Professional Documents
Culture Documents
Structural 51017 PDF
Structural 51017 PDF
Structural 51017 PDF
REINFORCEMENT AS TABULATED SHALL BE PROVIDED UNLESS OTHERWISE 1. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTMA - 36Fy=252.0Mpa
A. MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS 1. ALL REINFORCEMENT SHALL BE 0.019 CLEAR MINIMUM FROM TOP SPECIFIED IN THE PLAN. 2. WELDING SHALL CONFORM TO AWS STANDARDS.
OF THE FOLLOWING BUILDING CODES: AND BOTTOM OF SLAB.
3. FABRICATOR SHALL SUBMIT SHOP DRAWINGS FOR APPROVAL BY THE
1. ACI 318 - 11 2. FOR TWO - WAY SLAB ALONG THE LONGER SPAN SHALL BE PLACED BELOW ENGINEER AND THE OWNER PRIOR TO FABRICATION.
2. AISC 2013 THOSE ALONG THE LONGER SPAN AT CENTER AND OVER THE LONGER SPAN
3. NSCP 20th EDITION BARS NEAR THE SUPPORT UNLESS OTHERWISE INDICATED OR SHOWN STANDARD DETAILS
B. ALL DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES IN DETAILS THE SPACING OF THE BARS AT THE COLUMN STRIPS CAN 24 DIA. 24 DIA.
UNLESS OTHERWISE INDICATED. BE APPROXIMATELY 1 13 OF THE MIDDLE STRIP IN NO CASE GREATER (0.30 MIN) (0.30 MIN)
C. FOR ALL OTHER REQUIREMENTS, REFER TO ARCHITECTURAL, SANITARY, THAN 2 13 TIMES THE SLAB THICKNESS. 0.0093
ELECTRICAL AND MECHANICAL WORKING DRAWINGS. SLAB REINFORCEMENT
3. UNLESS OTHERWISE DETAILED IN CONDITIONING SLAB HAVING SAME
REINFORCEMENT RUNNING IN ONE DIRECTION, REINFORCING SHALL
FOOTINGS BE BEND, EXTENDED OR CUT AS FOLLOWS. CONCRETE WALLS
UNLESS OTHERWISE INDICATED IN THE PLANS, WALL REINFORCEMENT SHALL
1. FOOTINGS ARE DESIGNED TO REST ON SOIL WITH BEARING L4 L4 L4 L4 L4 L4 BE FOLLOWED ACCORDING TO THE FOLLOWING SCHEDULE.
CAPACITY OF 188 KPa
2. NO FOOTING SHALL REST ON FILL.
0.30
MIN
T
0.10mm (MIN) COMPACTED
3. MINIMUM CONCRETE PROTECTION FOR REINFORCE SHALL BE 0.076 CLEAR GRAVEL BASE
FOR CONCRETE DEPOSITED AGAINST THE GROUND AND 0.051 CLEAR
FOR CONCRETE DEPOSITED AGAINST THE FRAMEWORK. L5 L5 L5 L5 L5 L5
NATURAL GRADE LEVEL OR
L1 L2 L3 CANTILIVER COMPACTED SOIL LAYER
(0.30 MIN)
(0.30 MIN)
24 DIA.
24 DIA.
REINFORCE CONCRETE STAIRS 40.00 MPa
BEDDED SLABS, CATCH BASINS & SIDEWALK 6. PROVIDE EXTRA REINFORCEMENT AT CORNER SLAB
17.50 MPa (TWO ADJACENT DISCONTINEOUS) AS SHOWN BELOW.
0.05X0.10m KEY 0.038X0.063m KEY
2. ALL CONCRETE MUST BE DEPOSITED, VIBRATED AND CURED IN ACCORDANCE
WITH ACI STANDARD. 5-10MMØ BARS @ 0.208M
CONCRETE COLUMN SEE NOTE
FOR DOWELS
12mmØ TIES
O.C. BOTTOM BARS d=MAX.
