RENOVATION OF TURBINE CONTROL SYSTEM USING PLC-BASED FOR SMALL


HYDROELECTRIC POWER GENERATION

Article

CITATIONS READS

0 1,271

2 authors, including:

C. Kongnam
Electricity Generating Authority of Thailand
6 PUBLICATIONS   82 CITATIONS   

SEE PROFILE

All content following this page was uploaded by C. Kongnam on 16 March 2016.

The user has requested enhancement of the downloaded file.


RENOVATION OF TURBINE CONTROL SYSTEM
USING PLC-BASED FOR SMALL
HYDROELECTRIC POWER GENERATION
Tanabodee Duangsoithong* and Chanapan Kongnam

Abstract--This paper presents the development I. INTRODUCTION


of PLC-based turbine control system for small
hydroelectric power generation with Kaplan T he electronic equipment installed at the various
number of small and medium hydroelectric
turbine type. The proposed system is a pilot power generation under responsibility of Electricity
project of modernization of power plant control Generating Authority of Thailand (EGAT) are
system prepared for supplantation of worn almost lifetime use, they have accordingly effect to
electronic equipment or analog technology. reliability of electricity generation on those power
The proposed system is implemented for Mae- plant. Consequently, the electrical maintenance
Ngat hydro-power plant, under responsibility of division has necessarily to establish a pilot project
Electricity Generating Authority of Thailand, as for modernization of those power plant control
a test system. The mentioned system consists of system. With a several advantages for instance
two main parts; governor control and operation compact size, comfortable modification and various
control. The governor control part composing of supporting accessories of the Programmable Logic
speed, power and position control mode Controller (PLC) technology, it is considered for
actuating to guide vane are designed and implementation of a new turbine control system as
implemented. In addition to guide vane control the pilot project. The new system shall be stability
function, the runner blade control function is operation, less maintenance, and low equipment
completely fulfilled. In the operation control cost. Moreover, all complete functions must be
part, all control sequence with Human Machine fulfilled and it can work properly as the existing
Interface (HMI) for configuration modification, system.
parameters setting, and indications are
developed. A. Description of the Existing System
The operation of the PLC-based turbine The pilot project development is performed at
control system is verified and confirmed by unit No. 1 of Mae-Ngat hydro power plant. The unit
simulation and severe tests, respectively. The generation capacity is 5 MVA with voltage level 22
results of test indicated that the proposed kV. Regarding to the original turbine control
turbine control system can work properly. system, it was simultaneously installed since early
1985s with the power plant. The turbine control is
Index Terms--Hydroelectric power generation, performed by an analog electronic governor while
governor control, Kaplan turbine, PLC. the operation control is done by operator through
sequential relay circuit.
B. Design of New System
The main objective of the new turbine control
system is designed to completely fulfill the existing
T. Duangsoithong and C. Kongnam are with the Electrical
Maintenance Department, Electricity Generating Authority of
system. All control functions composing of turbine
Thailand, Nonthaburi, Thailand. control, generator control, load control and unit
e-mail: tanabodee.d@egat.co.th, chanapan.k@egat.co.th. startup/shutdown sequence are implemented on
* Corresponding author
PLC. The new system is designed to incorporate provided. The project development cost is then
with the original electronic governor system and given in Section IV. Finally, conclusion of the work
operation control system with sequential relay is provided in section VI.
circuit. In order to maintain the operation of
existing control system as backup system, the II. SYSTEM DEVELOPMENT AND CONFIGURATION
designed control system can therefore be switched Owing to the developed control system has two
between conventional system and PLC system. The parts as governor and operation control, this section
implemented system structure is simply indicated is therefore described in separated detailed.
as in Fig. 1. The Human Machine Interface (HMI)
A. Software Development
is used for machine parameters and status
monitoring in addition controllability of turbine The software development is separated into two
operation. The engineering unit is utilized for edit parts; governor control and operation control. The
of HMI configuration. governor control function is implemented on PLC
standard language, IEC61131-5. The operation
control (HMI) is developed on a personal computer
with Microsoft® Window® operating system and the
ProficyTM HMI/SCADA – iFIX (Unlimited Tag
with OPC Client/Server) software.
1) Governor Control
Regarding to the governor control function, it is
generally composed of turbine speed, power and
position control mode that actuating to guide vane
or wicket gate of turbine. As aforementioned,
turbine installed at Mae-Ngat hydro power plant is
Kaplan type, the runner blade control function is
Fig. 1. New system structure [1]. therefore necessarily implemented. The structure of
governor control function is indicated as flow chart
Furthermore from designed concept, the PLC- in Fig. 3.
based turbine control system is implemented with
Siemens’s PLC, S7-400 (single CPU). The PLC-
based control system overview is shown as in Fig.
2.

