RA Templates - Electrical
RA Templates - Electrical
Severity
Likelihood
Risk Level
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/III Control Measure Follow-up Date) Reference
Health &
Persons-at-risk
1 Inspect faulty Falling from Fatal -VSCC 5 1 M Monitor workers Supervisor & Safety
navigation light height -Staging / Scaffold to be equipped
-Use body harness and anchor with proper PPE
at hard point (body harness)
2 Remove existing -Live wire Electric shock -Isolate power supply with lock 5 1 M -Counter check by Supervisor & Safety
navigation light Electrocution out / tag out multi-meter
Fatal --VSCC
3 Bring down Falling hazard Bodily injury -Qualified Signaler/Rigger 3 2 M -Provide lifting Lifting Supervisor
existing -Valid inspection tag for lifting containers /
navigation light appliances casing
and bring up new -Barricade affected area
light
4 Install new -Falling hazard -Bodily injury -Staging 3 2 M -Use line yard for Supervisor
navigation light -Slip, tripping -Hand and finger -PPE (Hand gloves, body tools
hazard injury harness)
Association of Singapore Marine Industries Page 1 of 2
Severity
Likelihood
Risk Level
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/ Ill Control (Follow-up Date) Reference
Health & Measure
Persons-at-risk
5 Testing and Live wire Electric shock -Permit to work system and 5 1 M -Conduct toolbox Commissioning
Commissioning Electrocution -Authorized person to conduct meeting Engineer/
test
Fatal -VSCC meeting Supervisor
Page 2 of 2
RISK ASSESSMENT FORM
Severity
Likelihood
Risk Level
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/III Control Follow-up Date) Reference
Health & Measure
Persons-at-risk
1 Work Area Slip, Trip -Slip & fall due to -Keep the area clear / dry 2 2 L Nil Supervisor
Assessment and Fall slippery surface or -Use cable hanger to
-Trip & fall due to hang cable -Use of PPE
wires and cables
on floor
-Minor injury
2 Transport of load -Moving -Collision, topple -Ensure only trained & 5 1 M -Warning siren Supervisor Operation of
bank / cables to vehicle of forklift licensed forklift driver during operation forklift or checklist
work site using -Fatality operates -Nil
fork lift -Falling -Overload of forklift -Ensure the path of forklift is 2 2 L
object free from obstruction
-Ensure not to overload
-Secure the load
3 Laying of cable -Hand / -Cut injury while -Ensure using of hand gloves 2 2 L Nil Supervisor Inspection record
from load bank to Finger injury pulling cable -Ensure area is barricaded for lift gear
switchboard -Falling (minor injury) -Ensure lifting belt is certified
using shore object -Cable falling while and fit for use 2 2 L
crane lifting (minor injury) -Ensure trained signalmen is
present
4 Isolation of power Live voltage -Electric Shock -Highlight in VSCC meeting 5 1 M Supervisor
in switch board -Electrocution -Ensure skilled electrician is
(fatal) used
-Lock out / Tag out at main
switch board
Page 1 of 2
Severity
Risk Level
Likelihood
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/ Ill Control (Follow-up Date) Reference
Health & Measure
Persons-at-risk
5 Termination of -Live -Electric shock -Ensure that line test is 5 1 M -Briefing by Supervisor
load bank cable voltage -Electrocution carried out Supervisor
in switch board (fatal) -Ensure no
-Hand & -Cut injury during -Ensure using of hand gloves 2 2 L presence of
finger injury connection (minor electricity
injury)
6 Load test of Live voltage -Electric shock -Ensure the switchboard & 5 1 M Operation of Supervisor
generator -Electrocution load bank are properly warning light
(fatal) barricade
-Ensure that physical check Use walkie-talkie
on the cable to communicate
7 Disconnect of Live voltage -Electric shock -Ensure load bank is shut off 5 1 M Ensure no Supervisor
cable & removal -Electrocution -Ensure generator is switched presence of
of load bank after (fatal) off & stopped electricity
testing -Ensure the main switch
board is isolated Use walkie-talkie
to communicate
Page 2 of 2
RISK ASSESSMENT FORM
Severity
Risk Level
Likelihood
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/III Health Control Measure Follow-up Date) Reference
& Persons-at-risk
