The document outlines the design of a sewage treatment scheme including an inlet bar screen, grit removal unit, two SBR aeration tanks, chlorination system, and sludge treatment system. Sludge is processed through a waste sludge thickener, belt press, and poly electrolyte dosing before disposal. The scheme is designed to treat an average flow of 30 m3/hr and peak flow of 66 m3/hr.
The document outlines the design of a sewage treatment scheme including an inlet bar screen, grit removal unit, two SBR aeration tanks, chlorination system, and sludge treatment system. Sludge is processed through a waste sludge thickener, belt press, and poly electrolyte dosing before disposal. The scheme is designed to treat an average flow of 30 m3/hr and peak flow of 66 m3/hr.
The document outlines the design of a sewage treatment scheme including an inlet bar screen, grit removal unit, two SBR aeration tanks, chlorination system, and sludge treatment system. Sludge is processed through a waste sludge thickener, belt press, and poly electrolyte dosing before disposal. The scheme is designed to treat an average flow of 30 m3/hr and peak flow of 66 m3/hr.
Sludge Handling system is design for the Air Blower Chlorination System Capacity = 166.72 m³/hr @ Capacity = 1.85 Kg/hr 0.6 kg/cm2
Chlorine Contact cum Treated
Inlet Bar screen Grit Removal Unit SBR based Aeration Tank water tank Inlet Sewage No of unit- 1 No of unit- 2 No of unit - 2 No of unit - 1 Peak Avg. Flow 30 66 66.48 L= 7.25 , W= 10.87 , H= 5.5 29.5 L= 4 , W= 4 , H= 3.5 Avg. Flow 30 L= 4.08 , W=1 , H=1.24 #NUM! Flow Peak Flow 66 COD 375.00 COD 50.00 COD 500.00 BOD 262.50 BOD 10.00 BOD 350.00 TSS 120.00 TSS 20.00 TSS 150.00