Fig. 2. PLC-based control system configuration [2]. Fig. 3. Flow chart of governor control program [2].

In section II, the system development and Each implemented functions of the governor
configuration of governor and operation control are control part can be described as in the following
described. In section III, field test and results are
details below.
a) Speed Control Function
The speed control function is shown as a diagram
in Fig. 4. The speed control function composes of
implemented main sub-function blocks for instance
Set Point, Ramp Rate, Dead Band, PID, and
Limiter. The maximum limit of speed set point is
100% while minimum limit depending on the field
circuit breaker (41) status. The set point can be
Fig. 5. Function block diagram of guide vane position control
obtained by SCADA with enable signal pulse. The
for the turbine [2].
demand signal from SCADA is then passed the
ramp rate that assigning the rising or decreasing c) Runner Vane Control Function
rate of signal. The guide vane position demand or In this function, the desired position of runner
speed control signal is then result of difference blade is obtained by the computation of relationship
value (error) from the speed set point and speed between the guide vane position and head water
feedback that passing PID function block. level in reservoir. The runner vane control function
is shown as a diagram in Fig. 6. The function is
consisted of Relation, Limiter, Set Point, Selector,
Summing, Dead Band and Gain Valve. The runner
vane control has three mode; auto, manual, and
runner stop.

Relation Limiter Manual


GV POS 100.0
RUN SP Runner Stop
Auto
0.0 0.00%
Head Water
A B C +
Selector ε
_
A Dead Band RUN Output
Set point
RUN Raise Raise HL
B
RUN Position x
100.0 C
RUN Lower Lower LL Feedback
Fig. 4. Function block diagram of turbine speed control for 100.0 HV
0.0 LV Runner SP Gain Valve
the turbine [2].
b) Position Control Function Fig. 6. Function block diagram of runner vane control for the
The guide vane position control function is turbine [2].
shown as a diagram in Fig. 5. The position of guide
d) Power Control Function
vane can directly be controlled by Raise and Lower The power control function is composed of Set
command while limiter is between 0% and 100%. Point, Ramp Rate, Selector, Droop, Summing, Dead
In this mode, the set point signal of gate position Band, PID and Limiter. The function is then shown
demand in each control mode is managed by the as a diagram in Fig. 7. The output of this function is
selector function. The delivered gate control signal a demand signal that delivered to an input of guide
or governor output from PLC, before governor vane position control function block. The power set
servo card, is provided by the summing value of point can be set when the load set signal is equal to
gate control feedback and selector which the 1. Furthermore, the active power of the turbine can
summing result is multiplied by gain value. directly be increased or decreased and by command
from SCADA.
Fig. 9. The page of turbine control sequence on HMI.
Fig. 7. Function block diagram of power control for the
turbine [2].
Figure 10 shown the governor control page
Regarding to the designed governor control including guide vane position control, speed control
function, it is created by a several number of sub- before synchronization and power control on HMI.
function blocks on PLC. In order to having the Besides, in this operation page, some important
fully effective operation of PLC system, the analog signals for example generator voltage,
executed functions in the program are classified generator current, excitation voltage and current,
into three tasks with different execution time. The active power, turbine speed, etc can be indicated
governor control program on execution time point and recorded as intending. These recorded signals
of view is therefore simply indicated as in Fig. 8. can be recalled.

Fig. 8. Governor control program on PLC system.

