Professional Documents
Culture Documents
AMA-73 Hydraulic Fracturing Proposal PDF
AMA-73 Hydraulic Fracturing Proposal PDF
AMA-73
SCHLUMBERGER WELL PRODUCTION SERVICES
Schlumberger Private
Hydraulic Fracturing Treatment Design
Well AMA-73
Field AMASSAK
Formation Ordovician | Unit III-3
BHST 77 degC
Date October 4, 2018
Prepared for Sonatrach DP-TFT
Disclaimer Notice:
This information is presented in good faith, but no warranty is given by and Schlumberger assumes no liability for advice or recommendations made concerning results to be obtained from
the use of any product or service. The results given are estimates based on calculations produced by a computer model including various assumptions on the well, reservoir and treatment.
The results depend on input data provided by the Operator and estimate as to unknown data and can be no more accurate than the model, the assumptions and such input data. The
information presented is Schlumberger’s best estimate of the actual results that may be achieved and should be used for comparison purposes rather than absolute values. The quality of
input data, and hence results, may be improved through the use of certain tests and procedures which Schlumberger can assist in selecting. The Operator has superior knowledge of the well,
the reservoir, the field and conditions affecting them. If the Operator is aware of any conditions whereby a neighboring well or wells might be affected by the treatment proposed herein it is
the Operator’s responsibility to notify the owner or owners of the well or wells accordingly. Prices quoted are estimates only and are good for 30 days from the date of issue. Actual charges
may vary depending upon time, equipment, and material ultimately required to perform these services. Freedom from infringement of patents of Schlumberger or others is not to be inferred.
Schlumberger-Private
Approvals & Signatures
StimulationTechnical Domain
X
Tayeb Khetib
Client Approval
Schlumberger Private
Schlumberger-Private
2
Sonatrach DP-TFT,
Algeria
1. Overview
Dear Sirs,
This report presents our technical proposal for the hydraulic fracture stimulation of AMA-73, targeting the Ordovician
formation Unit III-3. It includes the objectives for the treatment, well history and formation data, well completion data, and
pumping schedule fro Injection and Main fracturing treatment.
Several design scenarios of job size were explored in order to develop a final frac design that meets the objective, the
recommended job size is 20,000 lbs of proppant 7,450 of 20/40 ISP & 12,600 lb of 16/30 ISP). Fluid efficiency and Net
pressure used in the model are calibrated based on offset well AMA-76 and AMA-57 and AMA-75.
Schlumberger Private
The fluid selected for the treatment YF130, it is 30# gel loading non delayed crosslinked fluid and stable at the BHST
(77degC) of this well.
This proposal includes details of the well completion; formation model used for simulation, fluid/proppant properties, frac
design scenarios and the recommended Frac design for Fracturing intervention on AMA-73.
