Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 107

PG Count - DRAWING NO

0 153
3 6
4 4
5 7
6 1
7 64
8 29
9 11
11 3
12 32
15 2
17 7
18 11
19 13
21 16
24 1
32 1
35 102
36 107
38 24
39 67
41 6
42 22
43 1
45 6
47 4
48 14
52 119
55 83
56 49
57 48
65 6
67 10
71 4
73 2
75 2
78 6
79 113
89 6
95 2
99 3
Total Result 1167
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
1 0 0-00-205-22551 0 4 14.11.11 BOILER DEPT 3 14.11.11 MAIN BOILER INSULATION ARRANGEMENT 2
2 0 0-00-205-22552 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE REAR ARCH INSULATION ARRANGEMENT 2
3 0 0-00-205-22553 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF VERTICAL ROOF AND DECK SUPPORT INSULATION 2
4 0 0-00-205-22554 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF VERTICAL ROOF ENCLOSURE INSULATION 2
5 0 0-00-230-22574 0 4 14.11.11 BOILER DEPT 3 14.11.11 INSULATION AND REFRACTORY AROUND INSTRUMENT TAPPINGS. 2
6 0 2-00-205-06426 0 4 14.11.11 BOILER DEPT 3 14.11.11 HIGH TEMPERATURE INSULATION 2
SLOPE FOR HORIZONTAL DUCT
7 0 2-00-235-06266 1 4 14.02.12 BOILER DEPT 3 14.02.12 2
(FOR SINGAL LAYER OF INSULATION)
8 0 2-00-235-06270 0 4 14.02.12 BOILER DEPT 3 14.02.12 PIPE INSULATION 2
VERTICAL PIPE INSULATION
9 0 2-00-235-06272 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
(WELDING OF FIXING PINS NOT PERMITTED ON PIPES)
10 0 2-00-235-06277 0 4 14.02.12 BOILER DEPT 3 14.02.12 TYPICAL DAMPER INSULATION 2
INSULATION FOR METALLIC EXPENTION JOINT
11 0 2-00-235-06278 5 4 14.02.12 BOILER DEPT 3 14.02.12 2
(MULTIPLE BELLOWS)
12 0 2-00-235-06287 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION OF AIR PREHEATER 2
INSULATION FOR EXPANSION PIECE
13 0 3-00-235-06258 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
(SINGAL BELLOW)
INSULATION FOR EXPANSION PIECE
14 0 3-00-235-06259 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
(SINGAL BELLOW SIFFENER CLEARED)
15 0 3-00-235-06260 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION FOR MANHOLE DOOR 2
16 0 3-00-235-06261 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION OF DRUM END 2
DUCT INSULATION
17 0 3-00-235-06262 0 4 14.02.12 BOILER DEPT 3 14.02.12 (CLEARING STIFFENERS) 2

18 0 3-00-235-06263 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION OF FLANGED VALVES 2


19 0 3-00-235-06264 0 4 14.02.12 BOILER DEPT 3 14.02.12 DETACHABLE INSULATION ON VALVES 2
20 0 3-00-235-06265 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION FOR HOT AIR GATE 2
21 0 3-00-235-06266 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION F WIDE BOX 2
22 0 3-00-235-06267 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION FOR DUCT 2
23 0 3-00-235-06268 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION FIXING DETAIL FOR FLAT SURFACE 2
24 0 3-00-235-06275 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION OF RADIAL FAN 2
25 0 4-00-235-08535 0 4 14.02.12 BOILER DEPT 3 14.02.12 GENERAL NOTES ON ERECTION OF INSULATION 2
26 0 4-00-235-08536 0 4 14.02.12 BOILER DEPT 3 14.02.12 GENERAL NOTES ON ERECTION OF INSULATION 2
27 0 4-00-235-08537 0 4 14.02.12 BOILER DEPT 3 14.02.12 GENERAL NOTES ON ERECTION OF INSULATION 2
28 0 4-00-235-08538 0 4 14.02.12 BOILER DEPT 3 14.02.12 GENERAL NOTES ON ERECTION OF INSULATION 2
29 0 4-00-235-08539 0 4 14.02.12 BOILER DEPT 3 14.02.12 GENERAL NOTES ON ERECTION OF INSULATION 2
INSULATION OF DRUM END
30 0 4-00-235-08540 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
(DRG. NO.3-00-235-06261, 3-32-010-00054)
INSULATION OF PIPES AND BUNCH OF TUBES
31 0 4-00-235-08541 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
(DRG. NO.2-00-235-06270, 4-00-235-08550)
INSULATION OF VERTICAL PIPES
32 0 4-00-235-08543 0 4 14.02.12 BOILER DEPT 3 14.02.12 DRG. NO.2-00-235-06272 2
(WELDING OF FIXING PINS NOT PERMITTED ON PIPES)
33 0 4-00-235-08545 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION OF VALVE 2
34 0 4-00-235-08546 0 4 14.02.12 BOILER DEPT 3 14.02.12 TEE INSULATION 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
35 0 4-00-235-08547 0 4 14.02.12 BOILER DEPT 3 14.02.12 ELBOW INSULATION 2
36 0 4-00-235-08548 0 4 14.02.12 BOILER DEPT 3 14.02.12 FLANGE INSULATION 2
37 0 4-00-235-08550 0 4 14.02.12 BOILER DEPT 3 14.02.12 BUNCH INSULATION 2
INSULATION OF DUCT/FLAT SURFACE
38 0 4-00-235-08560 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
DGR. Nos. 3-00-235-06267, 3-00-235-06268
INSULATION OF DUCT
39 0 4-00-235-08634 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
(CLEARING STIFFENERS) DGR. No. 3-00-235-06262
40 55 1-55-911-00794 2 ACOUSTIC INSULATION (200 mm THICK)
41 55 1-55-911-00794 2 ACOUSTIC INSULATION (200 mm THICK)
42 55 1-55-911-00662 3 ACOUSTIC INSULATION (50 mm THICK)
43 55 1-55-911-00794 2 2 12.12.11 BOILER DEPT 2 12.12.11 ACOUSTIC INSULATION 200mm THICK
20.12.201
44 79 3-79-068-00660 0 4 Boiler 3 20.12.2011 ERECTION NOTES ON INSULATION OF ELECTROSTATIC PRECIPITATOR 2
1
20.12.201
45 79 1-79-068-00528 1 4 Boiler 3 20.12.2011 INSULATION DETAILS FOR ESP 2
1
20.12.201 Boiler
46 79 4-79-568-00936 0 4 3 20.12.2011 ESP INSULATION FIXING PIN DETAILS 2
1
47 79 1-79-026-00528 1 2 12.12.11 BOILER DEPT 2 12.12.11 INSULATION DETAILS FOR ESP
48 79 4-79-568-00936 0 2 12.12.11 BOILER DEPT 2 12.12.11 ESP INSULATION FIXING PIN DETAILS
49 79 3-79-068-00660 0 2 12.12.11 BOILER DEPT 2 12.12.11 ERECTION NOTES ON INSULATION OF ELECTROSTATIC PRECIPITATOR
50 0 0-00-027-40293 2 4 20.07.11 BOILER DEPT 3 20.07.11 ERECTION WELDING DETAIL OF FUSION WELDED PANEL 2
51 0 0-00-030-45967 0 4 20.07.11 BOILER DEPT 3 20.07.11 PPA-EXPANSION MOVEMENT DIAGRAM 2
52 0 0-00-027-45968 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-GENERAL ARRANGEMENT OF PR.PARTS(PGMA) 2
53 0 0-00-027-45969 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-UPPER SECTIONAL SIDE ELEVATION-I PASS 2
54 0 0-00-027-45970 1 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-SECTIONAL SIDE ELEVATION-II PASS 2
55 0 0-00-027-45971 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-DOWN COMER ARRANGEMENT 2
56 0 0-00-027-45972 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PANEL ARRANGEMENT I-PASS 2
57 0 0-00-027-45973 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PANEL ARRANGEMENT II-PASS 2
58 0 0-00-027-45974 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-WATER WALL UPPER CORNER TRANSITION 2
59 0 0-00-027-45975 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-WATER WALL LOWER CORNER TRANSITION 2
60 0 0-00-027-45976 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-TRANSITION AT REAR ARCH TUBES 2
61 0 0-00-027-45977 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-ASSY.OF REAR ARCH SCREEN AND HANGER TUBES 2
62 0 0-00-027-45978 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-LTSH TERMINAL TUBES(SEC.VV) 2
63 0 0-00-027-45979 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-EXTENDED SIDE SUPPLY TUBES 2
64 0 0-00-027-45980 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-FRONT AND REAR REHEATER SECTIONS 2
65 0 0-00-027-45981 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PLAN OVER HDRS.,LINKS & RISERS(SEC.AA&BB) 2
66 0 0-00-027-45982 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PLAN OVER ROOF TUBES(SEC.CC&C1C1) 2
67 0 0-00-027-45983 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-SEC.THROUGH FURNACE(SEC.DD&D1D1) 2
68 0 0-00-027-45984 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PLAN FOR ECNOMISER ASSY. 2
69 0 0-00-027-45985 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PLAN OVER BACK PASS "U" HEADERS 2
70 0 0-00-260-87609 1 4 10.08.11 BOILER DEPT 3 10.08.11 DUCT CONSTRUCTION DETAIL (FLANGE & EXPANSION JOINT) 2
71 0 0-00-260-87610 0 4 10.08.11 BOILER DEPT 3 10.08.11 DUCT CONSTRUCTION DETAIL (SUPORT & FIELD JOINT) 2
72 0 0-00-260-87611 0 4 10.08.11 BOILER DEPT 3 10.08.11 DUCT CONSTRUCTION DETAIL (CORNER CONSTRUCTION WELDING) 2
73 0 0-00-260-87612 0 4 10.08.11 BOILER DEPT 3 10.08.11 DUCT CONSTRUCTION DETAIL (STIFFNER & OTHER WELDING) 2
74 0 0-00-260-89244 0 4 10.08.11 BOILER DEPT 3 10.08.11 FD FAN TO AH DUCTING 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
75 0 0-00-260-89245 0 4 10.08.11 BOILER DEPT 3 10.08.11 FD FAN TO AH DUCTING 2
