Subcontractor Management Plan (SMP) : Purpose
Subcontractor Management Plan (SMP) : Purpose
STURGEON ELECTRIC COMPANY
Initial Issue Date 01/01/2011
Safety Management System
Revision Date: Initial Version
Revision No. 0
SUBCONTRACTOR MANAGEMENT PLAN (SMP)
Next Revision Date: 01/01/2011
Preparation: Safety Mgr Authority: Vice President Issuing Dept: Safety Page: Page 1 of 9
Purpose
The purpose of this program is to ensure that STURGEON ELECTRIC COMPANY continues to improve subcontractor
health, safety and environmental performance and to establish a standard for pre‐qualification,
evaluation/selection and development of our subcontractors.
Scope
This program applies to all subcontractors and all STURGEON ELECTRIC COMPANY locations.
General Requirements
All STURGEON ELECTRIC COMPANY subcontractors are to be managed in accordance with this program.
The use of subcontractors must be pre‐approved by STURGEON ELECTRIC COMPANY. Approval requirements
include:
A formal safety review of the subcontractor being performed by STURGEON ELECTRIC COMPANY safety
department.
The scope of the review was commensurate with the hazards and risk exposure.
Subcontractor has been/will be oriented to the safety policies, expectations and requirements of
STURGEON ELECTRIC COMPANY.
The subcontractor agrees to abide by our Drug and Alcohol policy and onsite safety rules throughout the
duration of the work.
Any subcontractor that has a “Non‐Approved” safety status will not be used on any STURGEON ELECTRIC
COMPANY site.
Procedure
Pre‐Qualification of Subcontractors
Subcontractors will be pre‐qualified by reviewing their safety programs, safety training documents and safety
statistics.
Evaluation Safety Metrics
Acceptable safety metrics will be used as criteria for prequalifying and selecting subcontractors. The safety metrics
and scoring will consider:
STURGEON ELECTRIC COMPANY Subcontractor Safety Pre‐Qualification Form responses and
subcontractor safety program documents review 60% (Rated from 0‐60 total points)
Subcontractor safety training documents review 20% (Rated from 0‐20 total points)
Subcontractor safety statistics review 20% (Rated from 0‐20 total points)
1
Doc No: SMP
STURGEON ELECTRIC COMPANY
Initial Issue Date 01/01/2011
Safety Management System
Revision Date: Initial Version
Revision No. 0
SUBCONTRACTOR MANAGEMENT PLAN (SMP)
Next Revision Date: 01/01/2011
Preparation: Safety Mgr Authority: Vice President Issuing Dept: Safety Page: Page 2 of 9
Evaluation Rating and Acceptance
The subcontractor rating system will have five designations:
Equal to or Greater than 90 points = A – no restrictions.
Between 85 and 89 points = B – Mitigation plan must be documented and approved by STURGEON
ELECTRIC COMPANY Safety.
Between 81 and 84 points = C – Mitigation plan must be documented and approved by STURGEON
ELECTRIC COMPANY Safety; management approval in writing.
Between 71 and 80 points = D – Mandatory commitment meeting with senior subcontractor management
present; mitigation plan documented and approved by STURGEON ELECTRIC COMPANY Safety;
management approval in writing; trained subcontractor safety personnel on site during work regardless of
number of workers.
Less than 70 points = F – not to be used.
Once each subcontractor has been evaluated and scored, STURGEON ELECTRIC COMPANY safety will provide
management the scores/ranking.
STURGEON ELECTRIC COMPANY reserves the right to change a subcontractor’s status to “Non‐Approved” if the
subcontractor shows insufficient progress towards accepted mitigation plan or other agreed upon criteria.
Subcontractor Involvement
Contractors are required to follow or implement the work practices and systems described below while performing
work at STURGEON ELECTRIC COMPANY worksites:
Attend an safety orientation, pre‐job meeting or kick‐off meeting provided by STURGEON ELECTRIC
COMPANY prior to any work beginning
Monitor employees for substance abuse and report nonconformities to STURGEON ELECTRIC COMPANY
Ensure personnel have the required training and competency for their work
Participate in STURGEON ELECTRIC COMPANY tailgate safety meetings, job safety analysis or hazard
assessments and on the job safety inspections.
Perform a pre‐job safety inspection that includes equipment
Participate in the BBS hazard reporting system
Report all injuries, spills, property damage incidents and near misses
Comply with onsite and Owner Client safety rules
Implement STURGEON ELECTRIC COMPANY safety practices and processes as applicable
Clean up and restore the worksite after the job is over
Ensure compliance with regulations at all times
Post job safety performance reviews shall be conducted for subcontractors.
