This document is a checklist from the maintenance department for a new horizontal lathe machine. It provides details of the machine such as the type, model, serial numbers, and year of manufacture. It then lists 17 items that were checked on the machine such as the head stock, jaw chuck, gear box, and electrical system. For each item, it notes if the condition is okay or not okay. Photos are also included verifying key components were checked. The checklist is signed off on by the supervisor and department head, approving the new machine.
This document is a checklist from the maintenance department for a new horizontal lathe machine. It provides details of the machine such as the type, model, serial numbers, and year of manufacture. It then lists 17 items that were checked on the machine such as the head stock, jaw chuck, gear box, and electrical system. For each item, it notes if the condition is okay or not okay. Photos are also included verifying key components were checked. The checklist is signed off on by the supervisor and department head, approving the new machine.
This document is a checklist from the maintenance department for a new horizontal lathe machine. It provides details of the machine such as the type, model, serial numbers, and year of manufacture. It then lists 17 items that were checked on the machine such as the head stock, jaw chuck, gear box, and electrical system. For each item, it notes if the condition is okay or not okay. Photos are also included verifying key components were checked. The checklist is signed off on by the supervisor and department head, approving the new machine.
Model CW62103C S/N Unit 114 S/N Engine - Year of manufacture 2017/9 ID/Code Project - Receive date 8 November 2017 ( Commissioning 22 November 2017)
Check List Information
No Item Checklist Condition Remark
Ok/Available Not Ok 1 Head stock v 2 Jaw Chuck v 3 Gear Box v 4 Base v 5 Tool post v 6 Cross slide v 7 Sleeve v 8 Tail stock v 9 Bed v 10 Saddle v 11 Lead screw v 12 Feed shaft v 13 Appron v 14 Electrical system v 15 Accessoris v 16 Installation Manual book v 17 Part book manual & service manual book v
Approval Information
Dilaporkan Oleh, Menyetujui,
(Gunawan) (Agung Budi P)
Supervisor Dep. Head DEPARTEMEN MAINTENANCE (MNT) CHECKLIST UNIT BARU
No Picture Remark
4 DEPARTEMEN MAINTENANCE (MNT) CHECKLIST UNIT BARU