76 0 0-00-260-89246 0 4 10.08.11 BOILER DEPT 3 10.08.11 FD FAN TO AH DUCTING 2
77 0 0-00-265-89250 0 4 10.08.11 BOILER DEPT 3 10.08.11 AH TO MILL DUCT ARRANGEMENT 2
78 0 0-00-265-89251 0 4 10.08.11 BOILER DEPT 3 10.08.11 AH TO MILL DUCT ARRANGEMENT 2
79 0 0-00-272-89072 0 4 10.08.11 BOILER DEPT 3 10.08.11 EP TO ID FAN DUCTING 2
80 0 1-00-272-20436 0 4 10.08.11 BOILER DEPT 3 10.08.11 EP TO ID FAN DUCTING 2
81 0 1-00-272-20437 0 4 10.08.11 BOILER DEPT 3 10.08.11 EP TO ID FAN DUCTING 2
82 0 2-00-047-47535 0 4 10.08.11 BOILER DEPT 3 10.08.11 SAFETY VALVE SETTING FOR DRUM, SH, RH AND SB 2
83 0 3-00-047-47022 1 4 10.08.11 BOILER DEPT 3 10.08.11 GUIDE LINE DURING SAMPLE COOLER ERECTIO 2
84 0 0-00-266-89272 0 4 09.09.11 BOILER DEPT 3 09.09.11 BUS TO MILL DUCT ARRANGEMENT 2
85 0 0-00-266-89273 1 4 09.09.11 BOILER DEPT 3 09.09.11 BUS TO MILL DUCT ARRANGEMENT 2
86 0 1-00-266-20547 0 4 09.09.11 BOILER DEPT 3 09.09.11 BUS TO MILL DUCT ARRANGEMENT 2
87 0 0-00-271-88735 0 4 17.09.11 BOILER DEPT 3 17.09.11 BOF TO EP DUCTING 2
88 0 0-00-271-88737 0 4 17.09.11 BOILER DEPT 3 17.09.11 BOF TO EP DUCTING 2
89 0 0-00-271-89283 0 4 17.09.11 BOILER DEPT 3 17.09.11 BOF TO EP DUCTING 2
90 0 0-00-202-22547 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE BOTTOM ENCLOSURE 2
91 0 0-00-202-22548 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF FURNACE BOTTOM ENCLOSURE 2
92 0 0-00-203-22549 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE EXTENDED SIDE BOTTOM ENCLOSURE FRAMING 2
93 0 0-00-204-22550 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE REAR ARCH ENCLOSURE 2
94 0 0-00-205-22555 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF ROOF TUBES REFRRACTORY ARRANGEMENT. 2
95 0 0-00-206-22556 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
96 0 0-00-206-22557 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
97 0 0-00-206-22558 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
98 0 0-00-206-22559 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
99 0 0-00-206-22560 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
100 0 0-00-206-22561 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
101 0 0-00-208-22562 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF DECK SUPPORT AND SEALS 2
102 0 0-00-208-22563 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF DECK SUPPORT AND SEALS 2
103 0 0-00-220-22564 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE BOTTOM SKIN CASING 2
104 0 0-00-221-22565 0 4 14.11.11 BOILER DEPT 3 14.11.11 COMPONENTS WELDED TO PRESSURE PARTS 2
105 0 0-00-221-22566 0 4 14.11.11 BOILER DEPT 3 14.11.11 COMPONENTS WELDED TO PRESSURE PARTS 2
106 0 0-00-221-22567 0 4 14.11.11 BOILER DEPT 3 14.11.11 COMPONENTS WELDED TO PRESSURE PARTS 2
107 0 0-00-222-22568 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE REAR ARCH SKIN CASING 2
108 0 0-00-222-22569 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE REAR ARCH SKIN CASING 2
109 0 0-00-229-22570 0 4 14.11.11 BOILER DEPT 3 14.11.11 BOILER OUTER CASING 2
110 0 0-00-229-22571 0 4 14.11.11 BOILER DEPT 3 14.11.11 BOILER OUTER CASING 2
111 0 0-00-229-22572 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF BOILER OUTER CASING 2
112 0 0-00-230-22573 0 4 14.11.11 BOILER DEPT 3 14.11.11 FIXING DETAILS OF OBD AND ADF 2
113 0 0-00-269-89313 0 4 14.11.11 BOILER DEPT 3 14.11.11 AH TO BOF DUCT ARRANGEMENT 2
114 0 0-00-269-89314 0 4 14.11.11 BOILER DEPT 3 14.11.11 AH TO BOF DUCT ARRANGEMENT 2
115 0 1-00-223-06888 0 4 14.11.11 BOILER DEPT 3 14.11.11 SECOND PASS SKIN CASING 2
116 0 1-00-230-06889 0 4 14.11.11 BOILER DEPT 3 14.11.11 FIXING DETAILS OF WACD 2
117 0 1-00-230-06890 0 4 14.11.11 BOILER DEPT 3 14.11.11 FIXING DETAILS OF ADE 2
118 0 2-00-229-06427 0 4 14.11.11 BOILER DEPT 3 14.11.11 CORNER CLOSING DETAIL OF OUTER CASING 2
119 0 3-00-229-06372 0 4 14.11.11 BOILER DEPT 3 14.11.11 NOTES FOR BOILER OUTER CASING 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
120 0 2-00-052-10106 2 BOILER DEPT 2
121 0 2-00-027-40315 0 BOILER DEPT ERECTION NOTES FOR PRESSURE PARTS (UTILITY BOILERS) 2
122 0 1-00-027-40509 0 BOILER DEPT PPA- ERECTION ATTACHEMENT ASSY. FOR PANELS/COILS. 2
123 0 0-00-268-89211 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
124 0 0-00-268-89212 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
125 0 0-00-268-89213 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
126 0 0-00-268-20495 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
127 0 0-00-268-20496 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
128 0 0-00-268-20497 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
129 0 0-00-268-20498 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
130 0 0-00-261-89716 0 4 BOILER DEPT 3 PA FAN TO AH DUCT ARRANGEMENT 2
131 0 0-00-261-89717 0 4 BOILER DEPT 3 PA FAN TO AH DUCT ARRANGEMENT 2
132 0 0-00-056-10931 2 4 BOILER DEPT 3 SCHEME OF FUEL OIL SYSTEM-BOILER FRONT
133 0 4-00-205-08525 0 4 14.11.11 BOILER DEPT 3 14.11.11 APPLICATION & CURING OF CASTABLE REFRACTORY 2
134 0 4-00-205-08526 0 4 14.11.11 BOILER DEPT 3 14.11.11 APPLICATION & CURING OF CASTABLE REFRACTORY 2
135 0 4-00-205-08527 0 4 14.11.11 BOILER DEPT 3 14.11.11 APPLICATION & CURING OF CASTABLE REFRACTORY 2
136 0 4-00-205-08528 0 4 14.11.11 BOILER DEPT 3 14.11.11 APPLICATION & CURING OF CASTABLE REFRACTORY 2
137 0 4-00-205-08529 0 4 14.11.11 BOILER DEPT 3 14.11.11 APPLICATION & CURING OF CASTABLE REFRACTORY 2
138 0 4-00-215-09548 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
139 0 4-00-215-09549 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
140 0 4-00-215-09550 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
141 0 4-00-215-09551 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
142 0 4-00-215-09552 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
143 0 4-00-215-09553 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
144 0 4-00-215-09554 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
145 0 4-00-215-09555 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
146 0 4-00-215-09556 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
147 0 4-00-235-08549 0 4 14.02.12 BOILER DEPT 3 14.02.12 EXPANSION JOINT FOR PIPES 2
FICOM BLR PP INSUL, BLR PP MIRL WOOL,
148 0 4-00-231-09675 0 4 14.02.12 BOILER DEPT 3 14.02.12 FICOM BLR MNTNGS INSUL, BLR MNTNGS WOOL, 2
FICOM SB PIPES INSUL, SB PIPES MINRL WOOL

FICOM AIR DUCTS INSUL, AIR DUCTS MINRLWOOL,


149 0 4-00-231-09676 0 4 14.02.12 BOILER DEPT 3 14.02.12 FICOM AH GAS DUCT INSUL, AH GAS DUCT MINRL WOOL, FICOM AH GAS DUCT 2
INSUL, ID DUCT MINRL WOOL

150 0 4-00-231-09677 0 4 14.02.12 BOILER DEPT 3 14.02.12 32-710 FICOM OIL SYST INSUL, 2
33-721 OIL SYST MINRL WOOL
151 0 1-00-112-21969 2 foundation plan and loading details of ESP
152 0 0-00-214-23020 0 BOILER DEPT 3 ANTI VIBRATION BAFFLES
SOFT
SOFT COPY
153 0 0-00-273-89073 1 ID FAN TO CHIMNEY DUCTING COPY
RECEIVED
ISSUE

SOFT
SOFT COPY
154 0 1-00-273-20438 0 ID FAN TO CHIMNEY DUCTING COPY
RECEIVED
ISSUE
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies

SOFT
SOFT COPY
155 0 1-00-273-20439 0 RECEIVED ID FAN TO CHIMNEY DUCTING COPY
ISSUE
GENERAL ARRANGEMENT OF BOWL MILL XRP 883 (WITH PLANETARY GEAR
156 0 0-00-620-85870 3 8 09.08.12 BOILER DEPT 8 09.08.12 2
BOX)

157 0 0-00-610-85871 3 8 09.08.12 BOILER DEPT 8 09.08.12 FOUNDATION PLAN OF BOWL MILL XPR 883 (WITH PLANETARY GEAR BOX 2

158 0 0-00-264-88209 0 3 18.10.12 AH TO WB CONNECTING DUCT (SHEET 01 OF 05)


159 0 0-00-264-88210 3 18.10.12 AH TO WB CONNECTING DUCT (SHEET 02 OF 05)
160 0 0-00-264-88211 3 18.10.12 AH TO WB CONNECTING DUCT (SHEET 03 OF 05)
161 0 1-00-264-20196 3 18.10.12 AH TO WB CONNECTING DUCT (SHEET 04 OF 05)
162 0 0-00-264-88447 3 18.10.12 AH TO WB CONNECTING DUCT (SHEET 05 OF 05)
163 0 1-00-112-21969 2 2 12.12.11 BOILER DEPT 2 12.12.11 FOUNDATION PLAN AND LOADING DETAILS OF ESP
164 3 2-03-000-00037 1 4 BOILER 3 HEMISPHERICAL DISHED END COVER (RAW FORMING) 2
165 3 2-03-000-00068 2 4 BOILER 3 SUSPENSION LUGS 2
166 3 3-03-000-00013 1 4 17.10.11 BOILER 3 17.10.11 MOUNTING ARRGT OF T30 MARK IE. SEAL PL.
167 3 3-03-000-00014 1 4 17.10.11 BOILER 3 17.10.11 MOUNTING ARRGT OF RW- 5E ( SEAL PL.)