2) Operation Control (HMI)


As mention before, the turbine control sequence Fig. 10. The page of governor control on HMI.
or operation control is implemented with ProficyTM
HMI/SCADA – iFIX software. With the usefulness Besides machine control page on HMI as shown in
of HMI, the operator can comfortably control the Fig. 9 and Fig. 10, the transmission system control
operation of machine. The page of turbine of Mae-Ngat hydro power plant is additional
start/stop sequence including step of operation is implemented. The HMI page of the transmission
indicated as showing in Fig. 9. system control is then indicated as in Fig. 11.
Fig. 11. The page of transmission system of Mae-Ngat
Hydro power plant on HMI.
B. Installation
The new turbine control system is placed on
control room, generator floor, and turbine floor due
to field equipments location and effectiveness of
signal communication. The PROFIBUS is applied
Fig. 13. Remote I/O located at turbine floor [1].
for signal communication between PLC’s CPU at
control room and remote I/O at turbine and
generator floor. While the communication between
HMI and PLC system is performed by Industrial
Ethernet (OPC SERVER).
The installed remote I/O at generator floor is
shown as in Fig. 12 while another remote I/O
locating at generator floor is indicated as in Fig. 13.
The PLC system’s CPU locating at control room is
shown as in Fig. 14.

Fig. 14. PLC system cubicle located at control room [1].

III. SYSTEM TEST AND RESULTS


Fig. 12. Remote I/O located at generator floor [1].
The operation of the PLC-based turbine control
system is verified and confirmed by simulation and
severe tests, respectively. The simulation test is
performed by developed turbine simulator in ACKNOWLEDGMENT
laboratory. The result of simulation test is indicated The authors would like to thank the project
that the control function operated, correctly. workers for worth cooperation and Control System
The dry test including loop test, function test, and Equipment Division, Electrical Maintenance
start up/ shut down step test, and system Department, Electricity Generating Authority of
parameters setting is then performed at the installed Thailand, for data and all support.
location. It is confirmed that those parameters and
the system can operate properly before wet test REFERENCES
performing. Finally, wet test composing of position [1] R. Sithisomang, and W. Akarawarananthagool,
control, load limit test, transfer mode control, step "Small Hydro Power Plant Control System
response test, ramp rate test, and step load test is Design and Development," Project Report, 2007
performed. During the test, the turbine is operated (in Thai).
by HMI. The result of the test is indicated that the [2] T. Duangsoithong, "Governor Control
PLC-based control system can work properly. Development of Mae-Ngat Hydro Power Plant,"
Technical Report, 2007 (in Thai).
IV. PROJECT DEVELOPMENT COST
BIOGRAPHIES
The project development cost can be described as
Tanabodee Duangsoithong received B.Eng. in Electrical
the following details.
Engineering from Kasertsart University, Bangkok, Thailand in
The hardware and software cost of PLC & 1999. Since 2000, he has been with the turbine and generator
HMI/SCADA is 40,625 US$ (1,300,000 Baht) control system section, department of electrical maintenance,
while human cost is represented as 400 Man-day. Electricity Generating Authority of Thailand. He is currently
In addition, the installation and test cost is 6,250 an electrical engineer by level 6 in the Electricity Generating
Authority of Thailand, Thailand. His interested researches are
US$ (200,000 Baht) [1].
the field of embedded technology application, PLC-based
control system, and power plant control system consisting of
V. CONCLUSION governor and excitation control system using digital
The new turbine control system with PLC-based technology.
is implemented as a pilot project for small
Chanapan Kongnam received B.Eng. in electrical
hydroelectric power generation. The system is engineering from King Mongkut Institute of Technology
verified and confirmed by simulation and severe North-Bangkok, Thailand in 1995. Since 1995, he was with
tests, respectively. The test result is shown that the the turbine and generator control system section, electrical
system control can work properly. Besides, the maintenance department, Electricity Generating Authority of
PLC system can completely be incorporated with Thailand. In 2004, he received M. Eng. in electrical
engineering and information technology from Rosenheim
the original system in addition that it can be University of Applied Sciences, Germany. He is currently a
replaced the sequential relay circuit. The developed Ph.D. student in the Electrical Engineering Department,
HMI can monitor and record the important signals Chiang Mai University, Thailand. His interested researches are
in addition control of the turbine operation. With the field of energy technology especially renewable electricity,
the usefulness of the implemented turbine control optimal power generation planning and operation, energy
storage system, efficient energy use, and optimal maintenance
system, the operator can comfortably work and schedule and planning.
control the turbine. Moreover, accuracy of the
control is increased.