1.0 GENERAL
1.1 Date of Inspection: 09-12-2018
1.2 Name of Quality Monitor: D.N.Patel
1.3 Name of Road: Malod kherali road Ch. 0/0 to 3/0 ( Wadhwan)
1.4 Package No: Buj/2017-18/Pkg no.03
1.5 Length: 3.00 Km.,Flexible Pavement, 0.00 Km.,C.C. / Other Pavement = Total 3.00 km
1.6 Technical Sanctioned Cost: Rs 13343400
1.7 Name of Agency: M/S Dharti connstruction
1.8 Date of Start of the Work: 12-03-2018
1.9 Stipulated Date of Completion: 11-12-2018
1.10 Actual Date of Completion ( If Work Completed ): 28-12-2018
1.11 Name of Officer Present: Sanjay Vaniya ( SO wadhwan)
Observations:
Engineer Present or NOT Whether
Whether Field Whether Necessary
Sr. Equipments
Laboratory Equipments
No. At Plant Site At Paver Site have been
Establishment (Y/N) Available ( Y/N )
used (Y/N)
1 - Y Y Y Y
*If Engineer of Agency is Not present on site than Proposed Dissection as per Tender Clause. (i.e. Rs 16500/-
Month)
Grading Grade: S SRI U
:
If this item is graded U, write clear reason and suggestion for Improvement.
Observation - Item 2b: Verification of test Results ( P - Conforms, F - Does Not Conform ):
Test result as per QC
Results of the test
Register at the same Whether the test result
conducted by QM
Sr. No. Name of tests location. (Mention the recorded in QC register
at a defined
page No. of QC Register found correct? (Y/N)
location. (P/F)
also ) (P/F)
Gradation test for WBM
1 P - 0/200 P/Page 108 Y
material
Grading: Grade: S SRI U
If this item is Graded, Write clear reasons and Suggestions for Improvement.
3.0 GEOMETRICS: The QM should take at least two measurements in 1km length and if found that the
Roadway and Carraigeway is inadequate QM may take more observation:
4.0 EARTHWORK:
Observations: Item - 4 a : Quality of Material for Embankment / Sub Grade:
On Visual Classification Identify
Location the group symbol & write (Type Quality of material is acceptable. (Y/N)
of Soil )
NA
If this item is Graded, Write clear reasons and Suggestions for Improvement.
Observation - Item no. 4 b: Workmanship for Embankment and Sub Grade Construction:
LAB TEST
Degree of Compaction
(As Per Record) Field
Location
Moisture
(Km) Compaction
MDD OMC Content Field Density Dry Density
CBR Adequate.
gm/cc % gm/cc gm/cc
(Y/N)
NA
0/200 - - - Y Y y Y 100.00m Y
0/800 - - - Y Y Y Y 101.00m Y
0/800 Y Y Y 15% Y -
250.0mm
NA
7.0 C Bitumen Extraction Tests Performed at Plant site at the time of Inspection:
Wt. of mix
% Asphalt % Asphalt
with Wt. of mix without Wt. of % Asphalt Remarks
w.r.t reqd as per
Asphalt Asphalt (gm) Asphalt w.r.t Mix Pass/Fail
Aggregate Specification
(gm)
NA
Grading : Grade: S SRI U
If this item is Graded U, Write clear reasons and Suggestions for Improvement.
NA
9.0 Observations - Item No.8, Quality of Shoulders (In case of completed works)
Whether Quality of
Sr. Whether Camber is
Location Shoulder Material Material is as per
No. maintained. (Y/N)
Specification
NA
10.0 Cross Drainage Works:
Whether General Whether general
Sr. Quality of the quality of
Location Type of CD
No. material is workmanship is
acceptable. (Y/N) acceptable. (Y/N)
N.A
NA
NA
Observations about deficiency in project preparation (Give detailed observations about deficiencies
15.1
in general and items which have been left but are required as per site conditions ):
It is recommended that PIU should take final dicision in Ch. 0/900 to 3/000 as local body ofkherali
village is abstructing the same.
Whether the work has been complete or is in progress as per work program or delay has occurred. If
15.2
delay has occurred, whether the liquidated damages have been withhold or recovered.
Whether the work has been completed within the sanctioned cost, if not, what is the action taken by
15.3
the PIU (In case of Complete works).
N.A
Observations about the action taken by the PIU on the inspecting officers including SQM's and NQMs.
15.4 (Clearly offer comments about the action on the observations of Departmental Officers, State Quality
Monitors).
Comments about difference in observations made by NQMs/SQMs in earlier inspection (the NQM
15.5 shall study earlier inspection reports of NQMs/SQMs, if any and offer his clear comments about the
differences in observations, if any).
N.A
16.0 Overall Grading of Work:
The overall grading calculated on the basis of item and sub item wise grading is given below:
L Quality Arrangements s
[a) Maintenance of QC register s
2 Attention to Quality
(b) Verification of tests results
-s
Seometric (a) Roadway width & Carriageway
3
-s
(a) Quality of Material
( c ) Workmanship
Quality of Material
9 Side shoulder
LL C.C. Pavements
L2 Road Furniture
OverallGrading S
signature:
A/
SITE PHOTOGRAPHS