Format No :

Checklist for Inlet Duct Arrangement DrawingsAPIL-NCR-NPP-CHKL-005


Dec 2008

Contract / Project Name


Contract / Project No.
Boiler Type
Drawing Nos.

Sl. Checkpoints Status (Tick Remarks


No. if Confirmed)
1 Does drawing title and number agree with the MDL &
the work instructions and is the Title Block as per
contract specifications?
2 Is North Arrow and Gas Flow is indicated and matches
General Arrangements?
3 Are Column location dimensions to Column Location
drawing #XXXXXX-1E2000?
4 Have all Customer Specification requirements been
satisfied?
5 Are Column and Beam sizes as per selection sheet
# 6.03?
6 Is Insulation thickness, liner and duct plate thickness
as per selection sheet # 6.01?
7 Has shop / field weld indications been checked with
respect to site assembly?
8 Are manufacturing and fabrication tolerances shown for
the general and any special case?
9 Is quantity and locations of field packed insulation was
checked with respective drawings?
10 Are quantity, size and location of test ports was
checked as per selection sheet # 11.01?
11 Is the location of cable openings were checked?

12 Have they shown batten bars as per the GA drawings.

13 Is the Inlet duct dimensions checked as per Gas


turbine outlet detail? Has DG Job leader drawing
referred?
14 Has GT outlet type of connection detail referred from
the contract document as well as reference project?
15 Are the Inlet Duct Outlet dimensions checked against
upper header elevations, lower header elevations, PPA
and Casing End wall drawing?
16 Is the accuracy of all dimensions checked?

17 Has the drafting work is checked? (proper drafting,


dimensioning, clean line work, no line work through
text, etc.,)

Checked by Approved by Date: Sh. 1 of 2


Signature : Signature :

Name : Name :
Format No :

Checklist for Inlet Duct Arrangement DrawingsAPIL-NCR-NPP-CHKL-005


Dec 2008

18 Whether all instrument tapping as mentioned in the P &


ID have been covered in the ducting / casing layout?
19 Ensure all necessary notes, reference drawings,
material and details are included on drawings.
20 Have access doors been provided at proper locations
as per requirement from maintenance / erection point
of view?
21 Ensure any additional scope such as expansion joint,
flow straighteners, etc., has been provided appropriate
to contract requirements.
22 Is the column to beam connection as per the latest
design standards?

Checked by Approved by Date: Sh. 2 of 2


Signature : Signature :

Name : Name :