3. STRIPPING OF FORMS AND SHORES SHALL BE AS FOLLOWS: @ 0.102m 12mmØ TIES
O.C. (MAX.) @ 0.102m
FOUNDATIONS 1 DAY O.C. (MAX.) WALL INTERSECTION
COLUMNS 3 DAY
24 DIA. 24 DIA.
BEAMS & GIRDER 21 DAY 3-10mmØ (0.30 MIN) (0.30 MIN)
6. UNLESS OTHERWISE NOTED IN PLAN OR IN SPECIFICATIONS, CAMBER ALL BEAMS 7. PROVIDE SUPPLEMENTARY REINFORCEMENT AT SMALL UNFRAMED 5mmX150mm CORR. TYPE PVC WATERSTOP
AND GIRDERS AT LEAST 6.2MM FOR EVERY 3.00M SPAN EXCEPT CANTILIVERS OPENINGS IN FLOOR SLABS AS SHOWN BELOW.
FOR WHICH THE CAMBERS SHALL BE AS NOTED IN PLANS OR AS ORDERED WALL CONSTRUCTION JOINT
BY THE DESIGNER, BUT IN NO CASE LESS THAN 16.7MM OF EVERY 3.00M
OF FREE SPAN. 24 DIA. 24 DIA.
h = HEIGHT BETWEEN FLOOR
76
0.
12mmØ TIES
76
0.
@ 0.102m
TRIMMER MAYBE
O.C. (MAX.)
(0.30 MIN)
(0.30 MIN)
24 DAI.
24 DAI.
OMITTED WHERE
OPENING IS FRAMED
BY BEAM COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE
25mm CLEAR
MIN. 1-16MMØ TOP & CAST MONOLITHICALLY WITH THE CORE OF MIN. THICKNESS OF 0.0127m AND
DISTANCE
(MINIMUM) BOT. FOR SLABS NOT LESS THAN 12 TIMES MAX. SIZE OF COARSE AGGREGATE WHERE COLUMNS
0.012M THICK AND OVER CHANGE IN SIZE. VERTICAL REINFORCEMENT SHALL BE OFFSET AT A SLOPE OF WALL REINFORCEMENT
NOT MORE THAN 0.025. AN EXTRA 12mmØ AT 0.076mm O.C. SHALL BE
0.914MM O.C. PROVIDE THROUGHOUT THE OFFSET REGION. WALL CORNERS
DISTANCE (MIN.)
37.7mm CLR.
37.7MM CLR.
HOCK SLAB REIN'T.
DISTANCE FOR
BEAMS & GIRDERS
(FOR BEAMS)
PROVIDE EXTRA BARS
OVER TRIMMER BAR MILD STEEL REINFORCEMENT 24 DIA.
(0.30 MIN)
24 DIA.
(0.30 MIN)
1. ALL MILLD STEEL REINFORCEMENT SHALL CONFORM TO ASTMA-15-62-2T 0.10m (MIN) COMPACTED
(NOT SHOWN) PARALLEL GRAVEL FILL
AND DEFORMATION TO A-305-56T LATEST REVISION.