168 3 2-03-000-00042 2 4 17.10.11 BOILER 3 17.10.11 SCH. PIPE INSPECTOR'S PRESS
169 3 2-03-000-00041 2 4 17.10.11 BOILER 3 17.10.11 SCH. PIPE COND. LOOP ASSY - AS
170 4 0-04-126-01278 1 4 BOILER 3 BOILER DRUM WITH STUBS AND DRILLING DETAILS 2
171 4 0-04-126-01279 1 4 BOILER 3 BOILER DRUM WITH STUBS AND DRILLING DETAILS 2
172 4 0-04-136-00795 0 4 BOILER 3 SITE ASSEMBLED DRUM INTERNALS 2
173 4 2-04-146-00662 1 4 BOILER 3 DRUM SUSPENSION ASSY WITH ROCKER 2
174 5 1-05-137-01249 0 4 BOILER 3 FRONT WALL INLET HEADER-H1 2
175 5 2-05-155-00381 4 4 BOILER 3 HAND HOLE PIPE 2
176 5 1-05-155-01250 0 4 BOILER 3 REAR WALL INLET HEADER H-2 2
177 5 1-05-155-01251 0 4 BOILER 3  LEFT SIDE WW INLET HEADER H-3 2
178 5 1-05-155-01252 0 4 BOILER 3 RIGHT SIDE WW INLET HEADER H-4 2
179 5 2-05-175-00567 0 4 BOILER 3 EXTENDED SIDE WALL INLET HEADER (LEFT)H10 2
180 5 2-05-175-00568 0 4 BOILER 3 EXTENDED SIDE WALL INLET HEADER (RIGHT)H11 2
181 6 2-06-651-08844 1 4 20.07.11 BOILER 3 20.07.11 OPENING FOR ASLD 2
182 7 0-07-109-00826 2 4 BOILER 3 DOWN COMER PIPES 2
183 7 0-07-109-00827 1 4 BOILER 3 DOWN COMER PIPES 2
184 7 3-07-109-05186 3 4 BOILER 3 NITROGEN BUBBLING ARRANGEMENT 2
185 7 0-07-109-00859 0 4 17.09.11 BOILER 3 17.09.11 DOWN COMER PIPES 2
186 7 0-07-109-00860 0 4 17.09.11 BOILER 3 17.09.11 DOWN COMER PIPES 2
187 7 2-07-216-06254 0 4 BOILER 3 RISER PIPE 2
188 7 2-07-216-06255 0 4 BOILER 3 RISER PIPE 2
189 7 2-07-216-06256 0 4 BOILER 3 RISER PIPE 2
190 7 2-07-216-06257 0 4 BOILER 3 RISER PIPE 2
191 7 2-07-216-06258 0 4 BOILER 3 RISER PIPE 2
192 7 2-07-216-06259 0 4 BOILER 3 RISER PIPE 2
193 7 2-07-216-06260 0 4 BOILER 3 RISER PIPE 2
194 7 2-07-216-06261 0 4 BOILER 3 RISER PIPE 2
195 7 2-07-216-06262 0 4 BOILER 3 RISER PIPE 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
196 7 2-07-216-06263 0 4 BOILER 3 RISER PIPE 2
197 7 2-07-216-06264 0 4 BOILER 3 RISER PIPE 2
198 7 2-07-216-06265 0 4 BOILER 3 RISER PIPE 2
199 7 2-07-216-06266 0 4 BOILER 3 RISER PIPE 2
200 7 2-07-216-06267 0 4 BOILER 3 RISER PIPE 2
201 7 2-07-216-06268 0 4 BOILER 3 RISER PIPE 2
202 7 2-07-216-06269 0 4 BOILER 3 RISER PIPE 2
203 7 2-07-216-06270 0 4 BOILER 3 RISER PIPE 2
204 7 2-07-216-06271 0 4 BOILER 3 RISER PIPE 2
205 7 2-07-216-06272 0 4 BOILER 3 RISER PIPE 2
206 7 2-07-216-06273 0 4 BOILER 3 RISER PIPE 2
207 7 2-07-216-06274 0 4 BOILER 3 RISER PIPE 2
208 7 2-07-216-06275 0 4 BOILER 3 RISER PIPE 2
209 7 2-07-216-06276 0 4 BOILER 3 RISER PIPE 2
210 7 2-07-216-06277 0 4 BOILER 3 RISER PIPE 2
211 7 2-07-216-06278 0 4 BOILER 3 RISER PIPE 2
212 7 2-07-216-06279 0 4 BOILER 3 RISER PIPE 2
213 7 2-07-216-06280 0 4 BOILER 3 RISER PIPE 2
214 7 2-07-216-06281 0 4 BOILER 3 RISER PIPE 2
215 7 2-07-216-06282 0 4 BOILER 3 RISER PIPE 2
216 7 2-07-216-06283 0 4 BOILER 3 RISER PIPE 2
217 7 2-07-216-06284 0 4 BOILER 3 RISER PIPE 2
218 7 2-07-216-06285 0 4 BOILER 3 RISER PIPE 2
219 7 2-07-216-06286 0 4 BOILER 3 RISER PIPE 2
220 7 2-07-216-06287 0 4 BOILER 3 RISER PIPE 2
221 7 2-07-216-06288 0 4 BOILER 3 RISER PIPE 2
222 7 2-07-216-06289 0 4 BOILER 3 RISER PIPE 2
223 7 2-07-216-06290 0 4 BOILER 3 RISER PIPE 2
224 7 2-07-216-06291 0 4 BOILER 3 RISER PIPE 2
225 7 2-07-216-06292 0 4 BOILER 3 RISER PIPE 2
226 7 2-07-216-06293 0 4 BOILER 3 RISER PIPE 2
227 7 2-07-216-06294 0 4 BOILER 3 RISER PIPE 2
228 7 2-07-216-06295 0 4 BOILER 3 RISER PIPE 2
229 7 2-07-216-06296 0 4 BOILER 3 RISER PIPE 2
230 7 2-07-216-06297 0 4 BOILER 3 RISER PIPE 2
231 7 2-07-216-06298 0 4 BOILER 3 RISER PIPE 2
232 7 2-07-216-06299 0 4 BOILER 3 RISER PIPE 2
233 7 2-07-216-06300 0 4 BOILER 3 RISER PIPE 2
234 7 2-07-216-06301 0 4 BOILER 3 RISER PIPE 2
235 7 2-07-218-05487 0 4 BOILER 3 RISER PIPE 2
236 7 2-07-218-05491 0 4 BOILER 3 RISER PIPE 2
237 7 0-07-401-00789 2 4 BOILER 3 WW HEADER SUSPENSION 2
238 7 0-07-410-00824 0 4 BOILER 3 DOWNCOMER SUSPENSION ARRANGEMENT 2
239 7 4-07-410-04925 0 4 BOILER 3 DOWN COMER SUSPENSION 2
240 7 0-07-420-00538 0 4 20.07.11 BOILER 3 DOWN COMER SEISMIC GUIDES 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
241 7 0-07-431-00820 1 4 BOILER 3 RISER TUBE SUPPORTS 2
242 7 2-07-500-05212 0 4 BOILER 3 WELDING DETAIL OF PROTECTION SHIELDS FOR WW SCREEN TUBES 2
243 7 1-07-601-00440 0 4 09.09.11 BOILER 3 09.09.11 PRESSURE PARTS SEALS ARRANGEMENT 2
05.03.201
244 7 0-07-109-01069 1 4 BOILER 3 05.03.2012 DOWN COMER PIPES 2
2
05.03.201
245 7 0-07-109-0100 1 4 BOILER 3 05.03.2012 DOWN COMER PIPES 2
2
246 8 1-08-000-00266 4 4 BOILER 3  BUCKSTAY CORNER ARRANGEMENT 2
247 8 1-08-000-00318 5 4 BOILER 3  DETAILS OF BUCKSTAYS 2
248 8 1-08-000-00319 4 4 BOILER 3  DETAILS OF BUCKSTAYS-(SITE) 2
249 8 4-08-000-02900 0 4 BOILER 3  PRODUCTION NOTES 2
250 8 1-08-000-00267 4 4 BOILER 3  BUCKSTAY CORNER ARRANGEMENT (H 2
251 8 2-08-000-00548 3 4 BOILER 3  BUCKSTAY CORNER ARRANGEMENT 2
252 8 4-08-000-03070 0 4 BOILER 3  EXPANSION MOVEMENT MEASURING ARRANGEMENT DETAILS 2
253 8 0-08-101-03124 0 4 BOILER 3  ASSEMBLY OF FURNACE UPPER BUCKSTAYS (SH. 01 OF 02) 2
254 8 0-08-101-03125 1 4 BOILER 3  DETAILS OF FURNACE UPPER BUCKSTAYS (SH. 02 OF 02) 2
255 8 0-08-104-03203 0 4 BOILER 3  ASSEMBLY OF FURNACE INTER BUCKSTAYS 2
256 8 0-08-104-03204 0 4 BOILER 3  ASSY. OF WIND BOX CONN. DUCT TRUSS WORK 2
257 8 0-08-104-03204 1 4 BOILER 3 ASSY. OF WIND BOX CONN. DUCT TRUSS WORK
258 8 0-08-107-03121 0 4 BOILER 3  ASSEMBLY OF FURNACE LOWER BUCKSTAYS 2
259 8 0-08-111-01136 3 4 BOILER 3  ASSY. OF FURN. REAR ARCH BUCKSTAYS 2
260 8 0-08-111-01152 2 4 BOILER 3  ASSEMBLY OF FURNACE BOTTOM SUPPORTS 2
261 8 0-08-400-03406 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +19.800M 2
262 8 0-08-400-03407 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +35.800M 2
263 8 0-08-400-03408 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +36.800M 2
264 8 0-08-400-03409 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +49.800M 2
265 8 0-08-400-03410 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +53.400M 2
266 8 0-08-400-03411 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +52.000M & 54.400M 2
267 8 1-08-400-04807 0 4 14.11.11 BOILER 3 14.11.11 BRACINGS AT +19.800M 2
268 8 0-08-500-03138 0 4 BOILER 3  ASSEMBLY OF BACKPASS BUCKSTAYS (SH.01/03) 2
269 8 0-08-500-03139 0 4 BOILER 3  DETAILS OF BACK PASS BUCKSTAYS (SH.02/03) 2
270 8 1-08-500-03138 0 4 BOILER 3  DETAILS OF BACK PASS BUCKSTAYS (SH.03/03) 2
271 8 2-08-500-00494 1 4 BOILER 3  BUCKSTAY CORNER ARRANGEMENT 2
272 8 3-08-500-02132 0 4 BOILER 3  BUCKSTAY ARRANGEMENT AT SH-H9 2
273 8 0-08-900-01281 1 4 BOILER 3  ASSY.OF FURNACE KEY BUCKSTAYS (SH.01 OF 02) 2
274 8 0-08-900-01282 1 4 BOILER 3  ASSY.OF FURNACE KEY BUCKSTAYS (SH.02 OF 02) 2
275 9 0-09-001-00197 0 4 20.07.11 BOILER 3 20.07.11  LOCATION OF SEAL BOXES FOR FURNACE OPENINGS 2
276 9 1-09-001-00124 1 4 20.07.11 BOILER 3 20.07.11  SEAL BOX FOR OBSERVATION DOOR 2
277 9 1-09-001-00135 1 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY FOR WALL BLOWER 2
278 9 1-09-001-00138 0 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY.FOR SOOT BLOWER 2
279 9 1-09-001-00139 2 4 20.07.11 BOILER 3 20.07.11  0SEAL BOX ASSY FOR ACCESS DOOR 2
280 9 1-09-001-00179 2 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY.FOR OBSERVATION DOOR 2
281 9 1-09-001-00366 1 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY FOR ACCESS DOOR 2
282 9 2-09-001-00684 0 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY FOR RET. SOOT BLOWER 2
283 9 2-09-001-00696 0 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY FOR RETRACTABLE SOOT BLOWER 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
284 9 2-09-001-01021 0 4 20.07.11 BOILER 3 20.07.11  WATER COOLED ACCESS DOOR SEAL BOX ASSY 2
285 9 0-09-002-00225 0 4 14.02.12 BOILER 3 14.02.12 LOCATION OF SEAL BOXES FOR INSTRUMENT INSERTS 2
286 11 0-11-691-00120 1 4 20.07.11 BOILER 3 20.07.11  FIELD FINNING OF RAD.ROOF TUBES 2
287 11 0-11-691-00229 0 4 20.07.11 BOILER 3 20.07.11  FIELD FINNING OF RADIANT ROOF TUBES 2
288 11 3-11-791-01157 0 4 20.07.11 BOILER 3 20.07.11  SH.RADIANT ROOF PANELS WELDING DETAILS 2
289 12 1-12-174-01340 1 4 BOILER 3  FINAL SH INLET LINKS 2
290 12 1-12-184-01357 0 4 BOILER 3  SH BP EXTD SIDE WALL INLET PIPES 2
291 12 1-12-187-01358 1 4 BOILER 3  REAR ROOF SH. INLET PIPES 2
292 12 0-12-803-01458 0 4 BOILER 3  STEAM COOLED SPACER (FOR RH ASSY.) 2
