This agreement made this 11thday of, August, 2019 between M/S BUILDBASE Contractors
Ltd of P.O Box 7525 Kampala (hereinafter “the main contractor”) of the one part; and M/S
RHCF Uganda (hereinafter “Labor contractor”) of the other part.
1) In this agreement, words and expressions shall have the same meaning as are
respectively signed to them in the contract referred to.
2) In consideration of the payments to be made by the Main Contractor to the labor-
contractor as indicated in this agreement, the Labor contractor hereby covenants with the
Main Contractor to execute and complete the works and remedy any defect therein in
conformity in all respects with the provisions of the contract.
3) The Main Contractor hereby covenants to pay the Labor contractor in consideration of the
execution and completion of the works and the remedying of defects therein the works.
4) The labor contractor shall deploy at least one key technical personnel on site with at least
a minimum of a diploma level in civil engineering with over 5years of experience.
5) The Labor contractor shall act as the assistant site engineer and shall deploy all technical
personnel on site. He will be responsible for the following duties during execution of the
project.
· Attend management and site meetings as shall be advised by the Project Manager
or his representative on site;
· Supervise the quality of materials and work on site and ensure compliance to the
technical specifications in the contract;
· Take material samples for quality control tests and ensure that results are on site
and ensure that all approvals are thought before work is done;
· Take progress photos on the physical progress of works;
· Mobilise all the key equipment required on site to execute his work (Accessories
shall be provided to him)
· Ensure safety and behavior of workers on site and ensure safety of materials on
site;
· Preparing weekly reports to the project manager on the progress of work and
material usage.
· Ensure that all the workers on site have safety gears and comply with Health and
safety standards required.
6) Scope of works detailed hereunder
a) Finishing of the complex/main facility including landscaping, Electrical and
mechanical works,
b) Construction of toilet facilities (Male and Female) from setting out to painting
including electrical and mechanical works,
c) Construction and finishing of the perimeter wall, attendants house and Parking.
d) Sand blinding, compaction and laying of pavers to the required standard.
e) Construction of a water reservoir on site together with the main contractor, and
f) Construction of temporary structures and sanitary facilities on site.
(9) Insurance
The labor-contractor shall take his own Insurance against Insurable risks and agrees to
defend and hold the main contractor harmless from and against any claim, liability or cost
(including legal cost) for bodily injury or death of the labour-contractor or his staff, such
occurring in the performance of the services under this contract.
(10) Arbitration
Upon termination of the contract, the Project Manager/main contractor shall instruct the labor
contractor to leave site immediately and all his workers. The main contractor shall assess the
value of works done by the labor contractor and pay him within 60 days failure of which he will
pay him interest at the current prevailing rate.
In case of any disagreement between both parties, the matter shall be referred to the
President Uganda Institution of Professional Engineers (UIPE) for arbitration or another
agreed upon arbitrator for amicable resolution. All disagreements shall be resolved and
settled amicably whatsoever; the case shall not be referred to courts of law.
IN WITNESS whereof the parties thereto have caused this Agreement to be executed in
accordance with the law specified in the Conditions of Contract on the day, month and year
indicated above.
DIRECTOR ADMINISTRATION
BUILDBASE CONTRACTORS LTD HAJJ ABDUL KATAMBA
S. WITNESS