The Construction Manager: The Contractor:

King Abdul-Aziz International Airport


Development Project (Phase I) Jeddah, KSA
RCI Stage. Facility / Sub-Facility Reference and Name Floor Plant Location (Room Number) Plant Ref.
Load Center C / SEC Cable Tunnel / C130 /
A Basement PDB-C130-UPS-15-B2-02
C13O
2
System / Sub System. Test Description. Test Sheet Ref. Sheet. Of. Rev.

LV PDB MCB TRIP TEST KAIA-INMA- 1 1 0


003-LVDB

1. MECHANICAL CHECKS AND VISUAL INSPECTION:


Document equipment nameplate data on test report & verify that equipment nameplate ratings are i n
accordance with the final approved or record drawings and specifications
Inspect the physical, electrical, and mechanical condition of structure and all electrical OK
1
Components
2 Verify appropriate anchorage, required area clearances, physical damage, and correct
OK
alignment and cleanliness
3 Inspect all doors, panels, and sections for paint, dents, scratches, fit, and missing hardware OK
Verify that bus bar, circuit breakers, relays, fuse and/or the disconnect switch and sizes and
4 OK
types correspond to drawings
5 Use the calibrated torque wrench method to verify that the tightness of accessible bolted
OK
connections and/or cable connections are accordance with the manufacturer's published data
6 Confirm correct operation and sequencing of electrical and mechanical interlock systems OK

8 Verify correct barrier and shutter installation and operation OK

9 Test the operation, alignment, and penetration of instrument transformer withdrawal


OK
disconnects, current carrying and grounding
10 Verify that customer connections to remote power, operators, interlocks, and indicators have
OK
been made

2. Auxiliary Supply for Instrument:

1 Ensure that the input voltage of the test instrument is regulated OK


2 Ensure that the input voltages are in range to the test instrument
OK
requirements
3 Ensure no other load is connected to the power source which is provided
OK
for testing.

Reviewed By Reviewed By Approved By


Test Information
(S/C) (Cx Team) (CM)
Readings by: Name / Ahmed Joudah / BSC Mustafa
Name:
Company / Signature Qanbar
Dates: Started/
Completed 11/01/2018 Signature:

Attached at the end of this Full Test


Instruments Used: Date: