A.2 Fabric
A.3 Leather
Measure length & width with leather measurement machine and sorted to minimize
wastage
After size wise sorting, shade separation done through visual inspection.
Collect samples (3*1 inch) for testing from each leather sheet
I. Butt – Toe cap / vamps & component could subject to high
stretch
II. Shank - decorative & small components
III. Belly- Inside quarter , straps, back counter, lounge
IV. Shoulder –quarter , back stripe
V. Neck- decorative parts & small pieces
Test for
I. Tensile strength
II. Tear strength
III. Basic testing
Leather must be stored under special conditions/ specialized room RH level between
60-70% to avoid mold issues.
B. Inner material
B.1. Insole
Sole material if in house (if no buyer approved material) it must be 100% align with
buyer approved swatch.
I. No air bubble
II. No color shading
III. No burn marks
IV. No twisting
V. Must be 100% flat / no rocking
VI. Shape outs are not allowed
VII. Cutting raw edges are not allowed
Sole output is must checked by a QC for above quality points.
Especially sole pairs test check for shading and bundle together with a rubber band
to avoid mixing.
No testing for synthetic sole along, only test after completing full shoe.
In shoe manufacturing prior to pp meeting bulk two types of samples are produced.
I. Development Sample
II. Production Samples
I. Development Sample
In general buyer provide following items prior to development sample production.
I. CFM Sample
II. Approved trims
III. Approved specification sheet
IV. Approved raw materials
ZXY merchandiser receive above items from buyer and will be hand over to factory
through a standard style hand over meeting.
But if buyer only provided CFM sample merchant should hand over it to factory in
advance.
Factory Technical and sample room will responsible to produce
1. Specification sheet
2. Material specification sheet
3. Pattern
4. Development sample
After developing above criteria’s factory is responsible to forward development
sample, material specification sheet and pattern to zxy merchant.
ZXY merchant send same information to buyer and take approval.
Factory PDS team and ZXY representatives have an internal meeting before start
sample process.
Based on meeting ZXY merchant should create a micro T & A for the style.
First PD samples create with available materials until pattern is approved.
After pattern approved produce one pair from each size with original materials and
send it for testing.
Testing must do in a buyer approved lab.
If testing pass send both DS and CFM sample to buyer for final approval.
Buyer will send back the approved DS sample with CFM sample.
Cutting
Receive material from stores, and check it against approved swatch before send to
cutting mini store.
Cutting raw material handling
I. Leather handling
II. Coated fabric handling
III. Fabric handling
I. Leather
I. Cut by using press clicking machine.
II. Use die cutting :
a) Must check for evenness on a glass plate
b) Templates and die must 100% check again
pattern
c) Die shapes must check against templates.
d) Die cutting edge must sharp, neat and not
damaged.
e) Die must store on racks, style wise & free from
rust.
f) Never store one over each other to avoid
cutting edge damage.
g) If die cutting edge damaged must repair or
replaced.
h) Die height should be 90 mm foe leather
One time only one die can be used for cutting. If used several dies it will cause
pressure spreading un-even and cutting defects will arise.
Cutting pressure is decide by technician.
Leather check for stretch direction before cutting. Always cut against stretch
direction.
Ex: If stretch width wise cutting is done on length wise
III. Fabric
Fabric shading must be separated prior to cutting
Layering is done same as coated fabric. And maximum 8 layers allowed.
It could be auto cut or die cut.
Cut panels must specially check for short cuts which could happen due to non-
uniformity of layering.
After cutting follow same process as coated fabric.
Cutter must use full cutting board for cutting. Every 2-3 hours board should rotate
and use opposite side for cutting.
Cutting board thickness must be minimum 20mm thick, must change to a new
cutting board.
Maximum after 8 hours work cutting board surface must be level by using cutting
board leveling machine.
Only use polyethylene as board materials, and PVC materials are totally prohibited.
Depending on style and buyer requirement material thickness control can be done in
two ways
Skiving is used only on leather upper components, top-ups and counter pocket
chemical sheet.
There are three major skiving practices used in shoe manufacturing,
Embellishments
I. Embroidery
II. Embossing
III. Printing
A. Heat seal
B. Screen printing
C. Foil print
I- Embroidery
II. Embossing
Before bulk embossing mold must approved by buyer.
Embossing mold could produce by
I. Factory
II. Buyer nominated supplier
Both cases after plate completion have to send a embossed swatch to buyer
for approval.
