Inspection Checklist: Light Installation Check List

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

INSPECTION CHECKLIST

REFNO :ABE-701-E&I-CHK-04
LIGHT INSTALLATION CHECK LIST
DATE:

Location: EQUIPMENT PIT, EOC


Reference Drawing No:
ABE-701-ELE-GA-01 (OVERALL CABLE ROUTE & EQUIPMENT LAYOUT)
ABE-701-ELE-GA-04 (ELECTRICAL INSTALLATION DRAWING)

Sl.No Activities to be checked Yes No NA Remarks

Light fixture is approved & material is


1 inspected.

Light installation location is as per


2
approved cable route drawing.

Light installation is correct as per approved


3
installation drawing.

4 Tag Name plate is correct as per approval.

All unused cable entries are plugged with


5
Exe certifed blinds.
Light terminal & cable entry are correct as
6 per drawing

7 All light cover cover tightly closed

10

11

12

COMMENTS:

GDES ALBANNA MOTT SEOT

NAME

SIGNATURE

Page 1 of 2 ABE-701-QC-F-CHK-004-REV.0
INSPECTION CHECKLIST

REFNO :ABE-701-E&I-CHK-04
LIGHT INSTALLATION CHECK LIST
DATE:

Location: EQUIPMENT PIT, EOC


Reference Drawing No:
ABE-701-ELE-GA-01 (OVERALL CABLE ROUTE & EQUIPMENT LAYOUT)
ABE-701-ELE-GA-04 (ELECTRICAL INSTALLATION DRAWING)

Sl.No Activities to be checked Yes No NA Remarks

DATE

Page 2 of 2 ABE-701-QC-F-CHK-004-REV.0