PROJECT TITLE: PN HAFEEZ HOSPITAL

LOCATION: NHQ, ISLAMABAD


DATED: 27TH JANUARY, 2020
SUBJECT PLUMBING SYSTEM METHODOLOGY
RECOVERED CONDENSATE SUPPLY PUMP (RCSP-01A/01B) CALCULATIONS

FLOW CALCULATIONS

MAXIMUM CAPACITY REQUIRED BY THE CONDENSATE OVERFLOW PUMP TO


= 13.8 GPM
COUNTER THE MAXIMUM INFLOW CONDENSATE RATE

TRANSFER PUMP'S - DISCHARGE PIPE SIZE (AS PER HAZEN WILLIAMS)

INPUT A DISCHARGE PIPE SIZE = 1.25 INCHES

DEVELOPED VELOCITY = 3.6 FEET / SECOND


VELOCITY CRITERION CHECK = PASS

DEVELOPED FRICTION HEAD LOSS = 2.1 PSI / 100 FEET


FRICTION HEAD LOSS CRITERION CHECK = PASS

RECOMMENDED PIPE MATERIAL = PPR

PUMP HEAD CALCULATIONS

STATIC HEAD AVAILABLE AT SUCTION = 0 PSI


STATIC ELEVATION HEAD = 12 PSI
FRICTION HEAD LOSS = 10 PSI
TOTAL HEAD REQUIRED (WITH 10% SAFETY FACTOR) = 24 PSI

NUMBER OF ACTIVE PUMPS = 1


NUMBER OF STANDBY PUMPS = 1
EACH PUMP WITH
FLOW = 14 GPM
HEAD = 24 PSI
POWER = 0.2 kW