The Construction Manager: The Contractor:

King Abdulaziz International Airport


Development Project (Phase I) Jeddah,
KSA
RCI Stage. Facility / Sub-Facility Reference and Name Floor Plant Location (Room Number) Plant Ref.
LPDB-C130-ES-15-B2-05
A Load Center C / SEC TUNNEL-C130/C13O Basement 2 SEC TUNNEL
System / Sub System. Test Description. Test Sheet Ref. Sheet. Of. Rev.

LV LPDB MAIN BUSBAR TESTING KAIA-INMA-001- 1 3 0


LVDB

1. Technical data:

LCC-SEC
Manufacturer: GEDAC Location: TUNNEL
Designation of SDB: LPDB-C130-ES-15-B2-05 Bus bracing: Copper Plated
Rated Voltage: 240V HZ: 60
Rated Nominal Current: 40A Incoming CB: 40A

2. Visual check & Mechanical Inspection :

S.No. Description Checks


1 Check the bus bar for any damage and they are bolted correctly OK
2 Check the insulator for any cracks or damage OK
3 Check the insulating boots on joints are in place OK
4 Check that complete bus bar is insulated and no damage of insulation OK
5 Check that all bus bar joints are silver plated OK
6 Check the enclosure for paint work OK
7 Check anti-condensation heaters are mounted at bottom OK

3. Mechanical check
Torque Check
Perform and Check the torque for all the interconnection joints of the bus bar which are made
At site the torque should be checked as per following values or as per manufacturer Recommendations.

8.8 Class SS A270


Bolt Size Maximum Bolt Size Maximum
Value Value
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A

Reviewed By Reviewed By Approved By


Test Information (S/C) (Cx Team) (CM)
Readings by: Name / Zaheer Ahmad / BSC Mohanad
Name:
Company / Signature Choker
Dates: Started/ 24.01.2018
Signature:
Completed

Attached at the end of this Full Test


Instruments Used: Date: 24.01.2018
Pack
The Construction Manager: The Contractor:
King Abdulaziz International Airport
Development Project (Phase I) Jeddah,
KSA
RCI Stage. Facility / Sub-Facility Reference and Name Floor Plant Location (Room Number) Plant Ref.
LPDB-C130-ES-15-B2-05
A Load Center C / SEC TUNNEL-C130/C13O Basement 2 SEC TUNNEL
System / Sub System. Test Description. Test Sheet Ref. Sheet. Of. Rev.

LV LPDB MAIN BUSBAR TESTING KAIA-INMA-001- 2 3 0


LVDB

4. Electrical test on Bus

4.1 Bus Bar Continuity and phasing test

Phases Continuity Phasing


From start of the bus to Extreme End
R Red phase OK
Y Yellow phase OK
B Blue phase OK
G Ground OK
N Neutral OK

5. Insulation Resistance Measurement of Bus bar.

Condition When all Breakers are OPEN


Phase R-G Y-G B-G R-Y Y-B B-R
G-ohms 474 415 400 NA NA NA
Test Voltage 1000VDC 1000VDC 1000VDC 1000VDC 1000VDC 1000VDC

Condition When all Breakers are OPEN


Phase R-N Y-N B-N
G-ohms 428 399 513
Test Voltage 1000VDC 1000VDC 1000VDC

Reviewed By Reviewed By Approved By


Test Information (S/C) (Cx Team) (CM)
Readings by: Name / Zaheer Ahmad / BSC Mohanad
Name:
Company / Signature Choker
Dates: Started/ 24.01.2018
Signature:
Completed

Attached at the end of this Full Test


Instruments Used: Date: 24.01.2018
Pack
The Construction Manager: The Contractor:
King Abdulaziz International Airport
Development Project (Phase I) Jeddah,
KSA
RCI Stage. Facility / Sub-Facility Reference and Name Floor Plant Location (Room Number) Plant Ref.
LPDB-C130-ES-15-B2-05
A Load Center C / SEC TUNNEL-C130/C13O Basement 2 SEC TUNNEL
System / Sub System. Test Description. Test Sheet Ref. Sheet. Of. Rev.

LV LPDB MAIN BUSBAR TESTING KAIA-INMA-001- 3 3 0


LVDB

6 Contact Resistance Measurement of Bus bar.

Phase (µΩ) Remarks


Joint no.
R Y B N
END TO END N/A N/A N/A N/A OK

Comments:

Reviewed By Reviewed By Approved By


Test Information (S/C) (Cx Team) (CM)
Readings by: Name / Zaheer Ahmad / BSC Mohanad
Name:
Company / Signature Choker
Dates: Started/ 24.01.2018
Signature:
Completed

Attached at the end of this Full Test


Instruments Used: Date: 24.01.2018
Pack