TO SIDE OF EQUAL
25MM∅ BAR
SEPARATOR AREA OF INTERRUPTED 2-16MMØ @ 2. DEVELOPMENT LENGHT FOR ALL BARS SHALL BE A MINIMUM OF 40-BAR Ø
SLAB REINFORCEMENT EACH CORNER UNLESS OTHERWISE SPECIFIED FOR REINFORCING BARS 12 ; 233.0Mpa
NOTE FOR DOWELS
LESS AREA TRIMMER FOR REINFORCING BARS 12 ; 280.0Mpa PROVIDE DOWELS OF SAME SIZE AND
BARS SPACING AS HORIZONTAL OR BENT
3. ALL BARS SHALL BE WELDABLE. HORIZONTAL BARS.
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
M
C3 C3 CF-1 CF-2 CF-3 CF-4 CF-2 CF-1 C3 C3
N
F2
FOUNDATION PLAN
SCALE 1:100M
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
GRADE
.90
.90
GRADE BEAM
BEAM
2.70 M.
2.70
NATURAL
GRADE LINE
VERIFY
VERIFY
FTB FTB FTB FTB FTB FTB
COMBINED FOOTING
COLUMN
FOOTING
3 4
VARIABLE
FTB FTB FTB FTB FTB
NOT TO SCALE
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
12.01 CF1 1.35 2.0 2.0 36.00 X 7.00 25mmØ@145mm C/C 32mmØ@175mm C/C 25mmØ@ 160mm C/C 25mmØ@ 160mm C/C
2.00 0.96 2.04 1.46 3.54 2.00
CF2 1.35 2.0 2.0 36.00X 7.00 25mmØ@ 130mm C/C 25mmØ@ 100mm C/C 25mmØ@ 160mm C/C 25mmØ@ 160mm C/C
5.78
CF3 1.45 2.0 2.0 36.00X 7.00 25mmØ@ 125mm C/C 25mmØ@ 100mm C/C 25mmØ@ 160mm C/C 25mmØ@ 160mm C/C
C1 CF4 1.60 2.0 2.0 36.00 X 10.00 25mmØ@ 75mm C/C 25mmØ@ 80mm C/C 25mmØ@ 160mm C/C 25mmØ@ 160mm C/C
A
F1 0.90 - - 4.70 x 4.70 20mmØ@ 230mm C/C 20mmØ@ 160mm C/C 20mmØ@ 230mm C/C 20mmØ@ 160mm C/C
5.00
F2 0.90 - - 6.75 X 6.75 20mmØ@ 230mm C/C 20mmØ@ 190mm C/C 20mmØ@ 230mm C/C 20mmØ@ 190mm C/C
B C1
C5
1.00
MF 1.60 2.0 2.0 (SEE DETAIL) 25mmØ@ 110mm C/C 32mmØ@ 110mm C/C 25mmØ@200mm C/C 25mmØ@ 200mm C/C
C
2.91
C5
D
1.45 2.10
C5 C1
E C5
F MF
3.53
C5 C5 C1 39.15
G
39.15
3.54
H C5
C5 C3
2.06 1.38
I
C5
J
C5
2.93
K C5
4.58
C5 C5
5.40
C1
1.001.00
L C3
C3 C3 C3 C5 C5
MF C5 C5
L
4.01
C1 C3 C1
6.60
C1 C1 C1 C1 C1
5.78
M
3.50
C3 C3
N
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
1.30
10.00 10.00 10.00 10.00 10.00 10.00 10.00
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
S1 S1 S1 S1 S1 S1 S1
GB1
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
S1 S1 S1 S1 S1 S1 S1
1
C5 C5
GB
D GB
1 C5 C1 C1 C1 C1 C1 C1 C1 C5 B1
G
E
1
C5 C5
GB1
GB
GB 1
GB2
GB
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
1 S1 S1 S1 S1 S1 S1 S1
F
C5 GB1 C5 C1 GB1 C1 GB1 C1 GB1 C1 GB1 C1 C1 GB1 C1 GB1 C1 GB1 C1 C5 GB1 C5
G
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
1 S1 S1 S1 S1 S1 S1 S1 GB
H GB C5 C5 1
1
GB
GB
G
I
1
B1
G
C5 C5
1
GB1
GB
GB
GB1
GB2
J
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
S1 S1 S1 S1 S1 S1 S1
1
K 1 C5 C5 GB1
GB C1 C1 C1 C1 C1 C1
GB1 GB1 GB1 GB1 C1 C1 GB1 GB1 GB1 C1
L C3 B5 C3 C3 B5 C3
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
GB2
S1 S1 S1 S1 S1 S1 S1
L
B5 B5 C1 GB1 C1 GB1 C1 GB1 C1 GB1 C1 C1 GB1 C1 GB1 C1 GB1 C1 B5 B5
M
B5 B5
N
C3 C3 C3 C3
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
1.30
10.00 10.00 10.00 10.00 10.00 10.00 10.00
C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2
