PRE QUALIFICATION FOR ITB OF DAI HUNG FIELD BLOCK 05.

1a OFFSHORE VIETNAM WELL ABANDONMENT LUMP SUM PACKET


I FLOATING UNIT
CONTRACTOR’s
ITEM SPECIFICATIONS Minimum requirements
Proposal

1 Year built 1998 or later 1977

Floating Unit (Semi-Submersible/DP


2 Type Semi- Submersible
Vessel/Barge)
Class with ABS, Lloyds, DNV or recognized Class DNV, Latest
3 Classification/ Builder age (date of newest upgrades)
society upgrade in 2011
4 Rate water depth 110m working water depth 500m
5 Draw -work lifting capacity Working capacity 250 mt 500 mt
3 x Continental
6 Mud pumps 2 x triplex pumps x 1600HP Emsco FB-1600
1600 HP
Subsea BOP 18-3/4 - 10M (required with 18-3/5" 15M BOP/
7 BOP's /Well control equipment clamp hub cameron connector with riser Hub Connector will
system) be provided
8 Subsea BOP's weight Specify 200 tons
9 Drawwork 3200HP 3000 HP
10 Top Driver Rate capacity 650 MT 650 MT
11 Mud Tank 2500BBLs 2000 Bbls
3000m x Drill pipe, 300m x 2-7/8'' Cement
12 Drill pipe will be provided
stinger
13 Crane Atleast 1 x 40 MT Yes, Available
14 Accommodation 100man Yes, Available

II. OTHER RELATED SERVICES


CONTRACTOR’s
No Description Minimum requirements
Proposal

I Seabed survey well control system

1 Riser less Light Well Intervention For subsea well re-entry & recovery No
2 Completion Workover Riser System (CMOR) For subsea well re-entry & recovery No
3 IWOCS For system operation/control No

II Cement unit
1 Twin Cementing unit Yes Yes
2 Liquid Additive System Yes Yes
3 Cement Surge tank Yes Yes
To provide Storm packer, Bridge plug and
4 Cementing Rekated downhole tools Will be provided
running tools.

III Kill Fluid Service


1 Brine Mixing and salt and Brine/ Mud Material supply Yes Yes
2 Mud testing kit or Laboratory Yes Yes
3 Mud Engineer on Board Yes Yes

CONTRACT NO. PVEP/PRO/2019/010


PROVISION OF JACK-UP DRILLING RIG SERVICES FOR WORKOVER CAMPAIGN, BLOCKS 01 02, OFFSHORE VIETNAM Page 1 of 4
PRE QUALIFICATION FOR ITB OF DAI HUNG FIELD BLOCK 05.1a OFFSHORE VIETNAM WELL ABANDONMENT LUMP SUM PACKET
I FLOATING UNIT
CONTRACTOR’s
ITEM SPECIFICATIONS Minimum requirements
Proposal

IV Fishing Services
1 Fishing Package for required tubing sizes To provide all required Fishing tools Yes
2 Fishing Engineer Yes Yes

V Slick line and Mon - Cable Services


To provided neccessary surface equipment
Yes, Will be
1 Slick line Unit and downhole tools as per required by P&A
provided
Procedure
To provided neccessary surface equipment
Yes, Will be
2 Mono cable Unit and downhole tools for possible cleaning,
provided
milling, lock out SCSSV..ete
To provided neccessary tubing cutting
Yes, Will be
3 Tubing cutting Explosives and / or Chemical cutter explosives and hardware including tubing
provided
puncher and casing puncher.
Yes, Will be
4 Pressure control equipment Yes
provided
Yes, Will be
5 Engineers Yes
provided
VI Tubing handling Services
All tubing handling tools including Dual tubing
1 Tubing handling tools Yes
as per well information
All casing handling tool to pull cut casing as
2 Casing handling tools Yes
per well information
3 Tubular handling crew Yes Yes

VII Coil Tubing Services


Yes, Will be
1 CTU and related equipment 1-1/2'' Coil with 3500m Length
provided
Yes, Will be
2 CTU downhole tools Possible Tool requiment for CTU run
provided
Yes, Will be
3 Personnel Yes
provided

VIII Subsea tree/ Wellhead Services


1 Xmas tree/ Wellhead Services Yes Yes
Essar will refurbish
2 Equipment and tools for Xmas tree/ Wellhead related Yes existing tools and
put it to use
3 Xmas tree/ Wellhead Engineers Yes Yes

IX Completion Services
To provide neccessary completion related
1 Completion Services Yes
services for all P&A work
Completion related tools and equipment to
2 Equipment and Tools for Completion related operate downhole completion to pull Yes
Completion
3 Completion Engineers Yes Yes

To provied neccessary HSE related services


X HSE Related
for all P&A work
1 HSE services Yes

XI Casing cutting Services


Cut all casing as per well information by
1 Casing cutting Hardware Yes
Abrasive or Explosive Cutting
2 Engineers Yes Yes

XII ROV Services


100 HP Working
1 ROV Work/ Observation Class All P&A Work
class
2 ROV Tools (Jetting, Cleaning, Cutting, Torque..ete) All P&A Work relating Xmas Tree Yes
3 ROV Crew Yes Yes

XIII SAT/ Diving Services


1 SAT/ Diving All P&A Works relating Xmas Tree This is not required

XIV Vessel Services


1 AHTS Vessel for Material supply and Standby No

XV Helicopter Services

CONTRACT NO. PVEP/PRO/2019/010


PROVISION OF JACK-UP DRILLING RIG SERVICES FOR WORKOVER CAMPAIGN, BLOCKS 01 02, OFFSHORE VIETNAM Page 2 of 4
PRE QUALIFICATION FOR ITB OF DAI HUNG FIELD BLOCK 05.1a OFFSHORE VIETNAM WELL ABANDONMENT LUMP SUM PACKET
I FLOATING UNIT
CONTRACTOR’s
ITEM SPECIFICATIONS Minimum requirements
Proposal
To provide neccessary helicopter services for
1 Helicopter Services crew change requipment and possible No
Medivac

CONTRACT NO. PVEP/PRO/2019/010


PROVISION OF JACK-UP DRILLING RIG SERVICES FOR WORKOVER CAMPAIGN, BLOCKS 01 02, OFFSHORE VIETNAM Page 3 of 4
PRE QUALIFICATION FOR ITB OF DAI HUNG FIELD BLOCK 05.1a OFFSHORE VIETNAM WELL ABANDONMENT LUMP SUM PACKET
I FLOATING UNIT
CONTRACTOR’s
ITEM SPECIFICATIONS Minimum requirements
Proposal
XVI Logistic Support
To Provide neccessary logistic services for all
1 Supply Base Services No
P&A work

XVII Other
Cement Who will provide cement and what grade?

Information provided by:

Signature

Name

Designation

CONTRACT NO. PVEP/PRO/2019/010


PROVISION OF JACK-UP DRILLING RIG SERVICES FOR WORKOVER CAMPAIGN, BLOCKS 01 02, OFFSHORE VIETNAM Page 4 of 4