The following form includes questions which refer to the course you have just completed.
Your answers will assist us to evaluate the level of understanding & delivery of course contents.
If you have participated in a course as part of a Certification Program, your answers will be examined to
determine your skills and level of qualification.
Please read carefully the following questions and select the best answer amongst the four.
There is only one correct answer for each question.
Please Note – You may use the provided course material, including Product User Manuals, User Guides and
Data Sheets, to answer the enclosed questions.
2. How many TDM ports does the RADWIN 2000 C‐Series radio support?
e) 2 TDM ports
f) 4 TDM ports
g) Up to 16 TDM ports
h) None
3. When will you use the “Local Connection” to access the radio?
a) All ingress frames are tagged with specific VLAN ID and priority
b) All ingress frames are removed from their VLAN Tag
c) All ingress frames are allowed
d) Answers b. and c. are correct
10. Please use the Link Budget Calculator to answer the following question:
Assuming RW2000 D+, 80MHz channel in 5.8GHz FCC, Integrated, 13KM in Moderate Rain
Region. Minimum 99.99% uptime is required. What is the modulation and aggregate capacity?
11. With respect to question 10 above, what is the .6 Fresnel clearance required?
12. Please use the Link Budget Calculator to answer the following question:
Assuming RW2000C, 5.8GHz FCC, Connectorized Radio with 2ft Parabolic Antennas –
(40MHz Channel, 4 T1s,Good Climate, 10 Miles, need 99.99% availability.)
What is the Ethernet capacity?
a) 192.168.1.220
b) 10.0.0.120
c) 20.0.0.120
d) 255.255.255.0
15. Which access level would you use to configure the ODU with full privileges?
16. When planning a link using the Link Budget Calculator and R‐Planner, when current planned throughput
is less than the required service, we need to:
18. What polarity should ODU RF Ports ANT 1 and ANT2 be connected to on the antenna?
a. ANT1 Horizontal ANT2 Vertical
b. Either port is correct
c. ANT1 Vertical ANT2 Horizontal
d. All of the above
20. When trying to locate a good ground point on a building, the following are acceptable?
a. Water pipe
b. Natural gas or propane pipe
c. Ground leg of AC outlet
d. None of the above
21. What is the default band and regulation of a 2000 C radio at default?
RADWIN Training Center – Certification Questionnaire – PtP – VCC ‐ Page 3
RADWIN Training Center | 2000 PTP Certification Exam
a. 2.4GHz IC 10MHz
b. 5.1GHz FCC/IC 80MHz
c. 5.8 FCC/IC 20MHz
d. All of the above
22. In Reference to Question 25, where can you find the 2 nd Polarity on the 2000 C radio?
a. Circular File
b. Diagnostic file
c. User Manual Chapter VI
d. Herringbone RF Power Handbook