Embossing quality depends on 4 parameters,
I. Pressure
II. Time
III. Temperature
IV. Nature of material (Soft or hard)
In general embossing pressure is 300Kg and around 40-90 0C and from 2-30
sec.
Embossed mark must appear on back side of component for better quality.
After embossing must check for cracking around embossed mark. If crack
must be rejected. And if temperature is not right burning mark could happen.
Embossing machine board must arranged with a pattern template for
respectable size and placement. So the operator directly place panel over
template.
III. Printing
ZXY merchant must provide placement, size wise, color, print type and testing
requirements to the factory.
All printing, is inspected by respectable QC against approved swatch.
Only required part is send to printing in poly bags with all details.
Printing QC will check for quality of printing.
A. No blurring
B. Placement & angles must be as per specification
C. Should not crack, peel off, wash, and rub off with finger.
Must check against approved swatch for color and quality.
After embellishment components counted and bundle properly and send
back to receiving delivery section to make cut kit.
Factory should provide swatches from all colors and sizes for ZXY approval.
If printing is done outside, factory must nominate a QC from their end, and
ZXY QAM will provide him with all relevant details (Approved swatch,
standards etc.).
Sewing section
Line feeding
Line issuer receive materials form cutting and trims from stores.
Technician collecting pattern (from pattern section), sample (from sample
responsible person) and approved spec (from quality).
Technician, production in charge, quality in charge, ZXY QAM/QA/QC and
mechanic must involve.
Technician feed line, each operator has to stitch 5 pcs and if quality ok,
everyone agreed and move to next operation.
Feeding time
Basic style – 4-5 hrs
Critical style – 7-8 hrs
Mockups are put while feeding with quality details. (Stitching allowance, stich
quality, seam quality etc.)
From first 10 pairs one pair is send to buyer/ ZXY GM/QAM for reference. If
any comments from buyer/ZXY GM/QAM implement in bulk.
The same buyer approved first bulk sample have to display in front of line
with comments in local language for sewing line reference.
Each line one end line QC checker. Check shoe in 5 different parameters.
I. Upper Bottom
II. Upper Front
III. Upper Back
IV. Upper Out side
V. Upper Inside
Upper Bottom
1. Label checking for size, barcode, style, color, production date,
Composition, place of origin, placement, stitching, secure or not,
check as pairs.
2. Tongue – check for length, alignment should be straight, seam should
be secured, dirt/glue/oil marks,
3. Counter sheet –
I. Sports shoes: chemical sheet lining should be open.
Checked for hand feel. If soft ok. If hard sheet is not
there.
II. Leather shoe: paper or PVC mold check for hardness. If
soft sheet is there and ok. But if hard sheet is not
there.
Upper Front
1. Toe puff – Press and check for hardness. If hard toe puff is ok.
2. Toe cap & Vamp – check for shape, Seam, stitching, pair color
shading, visual size balance, quarter attachment point to vamp
should not be up down
3. Inter-tech stitch /Box stitch – inside and outside seam should
be same, no skip
4. Eyelets – checked for broken or damaged eyelets, insecure,
missing alignment , balance, manual test for shoe lace
threading
Upper Back
1. Heel cap / counter pocket- heel cap height must be same
in pair, Top high low should avoided, Top line to heel cap
measurement should be as per CFM sample.
2. Back strap- check for straight and centered, stitch quality,
seam
3. Top line – Check for folding thickness and shape
4. Collar – Collar folding should be as per CFM and folding
should be same in both pairs.
End line check table should have three spate bins for checked shoe
segregation.
Green bin – good shoes
Yellow bin – repairable shoes
Red bin- rejects
Daily rejection must count and sealed by QC and keep under QA department
until shipment goes.
Defects must repair on time
End line defect marking report and defect repair report must update and
maintain.
End line audit
End line Audit team check 20 pairs in each line twice a day (Morning &
evening).
Follow internal AQL.
If audit fail has to recheck by line and re-offer.
After end line audit shoes will pack in to a poly bag (30-40 pairs) with style
detail tag and forward to assembly section.
Assembly Section
Issuer bring poly bagged upper and other trims.
In assembly generally three basic components are combining together to
make the complete shoe (Basic components - Sole, insole and upper)
2 major construction in assembly section
I. Stroble
II. Flat lasting
Whatever the style use same machine settings except
I. Flat lasting
II. Butte upper
All process in assembly section are almost similar to in all styles with only
minor differences. Below table shows the basic steps of most common
strobe construction.
Packing
After final check all good shoes will go through needle detector.