Assignment Estimation and Specification
Assignment Estimation and Specification
SPECIFICATION
ELSA FATIMA
170823024
SPECIFICATION AND ESTIMATION
B.ARCH 3RD YEAR SEC A
DIT UNIVERSIRT
EXAMPLE: 1
Estimate the cost of a mansory platform 6m*5m from the given diagram and specification.
GENERAL SPECIFICATION:
1) Foundation - lime concrete
2) Mansory - 1st class brickwork in l
3) Flooring - 2.5 cm cement concrete over 7.5 cm lime concrete, over wall only 2.5 cm ce
4) Wall Finishing - Outsides walls are 12mm cement p
RATES: take local current rates
Total 8177.057
Add 3% For Contingencies 245.3117
dd 2% For Workcharged Establishment 163.5411
Grand Total 8585.91
EXAMPLE: 3
Prepare a detailed estimate of a mortar garage from the given drawings, plan and section.
Adopt suitable rates. General Specifications are as follows:
1) Foundation and plinth
2) Superstructure
3) Finishing
motor garage:
long wall = 6.5+0.3 = 6.8
Deduct-
Gate opening 1 2.5 0.3 2.3 1.725
Window opening 3 1 0.3 1.2 1.08
Shelve opening 2 1 0.2 1.8 0.72
1 6.5 3 19.5
ceiling-
outer projection of
slab, bottomand
vertical faces-
long side 2 7.4 0.27 3.996 b= 15 +12 = 27 cm
short side 2 3.9 0.27 2.106
2.5 cm c.c. 1:2:4 floor
over and including 7.5
1 6.5 3 19.5 20.375
cm lime concrete inside
10 room
sill of gate 35 cm width 1 2.5 0.35 0.875 only 2.5cm c.c
Particular of item of
Nos. Quantity Explanatory
Item work Dimension in meter
length breadth height notes
Earthwork in
excavation in
1 foundation...
garage 1 20.2 0.6 0.65 7.88
L= 7.1 - 2*
1 6.5 0.2 0.34 0.44
ramp (60/2) = 6.5
Lime concrete in
2 foundation
garage 1 20.2 0.6 0.3 3.64
L= 7.1 - 2*
1 6.7 0.2 0.1 0.134
ramp (40/2) = 6.7
First class brick work in
foundation and plinth
with 1:6 cement sand
3 mortar
garage 1 20.2 0.4 0.5 4.04
ramp
L= 2.6 + 0.1 =
1 2.7 0.1 0.2 0.054
front wall 2.7
L= 2.25-
2 2 0.1 0.2 0.08 (0.1/2)-
side wall (0.4/2)
2 cm thick damp proof
1 20.2 0.4 8.08
4 course-
deduct sill gate 13 2.5 0.4 1
total 7.08
1st class brickrwork in
superstructure in lime 1 20.2 0.3 3 18.18
5 mortar
Deduct-
Gate opening 1 2.5 0.3 2.3 1.725
Window opening 3 1 0.3 1.2 1.08
Shelve opening 2 1 0.2 1.8 0.72
lintel over gate 1 2.9 0.3 0.2 0.174
lintel over window 3 1.2 0.3 0.1 0.108
lintel over shelves 2 1.2 0.2 0.1 0.048
total 14.3
Example 5:
Prepare a detailed estimate of a two roomed building with front verandha from the given drawings-plan, elevatio
calculate also the plinth area and the general specification are as follow:
1) Foundation and Plinth
2) Damp proof course
3) Superstructure
4) Roof
5) Flooring
6) Plastering and finishing
7) Doors and windows
8) Miscelleanous items.
Center to center length:
Room:
room:
chajja projections
2 4.2 3.95
short wall inner surface
short wall top surface 2 4.2 0.2 1.68
Verandah parapet
front wall outer 1 8.4 0.4 3.36
fornt wall inner face 1 8 0.27 2.16
1 8.4 0.2 1.68
front wall top face
side wall outer face 2 2.7 0.4 2.16
side wall inner face 2 2.5 0.27 1.35
2 2.5 0.2 1
side wall top face
Deduct 20.24
window openings 8 1 0.5 6 one surface of each
Cs window openings 12 2.7 0.7 1.89
step from plinth level 1 including 10 cm below G
ends of ver. Side wall
and lintel above col 2 0.2 0.6 0.24
level
ends of ver parapet
wall. From wall above 2 0.2 0.27 0.11
ver. Roof level
total 285.6
20 mm thick cement
plaster 1:3in step
18
finished cement
rendered
1st step river 1 4.5 0.15 0.675 1.49 Front and sides
2nd step river 1 3.3 0.15 0.495 Front and sides
Qua
Item Particular of item of Amount
ntity
No: work Units Rates Per
Rs .P Rs .P
26 cu m 275 % cu m 70.4275
Earthwork in filling in
2 plinth..
1-class brickwork in
3 foundation and plinth
1:6 cement motor
rooms
L=29.10-
1st footing 1 28.4 0.7 0.2 3.98 2X70/2=28.
4m
L=29.10--
2nd footing 1 28.5 0.6 0.1 1.71
.6=28.5m
L=29.10-
3rd footing 1 28.6 0.5 0.1 1.43
.4=28.7m
L=29.10-
Pint wall above footing 1 28.7 0.4 0.8 9.18
.5=28.6m
verandah
L=13.7-
1st footing 1 13 0.5 0.2 1.3 2X70/2=13
m
L=13.7-
2nd footing 1 13.1 0.4 0.1 0.52
.6=13.1m
L=13.7-
Pint wall above footing 1 13.2 0.3 0.1 0.4
.5=13.2m
L=13.7-
Pint wall above footing 1 13.3 0.3 0.8 3.19
.4=13.3m
total 21.71
length same
rooms 1 28.7 0.4 11.48
as pint wall
deduct door sills 2 1.2 0.4 0.96
total 10.52 sq m
1-class brickwork in
5 superstructure in
lime motor
L=29.10-
rooms 1 28.8 0.3 4 34.56
.3=28.8m
L=13.7-
verandah above lintel 1 13.4 0.2 0.3 0.8
.3=13.4
total center
line length
parapet over room 1 25.2 0.2 0.6 3.02 =2X
8.2+2X4.4=
25.2
total length
=
parapet over verandah 1 13.4 0.2 0.4 1.07
1X8.4+2X2.
5=13.4m
total 39.45
deduct openings
9.36
lintels etc
net total 30.09 cu m