2
Doc No: SMP
STURGEON ELECTRIC COMPANY
Initial Issue Date 01/01/2011
Safety Management System
Revision Date: Initial Version
Revision No. 0
SUBCONTRACTOR MANAGEMENT PLAN (SMP)
Next Revision Date: 01/01/2011
Preparation: Safety Mgr Authority: Vice President Issuing Dept: Safety Page: Page 3 of 9
7. Insurance Carrier(s):
Name Type of Coverage Telephone
8. Worker’s Compensation Account Status (Please enclose a copy of your workers compensation
insurance certificate.
Account Number: Industry Code:
3
Doc No: SMP
STURGEON ELECTRIC COMPANY
Initial Issue Date 01/01/2011
Safety Management System
Revision Date: Initial Version
Revision No. 0
SUBCONTRACTOR MANAGEMENT PLAN (SMP)
Next Revision Date: 01/01/2011
Preparation: Safety Mgr Authority: Vice President Issuing Dept: Safety Page: Page 4 of 9
HEALTH, SAFETY AND ENVIRONMENTAL PERFORMANCE
Health, Safety and Environmental Performance
Provide the following data for your firm using your record keeping forms from the past three (3) years.
If the data is not available please reply with Not Available - N/A.
4
Doc No: SMP
STURGEON ELECTRIC COMPANY
Initial Issue Date 01/01/2011
Safety Management System
Revision Date: Initial Version
Revision No. 0
SUBCONTRACTOR MANAGEMENT PLAN (SMP)
Next Revision Date: 01/01/2011
Preparation: Safety Mgr Authority: Vice President Issuing Dept: Safety Page: Page 5 of 9
HEALTH, SAFETY AND ENVIRONMENTAL PERFORMANCE
Health and Safety Incidents - continued 2009 2008 2007
f. Motor Vehicle Incidents (MVI)
# Motor Vehicles Incidents
# Kilometers/Miles driven
g. Motor Vehicle Incident Frequency Rate (MVIFR)
Total # of Firm’s Motor Vehicle Incidents x 1,000,000
Total # Kilometers/Miles driven
Environmental Incidents 2009 2008 2007
Total # Spills to Water
a. Petroleum Spills
# spills Sheen (est. volume as 0.1 bbl. To < 1bbl.
# spills 1 bbl. To < 100 bbls.
# spills 100 bbls. or more
b. Chemical Spills
# spills 1 bbl./160 kg. to < 100 bbls./16,000 kg.
# spills 100 bbls./16,000 or more
Total # Spills to Land
a. Petroleum spills
# spills 1 bbl. To < 100 bbls.
# spills 100 bbls. or more
b. Chemical Spills
# spills 1 bbl./160 kg. to < 50 bbls./8,000 kg
# spills 50 bbls./8,000 kg. or more
Enforcement Actions 2009 2008 2007
Citations
# Health and Safety
# Environmental
Please provide details
Fines
Total # Fines
Total $$ Paid
Please provide details
5
Doc No: SMP
STURGEON ELECTRIC COMPANY
Initial Issue Date 01/01/2011
Safety Management System
Revision Date: Initial Version
Revision No. 0
SUBCONTRACTOR MANAGEMENT PLAN (SMP)
Next Revision Date: 01/01/2011
Preparation: Safety Mgr Authority: Vice President Issuing Dept: Safety Page: Page 6 of 9
6
Doc No: SMP
STURGEON ELECTRIC COMPANY
Initial Issue Date 01/01/2011
Safety Management System
Revision Date: Initial Version
Revision No. 0
SUBCONTRACTOR MANAGEMENT PLAN (SMP)
Next Revision Date: 01/01/2011
Preparation: Safety Mgr Authority: Vice President Issuing Dept: Safety Page: Page 7 of 9
Do you have personnel trained to perform first aid and CPR? Yes No
7
Doc No: SMP
STURGEON ELECTRIC COMPANY
Initial Issue Date 01/01/2011
Safety Management System
Revision Date: Initial Version
Revision No. 0
SUBCONTRACTOR MANAGEMENT PLAN (SMP)
Next Revision Date: 01/01/2011
Preparation: Safety Mgr Authority: Vice President Issuing Dept: Safety Page: Page 8 of 9
8
Doc No: SMP
STURGEON ELECTRIC COMPANY
Initial Issue Date 01/01/2011
Safety Management System
Revision Date: Initial Version
Revision No. 0
SUBCONTRACTOR MANAGEMENT PLAN (SMP)
Next Revision Date: 01/01/2011
Preparation: Safety Mgr Authority: Vice President Issuing Dept: Safety Page: Page 9 of 9
HEALTH, SAFETY AND ENVIRONMENTAL MANAGEMENT
Employee and Trades Training
a. Have employees been trained in appropriate job
Yes No
skills?
b. Are employees’ job skills certified where required by
Yes No
regulatory or industry consensus standards?
c. List trades/crafts which have been certified:
Written test Oral test Performance test Job Monitoring Other (List)
9