293 12 0-12-803-01459 0 4 BOILER 3  STEAM COOLED SPACER (FOR PLATEN ASSY.) 2
294 12 0-12-850-01219 0 4 BOILER 3  SH CONNECTING PIPES (SATURATED)-ASSY. 2
295 12 0-12-852-01474 4 4 14.02.12 BOILER 3 14.02.12 SH. DESH. LINKS STAGE-1 2
296 12 0-12-900-01475 1 4 BOILER 3  ASSY. OF SH. DESH. 2
297 12 0-12-903-00309 2 4 BOILER 3  BACKPASS PANEL ATTACHMENT FOR DUCT 2
298 12 0-12-903-00774 0 4 BOILER 3  CASETTE BAFFLE FOR LTSH & ECO. 2
299 12 3-12-903-03372 1 4 BOILER 3  CASSETTE BAFFLE SLIDING ARRESTOR ARRANG 2
300 12 0-12-906-01422 0 4 20.07.11 BOILER 3  SUPPORT FOR EXT.SIDE WALL INLET HDR(SHH-6) & PANELS 2
301 12 0-12-906-01460 0 4 20.07.11 BOILER 3  SUSPN.OF DESH LINKS& FINAL SH LINKS 2
302 12 2-12-906-02644 0 4 20.07.11 BOILER 3  HANGER SUPPORT FOR SUPPLY TUBES 2
303 12 2-12-906-02645 0 4 20.07.11 BOILER 3  GUIDE FOR CONN. TUBES SHH 5-6 2
304 12 2-12-914-02542 0 4 BOILER 3  SUSPN. OF RAD. ROOF OUTLET HDR. 2
305 12 2-12-914-02578 0 4 BOILER 3  SUSPTN. OF RADIANT ROOF INLET HDR. 2
306 12 1-12-917-01266 0 4 BOILER 3  SUSPN. OF RADIANT ROOF ROWS (B&C) 2
307 12 0-12-924-01435 1 4 BOILER 3  SUSPN. OF SH SIDE WALL HDRS. SHH.3&3A 2
308 12 1-12-924-01267 0 4 BOILER 3  SUSPN. OF REAR ROOF JUNCTION HDR-SHH 7 2
309 12 1-12-924-01332 1 4 BOILER 3  SUSPN. OF LTSH OUTLET HDR-SHH-10(ROW-R) 2
310 12 0-12-924-08518 2 4 BOILER 3 VLH 11/80 WITH NEW BOTTOM ROD & TURN BUCKLE 2
311 12 1-12-927-01327 1 4 BOILER 3  SUSPENSION OF REAR ROOF TUBES(ROW-V) 2
312 12 1-12-928-01269 1 4 BOILER 3  SUSPOREAR WALL ROW-Z 2
313 12 2-12-944-02543 0 4 BOILER 3  SUSPN. OF SHH 11 (ROW-D1) 2
314 12 2-12-944-02544 0 4 BOILER 3  SUSPN. OF SHH 12 ( ROW-D2) 2
315 12 0-12-948-01436 1 4 BOILER 3  SUSPN. OF SH.VERT. SP.ASSY ROWS(N&P) 2
316 12 1-12-954-00600 2 4 BOILER 3  HEADER GUIDES SHH-14 2
317 12 1-12-954-01271 0 4 BOILER 3  SUSPN.OF.SHH-13 (ROW-N1) 2
318 12 1-12-954-01272 0 4 BOILER 3  SUSPN.OF.SHH-14HEADERS (ROW-N2) 2
319 12 0-12-968-01441 1 4 BOILER 3  SUSPN. OF PLN.COILS AND RADIANT ROOF(ROW D&E) 2
320 12 3-12-852-08080 1 3 SITE HYDRO TEST PIPE 2
321 15 0-15-274-00199 0 4 BOILER 3  RH.OUTLET HEADER (RHH-2) 2
322 15 0-15-274-00200 2 4 BOILER 3  RH.OUTLET HEADER (RHH-3) 2
323 17 3-12-924-08518 2 4 BOILER 3  VLH 11/80 WITH NEW BOTTOM ROD & TURN BUCKLE 2
324 17 1-17-904-00131 2 4 BOILER 3  HDR.GUIDES 2
325 17 2-17-904-00801 0 4 BOILER 3  SUSPN.OF RHH2 AND RHH3 (ROW J1,J2) 2
326 17 2-17-904-00827 0 4 BOILER 3  SUSPENSION OF RHH-1(ROW - F1) 2
327 17 3-17-904-01045 0 4 BOILER 3  VLH SA 08/80 WITH NEW BOTTOM TIE ROD & TURN BUCKLE 2
328 17 0-17-919-00202 3 4 BOILER 3  SUSPN. OF RH FRT. SPCD. ASSY. ROW:F&G 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
329 17 0-17-929-00203 0 4 BOILER 3  SUSPN. OF RH REAR ASSY. ROW: J&K 2
330 18 1-18-001-00190 0 4 BOILER 3  FURNACE ROOF SKIN CASING (BOM) 2
331 18 0-18-001-00137 4 4 BOILER 3  FURN.ROOF SKIN CASING 2
332 18 0-18-001-00138 1 4 BOILER 3  FURN.ROOF SKIN CASING 2
333 18 0-18-001-00139 1 4 BOILER 3  FURN.ROOF SKIN CASING 2
334 18 0-18-001-00140 0 4 BOILER 3  FURN.ROOF SKIN CASING 2
335 18 1-18-001-00110 0 4 BOILER 3  FURN.ROOF SKIN CASING 2
336 18 0-18-010-00134 3 4 BOILER 3  FURN.ROOF SKIN CASING 2
337 18 0-18-010-00135 1 4 BOILER 3  FURNACE ROOF SKIN CASING 2
338 18 0-18-010-00136 1 4 BOILER 3  FURN.ROOF SKIN CASING 2
339 18 1-18-010-00191 0 4 BOILER 3  FURNACE ROOF SKIN CASING PR. PARTS ATTACHMENTS 2
340 18 1-18-020-00103 1 4 BOILER 3  VIBRATION SNUBBERS 2
341 19 0-19-701-00383 0 4 BOILER 3  ECO. INLET HEADER "EH-01" 2
342 19 0-19-753-00869 0 4 BOILER 3  ECO.INTERMEDIATE HEADER (REAR) 2
343 19 0-19-763-00870 0 4 BOILER 3  ECO. INTERMEDIATE HEADER (FRONT) 2
344 19 0-19-783-00868 0 4 BOILER 3  ECO. INTERMEDIATE HEADER 2
345 19 1-19-850-01993 0 4 BOILER 3  ECONOMISER FEED PIPE 2
346 19 1-19-851-01700 0 4 BOILER 3  ECO LINKS TO DRUM 2
347 19 1-19-904-01837 1 4 20.07.11 BOILER 3 20.07.11  SUSPENSIONS OF ECO. OUTLET HEADER 2
348 19 1-19-904-01838 1 4 20.07.11 BOILER 3 20.07.11  SUSPENSIONS OF ECO. HANGER TUBES (ROW S,U&W) 2
349 19 3-19-904-03464 0 4 20.07.11 BOILER 3 20.07.11  SUSPENSION OF ECO. HANGER TUBE (ACCESS) 2
350 19 1-19-906-01849 0 4 09.09.11 BOILER 3 09.09.11 ECO. CONN. LINKS SUSPN. (ROW-C&J1) 2
351 19 1-19-907-02287 0 4 17.10.11 BOILER 3 17.10.11 ECO FEED PIPE SUPPORT FW-1 2
352 19 4-19-907-06589 0 4 17.10.11 BOILER 3 17.10.11 LOAD MOVEMENT CHART 2
353 19 1-19-850-02333 3 BOILER 3 ECO. FEED PIPE
354 21 2-21-600-00080 1 4 17.10.11 BOILER 3 17.10.11 GENERAL ERECTION NOTES
355 21 2-21-600-00136 0 4 17.10.11 BOILER 3 17.10.11 CONDENSING LOOP ASSY -AS
356 21 2-21-600-00137 0 4 17.10.11 BOILER 3 17.10.11 INSPEC "S PR. GAUGE ASSY - AS
357 21 3-21-600-00029 4 4 17.10.11 BOILER 3 17.10.11 SUPPORT FOR LRSB
358 21 4-21-600-00173 0 4 17.10.11 BOILER 3 17.10.11 DETAIL OF SOCKET WELDING
359 21 2-21-601-00098 2 4 17.10.11 BOILER 3 17.10.11 TEMP. PROBE SUPPORT
360 21 3-21-601-00204 0 4 17.10.11 BOILER 3 17.10.11 SUPPORT FOR SAFETY VALVE
361 21 3-21-601-00242 2 4 17.10.11 BOILER 3 17.10.11 PIPE SADDLE 1
362 21 3-21-601-00243 2 4 17.10.11 BOILER 3 17.10.11 PIPE SADDLE 2
363 21 3-21-601-00244 2 4 17.10.11 BOILER 3 17.10.11 PIPE SADLE NB-80
364 21 3-21-601-00254 0 4 17.10.11 BOILER 3 17.10.11 PIPE GUIDE 2
365 21 3-21-601-00255 2 4 17.10.11 BOILER 3 17.10.11 PIPE ANCHOR 2
366 21 3-21-601-00260 2 4 17.10.11 BOILER 3 17.10.11 SINGLE TIE ROD HANGER 2
367 21 3-21-601-00572 1 4 17.10.11 BOILER 3 17.10.11 GUIDE FOR S.V. EXHAUST PIPE D166.5
368 21 3-21-601-00583 2 4 17.10.11 BOILER 3 17.10.11 SINGLE TIE ROD HANGER 2 WITH SCA
369 21 3-21-601-00590 1 4 17.10.11 BOILER 3 17.10.11 FIXED SUPPORT FOR SV EXHAUST PIPE D166.5
370 24 3-24-000-01573 1 4 10.08.11 BOILER 3 10.08.11 recentrecent 2
371 32 3-32-010-00054 3 4 09.09.11 BOILER 3 09.09.11 DRUM END DOOR COVER 2
372 35 0-35-110-08605 3 4 BOILER 3  WPI COLUMN MFG.& WELD DETAILS 2
373 35 0-35-110-11107 1 4 BOILER 3  COLUMNS ASSEMBLY S6L&R,S7L&R,S8L&R,S9L&R,S10L&R 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
374 35 0-35-130-11108 1 4 BOILER 3  COLUMN ASSEMBLY S11,S12,S13&S16 2
375 35 1-35-140-06373 1 4 BOILER 3  BOX COLUMN MFG.& WELD DETAIL 2
376 35 0-35-140-11112 1 4 BOILER 3  COLUMNS ASSEMBLY S1L&R,S2L&R,S3L&R,S4L&R,S5L&R 2
377 35 3-35-110-00995 3 4 BOILER 3  PRODUCTION NOTES 2
378 35 0-35-160-11109 0 4 BOILER 3  AIR HEATER COLUMNS S14 & S15 2
379 35 0-35-160-11111 0 4 BOILER 3  COLUMNS ASSY LC1,LC2,LC3,LC4 2
380 35 1-35-160-09111 0 4 BOILER 3  AIR HEATER COLUMN S17,S18 (L&R) 2
381 35 1-35-190-09078 0 4 BOILER 3  GIRDER PIN CONNECTION COLUMNS S7(L&R) , S8(L&R) & S9(L&R) 2
382 35 0-35-210-11014 1 4 BOILER 3  CEILING STRUCTURE WELDED BEAM-1 2
383 35 0-35-210-11015 1 4 BOILER 3  CEILING STRUCTURE WELDED BEAM-2 2
384 35 0-35-210-11016 1 4 BOILER 3  CEILING STRUCTURE WELDED BEAM-3 2
385 35 0-35-210-11017 0 4 BOILER 3  CEILING STRUCTURE ASSEMBLY-1 PASS 2
386 35 0-35-210-11018 0 4 BOILER 3  CEILING STRUCTURE ASSEMBLY-2 PASS 2
387 35 0-35-210-11019 0 4 BOILER 3  CEILING GIRDER-B 2
388 35 0-35-210-11020 0 4 BOILER 3  CEILING GIRDER-C 2
389 35 0-35-210-11021 0 4 BOILER 3  CEILING GIRDER-D 2
390 35 1-35-210-09034 0 4 BOILER 3  CEILING STRUCTURE WELDED BEAM-4 2
391 35 1-35-210-09035 0 4 BOILER 3  CEILING GIRDER-A 2
392 35 1-35-210-09036 0 4 BOILER 3  CEILING GIRDER-B (DETAILS) 2
393 35 1-35-210-09037 0 4 BOILER 3  CEILING GIRDER-C (DETAILS) 2
394 35 1-35-210-09038 0 4 BOILER 3  CEILING GIRDER-D (DETAILS) 2
395 35 1-35-210-09039 0 4 BOILER 3  CEILING GIRDER-E 2
396 35 1-35-210-09040 0 4 BOILER 3  DRUM SUPPORT BEAM 2
397 35 0-35-220-11022 0 4 BOILER 3  CEILING STRUCTURE ROLLED BEAM 2
398 35 2-35-220-01210 0 4 BOILER 3  TYPE DRAWINGS 2
399 35 0-35-230-11023 0 4 BOILER 3  CEILING BRACING (DETAIL) 2
400 35 0-35-230-11024 0 4 BOILER 3  CEILING BRACING 2
401 35 0-35-310-11460 0 4 BOILER 3  HOR. TRUSS WORK AT +7.000M 2
402 35 0-35-310-11461 0 4 BOILER 3  HOR. TRUSS WORK AT +7.000M (DETAILS) 2
403 35 0-35-320-11316 1 4 BOILER 3  HORIZONTAL BRACING @ 16.500M 2
404 35 0-35-320-11317 0 4 BOILER 3  HORIZONTAL BRACING @ 16.500M DETAILS 2
405 35 0-35-330-11401 0 4 BOILER 3  HORIZONTAL TRUSS WORK AT +25.725M 2
406 35 0-35-330-11402 0 4 BOILER 3  HORIZONTAL TRUSS WORK AT +25.725M (DETAIL) 2
407 35 0-35-340-11490 0 4 BOILER 3  HORIZONTAL BRACING AT +36.800M 2
408 35 0-35-340-11491 0 4 BOILER 3  HORIZONTAL BRACING AT + 36.800M (DETAILS) 2