A
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
B2
B2
B3
B2
B3
B2
B3
B2
B3
B2
B3
B2
B3
B2
B2
B3
B C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2
C6 C6
B4
C B4
B3
B3
B3
B3
B3
B3
B3
B2
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
B2
B2
B2
B2
B2
B2
B2
B2
B7
B7
B4
B4
C6 C6
B3
B3
D
C6 C2 C2 C2 C2 C2 C2 C2 C6 B4
B4
B1 B1 B1 B1 C2 C2 B1 B1 B1
E C6 C6
B4
B4
B3
B3
B2
B3
B3
B3
B3
B3
B3
B3
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
B2
B2
B2
B2
B2
B2
B2
B2
F
C6 B4 C6 C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2 C6 B4 C6
G
B2
S1 B3 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
B3
B3
B3
B3
B3
B3
B2
B2
B2
B2
B2
B2
B2
B2
B3
H B3 C6 C6
B4
C6 C2 C4 C6
B4
B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1
B4
I
B4
C6 C6
B3
B4
B3
B7
B7
J
B4
B2
B3
B3
B3
B3
B3
B3
B2
B3
B2
B2
B2
B2
B2
B2
B2
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
K C6 C6 B4
B4 C2 C2 C2 C2 C2 C2
B1 B1 B1 B1 C2 C2 B1 B1 B1 C2
L C4 B5 C4 C4 B5 C4
B2
B3
B3
B3
B3
B3
B3
B3
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
B2
B2
B2
B2
B2
B2
B2
B2
L
B7
B7
B5 B3 B5 C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2 B5 B3 B5
M
CB1
CB2
CB1
CB2
CB1
CB2
CB1
CB2
CB1
CB2
CB1
CB2
CB1
CB2
CB1
CB1
B5 B5
N
C4 C4 C4 C4
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
1.41
B6 B6
C2 CS B1 CS C2 CS B1 CS C2 CS B1 CS C2 CS B1 CS C2 C2 CS B1 CS C2 CS B1 C2 CS B1 CS C2
A
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
CS
S1
B6
B2
B6
B3
B2
B3
B2
B3
B2
B3
B2
B2
B2
B2
B3
B3
B3
B2
CS
B C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2
0.31
C6 C6 B4
C B4
S1
B3
B3
B3
B3
B3
B3
B3
S1
B2
S1 S1 S1 S1 S1 S1 S1 S1
B2
S1 S1 S1 S1
B2
B2
B2
B2
B2
B2
B2
B7
B7
B4
B4
C6 C6
B3
B3
D
C6 C2 C2 C2 C2 C2 C2 C2 C6
B4
B1 B1 B1 B1 C2 C2 B1 B1 B1 B4
E C6 C6
B4
B4
B3
B3
B2
S1 S1
B3
B3
B3
B3
B3
B3
B3
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
B2
B2
B2
B2
B2
B2
B2
B2
F
C6 B4 C6 C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2 C6 B4 C6
G
S1 S1 S1 S1 S1 S1 S1
B2
S1 B3 S1 S1 S1 S1 S1 S1
B3
B3
B3
B3
B3
B3
B2
B2
B2
B2
B2
B2
B2
B2
B3
H B3 C6 C6
B4
C6 C2 C4 C6
B4
B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1
B4
I
B4
C6 C6
B3
B4
B3
B7
B7
J
B4
B2
B3
B3
B3
B3
B2
B2
B3
B3
B3
S1 S1 S1 S1 S1 S1 S1
B2
B2
B2
B2
B2
B2
S1 S1 S1 S1 S1 S1 S1
K C6 C6 B4
B4 C2 C2 C2 C2 C2 C2
B1 B1 B1 B1 C2 C2 B1 B1 B1 C2
L C4 B5 C4 C4 B5 C4
S1
B2
B3
B3
B3
B3
B3
B3
B3
S1 S1 S1 S1 S1 S1 S1 S1
B2
S1 S1 S1 S1 S1
B2
B2
B2
B2
B2
B2
B2
L
B7
B5 B3 B5 C2 B1 C2 B1 C2 B1 C2 B1 C2 C2 B1 C2 B1 C2 B1 C2 B5 B3 B5
M
CB1
CB2
CB1
CB2
CB1
CB2
CB1
CB2
CB1
CB2
CB1
CB2
CB1
CB2
CB1
CB1
CS CS CS CS CS CS CS CS CS CS CS CS CS CS
B6 B6
B5 B5
N
C4 C4 C4 C4
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
DEPTH
BEAM
50
7 SETS OF EXTRA TIES
Ah
AT BEAM-COLUMN
SCHEDULE OF COLUMN INTERSECTION
C1
3.50
0.80
Bh
ASPHALT TOPPING
0.80
FOUNDATION
25mm X1.2m X 25m STEEL PLATE TO
SECOND FLOOR
Ah
FOURTH FLOOR LVL.
