Professional Documents
Culture Documents
Precommissioning Checklist
Precommissioning Checklist
COLUMN
Unit/Item No.
Service
Licensor
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
LICENSOR
COMPANY
Precommissioning Checklist
PACKED COLUMN
Unit/Item No.
Service
Licensor
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
LICENSOR
COMPANY
Precommissioning Checklist
DRUM / VESSEL
Unit/Item No.
Service
Licensor
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
LICENSOR
COMPANY
Precommissioning Checklist
REACTOR
Unit/Item No.
Service
Licensor
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
LICENSOR
COMPANY
Precommissioning Checklist
FIRED HEATER
Unit/Item No.
Service
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
1. Check the fired heater as per vendor’s drawing, specification and
instructions
2. Make sure the following is complete:
K) External insulation
R) Final box-up
LICENSOR
COMPANY
Precommissioning Checklist
STEAM TURBINE
Unit/Item No.
Service
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
1. Check the equipment as per vendor’s drawing, specification and
instructions
2. Make sure the following are complete:
COMPANY
Precommissioning Checklist
Unit/Item No.
Service
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
5. Check earthing
12. Drive belt tension correct, safety guard in place and secured
14. Fan blade angle set for maximum amperage, check vibration
COMPANY
Precommissioning Checklist
BLOWER
Unit/Item No.
Service
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
7. Gear unit checked per gear unit check list (when applicable)
COMPANY
Precommissioning Checklist
PROPORTIONAL/METERING/RECIPROCATING PUMP
Unit/Item No.
Service
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
COMPANY
Precommissioning Checklist
Unit/Item No.
Service
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
COMPANY
Precommissioning Checklist
AGITATOR
Unit/Item No.
Service
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
COMPANY
Precommissioning Checklist
SAND FILTER
Unit/Item No.
Service
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
LICENSOR
COMPANY
Precommissioning Checklist
CENTRIFUGAL PUMP
Unit/Item No.
Service
Reference Drawings
CHECKED
ACTIVITIES BY DATE REMARKS
OK
13. Check cooling water supply to bearings, cooler, stuffing box, etc.
COMPANY