409 35 0-35-350-11508 0 4 BOILER 3  HOR.BRACING AT 43.725M (T.O.S) 2
410 35 1-35-350-10079 0 4 BOILER 3  HOR.BRACING AT 43.725M (T.O.S) DETAIL 2
411 35 0-35-360-11560 0 4 BOILER 3  HORIZONTAL BRACING AT +52.975M (T.O.S.) 2
412 35 0-35-360-11561 0 4 BOILER 3  HORIZONTAL BRACING AT +52 .975M (T.O.S.) DETAILS 2
413 35 0-35-380-11513 0 4 BOILER 3  LANDING PLATFORM AT +7.000M (T.O.F) 2
414 35 0-35-380-11514 0 4 BOILER 3  LANDING PLATFORM AT +28.250M & +30.000M (T.O.F) 2
415 35 0-35-380-11527 0 4 BOILER 3  LANDING PLATFORMS AT +22.900M (T.O.F) 2
416 35 0-35-380-11528 0 4 BOILER 3  LANDING PLATFORMS AT +36.800M (T.O.F) 2
417 35 0-35-380-11529 0 4 BOILER 3  LANDING PLATFORMS AT +43.750M (T.O.F) 2
418 35 1-35-380-10093 0 4 BOILER 3  LANDING PLATFORM AT +2.500M & +4.000M (T.O.F) 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
419 35 1-35-380-10094 0 4 BOILER 3  LANDING PLATFORM AT +10.000M & +13.500M (T.O.F) 2
420 35 1-35-380-10095 0 4 BOILER 3  LANDING PLATFORM AT +40.550M (T.O.F) 2
421 35 1-35-380-10096 0 4 BOILER 3  LANDING PLATFORM AT +46.700M (T.O.F) 2
422 35 1-35-380-10097 0 4 BOILER 3  LANDING PLATFORM AT +57.000M (T.O.F) 2
423 35 1-35-380-10111 0 4 BOILER 3  LANDING PLATFORMS AT +16.500M (T.O.F) 2
424 35 1-35-380-10114 0 4 BOILER 3  LANDING PLATFORMS AT +19.800M(T.O.F) 2
425 35 1-35-380-10115 0 4 BOILER 3  LANDING PLATFORMS AT +25.750M (T.O.F) 2
426 35 1-35-380-10116 0 4 BOILER 3  LANDING PLATFORMS AT +33.050M(T.O.F) 2
427 35 2-35-380-10572 0 4 BOILER 3  LANDING PLATFORM AT +49.800M (T.O.F) 2
428 35 2-35-380-10574 0 4 BOILER 3  LANDING PLATFORMS AT +53.000M&+59.850M (T.O.F) 2
429 35 0-35-390-11713 0 4 BOILER 3  FLOOR AT +57.000M & 56.300M 2
430 35 0-35-390-11714 0 4 BOILER 3  FLOOR AT +57.000M & 56.300M (DETAILS) 2
431 35 2-35-390-11121 0 4 BOILER 3  STAIR 2
432 35 2-35-390-11122 0 4 BOILER 3  DRUM FLOOR AT +57.000M 2
433 35 2-35-390-11123 0 4 BOILER 3  DRUM FLOOR AT +57.000M 2
434 35 2-35-390-11124 0 4 BOILER 3  DRUM FLOOR AT +57.000M 2
435 35 1-35-441-09182 0 4 BOILER 3  ASSEMBLY B.O.M 2
436 35 1-35-441-09183 0 4 BOILER 3  FRAME S1L&R - S2L&R - S3L&R - S4L&R - S5L&R 2
437 35 1-35-441-09184 0 4 BOILER 3  FRAME S1L-S6L-S11-S6R-S1R 2
438 35 1-35-441-09185 0 4 BOILER 3  FRAME S2L-S7L-S7R-S2R 2
439 35 1-35-441-09186 0 4 BOILER 3  FRAME S3L-S8L-S8R-S3R 2
440 35 1-35-441-09187 0 4 BOILER 3  FRAME S4L-S9L-S13-S9R-S4R 2
441 35 1-35-441-09188 0 4 BOILER 3  FRAME S5L-S10L-S16-S10R-S5R 2
442 35 1-35-441-09189 0 4 BOILER 3  FRAME S6L&R-S7L&R-S8L&R-S9L&R-S10L&R 2
443 35 1-35-441-09190 0 4 BOILER 3  FRAME S11-S12-S13-S14-S15-S16 2
444 35 0-35-443-11578 0 4 BOILER 3  FRAME S1L-S6L-S11-S6R-S1R 2
445 35 0-35-443-11579 0 4 BOILER 3  FRAME S2L-S7L-S7R-S2R 2
446 35 0-35-443-11580 0 4 BOILER 3  FRAME S3L-S8L-S8R-S3R 2
447 35 0-35-443-11581 0 4 BOILER 3  FRAME S4L-S9L-S13-S9R-S4R 2
448 35 0-35-443-11582 0 4 BOILER 3  FRAME S5L-S10L-S16-S10R-S5R 2
449 35 0-35-443-11583 0 4 BOILER 3  FRAME S1-S2-S3-S4-S5 (L&R) 2
450 35 0-35-443-11584 0 4 BOILER 3  FRAME S6-S7-S8-S9-S10 (L&R) 2
451 35 0-35-443-11585 0 4 BOILER 3  FRAME S11-S12-S13-S14-S15-S16 2
452 35 1-35-443-10279 0 4 BOILER 3  ASSEMBLY B.O.M 2
453 35 0-35-521-11223 0 4 BOILER 3  GUSSET PLATE DETAILS FOR SIDE BREACING LOWER 2
454 35 1-35-511-05699 4 4 BOILER 3  WELDED VBRACING PRODUCTION & ERECTION NOTES 2
455 35 1-35-511-09286 0 4 BOILER 3  FRAME S1L-S6L-S11-S6R-S1R 2
456 35 2-35-511-09066 0 4 BOILER 3  GUSSET PLATE DETAILS FOR FRONT BRACING LOWER 2
457 35 0-35-513-11586 0 4 BOILER 3  FRAME S1L -S6L-S11-S6R-S1R 2
458 35 1-35-521-09281 0 4 BOILER 3  FRAME S6L&R-S7L&R-S8L&R-S9L&R-SIOL&R 2
459 35 1-35-521-09282 0 4 BOILER 3  FRAME S11-S12-S13-S14-S15-S16 2
460 35 0-35-523-11576 0 4 BOILER 3  FRAME S1-S2-S3-S4-S5 (L&R) 2
461 35 0-35-523-11577 0 4 BOILER 3  FRAME S6-S7-S8-S9-S10 (L&R) 2
462 35 1-35-531-09284 0 4 BOILER 3  FRAME S4L-S9L-S13-S9R-S4R 2
463 35 1-35-531-09285 0 4 BOILER 3  FRAME S5L-S10L-S16-S10R-S5R 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
464 35 1-35-531-09301 0 4 BOILER 3  GUSSET PLATE DETAILS FOR REAR BRACING LOWER 2
465 35 0-35-533-11574 0 4 BOILER 3  FRAME S4L-S9L-S13-S9R-S4R 2
466 35 0-35-533-11575 0 4 BOILER 3  FRAME S5L-S10L-S16-S10R -S5R 2
467 35 1-35-821-09032 0 4 BOILER 3  STAIRS 2
468 35 2-35-823-08739 0 4 BOILER 3  STAIRS 2
469 35 1-35-851-02994 2 4 BOILER 3  FIXING ARRGT. FOR HAND RAILS, POSTS AND GUARD PLATE 2
470 35 1-35-995-02927 0 4 BOILER 3  CHUTE PIPE FOR ERECTION 2
471 35 3-35-995-00693 0 4 BOILER 3  VERTICAL LADDER FOR ERECTION 2
472 35 0-35-311-09136 5 4 BOILER 3  HORI.BRACING PRODUCTION AND ERECTION NOTES 2
473 35 2-35-511-00775 2 4 10.08.11 BOILER 3 STITCH PL. FIXING ARRGT. 2
474 36 0-36-310-11678 0 4 BOILER 3  FLOOR AT +4.500M 2
475 36 0-36-310-11679 0 4 BOILER 3  FLOOR AT +5.200M , +1.250 & +2.000M 2
476 36 0-36-310-11680 0 4 BOILER 3  FLOOR AT +7.000M 2
477 36 0-36-310-11681 0 4 BOILER 3  FLOOR AT +7.000M 2
478 36 0-36-310-11682 0 4 BOILER 3  FLOOR AT +7.000M 2
479 36 0-36-310-11683 0 4 BOILER 3  BRACING AT +7.000M 2
480 36 0-36-310-11684 0 4 BOILER 3  BRACING AT +7.000M 2
481 36 3-36-310-00620 0 4 BOILER 3  ERECTION NOTES 2
482 36 0-36-311-11699 0 4 BOILER 3  FLOOR AT +10.000M (DETAILS) 2
483 36 0-36-311-11700 0 4 BOILER 3  FLOOR AT +12.300M & 12.900M 2
484 36 0-36-311-11701 0 4 BOILER 3  FLOOR AT +10.000M 2
485 36 2-36-311-12524 0 4 BOILER 3  FLOOR AT +10.000M (DETAILS) 2
486 36 0-36-320-11690 0 4 BOILER 3  FLOOR AT EL.16.500M (BEAMS-I PASS) 2
487 36 0-36-320-11691 0 4 BOILER 3  FLOOR AT EL.16.500M (BEAMS-I PASS) (DETAILS) 2
488 36 0-36-320-11692 0 4 BOILER 3  BRACING AT +16.500M (I PASS) 2
489 36 0-36-320-11693 0 4 BOILER 3  BRACING AT EL.16.500M (I-PASS) (DETAILS) 2
490 36 0-36-320-11694 0 4 BOILER 3  FLOOR AT +16.500M (BEAMS-II PASS ) 2
491 36 0-36-320-11695 0 4 BOILER 3  FLOOR AT +16.500M ( BRACING - II PASS) 2
492 36 0-36-321-11761 0 4 BOILER 3  FLOOR AT +19.800M (RHS ONLY) 2
493 36 0-36-321-11762 0 4 BOILER 3  FLOOR AT +19.800M (LHS) 2
494 36 0-36-321-11763 0 4 BOILER 3  FLOOR AT +19.800M (RHS & LHS) 2
495 36 1-36-321-05948 0 4 BOILER 3  FLOOR AT +19.800M (RHS DETAILS) 2
496 36 1-36-321-05949 0 4 BOILER 3  FLOOR AT +19.800M (LHS DETAILS) 2
497 36 1-36-321-05950 0 4 BOILER 3  FLOOR AT +19.800M (POST DETAILS) 2
498 36 1-36-321-05951 0 4 BOILER 3  SHIPLADDER & STAIRCASE AT +19.800M 2
499 36 0-36-322-11809 0 4 BOILER 3  FLOOR AT +22.900M (LHS ONLY) 2
500 36 0-36-322-11810 0 4 BOILER 3  FLOOR AT +22.900M (LHS DETAILS) 2
501 36 0-36-322-11811 0 4 BOILER 3  FLOOR AT +22.900M (RHS DETAILS) 2
502 36 0-36-322-11812 0 4 BOILER 3  FLOOR AT +22.900M (RHS ) 2
503 36 0-36-322-11813 0 4 BOILER 3  FLOOR AT +22.900M (RHS DETAILS) 2
504 36 1-36-322-05960 0 4 BOILER 3  FLOOR AT +22.900M (LHS DETAILS) 2
505 36 0-36-330-11926 0 4 20.07.11 BOILER 3  FLOOR AT +23.600M (T.O.F) 2
506 36 0-36-330-11927 0 4 20.07.11 BOILER 3  FLOOR AT +25.750M (T.O.F) 2
507 36 0-36-330-11928 0 4 20.07.11 BOILER 3  FLOOR AT +26.900M(T.O.F) 2
508 36 2-36-330-14594 0 4 BOILER 3 BEAM AT +25.725M (T.O.S)
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
509 36 0-36-331-11945 0 4 10.08.11 BOILER 3 FLOOR AT +30.000M (TOE) 2
510 36 0-36-331-11948 0 4 10.08.11 BOILER 3 ASSY BOM 2
511 36 0-36-332-11962 0 4 10.08.11 BOILER 3 FLOOR AT 33.050M (TOF) 2
512 36 1-36-332-06030 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
513 36 3-36-332-01114 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
514 36 0-36-340-11989 0 4 10.08.11 BOILER 3 FLOOR AT 36.800M (TOF) 2
515 36 0-36-340-11990 0 4 10.08.11 BOILER 3 BENCH AT EL. +37.200M(TOF) 2
516 36 1-36-340-06043 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
517 36 1-36-340-06044 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
518 36 0-36-341-12029 0 4 10.08.11 BOILER 3 FLOOR AT 40.55 M (TOF) RHS 2
519 36 0-36-341-12030 0 4 10.08.11 BOILER 3 FLOOR AT 40.55 M (TOF) LHS 2
520 36 1-36-341-06086 0 4 10.08.11 BOILER 3 FLOOR AT +40.550M BOM 2
521 36 0-36-350-12004 0 4 10.08.11 BOILER 3 FLOOR AT 43.750 M (TOF) 2
522 36 0-36-350-12005 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
523 36 0-36-351-12031 0 4 10.08.11 BOILER 3 FLOOR AT +46.700M (TOS +46.675) 2
524 36 1-36-351-06087 0 4 10.08.11 BOILER 3 FLOOR AT +46.700M BOM 2
525 36 0-36-352-12045 0 4 09.09.11 BOILER 3 FLOOR AT +49.800M (TOF) 2
526 36 1-36-352-06093 1 4 09.09.11 BOILER 3 ASSEMBLY BOM 2