1 Inspect alternator - Unknown -Lack of oxygen -Entry permit for confine space 5 1 M -Portable gas Supervisor
located in E/RM condition -Toxic fumes -Gas check monitor per HSE Officer
-Forced ventilation &general working group
lighting
-Housekeeping
-Trip, slip and fall -Bodily injury or -Adequate PPE 5 1 M
fatal
2 Dismantle the Live power supply -Electric shock and -VSCC Meeting 5 1 M -Check to ensure Supervisor
alternator cable terminals electrocution -Isolate the circuit breaker there is no presence
-Bodily injury -Lock out & Tag Out of electricity
-Use correct tool
3 Remove of Fire and explosion -Spark or molten -Hot work permit 5 1 M Brief worker before Supervisor
corroded mounting generated from gas -PPE work commences
bolts cutting, may cause -Fire watch
flame
-Bodily injury/ fatal
4 Lifting the Falling object -Hit by falling object -Trained rigger / signalmen 3 1 L Supervisor Inspection
alternator -Bodily injury / fatal -Check SWL & condition of wire record for lifting
sling or lifting belt gear
-Use bucket container to lift from
onboard to shore
Severity
Risk Level
Likelihood
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/ Ill Control Measure (Follow-up Date) Reference
Health &
Persons-at-risk
5 Transportation of Moving vehicle -Collision, topple, -Ensure proper lashing 3 1 L Supervisor Ensure checklist
alternator from over capacity -Use low bed trailer for over site for forklift
dock to workshop -Bodily injury/ fatal alternator
and vice versa -Damage property -Keep road clear of obstruction
7 Chemical cleaning -Toxicity -Burn -Appropriate PPE 2 2 L Supervisor Know the stated
-Fluid spill -Allergic -MSDS 1st-aid
-Permit for cleaning recommended in
MSDS
8 Baking Caught by hot Burn Train personnel using the hot / 2 2 L Supervisor
equipment oven room
9 Testing Live power supply -Bodily injury -Trained personnel 5 1 M Ensure no contact Supervisor
terminal -Electric shock & -Test protocol while testing in
electrocution progress/ Display
warning
signboard
Page 2 of 2
RISK ASSESSMENT FORM
Severity
Risk Level
Likelihood
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/III Health Control Measure Follow-up Date) Reference
& Persons-at-risk
1 Main switch Chemical exposure -Skin itch -Highlight in VSCC 2 1 L Supervisor/ MSDS
board cleaning to skin and body -Eye irritation -PPE Charge hand
parts (eye protection, hand gloves)
-Continuous ventilation
-Temporary light and ventilation
-Display warning sign
2 MSB Bus Bar Electric hazard Finger injury -PPE (hand gloves) 2 1 L Supervisor/
Insulation test -Calibrated and tested equipment Charge hand
and check -Skilled electrician
-Rubber Mat
4 Bus Bar Torque & -Slip -Hand injury -Use appropriate tools 2 2 L Supervisor/
Breaker -Sharp edges -Body injury -PPE Charge hand
Termination -Cut/hand and body -Skilled electrician
check injury
Page 1 of 2
1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
Severity
Risk Level
Likelihood
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/ Ill Control Measure (Follow-up Date) Reference
Health &
Personsat-risk
5 Energize the -Short circuit -Death (Steps before this step) 5 1 M -Permit highlight in Commissioning
main switch -Explosion -Body injury -Sign boards VSCC Engineer/
board -Burn -Barricade -Briefing all Supervisor
-Insulation mat personnel
-Standby FFA
-PPE
-Skilled electrician
Severity
Likelihood
Risk Level
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/III Health Control Measure Follow-up Date) Reference
& Persons-at-risk
1 Inspection of -Lack of O2 -Asphyxiation -Entry
RISKpermit
ASSESSMENT FORM 5 1 M -portable gas Supervisor
echo sounder -Force ventilation meter
Companyand speed log Group 6 -General lighting Conducted By (Date) -Torchlight Group 6 (13/09/2006)
-Tank cleaning
Task Test Commission
-Falling hazards Main Distribution
-Body injury Board
-Lifeline (DB)
rope 5 1 M
-Body harness/ safety belt
3 Hotwork Fire and explosion Burns -Workers briefed 5 1 M -Pressurized Fire Supervisor and
Fatality -Work highlighted in VSCC line Hot worker
-Permit to work
-Proper PPE
-Proper tool
-Fire watchman
4 Work at height Falling hazard Fractures -Workers briefed 5 1 M Supervisor and
Fatality -Work highlighted in VSCC Individual