Sincerely yours,
Schlumberger Well Services Team
Schlumberger-Private
3
Contents
1. Overview .................................................................................................................................................... 3
2. Contacts..................................................................................................................................................... 5
3. Well Data ................................................................................................................................................... 6
3.1 Well location .......................................................................................................................................... 6
3.2 Well Completion ..................................................................................................................................... 6
3.3 Well Volumes: ........................................................................................................................................ 8
3.3 Reservoir General Information................................................................................................................. 9
3.4 Well General logs ................................................................................................................................. 10
1.1. Break Down .................................................................................................................................. 11
1.2. Main Fracturing Treatment ............................................................................................................. 11
Pumping schedule ............................................................................................................................................. 11
2. Personnel Requirement ............................................................................................................................. 15
Schlumberger Private
3. Equipment ................................................................................................................................................ 15
Tables:
Table 1 AMA-73 Completion Data. ....................................................................................................................... 6
Table 2 General Formation Properties of AMA-73.................................................................................................. 9
Table 3 Breakdown injection schedule ................................................................................................................ 11
Table 4 Total Fluid DataFRAC ........................................................................................................................... 11
Table 5 Pump Schedule Main Frac Treatment. .................................................................................................... 11
Table 6 Main Frac Totals .................................................................................................................................. 11
Table 7 Fracturing Treatment Summary.............................................................................................................. 13
Table 8 Personnel Requirement. ........................................................................................................................ 15
Table 9 Equipment ........................................................................................................................................... 15
Figures:
Figure 1: AMA-73 location ................................................................................................................................... 6
Figure 2 AMA-73 Well Schematic......................................................................................................................... 7
Figure 3: AMA-73 Well volumes........................................................................................................................... 8
Figure 4 Logs from Techlog software................................................................................................................. 10
Figure 5 Treatment PRC Plot with Net pressure .................................................................................................. 13
Figure 6 Fracture Geometry. ............................................................................................................................. 14
Schlumberger-Private
4
2. Contacts
Please feel free to contact us at any time should you have any questions/clarifications regarding this proposal
Schlumberger Private
Schlumberger-Private
5
3. Well Data
3.1 Well location
Schlumberger Private
Figure 1: AMA-73 location
Deviation Vertical
Schlumberger-Private
6
SH / DP / T . F . T
EQUIPEMENT DU PUITS FOLIO N° : 01
COLONNE DE TUBINGS
N° DES IGNATION NBRE TYPE DIAM LONG COTE PRD OBSERVATIONS
1 Sabot 1 EU 2"7/8 1.20 1685.30 Tbg crt biseauté Csg-13"3/8-68#
2 Siége "XN" 1 XN 2"7/8 0.27 1684.03 OTIS Dint=55 mm 37,64 m
3 Tbgs long 1 EU 2"7/8 9.54 6,50 Lbs/ft N80 Dint=62 mm Csg-9"5/8-P110#-47#
4 RED 1 WFD 4"1/2 0.25 RED 4"1/2 NAVM * 2"7/8 EU Mandrin 441,24
Schlumberger Private
5 Packer 1 WFD 7" 1.37 1673.04 WEATHERFORD HP=0,44 BP=1,37 785,64 m
6 Anchor seal 1 WFD 7" 0.21
7 Tbgs long 1 EU 2"7/8 9.29 6,50 Lbs/ft N80 Dint=62 mm Mandrin- 865,25
8 Mandrin 1 EU 2"7/8 2.08 1663.10 Weatherford
9 Tubings 23 WF 2"7/8 214.21 6,50 Lbs/ft N80 Dint=62 mm
10 Mandrin 1 EU 2"7/8 2.08 1446.71 Weatherford Csg-7" P110-29#
11 Tubings 32 WF 2"7/8 297.92 6,50 Lbs/ft N80 Dint=62 mm
12 Mandrin 1 EU 2"7/8 2.08 1146.71 Weatherford Mandrin- 1146,71
13 Tubings 30 WF 2"7/8 279.38 6,50 Lbs/ft N80 Dint=62 mm Tbg-2"7/8 EU -6,5 #
14 Mandrin 1 EU 2"7/8 2.08 865.25 Weatherford N80
15 Tubings 45 WF 2"7/8 421.93 6,50 Lbs/ft N80 Dint=62 mm
16 Mandrin 1 EU 2"7/8 2.08 441.24
17 Tubings 47 EU 2"7/8 439.49 Mandrin- 1446,71
Olive EU 2"7/8 0.35
Total colonne 1685.81
Mandrin 1663,1
Packer- 1673,04
TOL 1680,64
Siege "XN"- 1684,03
Sbt Tbg- 1685,30 m
Anneau 2001,64
OBSERVATIONS : 2030,64 m
Poids de la colonne de tubings au MD = 21 Tonnes
Appareil TP 200 ANNULE LE FOLIO N° 1
Schlumberger-Private
7
new
Zoom : 1200 m
7.000 in Csg
26.00 lbm/ft
1854 m
Tbg Volum e
32.00 bbl
Schlumberger Private
2.875 in Tbg
6.50 lbm/ft
1685 m
4.500 in Csg/Hgr
13.50 lbm/ft
2001 m
Zoom : 2001 m
Schlumberger-Private
8
3.3 Reservoir General Information
The fracturing gradient in this area is expected to be in range 0.6 psi/ft based on offset wells data (AMA-66
and AMA-75). The basic formation mechanical properties of AMA-73 well are listed in the table below:
Schlumberger Private
Schlumberger-Private
9
3.4 Well General logs
Schlumberger Techlog log analysis and zoning software was used to process the log Image. The Mechanical properties
were computed from sonic data and calibrated based on offset well data (AMA-66) and have been mainly used to
differentiate between shale and sandstones and zoned formation for design purpose.