527 36 0-36-360-11995 0 4 10.08.11 BOILER 3 FLOOR AT +53.700M (TOF) 2
528 36 0-36-360-11996 0 4 10.08.11 BOILER 3 EXISTING TRUSS WORK AT +53.000M (TOF) 2
529 36 1-36-360-06046 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
530 36 0-36-361-12003 0 4 10.08.11 BOILER 3 FLOOR AT +59.850M (TOF) 2
531 36 1-36-361-06052 0 4 10.08.11 BOILER 3 FLOOR AT +59.000M & 59.200M (TOF) 2
532 36 1-36-361-06054 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
533 36 1-36-361-06055 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
534 36 2-36-361-13124 0 4 10.08.11 BOILER 3 FLOOR AT +61.200M (TOF) 2
535 36 0-36-391-12057 0 4 09.09.11 BOILER 3 FLOOR AT +10.000M (TOF) 2
536 36 0-36-391-12058 0 4 09.09.11 BOILER 3 FLOOR AT +16.500M (TOF) 2
537 36 0-36-391-12061 0 4 09.09.11 BOILER 3 MISC FLOOR AT +19.800M (TOF) 2
538 36 0-36-391-12062 0 4 09.09.11 BOILER 3 FLOOR AT +25.750M (TOF) 2
539 36 0-36-391-12070 0 4 09.09.11 BOILER 3 APH ELEMENT HANDLING ARRANGEMENT 2
540 36 0-36-391-12071 0 4 09.09.11 BOILER 3 APH ELEMENT HANDLING ARRANGEMENT 2
541 36 0-36-391-12087 0 4 09.09.11 BOILER 3 POST AND HANGERS 2
542 36 1-36-391-06115 0 4 09.09.11 BOILER 3 LANDING PLATFORM AT +4.00M (TOF) 2
543 36 1-36-391-06116 0 4 09.09.11 BOILER 3 FLOOR AT +16.500M (TOF) 2
544 36 1-36-391-06117 0 4 09.09.11 BOILER 3 HORIZONTAL BEAMS AT +15.075M (TOS) 2
545 36 1-36-391-06134 0 4 09.09.11 BOILER 3 HOR. BEAMS AT +19.800M (TOF) 2
546 36 2-36-391-13405 0 4 09.09.11 BOILER 3 FLOOR AT +16.500M (TOF) 2
547 36 2-36-391-13455 0 4 09.09.11 BOILER 3 HOR. BEAMS AT +25.750 M (TOF) 2
548 36 3-36-391-01568 0 4 09.09.11 BOILER 3 FLOOR AT +7.000M (TOF) 2
549 36 3-36-391-01569 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +22.900M (TOF) 2
550 36 3-36-391-01574 0 4 09.09.11 BOILER 3 FLOOR AT +7.000M (TOF) 2
551 36 1-36-392-06132 0 4 09.09.11 BOILER 3 MISC FLOOR AT +54.900M (TOF) 2
552 36 1-36-392-06135 0 4 09.09.11 BOILER 3 FLOOR AT +59.900M (TOF) 2
553 36 2-36-392-13453 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +55.400M (TOF) 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
554 36 2-36-392-13454 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +53.400M (TOF) 2
555 36 3-36-392-01570 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +30.000 M(TOF) 2
556 36 3-36-392-01571 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +33.050 M(TOF) 2
557 36 3-36-392-01572 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +36.800 M(TOF) 2
558 36 3-36-392-01573 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +49.800 M(TOF) 2
559 36 0-36-610-11966 0 4 10.08.11 BOILER 3 BOILER ROOF PLAN (SHEET-1) 2
560 36 0-36-610-11967 0 4 10.08.11 BOILER 3 BOILER ROOF PLAN (SHEET-2) 2
561 36 0-36-610-11968 0 4 10.08.11 BOILER 3 BOILER ROOF & COMPRESSION FLANGE SUPPORT DETAILS (SH-3) 2
562 36 0-36-610-11969 0 4 10.08.11 BOILER 3 BOILER ROOF DETAILS (SH-4) 2
563 36 1-36-610-06035 0 4 10.08.11 BOILER 3 BOILER ROOF DETAILS 2
564 36 1-36-612-06031 0 4 10.08.11 BOILER 3 GUTTER & DRAIN PIPE ARRANGEMENT OF BOILER 2
565 36 2-36-613-01198 2 4 10.08.11 BOILER 3 DRAIN PIPES, SHOES, SPL BEND & CLAMPS 2
566 36 2-36-613-01199 5 4 10.08.11 BOILER 3 GUTTER & GUTTER END PIECES 2
567 36 2-36-613-01200 1 4 10.08.11 BOILER 3 BRACKET FOR GUTTER & FIXING CHANELS. 2
568 36 0-36-620-12114 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
569 36 0-36-620-12115 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
570 36 0-36-620-12116 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
571 36 0-36-620-12117 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
572 36 0-36-620-12118 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
573 36 0-36-620-12119 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
574 36 0-36-620-12120 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
575 36 0-36-620-12121 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
576 36 2-36-740-13967 0 4 09.09.11 BOILER 3 POST AND HANGERS 2
577 36 1-36-820-05556 0 4 BOILER 3  STAIRS 2
578 36 1-36-820-05557 0 4 BOILER 3  VERTICAL LADDERS 2
579 36 1-36-820-05558 0 4 BOILER 3  HOOD LADDERS 2
580 36 2-36-820-09341 0 4 BOILER 3  SHIP LADDERS 2
581 38 0-38-110-02707 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE (RHS ONLY) 2
582 38 1-38-210-01250 0 4 17.09.11 BOILER 3 17.09.11 LIFT INTERCONNECTION PLATFORMS 2
583 38 0-38-310-02733 0 4 17.09.11 BOILER 3 17.09.11 FLOOR AT +4.500M (TOF) 2
584 38 1-38-310-01251 0 4 17.09.11 BOILER 3 17.09.11 FLOOR AT +10.000M (TOF) 2
585 38 1-38-310-01252 0 4 17.09.11 BOILER 3 17.09.11 FLOOR AT +58.000M (TOF) 2
586 38 1-38-310-01267 0 4 17.09.11 BOILER 3 17.09.11 FLOOR AT +47.703M (TOF) 2
587 38 2-38-310-01050 0 4 17.09.11 BOILER 3 17.09.11 FLOOR AT +19.800M (TOF) 2
588 38 1-38-310-01396 0 4 BOILER 3 FLOOR AT +25.750 (T.O.F)
589 38 2-38-410-02750 0 4 17.10.11 BOILER 3 17.10.11 MILL MAINTENANCE PLATFORM AT +3.971M (TOF) 2
590 38 2-38-410-02751 0 4 17.10.11 BOILER 3 17.10.11 MILL MAINTENANCE PLATFORM (DETAILS) 2
591 38 0-38-510-02695 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC1, LC2 2
592 38 0-38-510-02696 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC1, LC2 (DETAILS) 2
593 38 0-38-510-02697 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC1, LC3 & S1R 2
594 38 0-38-510-02698 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC1, LC3 ,LC2,LC3 2
595 38 0-38-510-02699 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC4, LC3 2
596 38 0-38-510-02700 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC4, LC3 2
597 38 0-38-510-02701 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC4, LC2 2
598 38 0-38-610-02708 0 4 17.09.11 BOILER 3 17.09.11 ELEVATOR CLADDING STRUCTURE (ASSEMBLY) 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
599 38 1-38-610-01246 0 4 17.09.11 BOILER 3 17.09.11 ELEVATOR CLADDING STRUCTURE (DETAILS) 2
600 38 0-38-710-02709 0 4 09.09.11 BOILER 3 09.09.11 MACHINE ROOM STRUCTURE 2
601 38 0-38-710-02710 0 4 09.09.11 BOILER 3 09.09.11 MACHINE ROOM STRUCTURE (DETAILS) 2
05.03.201
602 38 0-38-299-02794 0 4 BOILER 3 05.03.12 MILL HANDLING STRUCTURE AT +11.000M (DET) 2
2
05.03.201
603 38 0-38-299-02795 0 4 BOILER 3 05.03.12 MILL HANDLING STRUCTURE AT +11.000M 2
2
05.03.201
604 38 2-38-299-01180 0 4 BOILER 3 05.03.12 MILL HANDLING STRUCTURE AT +11.000M (DETAIL) 2
2
605 39 4-39-012-00435 0 4 BOILER 3  DUCT SUPPORT PEDESTAL DETAILS 2
606 39 0-39-101-06412 0 4 09.09.11 BOILER 3 09.09.11 COLUMNS P-ROW 2
607 39 0-39-101-06410 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P1-P2-P3-P4-P5-P6-P7-P8-P9 2
608 39 1-39-101-10211 0 4 09.09.11 BOILER 3 09.09.11 ASSEMBLY BOM 2
609 39 1-39-101-10212 0 4 09.09.11 BOILER 3 09.09.11 COLUMNS Q-ROW 2
610 39 0-39-102-04844 6 4 14.11.11 BOILER 3 14.11.11 ID SYSTEM BEAMS & BRACINGS PRODUCTION NOTES. 2
611 39 1-39-102-10175 0 4 09.09.11 BOILER 3 09.09.11 FRAMES Q3-Q4-Q5-Q6-Q7 2
612 39 1-39-102-10210 0 4 09.09.11 BOILER 3 09.09.11 ASSEMBLY BOM 2
613 39 2-39-102-08237 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P3-Q3 2
614 39 2-39-102-08238 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P4-Q4 2
615 39 2-39-102-08239 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P5-Q5 2
616 39 2-39-102-08240 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P6-Q6 2
617 39 2-39-102-08241 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P7-Q7 2
618 39 0-39-140-06359 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R2-R3-R4-R5-R6 2
619 39 0-39-140-06360 0 4 10.08.11 BOILER 3 10.08.11 FRAMES T2-T3-T4-T5-T6 2
620 39 0-39-140-06361 0 4 10.08.11 BOILER 3 10.08.11 FRAMES U1-U2-U3-U4-U5-U6-U7 2
621 39 0-39-140-06362 0 4 10.08.11 BOILER 3 10.08.11 FRAMES V1-V2-V3-V4-V5-V6-V7 2
622 39 0-39-140-06363 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R2-T2-U2-V2 2
623 39 0-39-140-06364 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R3-T3-U3-V3 2
624 39 0-39-140-06365 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R4-T4-U4-V4 2
625 39 0-39-140-06366 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R5-T5-U5-V5 2
626 39 0-39-140-06367 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R6-T6-U6-V6 2
627 39 0-39-140-06370 0 4 10.08.11 BOILER 3 10.08.11 COLUMNS R-ROW 2
628 39 0-39-140-06371 0 4 10.08.11 BOILER 3 10.08.11 COLUMNS T-ROW 2