C2
DEPTH
BEAM
0.10
0.700
0.3
50
0.85
Ah
0.700
AM
RAMP BE
SECOND FLOOR 7 SETS OF EXTRA TIES
TO
ROOFDECK AT BEAM-COLUMN
24-32MMØ VERT. BARS, 7 SETS INTERSECTION
3.50
M CANTILEVER BEAM 12MMØ CLOSED TIES SPACED @
1@0.05, 4@0.15 REST @ .20M O.C
Bh
COLUMN
C3
0.60 7 SETS OF EXTRA TIES
.075.075.075.075
AT BEAM-COLUMN
INTERSECTION
0.60
Ah
FOUNDATION THIRD FLOOR LVL.
50
TO
DEPTH
SECOND FLOOR
BEAM
TYPICAL EXPANSION JOINT TIES: 24-25MMØ VERT. BARS, 7 SETS
50
12MMØ CLOSED TIES SPACED @
1@0.05, 4@0.10 REST @ .20M O.C
NOT TO SCALE
Ah
C4
3.50
0.50
7 SETS OF EXTRA TIES
Bh
AT BEAM-COLUMN
INTERSECTION
0.50
1.2Ld
SECOND FLOOR
TO
TIES: 20-25MMØ VERT. BARS, 7 SETS
Ah
ROOFDECK
12MMØ CLOSED TIES SPACED @
1@0.05, 4@0.10 REST @ .250M O.C
ELEVATION 2ND FLOOR LVL.
50
1
DEPTH
C5
BEAM
0.70 NOT TO SCALE 6 (OFFSET MAXIMUM)
50
EXPANSION JOINT (SEE DETAIL)
Ah
FOUNDATION
TO
1.32 SECOND FLOOR
4.20
TRANSITION TIES: 24 -25MMØ VERT. BARS,
5 SLOPE
12MMØ SPIRAL SPACED @ 1@0.05 7 SETS OF EXTRA TIES
6@0.05, 4@0.075M O.C AT BEAM-COLUMN
Bh
C6 INTERSECTION
0.90
FINISH GRADE LINE
0.60
LEGENDS:
Ah
5 SLOPE AM
TYPICAL SECOND LEVEL TO FOURTH LEVEL RAMP BE
SECOND FLOOR Ah = CONFINEMENT TIES GROUND FLOOR LVL
0.180
50
TO Bh = REGULAR TIE SPACING
ROOFDECK 1
DEPTH
4.20
BEAM
Ld = DEVELOPMENT LENGTH GB 6 (OFFSET MAXIMUM)
2.0 (MIN.)
TIES: 20-25MMØ VERT. BARS,
50
12MMØ SPIRAL SPACED @ 1@0.05
1.50 GROUND LEVEL 7 SETS OF EXTRA TIES
6@0.05, 4@0.075M O.C
TRANSITION NOTE:
AT BEAM-COLUMN
Ah
5 SLOPE
1.50 INTERSECTION
TRANSITION 1. SEE SCHEDULE OF COLUMNS
FOR NUMBER OF TIES PER SET.
