SUMMARY REPORT OF COMPRESSION TEST

NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD June 24 - July 23, 2020

Sampled Tested Results


Quantity Original Source Age Average
Lab. No Kind of Materials Part of Structure Station Reading Strength Specifications Remarks
Represented of Materials By Date By Date At (Days) (MPa)
(KN) (MPa)

PART F- BRIDGE CONSTRUCTION


ABUSAG BRIDGE

400(23)a13 Bored Piles (2200mm diameter)


555.82 30.47
543.41 29.79
Bored Pile, 541.41 29.68 27.6 Mpa
CC-07-34-2020 Concrete Cylinder 150 cu m Project Site J. Oquindo Jun. 24, 2020 Jul. 22, 2020 DPWH-RO2 28 31.24 Passed
# 15 L 581.72 31.89 @ 28 days
597.96 32.78
599.23 32.85

375.23 20.57
619.85 33.98
Bored Pile, 355.71 19.50 27.6 Mpa
CC-07-18-2020 Concrete Cylinder 150 cu m Project Site J. Oquindo Jun. 25, 2020 Jul. 10, 2020 DPWH-RO2 15 26.08 Passed
# 7a L 496.53 27.22 @ 28 days
490.88 26.91
515.87 28.28
0.00
0.00
AWAITING FOR Bored Pile, 0.00 27.6 Mpa
Concrete Cylinder 150 cu m Project Site J. Oquindo Jun. 25, 2020 Aug. 10, 2020 DPWH-RO2 28 0.00 Passed
OFFICIAL REPORT # 7a L 0.00 @ 28 days
0.00
0.00

575.70 31.56
565.12 30.98
Bored Pile, 578.07 31.69 27.6 Mpa
CC-07-34-2020 Concrete Cylinder 150 cu m Project Site J. Oquindo Jun. 26, 2020 Jul. 22, 2020 DPWH-RO2 26 31.49 Passed
# 14 L 565.67 31.01 @ 28 days
563.66 30.90
598.14 32.79

516.23 28.30
507.66 27.83
Bored Pile, 477.74 26.19 27.6 Mpa
CC-07-18-2020 Concrete Cylinder 150 cu m Project Site J. Oquindo Jun. 30, 2020 Jul. 22, 2020 DPWH-RO2 10 25.30 Passed
# Abutment B L 394.75 21.64 @ 28 days
321.05 17.60
551.99 30.26
485.48 26.61
594.02 32.56
AWAITING FOR Bored Pile, 511.88 28.06 27.6 Mpa
Concrete Cylinder 150 cu m Project Site J. Oquindo Jun. 26, 2020 Aug. 10, 2020 DPWH-RO2 31.57 Passed
OFFICIAL REPORT # Abutment B L 602.01 33.00 @ 28 days
575.31 31.54
686.15 37.61
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD June 24 - July 23, 2020

388.36 21.29
516.23 28.30
Bored Pile, 483.58 26.51 27.6 Mpa
CC-07-18-2020 Concrete Cylinder 150 cu m Project Site J. Oquindo Jul. 01, 2020 Jul. 10, 2020 DPWH-RO2 9 23.02 Passed
# 12 L 341.30 18.71 @ 28 days
309.92 16.99
479.75 26.30
579.41 31.76
569.57 31.22
AWAITING FOR Bored Pile, 561.56 30.78 27.6 Mpa
Concrete Cylinder 150 cu m Project Site J. Oquindo Jul. 01, 2020 Aug. 10, 2020 DPWH-RO2 40 30.05 Passed
OFFICIAL REPORT # 12 L 542.07 29.72 @ 28 days
542.41 29.73
494.25 27.09

517.15 28.35
517.51 28.37
Bored Pile, 530.83 29.10 27.6 Mpa
CC-07-18-2020 Concrete Cylinder 150 cu m Project Site J. Oquindo Jul. 01, 2020 Jul. 10, 2020 DPWH-RO2 9 26.87 Passed
# 16 L 406.06 22.26 @ 28 days
575.52 31.55
394.02 21.60
536.91 29.43
530.79 29.10
AWAITING FOR Bored Pile, 524.89 28.77 27.6 Mpa
Concrete Cylinder 150 cu m Project Site J. Oquindo Jul. 01, 2020 Aug. 10, 2020 DPWH-RO2 40 28.80 Passed
OFFICIAL REPORT # 16 L 518.19 28.41 @ 28 days
521.90 28.61
519.47 28.48

526.27 28.85
268.15 14.70
Bored Pile, 419.37 22.99 27.6 Mpa
CC-07-21-2020 Concrete Cylinder 150 cu m Project Site J. Oquindo Jul. 04, 2020 Jul. 14, 2020 DPWH-RO2 10 22.81 Passed
# 7b L 364.10 19.96 @ 28 days
476.47 26.12
441.63 24.21
535.72 29.37
546.47 29.96
AWAITING FOR Bored Pile, 551.64 30.24 27.6 Mpa
Concrete Cylinder 150 cu m Project Site J. Oquindo Jul. 04, 2020 Aug. 12, 2020 DPWH-RO2 39 29.63 Passed
OFFICIAL REPORT # 7b L 527.88 28.94 @ 28 days
532.86 29.21
548.53 30.07

546.28 29.95
549.07 30.10
Bored Pile,
AWAITING FOR 537.69 29.48 27.6 Mpa
Concrete Cylinder 150 cu m Project Site J. Oquindo Jul. 04, 2020 Aug. 12, 2020 DPWH-RO2 39 # Abutment 29.62 Passed
OFFICIAL REPORT 531.79 29.15 @ 28 days
BR
531.74 29.15
545.35 29.90
SUMMARY REPORT OF COMPRESSION TEST
NAME OF PROJECT 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin - Sta. Margarita Road

LOCATION Baggao, Cagayan


CONTRACTOR FREY-FIL CORPORATION
PERIOD June 24 - July 23, 2020
405(1)b3 Structural Concrete Class "A", Fc'=28MPa
535.95 29.38
AWAITING FOR Coping Beam @ 27.6 Mpa
Concrete Cylinder 30 Project Site A. Buscas Jul. 16, 2020 Aug. 12, 2020 DPWH-RO2 28 524.14 28.73 29.20 Passed
OFFICIAL REPORT Pier 4 @ 28 days
538.07 29.50

Prepared By: ` Checked by: Noted by:

JAY MAR T. ISORENA GLENN TIMOTHY L. ALAN ALEJANDRO S. ABELLA


Materials Engineer - Contractor Materials Engineer - DPWH Project Engineer - DPWH