629 39 0-39-140-06372 0 4 10.08.11 BOILER 3 10.08.11 COLUMNS U-ROW 2
630 39 0-39-140-06373 0 4 10.08.11 BOILER 3 10.08.11 COLUMNS V-ROW 2
631 39 1-39-140-09749 0 4 10.08.11 BOILER 3 10.08.11 FRAMES U1-V1 2
632 39 1-39-140-09750 0 4 10.08.11 BOILER 3 10.08.11 FRAMES U7-V7 2
633 39 1-39-140-09751 0 4 10.08.11 BOILER 3 10.08.11 ASSEMBLY BOM 2
634 39 1-39-140-09754 0 4 10.08.11 BOILER 3 10.08.11 ASSEMBLY BOM 2
635 39 0-39-150-06375 0 4 10.08.11 BOILER 3 10.08.11 FRAMES W1-X1, W2-X2, X1-X2, W1-W2 2
636 39 0-39-300-06549 0 4 BOILER 3 FLOOR AT +13.250M(T.O.F)
637 39 0-39-300-06550 1 4 BOILER 3 FLOOR AT +16.450M(T.O.F)
638 39 1-39-300-10843 1 4 BOILER 3 FLOOR AT +12.000M(T.O.F)
639 39 1-39-300-10936 0 4 BOILER 3 FLOOR AT +49.800M(T.O.F)
640 39 1-39-300-10972 0 4 BOILER 3 FLOOR AT +16.000M(T.O.F)
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
641 39 1-39-300-10973 0 4 BOILER 3 VERTICAL LADDER AND BENCH
642 39 3-39-300-00740 0 4 BOILER 3 FLOOR AT +4.000M (T.O.F)
643 39 3-39-300-00764 0 4 BOILER 3 FLOOR AT +8.000M (T.O.F)
644 39 1-39-301-03767 0 4 17.09.11 BOILER 3 17.09.11 FIXING ARRGT. OF HANDRAIL, POSTS & G.PLATE 2
645 39 1-39-301-10256 0 4 17.09.11 BOILER 3 17.09.11 STRUC & PLATFORM FOR FANS (FOR FD,ID & PA FANS) 2
HANDRAIL POST & M.HANDRAIL (FOR GRILL, CHEQD. PL & CONCRETE
646 39 2-39-301-01240 1 4 17.09.11 BOILER 3 17.09.11 2
PLATFORM)
647 39 2-39-301-01241 1 4 17.09.11 BOILER 3 17.09.11 HANDRAIL POST & M.HANDRAIL (FOR CONCRETE STAIRS) 2
648 39 1-39-302-02413 4 4 09.09.11 BOILER 3 09.09.11 HOOD DETAILS FOR HAN MOTOR 2
649 39 0-39-303-06643 0 4 BOILER 3 ID FAN HANDLING ARRANGEMENT AT 17.050M(T.O.S)
650 39 0-39-303-06644 0 4 BOILER 3 ID FAN HANDLING ARRANGEMENT AT 17.050M(T.O.S)
651 39 0-39-303-06646 0 4 BOILER 3 PA & FD FAN HANDLING ARRANGEMENT AT 7.850M (T.O.S)
652 39 0-39-303-06648 0 4 BOILER 3 PA & FD FAN HANDLING ARRANGEMENT AT +9.100M(T.O.S)
653 39 1-39-303-11304 0 4 BOILER 3 ASSEMBLY B.O.M
654 39 1-39-303-11306 0 4 BOILER 3 PA & FD FAN HANDLING ARRANGEMENT AT +7.850M(T.O.S)
655 39 1-39-303-11325 0 4 BOILER 3 PA & FD FAN HANDLING ARRANGEMENT AT +9.1000M(T.O.S)
656 39 1-39-303-11326 0 4 BOILER 3 BEAMS AT +16.450 (T.O.S)
657 39 1-39-303-11327 0 4 BOILER 3 SILENCER SUPPORT AT +10.000M (T.O.S)
658 39 2-39-303-09433 0 4 BOILER 3 ASSEMBLY B.O.M
659 39 2-39-303-09479 0 4 BOILER 3 ASSEMBLY B.O.M
660 39 2-39-303-09480 0 4 BOILER 3 BEAMS AT +7.000 (T.O.S)
661 39 2-39-303-09481 0 4 BOILER 3 BEAMS AT +10.000 (T.O.S)
662 39 2-39-303-09482 0 4 BOILER 3 BEAMS AT +16.450 (T.O.S)
663 39 2-39-303-09483 0 4 BOILER 3 ASSEMBLY B.O.M
664 39 0-39-304-06540 0 4 14.11.11 BOILER 3 14.11.11 COLUMNS ASSEMBLY FH5L&R, FH6L&R, FH7L&R, & FH8L&R 2
665 39 1-39-304-10805 0 4 14.11.11 BOILER 3 14.11.11 COLUMNS ASSEMBLY FH1L&R, FH2L&R, FH3L&R, & FH4L&R 2
666 39 0-39-305-06541 0 4 14.11.11 BOILER 3 14.11.11 FRAMES FH1L&R- FH2L&R- FH3L&R- FH4L&R & FH3L&R-FH7L&R 2
667 39 0-39-305-06542 0 4 14.11.11 BOILER 3 14.11.11 FRAMES FH5L&R- FH6L&R- FH7L&R- FH8L&R & FH1L&R-FH5L&R 2
668 39 0-39-305-06543 0 4 14.11.11 BOILER 3 14.11.11 FRAMES FH4L&R- FH8L&R & FH2L&R- FH6L&R 2
669 39 2-39-305-08899 0 4 14.11.11 BOILER 3 14.11.11 ASSEMBLY BOM 2
670 39 3-39-305-00716 0 4 14.11.11 BOILER 3 14.11.11 KEY PLAN FOR FAN HANDLING STRUCTURES 2
671 39 1-39-820-10257 0 4 17.09.11 BOILER 3 17.09.11 STAIRS 2
672 41 2-00-052-10106 2 4 09.09.11 BOILER 3 09.09.11 WELDING AND ERECTION NOTES 2
673 41 4-41-310-00786 2 4 09.09.11 BOILER 3 09.09.11 OIL GUN HYDRO TEST TIP 2
674 41 4-41-350-01166 2 4 09.09.11 BOILER 3 09.09.11 TOOL FOR NOZZLE SLEEVE NUT 2
675 41 4-41-350-01921 0 4 09.09.11 BOILER 3 09.09.11 BOM FOR A.C OIL GUN ASSY. 2
676 41 4-41-390-01780 0 4 09.09.11 BOILER 3 09.09.11 BOM FOR OIL GUN VICE AND RACK 2
677 41 2-41-500-00320 4 4 09.09.11 BOILER 3 09.09.11 HEA IGNITOR INSTALLATION 2
678 42 0-00-056-10931 2 3 14.11.11 BOILER 14.11.11 SCHEME OF FUEL OIL SYSTEM - BOILER FRONT 2
679 42 0-42-000-01944 0 3 17.10.11 BOILER 17.10.11 PIPING, OPERATING FLOOR LFO /AIR 2
680 42 0-42-000-00338 4 3 17.10.11 BOILER 17.10.11 STEAM TRACER ERECTION NOTES (FO SYSTEM) 2
681 42 1-42-001-02106 0 3 14.02.12 BOILER 14.02.12 PNEUMATIC FITTINGS 2
682 42 1-42-005-02136 0 3 14.02.12 BOILER 14.02.12 INSTRUMENT FITTINGS 2
683 42 0-42-010-01977 1 3 17.10.11 BOILER 17.10.11 LFO PUMP SET 2
684 42 0-42-020-01981 0 3 17.10.11 BOILER 17.10.11 HFO PUMP SET 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
685 42 0-42-030-01943 0 3 17.10.11 BOILER 17.10.11 HFO HEATER SET 40 SQM (2 NOS)1233 2
686 42 1-42-070-02116 0 3 BOILER PIPING - OIL BURNER FITTINGS 2
687 42 1-42-070-02117 0 3 BOILER OIL BURNER ASSY - HFO & LFO (SKID MOUNTING) 2
688 42 1-42-070-02118 0 3 BOILER OIL BURNER ASSY - HFO (SKID MOUNTING) 2
689 42 0-42-120-02005 1 3 14.02.12 BOILER 14.02.12 PIPING-PUMP HOUSE (PUMP HOUSE LAYOUT & SUPPORT DETAILS) 2
690 42 0-42-150-01972 0 3 17.10.11 BOILER 17.10.11 PIPING- OPERATING FLOOR HFO AND TRACER STEAM 2
691 42 0-42-154-01979 0 3 14.11.11 BOILER 14.11.11 PIPING, OPERATING FLOOR DRAIN OIL SYSTEM. 2
692 42 0-42-158-01945 0 3 17.10.11 BOILER 17.10.11 PIPING, OPERATING FLOOR STEAM /IBR 2
693 42 4-42-005-02589 1 SEAL POT ERECTION NOTES
694 42 4-42-002-03958 0 STEAM BLOWING MATERIALS
695 42 4-42-992-03959 0 SUMMARY LIST OF SITE ELECTRODES
696 42 4-42-992-03960 0 ERECTION WELDING MANUAL (NPP)
697 42 4-42-992-03961 0 ERECTION WELDING MANUAL (NPP)
698 42 2-42-070-02102 0 3 07.02.13 SHIPPING FRAME FOR BURNER TRIP SKID ASSLY 2
699 42 3-42-900-00035 0 3 07.02.13 LIFTING EYE NB50 2
700 43 0-43-000-00522 0 4 17.10.11 BOILER 3 17.10.11 SCANNER-GUN AIR SYSTEM
701 45 0-45-220-01260 0 4 20.07.11 BOILER 3 20.07.11  T T BURNERS ASSY 2
702 45 3-45-000-00601 0 4 20.07.11 BOILER 3 20.07.11  TILT MECH ASSY 2
703 45 0-45-221-01298 0 4 09.09.11 BOILER 3 09.09.11 WB SUPPTS AND ACTUATOR MOUTGS 2
704 45 1-45-221-00830 1 4 09.09.11 BOILER 3 09.09.11 SEAL BOX (FOR WIND BOX) 2
705 45 1-45-221-01193 0 4 09.09.11 BOILER 3 09.09.11 WB DAMPER DRIVE MOUTG DETAILS 2
706 45 1-45-221-01340 0 4 09.09.11 BOILER 3 09.09.11 BURNER TILT DRIVE MOUNTING DETAILS 2
707 47 0-47-221-02075 0 4 17.10.11 BOILER 3 17.10.11 PULVERISED COAL PIPE LOADING PLAN
708 47 0-47-221-02340 0 4 17.10.11 BOILER 3 17.10.11 FUEL PIPE SUPPORTS
709 47 3-47-001-00647 0 4 17.10.11 BOILER 3 17.10.11 SUPPORT
710 47 3-47-221-01522 0 4 17.10.11 BOILER 3 17.10.11 LOAD MOVEMENT CHART
711 48 0-48-207-35356 0 4 10.08.11 BOILER 3 10.08.11 AIR FOIL ASSEMBLY 2510 (W)X4010(H)X2820(L) 2
712 48 0-48-999-33149 1 4 BOILER 3  RCEJ - FULL SIZE - SDU - 2 STYLE #01,#02 2
713 48 0-48-999-33150 1 4 20.07.11 BOILER 3 20.07.11  RCEJ - FULL SIZE - SDU -3 STYLE #01,#02 2
714 48 0-48-999-33152 2 4 10.08.11 BOILER 3 10.08.11  RCEJ - FULL SIZE - SDU -2 STYLE #04,#06 2
715 48 0-48-999-33153 1 4 20.07.11 BOILER 3 20.07.11  RCEJ - FULL SIZE - SDU -3 STYLE #04,#06 2
716 48 0-48-999-33154 1 4 10.08.11 BOILER 3 10.08.11  RCEJ - HS- SDU -1 STYLE #01,#02,#04, #06 2
717 48 0-48-999-33155 1 4 10.08.11 BOILER 3 10.08.11  RCEJ - HS- SDU -2 STYLE #01,#02,#04, #06 2
718 48 0-48-999-33156 1 4 20.07.11 BOILER 3 20.07.11  RCEJ - HS- SDU -3 STYLE #01,#02,#04, #06 2
719 48 0-48-999-33157 1 4 BOILER 3  RCEJ - FULL SIZE - MDU - 2 STYLE #01,#02 2
720 48 0-48-999-33158 2 4 20.07.11 BOILER 3 20.07.11  RCEJ - FULL SIZE - MDU -2 STYLE #04,#06 2
721 48 2-48-141-42566 1 4 10.08.11 BOILER 3 10.08.11 TYPICAL SEAL AIR LINE FOR HOT AIR GATES 2
722 48 4-48-200-60292 0 BOILER 3 TAPING POINTS ON DUCTS
SOFT
SOFT COPY
723 48 2-48-499-51392 2 CHIMNEY WALL FRAME COPY
RECEIVED
ISSUE
724 48 0-48-466-33279 3 PLATFORM FOR GATES
725 52 2-52-000-02434 3 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL SEAL STRAIGHT EDGE ASSY
726 52 3-52-000-01184 4 2 12.12.11 BOILER DEPT 2 12.12.11 JACKING PROCEDURES
727 52 3-52-000-01278 0 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT. OF HYDRAULIC LIFTING CYLINDER (75T)
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
728 52 4-52-000-02906 5 2 12.12.11 BOILER DEPT 2 12.12.11 ITEMS PER CONTRACT
729 52 0-52-010-01249 1 2 12.12.11 BOILER DEPT 2 12.12.11 MODULE ASSY
730 52 0-52-010-01250 1 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR ASSEMBLY
731 52 2-52-010-02128 2 2 12.12.11 BOILER DEPT 2 12.12.11 MOUDLE LIFTING ARRGT
732 52 0-52-011-01109 3 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR POST, TRUNNION & SPOOL ASSY.