50
5 SLOPE
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
GB1 500 700 8-25mm ∅ 8-25mm ∅ 8-25mm ∅ 8-25mm ∅ 4-16mm ∅4-leg 12MM∅ @ 0.05, 4@ 0.15 LINE OF BEAM
rest @ 0.20M O.C
4-16mm ∅4-leg 12MM∅ @ 0.05, 4@ 0.15 EXTERIOR
GB2 500 700 4-32mm ∅ 4-32mm ∅ 4-32mm ∅ 4-32mm ∅ rest @ 0.20M O.C COLUMN LINE OF BEAM R.C BEAM
4-leg 12MM∅ @ 0.05, 4@ 0.15 12MM∅ CLOSED TIES
B1 500 700 6-32mm ∅ 6-32mm ∅ 6-32mm ∅ 6-32mm ∅ 4-16mm ∅ @ 100MM O.C
rest @ 0.20M O.C EDGES OF COLUMN
REBARS
B2 500 700 7-32 mm ∅ 7-32mm ∅ 7-32mm ∅ 7-32mm ∅ 4-16mm ∅4-leg 12MM∅ @ 0.05, 4@ 0.15
rest @ 0.150M O.C
4-16mm ∅2-leg 12MM∅ @ 0.05, 4@ 0.15 BEAMS REBARS
B3 300 400 3-25mm ∅ 3-25mm ∅ 3-25mm ∅ 3-25mm ∅ rest @ 0.250M O.C
B4 400 700 7-20mm ∅ 7-20mm ∅ 7-20mm ∅ 7-20mm ∅ 4-16mm ∅4-leg 12MM∅ @ 0.05, 4@ 0.15
rest @ 0.250M O.C
B5 400 700 5-25mm ∅ 5-25mm ∅ 5-25mm ∅ 5-25mm ∅ 4-16mm ∅4-leg 12MM∅ @ 0.05, 4@ 0.15
FOR BEAM WIDTH LESS THAN
rest @ 0.250M O.C
B6 2-10mm ∅2-leg 10MM∅ @ 0.05, 4@ 0.15
COLUMN DIMENSION
200 700 2-16mm ∅ 2-16mm ∅ 2-16mm ∅ 2-16mm ∅ rest @ 0.200M O.C
B7 300 500 3-20mm ∅ 3-20mm ∅ 3-20mm ∅ 3-20mm ∅ 2-16mm ∅2-leg 12MM∅ @ 0.05, 4@ 0.15
BEAMS REBARS
12-12MM∅ VERT.
CONFINEMENT TIES @
BARS (TOTAL) LINE OF BEAMS COLUMN TO BEAM JOINT
0
10
R.C BEAM TIES @ 100MM O. C
TIES
SHORT SPAN (MM) LONG SPAN (mm)
(SPACING) (SPACING)
SLAB THK BAR BOTTOM BOTTOM REMARKS R.C BEAM
MARK (MM) (dia) BARS TOP BARS BARS TOP BARS
45.
00°
EDGES OF
m
CS 180 12MM∅ 200 100 200 100 INTERIOR
COLUMN COLUMN 12MM∅ VERT. BARS
(TYPICAL)
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
1.00
B7
B4
ROOFDECK FFL
C6
5.00
B3
D SIDE
WALK
C6
B4 12MM∅ RSB
3.30
E C6 @ 400 BOTHWAYS SPIRAL RAMP
B4
B3
7-20MM∅ TOP BEAM
200
BARS
S2 SIDE
WALK
C6 B4 C6 4-16MM∅ SIDE
10.00
G SEE DETAIL
3.30
BARS SPIRAL RAMP
S1 BEAM
H C6
7-20MM∅ BOTTOM B-4 B-4 WALK
C6
B4
SIDE
BARS
I
B4
3.30
SPIRAL RAMP
C6
RAMP DETAIL
B3
B7
J
B4
5.00
BEAM
2ND FLR FFL BEAM
B4
4.20
SPIRAL RAMP
BEAM
GROUND FLR FFL BEAM
0.40
NGL
50 x 75mm
C-PURLINS BAR SPACED
.90
C C-PURLINS SPACED
@ 0.60M O.C.
RAFTER
RAFTER
RAFTER
7.50
A
.90
RAFTER DETAIL
NOT TO SCALE
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
0
75
ALONG THE LONG ALONG THE SHORT SPAN
SPAN DIRECTION (SEE SCHEDULE) 1 (ONE) @ 75 O.C. 6h
PART OF BEND UP BARS
0
75
EXTENDED TO ADJACENT SLAB
T
ADD 1-16 ∅
T
L4
EACH FACE
OPEN EACH CORNER
PART OF STRAIGHT
FOR OPENINGS
BOTTOM BARS
TOP BARS DISCONT.
