Field Test Report of 10 mm Stone Grit

Name of Work :- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.

C.B. No. :- 27/SE-Barabanki Circle/2018-19 Date 12-06-2018

Chainage :- Km

Total Wieght :- 3345 g Date of Testing:-

Sieve As per
Material Cummulative Cummulative Passing
S.No. Size in Required Remark
Retained Retained Retained % %
mm %

1 20 0 0 0.00 100.00 100


2 12.5 67 67 2.00 98.00 90-100
3 10 1304 1371 41.00 59.00 40-85
4 4.75 1957 3328 99.50 0.50 0-10
Note:- Three Samples for each quarry source.

J.E. A.E.
Field Test Report of 10 mm Stone Grit
Name of Work :- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.

C.B. No. :- 27/SE-Barabanki Circle/2018-19 Date 12-06-2018

Chainage :- Km

Total Wieght :- 4345 g Date of Testing:-

Sieve As per
Material Cummulative Cummulative Passing
S.No. Size in Required Remark
Retained Retained Retained % %
mm %

1 20 0 0 0.00 100.00 100


2 12.5 43 43 1.00 99.00 90-100
3 10 1608 1651 38.00 62.00 40-85
4 4.75 2674 4325 99.55 0.45 0-10
Note:- Three Samples for each quarry source.

J.E. A.E.
Field Test Report of 10 mm Stone Grit
Name of Work :- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.

C.B. No. :- 27/SE-Barabanki Circle/2018-19 Date 12-06-2018

Chainage :- Km

Total Wieght :- 4433 g Date of Testing:-

Sieve As per
Material Cummulative Cummulative Passing
S.No. Size in Required Remark
Retained Retained Retained % %
mm %

1 20 0 0 0.00 100.00 100


2 12.5 133 133 3.00 97.00 90-100
3 10 1818 1951 44.00 56.00 40-85
4 4.75 2464 4415 99.60 0.40 0-10
Note:- Three Samples for each quarry source.

J.E. A.E.
Test For Aggregate Impact Value of Aggregate
Name of Work :- C/o 3x18.00 m span minor bridge on Baheri Nala at Baheri Link Road.

C.B. No. :- 27/SE-Barabanki Circle/2018-19 Date 12-06-2018

Chainage :- Km

Test Nos.
S.No. Observations Average
1 2 3
1 Weight of Aggregate Sample (Passing through
12.5mm & Retained on 10mm IS Sieve)Filled in the
Cylinder = W1 (gm) 621 621 621 621.00

2 Weight of Aggregate Passing 2.36 mm Seive After


15 Nos. of Blow = W2 (gm)
59 59 59 59.00

3 A I V = (W2 / W1) X100 9.50 9.50 9.50 9.50

Note:- 1- Cylindrical Measure shall be filled in 3 Layers by tamping 25 blow.


2- One Test per source of supply. If AIV is more than 18%, Stone Grit should be rejected.