By Purchasing.
Machine Shop
Work Order and Manager creates
A review and
associated drawings and attaches
confirmation email
emailed to Machine Inspection Sheet to
Machine Shop Process Shop Manager by
required prior to work
Work Order.
being performed.
Purchasing.
100% Inspection:
Manufacture material to Fill out Inspection
Measure Key callouts
required specifications Sheets with actual
specified on
as described on measurements.
engineering drawing
engineering drawing.
against machined part.
Results of
Inspection
FAIL
PASS
FAIL
Results of
Inspection
PASS
100% Inspection:
Visual Inspection and Deliver to Pump Shop
thread check with Inventory.
gages. BG_421_FC_MFG_Machine Shop Process_R1.1