(TYP.)
750
ALONG THE SHORT SPAN
(SEE SCHEDULE)
LONG SPAN "L"
BEAM
h
1
T
DIFFER AT THEIR COMMON SUPPORT THE 6
NOT TO SCALE BEAM OR
T
SMALLER SPACING SHALL GOVERN.
WALL 45°
PART OF STRAIGHT
NOT TO SCALE BOTTOM BAR SHALL BE BOTTOM BARS
S5 S5
CUT-OFF W RATIO 1 OF 3
SHORT SPAN "A" = S SHORT SPAN "B" = S BEAM
BOTTOM BARS @ COLUMN STRIP @ DISTANCE S5 FROM THE FACE L5
L4 SPAN "A" *L4 SPAN "A" *L4 SPAN "A" SHALL BE SPACED 43 TIMES SUPPORTING MEMBER
OR L4 SPAN "B" OR L4 SPAN "B" THE MIDDLE STRIP
TOP BARS DISCONT. (TBD)
TOP BARS CONT. (TBC) SECTION "B" CHANGE IN SLAB ELEVATION
(TWO-WAY SLABS)
2 010 TIE BARS
2 010 TIE BARS
NOT TO SCALE
SHORT CLEAR SPAN "S" SHORT CLEAR SPAN "S"
COL MIDDLE COL COL MIDDLE COL
BEAM OR BOTTOM BARS ALONG SHORT SPAN STRIP STRIP STRIP STRIP STRIP STRIP
WALL BOTTOM BARS (BB)
BOTTOM BARS ALONG THE LONG SPAN DIRECTION S4 S2 S4 S S S
SEE SCHEDULE 4 2 4
SPAN "A" SPAN "B"
* WHICHEVER IS LARGER GOVERN.
SECTION "A"
A
STRIP
LONG CLEAR SPAN "L"
STRIP
COL
100
COL
L4
L4
LONG CLEAR SPAN "L"
150
MIDDLE
STRIP
100 THK. CHB
MIDDLE
STRIP
150 THK. CHB WALL W/ 10Ø @
L2
WALL W/ 10Ø @ 600 EACH WAY
600 EACH WAY (TYPICAL)
STRIP
COL
NATURAL (TYPICAL) 3-10Ø
L4
STRIP
GRADE LINE
COL
100 THK. SLAB
L4
ON GRADE W
300 10Ø @ 350
EACH WAY
750 (MIN.)
PLAN
3-10Ø
100
10Ø @ 300 10Ø @ 300 fy' = 40,00 psi (Ø10) SHOWING BOTTOM BAR REINFORCEMENT
400 300 TYP. FRAMING PLAN OF TWO WAY SLAB
100 100
SHOWING TOP BAR REINFORCEMENT
WF-1 DETAIL WF-2 DETAIL
NTS
TYPICAL TWO-WAY R.C. SLAB DETAIL
NTS
NOT TO SCALE
WALL FOOTING DETAIL
SCALE 1:100M
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
150
BEAM DEPTH
BEAM DEPTH
25mm
10∅ @300
2-12∅
t3
t3
JOINT DETAIL
2-12∅
NOT TO SCALE 2-12∅
PROVIDE SEALANT
350
300
25X75 WIDE 10∅ DOWELS
200
200
FLOOR SYTROPOR FLOOR @800 FOR 100THK CHB
LINE (TYP.) BEAM @600 FOR 150THK CHB 12∅ 2-12∅ 2-16∅
ON EXPOSED FACE WALL 2-16∅
RAKE PUT MORTAR 19
AND FILL WITH CAULKING 10∅ STIRR 1@50; 10∅ STIRR 1@50;
COMPOUND
REST @ 300 REST @ 300
t2
t3
OR RC WALL
t
t
25
75
RC SLAB OR BEAM
200
75 WIDE STYROPOR
25
PLASTER BOTTOM OF BEAM
4-10 ∅ CONT.BAR
WITH 10 ∅ STIRRUP 25X75 WIDE PLASTER
1@ 50 REST @250 150 THK CHB WALL STYROPOR
WITH 10∅ mm @ 600
O.C. EACHWAY (TYP.)
