Professional Documents
Culture Documents
Calculation of Seasonal Correction Factor
Calculation of Seasonal Correction Factor
Name of Work : - Consultancy Services for preparation of feasibility study and detailed project report for the work of Widening to Single
lane/Two lane to 2 lane with PSS Km. 0/00 to 56/620 Khokhra Gujarat Border–Vijaynagar-Antarsuba-Mathasur road on NH-58 in State of
Gujarat. (Job No. 058/GJ/2017-18/591)
The SCF has been calculated based on Petrol / Diesel Sales Data as collected from the Petrol pumps along the Project Road.
Passenger car units (PCU)value per day For CVPD = 599 578