Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Inspection Flash Report

Flash Report No. : JI2043-PPF021-FL-4-006 Date Of Inspection :30-07-2020

CLIENT: SONATRACH CONTRACTOR: PETROFAC


VENDOR: Kinetic Energy Factory Company LOCATION: Jubail

SUB VENDOR:N/A LOCATION: N/A

PETROFAC PURCHASE ORDER NO.:JI2043-PPF021 C-01


ITP No. & Sl No : W20015-ITP-001& 12,13.
RFI NO & Date: 02 REV 03 26-07-2020
1.0 TYPE OF VISIT:

Pre-Inspection Meeting • Visual & Dimensional inspection, Final painting inspection and PMI
testing of the Items.
Intermediate Inspection

Final Inspection

2.0 MATERIAL INSPECTED DURING THIS VISIT:


ITEM / TAG No. DESCRIPTION QUANTITY

108,109 ACOUSTIC PAD 06

07,39,44,49,53,56,57,60,61,64,65,66,70,71,
98,
99,100,101,102,103,104,106,107,108,113,1 CLAMP 1043
14, 115, 124,125

75,77,78,79,84,90,93,
U BOLT 1082
95,97,
105,106 TEFLON & ACOUSTIC PAD 06

27,28,29,30,31,32,37,38,138,140 Teflon Pad Assembly 37

3.0 RESULT OF INSPECTION:

Accepted Rejected ORDER STATUS Complete


Incomplete
4.0 AREA OF CONCERN:
5.0 SUMMARY:
1. Final Visual and dimensional inspection of the Structural items was performed at the
vendor facility as per the approved drawings. The items included Clamp of shoe,
Teflon and Acoustic pads & U-Bolts respectively All the dimensions were verified
which included length, width, height thickness etc. The results of Dimensional

08572-TRHT-AQ-QC-00-OO-206 FRM 03
Inspection Flash Report

inspections were found to be ok as per the drawings, the results were found to be
acceptable.
2. PMI testing of various structural items was also performed in order to know about the
material characteristics. The results were deemed satisfactory. The PMI reports will be
submitted by the vendor later.
3. Final coating inspection of the finished structural items was also performed, DFT
was checked for the top coat randomly by using a calibrated DFT meter
6.0 PHOTOS:

Note:
1.This report must be completed by hand/typed while at the Vendor and E-mailed from the vendor to Inspection
Coordinator and Functional Quality Engineer of Petrofac.

08572-TRHT-AQ-QC-00-OO-206 FRM 03
Inspection Flash Report

2.Any NCR observed during Inspection shall be notified to PECO Quality Engineer within 24 hours of Inspection for issuance
and concurrence.

Inspector detail :
Fahad Ahmad
Name
Signature
30/07/2020
Date

08572-TRHT-AQ-QC-00-OO-206 FRM 03

You might also like