-Permit to work Electrician
-Safety harness
Page 1 of 1
Severity
Likelihood
Risk Level
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/III Health Control Measure Follow-up Date) Reference
& Persons-at-risk
1 Identify the -Live power supply -Electrical shock -Tag-Out and Lock-Out all the 5 1 M Use walkie-talkie Supervisor
location of the equipments relate to this loop or mobile talk to Officer
whole loop -Falling from height communicate
according to the -Fatal bodily injury -PPE, 5 1 M
one-line diagram -Check the staging “OK”
and P&ID layout -Unknown gas -Tag and use harness
drawing condition -Lack of oxygen
-Gas of explosion -Apply entry permit and use 5 1 M
ventfan
2 Visual check the Live power supply Electrical shock -Tag-Out and Lock-Out power 5 1 M Use walkie-talkie Supervisor
grounding cable supply unit for the panel or mobile talk to Officer
and cleaning for -PPE communicate
the panel -Use proper tool
3 Disconnect all the Live power supply Electrical shock -PPE 5 1 M Use walkie-talkie Supervisor
cables to do the -Tag-Out and Lock-Out power or mobile talk to Officer
continuous check supply unit for the panel communicate
and merger test -Make sure use proper tools and
the tools all in good condition
-Line check by skilled electrician
Page 1 of 2
1. Hazard Identification 2. Risk Evaluation 3. Risk Control Reference
Severity
Likelihood
Risk Level
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/ Ill Control Measure (Follow-up Date) Reference
Health &
Personsat-risk
4 Connect back all Live power supply Electrical shock -PPE RISK ASSESSMENT FORM 5 1 M Use walkie-talkie Supervisor
the cables and -Tag-Out and Lock-Out power or mobile talk to Officer
Company
make sure its Group 7 supply unit for the panel Conducted By (Date)
communicate Group 7 (13/09/06)
exactly following - Ensure all termination must be
Task the connection Test and Commissioning oftightened.
High Tension Switchboard
diagram -Out-going must be secured
-Line check by skilled electrician
Approved By (Date) Next Review Date 13/09/09
5 Power On Live power supply Electrical shock -Put warning symbol of 5 1 M Barricade work Supervisor
energized area Officer
-First quickly ON-OFF one or two
times
Page 2 of 2
Risk Level
Likelihood
No. Task Step Hazard Possible ExistingRISK
RiskASSESSMENT
Control FORM Additional Risk Action Officer Document for
Accident/III Health Control Measure Follow-up Date) Reference
Company Group 8
& Persons-at-risk Conducted By (Date) 13/09/06
1 Approved By (Date)
Cleaning of -Fumes, vapor, -Inhalation of -VSCC meeting Next
3 Review
1 Date
L -Respirator 12/09/09
Supervisor MSDS
switchboard chemical and dust harmful chemical -Wear mask
-Hand Glove
-Present of live -HSE Manual
power -Electrocution -LOTO 5 1 M -Temporary
earthing of Bus
Bar
2 Line check from Live terminal Electrocution -Isolate external source 5 1 M Barricade & Supervisor
MSB to source of -LOTO external source display warning
supply and --Use proper tool/ sign
internal wiring measuring device -Rudder
mat
-Deploy skilled electrician
3 High pot and Present of live Electrocution --Deploy skilled electrician 5 1 M Discharge residue Supervisor
megger test power -Do it at night (silent hour) power
--Use proper tool/
measuring device -Rubber
Mat
Page 1 of 1
Risk Level
Likelihood
No. Task Step Hazard Possible Existing Risk Control Additional Risk Action Officer Document for
Accident/III Health Control Measure Follow-up Date) Reference
& Persons-at-risk
1 Assessment of -Greasy/Oily floor Tripping and -Housekeeping 2 3 M Clean and dry Safety Assessor
area of work Slipping environment and Supervisor
2 Isolation of power Live power supply -Electrocution -VSCC meeting 5 1 M Check and ensure Supervisor
-Isolate the circuit breaker no presence
-Lock/Tag Out electricity
4 Cable Pulling & -Height -Body injury (back -Harness to wear and anchor at 5 1 M -Men evenly Staging Supv &
Strapping -Ergonomics sprain/strain) strong point spaced out while Supervisor
-Falling (fatality) -Ladder/Staging to be provided working on
with OK tags staging
5 Termination Slippage of tools Hand, finger and -PPE 2 3 M Wear anti-slip Supervisor
and over tightening eye injury -Proper tools gloves
Page 1 of 1