TS GTS 1; 35/6 kV

EXISTING

cable line
CONFIGURATION

Mobile power center 6 kV


(existing)

Mobile power center 6 kV


(existing, new position)

Crusher

PPkIII-15 Mobile power center 6 kV (existing)


PPkIII-09 Mobile power center 6 kV (new), owned by investor, new
position
BTSR04 Armour portable power substation, owned by investor, in use, new position Investitor:

Sektor za inženjering i projektovanje ZP Rudnik i TE"GACKO", AD GACKO


Projektni biro MEGA

Datum Ime i prezime Potpis Objekat:


Odgovorni
PK "Gračanica" Gacko - Polje C
projektant 09. 2015. Z. Vaduvesković,dipl.inž.rud.

Projektovao 09. 2015. Dragoljub Cvetković, dipl.ing.el.


Project: Strategy of mining technology opening, development, optimization and maintenance
svsvsvsv
of sustainable coal production with the introduction of the process of enrichment of coal
NOTE: Block scheme - Layout - Power supply for crusher and transporter. Obradio 09. 2015. Dragoljub Cvetković, dipl.ing.el. through dry gravitational separation on the Open Pit Gacko

Preliminary design of supply of electrical energy


Razmera: Naziv crteža: Odeljenje za:
ELEKTROTEHNIKU
Block scheme of supply of electrical energy
to consumers Broj crteža:

VARIANT 1 E-04.1/5