In Between Jinsi Chourah & Bogda Pull on Missing Link For Bhopal City
Portion
(SOR w.e.f. 29/08/2017)
PAC RS 58.78 Lacs
S No. Item Unit Qty Rate Amount
1/3.9/20 Scarifying existing bituminous surface to a
depth of 50 mm by
mechanical means
Scarifying the existing bituminous road
surface to a depth of 50 mm
and disposal of scarified material with in all
lifts and lead upto 1000
metres
Qty-2X7.00X180=2520.00 sqm sqm 2520.0 5. 00 12600.00
Total Rs 5877896.00
Say Rs 58.78 Lacs
1X14.00X2.25X0.050=1.58cum
cum 1.58 6557.00 10360.00
12/5.6(b) Bituminous Concrete
(iv)/P-28 Providing and laying bituminous concrete
using crushed aggregates of specified
grading, premixed with bituminous
binder @ 5.4 to 5.6 % of mix and filler,
transporting the hot mix to work site, laying
with a hydrostatic paver finisher with sensor
control to the required grade, level and
alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the
desired compaction as per clause 507 of
specification.
(b) Using Drum Mix Plant of appropriate
capacity.
(iv) for Grading-II ( 30-45 mm thickness )
with 60/70 bitumen(VG-30)
1X14.00X2.25X0.030=0.95cum
cum 0.95 7376.00 7007.00
13/8.11 Painting Two Coats on New Concrete
/P-45 Surfaces
Painting two coats after filling the surface
with synthetic enamel paint in all shades on
new plastered concrete surfaces
For inscribing pillers
Side face :-4 No.X4X0.50X0.40=3.20
Top face:- 4No.X4X0.40X0.40=2.56
Total Qty 5.76 sqm
S No. Item Unit Qty Rate Amount
sqm 5.76 48.00 276.00
14/10.11 Providing painting, figuring and numbering
(ii)/P-54 to culvert upto 6m.Span complete with
Synthetic Enamal Paint.
(i) Two coats on new work.
1CD. =1.00No.
each 1.0 100.00 100.00
15/8.34 Providing and fixing guard stones
/P-49 220x220x1000mm made of hammer dressed
stones and fixed 400mm into the ground in
moorum and broken aggregates block of size
500x500x500 mm and given two coats of
paints with white and black bands i/c
excavation etc. complete.
On U/S= 7.00 No.
On D/S =9.00 No.
Total Qty 16.00 No.
each 16.00 298.00 4768.00
16/8.32 Drum Delineator in Construction Zone
/P-49 Provision of metal drum/empty bitumen
drum delineator, 300 mm in diameter, 800
mm high, filled with earth for stability,
painted in circumferential strips of alternate
black and white 100 mm wide fitted with
reflectors 3 Nos of 7.5 cm dia, all as per
IRC:SP:55-2001
Qty same as above item No. 15=16.00No.
each 16.00 380.00 6080.00
17/15.4(A) Providing and laying Pitching on slopes laid ²
/P-73 over prepared filter media including boulder
apron laid dry in front of toe of embankment
complete as per drawing and Technical
specifications
(A) Stone/Boulder
(i) On U/S Apron
(a) on base :-1X7.25X1.70X0.30=3.70
(b) on both side slopes :-2X1/4X3.14X1.50X
/ (1.50)²+(1.325)² X0.30 =1.41
(ii) On D/S Apron
(a) on base :-1X7.25X3.00X0.30=6.53
(b) on both side slopes :-2X1/4X3.14X2.90X
/ (2.90)²+(1.325)² X0.30 =4.36
Total Qty 16.00 cum
cum 16.00 2033.00 32528.00
18/3.7/P- Removal of Unserviceable Soil with Disposal 650716.00
19 upto 1000 metres
Removal of unserviceable soil including
excavation, loading and disposal upto 1000
metres lead but excluding replacement by
suitable soil which shall be paid separately as
per clause 305.
For shoulder Excavation in km 4/2 to 13/6 as
per site requirement at different locations
2X2600X2.50X0.150 (Average)=1950.00 m3
1 ; Name of work - Repairing & Painting work of median km 312/2 to 314 & km 1.00 to 3/10 on NH –
1X376X(0.20+0.30+0.20) = 263.20sqm
1X140X(0.20+0.30+0.20) = 98.00sqm
1X255X(0.40+0.50+0.40) = 331.50sqm
1X240X(0.20+0.30+0.20) = 168.00sqm
1X118X(0.20+0.30+0.20) = 82.60sqm
(v) km 1 on NH-12
(vi) Km 2 on NH-12