Key Plan Notes:: This DWG

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

DCIL No. Contract No.

1401

THIS DWG.

STREET
HAZZA
AL FALAH STREET
EXISTING STORM STORM WATER
EXISTING

STATION
WATER PUMPING PUMPING
STATION

U.G. TANK / CHAMBER CONTROL


ROOM

01 02 03 04 05 06 07

EX.
BUILDING

08 09 10 11

PORTAL
TUNNEL
12 13 14 15 16

.
17 IP-36

DALMA ST
IP-44 IP-SP SH
K. ZAYED STREET IP-69
18
IP-36B

KEY PLAN
NOTES:

LEGEND:

REDUCE
SPEED

REDUCE

DETOUR
AHEAD
SPEED

CONSTRUCTION
VEHICLE ONLY
ACCESS FOR
60 60

END
AHEAD
DETOUR
60

DETOUR
REDUCE

AHEAD
EXISTING
STORM WATER SPEED
60
EXISTING STORM
WATER PUMPING PUMPING
STATION STATION
U.G. TANK / CHAMBER CONTROL

REDUCE
ROOM

SPEED
40

DETOUR
AHEAD
AHEAD EX. BUILDING

80

DETOUR
DETOUR

AHEAD
CONSTRUCTION
VEHICLE ONLY
ACCESS FOR
END

AHEAD
60 EX.
BUILDING

DETOUR
IP-44
BI
TO ABU DHA SHEIKH ZAYED BIN S
ULTAN STREET
AHEAD
DETOUR
EX. BUILDING
IP-SP

REFERENCE:

IP-36
60

DETOUR
60

AHEAD

CONSTRUCTION
EX. BUILDING

VEHICLE ONLY
RTAL

ACCESS FOR
EX. BUILDING

60

TUNNEL PO
CONSTRUCTION
VEHICLE ONLY

ACCESS FOR

END
REDUCE

60
SPEED

END
60
DETOUR
AHEAD

REV. DATE DESCRIPTION APPR'D


Client:
DETOUR
AHEAD

DEPARTMENT OF URBAN PLANNING


TO DUBAI AND MUNICIPALITIES

ABU DHABI CITY MUNICIPALITY

40
T

Employer:
AL FALAH STREE

DETOUR
AHEAD
Abu Dhabi General Services Company

Consultant: ABU DHABI

DeLEUW
CATHER
DETOU
R
AHEAD Contractor:

ENGINEERING & CONTRACTING

Project Title:
COMPLETION OF DEVELOPMENT WORKS
OF SHEIKH ZAYED BIN SULTAN STREET
FROM AL FALAH INTERSECTION TO
SEA PALACE INTERSECTION (PACKAGE-1)
Drawing Title:

DETOUR FOR DOUBLE RAMP OPENING

CONTRACT No:
1401
DRAWN BY CHECKED APPROVED

SCALE: DATE ACTUAL SIZE

A1-CUSTOM
Drawing No. Rev.
C1401-SZBSS-ZZ-AEC-TWS-SPD-0201 01

You might also like