = 10 mm
d provided = 125 - 20 - 5 = 100 mm
Mu / bd^2 = 1.73 1e6 / 1000*100^2 0.17 N/mm2
from SP 16 pt = 0.07
ptmin = 0.12
Ast required = 120 mm2/m
spacing required = 654.50 mm
Provide 10 mm dia at 150 mm c/c
Pt provided = 0.52
Distribution reinforcement
Provide 6 nos. 10 dia in long. Direction @ 150 c/c
Check for shear
Tv = Vu / bd = 1.5 *2.7 * 1e3 / 1000 / 100
= 0.04 N/mm2
for Pt =0.52 Tc = 0.49 N/mm2 Hence Safe
Check for Deflection
IS 456: CL 23.2.2 for cantilever slab
Leff / d = 7
fs = 0.58* 500* 120 / 520
From Fig 4 IS 456 - 2000 = 66.9
multiplication factor = 2
l/ d (allowed) = 14
l/d (actual) = 725 /100 since l/d actual<l/d allowed,
= 7.25 deflection is with in permissible limit

Consultant:- Tavan Infratech LLP


GOVERNMENT OF MADHYA
L&T Construction PRADESH WATER RESOURCE
DEPARTMENT
COMPOSITE GRAVITY DAM RUNJ MEDIUM PROJECT, DOCUMENT NO DATE
PROJECT:
DISTRICT PANNA,M.P G-O18006-CS-IR-DA-DC-2256 18-07-2020
DESIGNED CHECKED SHEET
TITLE: DESIGN CALCULATIONS FOR CONTROL ROOM-2
GS PLT 143

DRAWINGS

Consultant:- Tavan Infratech LLP

You might also like