CHB THICKNESS X .40m
LINTEL BEAM WITH
10∅ X 900 LONG 4-16∅ BARS
DOWELS 10∅ X 900 LONG AND 10∅ STIRRUPS
@800 FOR 100THK CHB DOWELS @ 250 O.C.
@600 FOR 150THK CHB @800 FOR 100THK CHB 10∅ HORIZONTAL BARS
@600 FOR 150THK CHB @800 FOR 100THK CHB
@600 FOR 150THK CHB
SEE CONTROL
(TYP)
SEE CONTROL
450
CONCRETE COLUMN
CONN. DETAIL 150 mm THK OR WALL
CHB WALL TO R.C. SLAB CHB WALL ELEVATION & TYPICAL CHB WALL SECTON
NOT TO SCALE LINTEL BEAM DETAIL NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
PROJECT TITLE : PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
K 12 13 14 15 16 17 18 19 20 11 12 13 14 15 16 17 18 19
DN
11 12 13 14 15 16 17 18 19
DN
11 12 13 14 15 16 17 18 19
DN
11 12 13 14 15 16 17 18 19
DN
11 10 10 10 10
10 9 8 7 6 5 4 3 2 1 9 8 7 6 5 4 3 2 1 9 8 7 6 5 4 3 2 1 9 8 7 6 5 4 3 2 1
9 8 7 6 5 4 3 2 1
4.50
UP UP UP UP
0.30
0.30 0.30 0.30 0.30
1.45 2.40 TREAD
1.45 2.40 TREAD 1.45 4.80 TREAD 1.45 4.80 TREAD TREAD
STAIR STAIR STEPS 1.45 2.40
STAIR STAIR STEPS STAIR STAIR STEPS STAIR STAIR STEPS STAIR STAIR STEPS
LANDING
L LANDING LANDING LANDING LANDING
2.50
W1
GROUND FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR ROOF DECK FLOOR
17
14
15
16
STAIR DETAIL PLAN
13
12
LANDING
11 NOT TO SCALE
3.50
9
8
7
6
5
4
3
2
1
19 FOURTH FLR FFL
18
RISER
0.18
17
16
15
13
14 B2- SEE
11
12 STRUC. DET.
LANDING
3.50
9
8
7 0.30 M 0.05
6
5 TREAD
4 2"Ø STAINLESS
0.1
3
HT. OF HANDRAIL
HANDRAIL
25
2
1
0.90M
±0.18 M
THIRD FLR FFL
RISER
19
18
RISER
0.18
17
16
15
14 SQUARE BAR GRILLS
13 PAINTED FIN.
12
11 FLR. FIN. 1-10MMØ NOZING BAR W/
LANDING 10
SEE STEPS 10MMØ TIES @ 300 MM.O.C.
3.50
9
8 FLOOR TILE 12MMØ @ 100 MM. O.C.
7 DETAIL
6 FIN. BOTT. BARS (TYP.)
12MMØ @ 100 MM. O.C. 5
BOTT. BARS (TYP.) 4
3
2 10MMØ @ 300 MM. O.C.
10MMØ @ 300 MM. O.C. 1
TEMP. BARS (TYP.) SECOND FLR FFL TEMP. BARS (TYP.)
20 CONCRETE STAIR
0. 18 M
RISER
19
17
18 SEE STRUC. DET.
16
15 0.30 M
0.05
14 TREAD
13
5
2
12
0.1
LANDING 11
2" NON-SLIP
10
STEPS D E T A IL
4.20
9 BRASS NOZING
8
7 0.30
6 TREAD
5 NOT TO SCALE
4
RISER
0.19
3
2
1
0.05
10MMØ @ 300MM. O.C. GROUND FLR FFL
HOR. BARS E.F. (TYP.)
.60