Schlumberger Private
Schlumberger-Private
10
4. Treatment Objective
The objective of the treatment is to create a conductive fracture in the uintI III-3 of AMA-73 in order to get it into production
Note:
* The volume may be changed during the treatment based on pressure response.
Schlumberger Private
Fluid Name Total (gal) Total (bbl)
WF130 2,000 47.6
Pumping schedule
The table below shows the pumping schedule of the selected design after exploring many scenarios. Two types of
proppant will be pumped during main fracturing treatment (20/40 ISP in the first stages and 16/30 ISP in last stages).
Table 5 Pump Schedule Main Frac Treatment.
Job Description
Step Pump Fluid Name Step Fluid Gel Prop. Prop.
Name Rate Volume Conc. Type and Mesh Conc.
(bbl/min) (gal) (lb/,1000gal) (PPA)
PAD 15.0 YF130 4100 30.0 0.00
1.0 PPA 15.0 YF130 800 30.0 ISP 20/40 1.00
2.0 PPA 15.0 YF130 800 30.0 ISP 20/40 2.00
3.0 PPA 15.0 YF130 750 30.0 ISP 20/40 3.00
4.0 PPA 15.0 YF130 700 30.0 ISP 20/40 4.00
5.0 PPA 15.0 YF130 700 30.0 ISP 16/30 5.00
6.0 PPA 15.0 YF130 700 30.0 ISP 16/30 6.00
7.0 PPA 15.0 YF130 700 30.0 ISP 16/30 7.00
Flush 15.0 WF130 1877.4 30.0
Fluid Totals
9,250 gal of YF130
1877.4 gal of WF130
Schlumberger-Private
11
Proppant Totals
7,450 lbs of 20/40 ISP
12,600 lbs of 16/30 ISP
Pad Percentages
% PAD Clean 44
% PAD Dirty 41
Schlumberger Private
Schlumberger-Private
12
Table 7 Fracturing Treatment Summary
Schlumberger Private
Fluid Efficiency 30 %
Schlumberger-Private
13
Schlumberger Private
Figure 6 Fracture Geometry.
Important Notes:
- Similarly to AMA-72, The stress profile was calculated based on Sonic Data,
- The offset wells AMA-66 and AMA-57 we used to calibrate the stress and leak off model.
- DataFRAC and Thermolog are highly recommended
- Water contact not encountered however AMA-66 is producing as per the latest test performed on (01/08/2018)
post frac at 23 m3.
- 3 scenarios are proposed 20k, 25k and 34k lb with privileging 20k lb scenario to comply with frac body
concentration and confinement regarding the WOC (app -1641 m MD)
- HiWAY treatment is a option in order to provide an infinite fracture conductivity and minimizes the risk of
screen out.
Schlumberger-Private
14
2. Personnel Requirement
Table 8 Personnel Requirement.
Personnel Number
Field Engineer 1
Field Supervisor 1
Electronic Supervisor 1
Lab Technician 1
Mechanic Technician 1
Equipment Operator 11
3. Equipment
Table 9 Equipment
4 2
Schlumberger Private
High Pressure Frac Pump Frac tank
1 1
1 1
1 1
Crane 2 HP Manifold 1
Schlumberger-Private
15