733 52 2-52-012-02121 1 2 12.12.11 BOILER DEPT 2 12.12.11 PIN RACK ASSY
734 52 0-52-013-01257 4 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL SEAL ASSY
735 52 4-52-013-00718 4 2 12.12.11 BOILER DEPT 2 12.12.11 SEAL GAUGE (RADIAL)
736 52 2-52-024-02141 0 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT OF BASKETED COLD END HEATING BASKETS
737 52 2-52-025-02130 3 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT OF HOT & HOT INTER BASKETED HEATING ELEMENTS
738 52 0-52-030-01526 2 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR HOUSING ASSY
739 52 0-52-041-01122 5 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE ASSEMBLY (HE)
740 52 0-52-041-01123 5 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE CENTRE SECTION (HE)
741 52 1-52-041-00846 4 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE DUCT BRACING
742 52 1-52-041-01315 4 2 12.12.11 BOILER DEPT 2 12.12.11 BY-PASS SEAL ANGLE ASSEMBLY (HE)
743 52 1-52-041-01342 5 2 12.12.11 BOILER DEPT 2 12.12.11 STATIC SEAL ASSEMBLY (HOT END)
744 52 1-52-041-01391 3 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE MAIN ASSEMBLY (HE)
745 52 3-52-041-01411 0 2 12.12.11 BOILER DEPT 2 12.12.11 ERECTION NOTES
746 52 0-52-042-00743 4 2 12.12.11 BOILER DEPT 2 12.12.11 STATIC SEAL ASSEMBLY (COLD END)
747 52 0-52-042-01059 2 2 12.12.11 BOILER DEPT 2 12.12.11 CENTER SECTION ASSY(C.E)
748 52 0-52-042-01331 2 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE ASSY. (72 DEGREE COLD END)
749 52 1-52-042-01841 0 2 12.12.11 BOILER DEPT 2 12.12.11 CONN. PL SECTOR PL STATIC SEAL ASSY (CE)
750 52 2-52-042-02146 2 2 12.12.11 BOILER DEPT 2 12.12.11 BYPASS SEAL BAR ASSY
751 52 1-52-047-00295 9 2 12.12.11 BOILER DEPT 2 12.12.11 HOT END STATIONARY SPOOL SEAL ASSY.
752 52 1-52-054-01410 3 2 12.12.11 BOILER DEPT 2 12.12.11 AXIAL SEAL ASSY
753 52 2-52-055-01151 5 2 12.12.11 BOILER DEPT 2 12.12.11 BYPASS SEAL ASSY
754 52 1-52-100-01935 1 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR DRIVE ASSEMBLY
755 52 4-52-210-03030 1 2 12.12.11 BOILER DEPT 2 12.12.11 ACCESS DOOR ASSY
756 52 1-52-211-01491 4 2 12.12.11 BOILER DEPT 2 12.12.11 SUGGESTEDAIR SEALING LAYOUT FOR AIR PREHEATER
757 52 1-52-212-02318 0 2 12.12.11 BOILER DEPT 2 12.12.11 OBSERVATION PORT AND LIGHT ASSY
758 52 1-52-217-02041 2 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR STOPPAGE ALARM ASSY (INT BRG)
759 52 0-52-220-00434 1 2 12.12.11 BOILER DEPT 2 12.12.11 CENTRELINE PROCEDURES
760 52 1-52-220-00899 4 2 12.12.11 BOILER DEPT 2 12.12.11 SEAL INSTYALLATION AND SETTING
761 52 1-52-220-01950 1 2 12.12.11 BOILER DEPT 2 12.12.11 ARRANGEMENT OF SERVICING BEAM
762 52 1-52-220-02355 1 2 12.12.11 BOILER DEPT 2 12.12.11 GA OF AIR PREHEATER 27.5 VIMT 2000
763 52 2-52-220-01000 8 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL SEAL STRAIGHT EDGE ASSY
764 52 2-52-220-01147 6 2 12.12.11 BOILER DEPT 2 12.12.11 PLATFORM SUPPORT (APH GUIDE BEARING)
765 52 2-52-220-01286 1 2 12.12.11 BOILER DEPT 2 12.12.11 SEAL SETTING PROCEDURE
766 52 3-52-220-02000 0 2 12.12.11 BOILER DEPT 2 12.12.11 OIL CARRY OVER DETECTOR
767 52 3-52-220-02250 1 2 12.12.11 BOILER DEPT 2 12.12.11 GAD NOTES FOR AIR PREHEATER 27.5 VIMT 2000
768 52 3-52-220-02310 0 2 12.12.11 BOILER DEPT 2 12.12.11 NAME PLATE FOR AIR PREHEATER
769 52 4-52-220-03638 0 2 12.12.11 BOILER DEPT 2 12.12.11 GENERAL DETAILS
770 52 0-52-261-01030 4 2 12.12.11 BOILER DEPT 2 12.12.11 GUIDE BEARING ASSEMBLY
771 52 2-52-261-01704 0 2 12.12.11 BOILER DEPT 2 12.12.11 ERECTION NOTES
772 52 0-52-262-01113 2 2 12.12.11 BOILER DEPT 2 12.12.11 SUPPORT BEARING ASSEMBLY
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
773 52 0-52-271-01064 7 2 12.12.11 BOILER DEPT 2 12.12.11 LUB. OIL PIPING ASSY (S.BERG) WITH STAND BY
774 52 1-52-272-01311 7 2 12.12.11 BOILER DEPT 2 12.12.11 LUB. OIL PIPE ASSY (S.BERG) WITH STAND BY
775 52 3-52-272-01891 1 2 12.12.11 BOILER DEPT 2 12.12.11 OIL DRAIN ASSY (S.Brg)
776 52 1-52-301-00750 10 2 12.12.11 BOILER DEPT 2 12.12.11 DELUGE AND WASH PIPE ASSEMBLY (HOT END)
777 52 1-52-302-00751 12 2 12.12.11 BOILER DEPT 2 12.12.11 DELUGE AND WASH PIPE ASSEMBLY (COLD END)
778 52 0-52-326-00018 6 2 12.12.11 BOILER DEPT 2 12.12.11 ARRANGEMENT OF SOOT BLOWER LIMIT SWITCHES
779 52 1-52-326-01905 2 2 12.12.11 BOILER DEPT 2 12.12.11 TWIN NOZZLE CLEANING DEVICE ARRGT (C.E)
780 52 0-52-329-01609 0 2 12.12.11 BOILER DEPT 2 12.12.11 CLEANING DEVICE ASSY.
781 52 2-52-329-03062 0 2 12.12.11 BOILER DEPT 2 12.12.11 CLEANING EQUIPMENT DRIVE UNIT
782 52 3-52-329-01025 1 2 12.12.11 BOILER DEPT 2 12.12.11 CAM AND LINK SETTING DETAIL
783 52 2-52-360-02188 2 2 12.12.11 BOILER DEPT 2 12.12.11 FIRE SENSING DEVICE ASSY.
784 52 4-79-580-00893 2 12.12.11 BOILER DEPT 2 12.12.11 GROUP OF COLUMNS FOR TEMPLATES
785 52 2-52-025-02130 3 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT OF HOT & HOT INTER BASKETED HEATING ELEMENTS
786 52 2-52-024-02141 0 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT OF BASKETED COLD END HEATING BASKETS
787 52 2-52-042-02146 2 2 12.12.11 BOILER DEPT 2 12.12.11 BYPASS SEAL BAR ASSY
788 52 2-52-360-02188 2 2 12.12.11 BOILER DEPT 2 12.12.11 FIRE SENSING DEVICE ASSY.
789 52 2-52-000-02434 3 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL SEAL STRAIGHT EDGE ASSY
790 52 2-52-329-03062 0 2 12.12.11 BOILER DEPT 2 12.12.11 CLEANING EQUIPMENT DRIVE UNIT
791 52 2-52-220-01000 8 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL SEAL STRAIGHT EDGE ASSY
792 52 2-52-220-01147 6 2 12.12.11 BOILER DEPT 2 12.12.11 PLATFORM SUPPORT (APH GUIDE BEARING)
793 52 2-52-055-01151 5 2 12.12.11 BOILER DEPT 2 12.12.11 BYPASS SEAL ASSY
794 52 2-52-220-01286 1 2 12.12.11 BOILER DEPT 2 12.12.11 SEAL SETTING PROCEDURE
795 52 2-52-261-01704 0 2 12.12.11 BOILER DEPT 2 12.12.11 ERECTION NOTES
796 52 2-52-012-02121 1 2 12.12.11 BOILER DEPT 2 12.12.11 PIN RACK ASSY
797 52 2-52-010-02128 2 2 12.12.11 BOILER DEPT 2 12.12.11 MOUDLE LIFTING ARRGT
798 52 1-52-220-01950 1 2 12.12.11 BOILER DEPT 2 12.12.11 ARRANGEMENT OF SERVICING BEAM
799 52 1-52-047-00295 9 2 12.12.11 BOILER DEPT 2 12.12.11 HOT END STATIONARY SPOOL SEAL ASSY.
800 52 1-52-301-00750 10 2 12.12.11 BOILER DEPT 2 12.12.11 DELUGE AND WASH PIPE ASSEMBLY (HOT END)
801 52 1-52-302-00751 12 2 12.12.11 BOILER DEPT 2 12.12.11 DELUGE AND WASH PIPE ASSEMBLY (COLD END)
802 52 1-52-041-00846 4 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE DUCT BRACING
803 52 1-52-100-01935 1 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR DRIVE ASSEMBLY
804 52 1-52-217-02041 2 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR STOPPAGE ALARM ASSY (INT BRG)
805 52 1-52-326-01905 2 2 12.12.11 BOILER DEPT 2 12.12.11 TWIN NOZZLE CLEANING DEVICE ARRGT (C.E)
806 52 1-52-211-01491 4 2 12.12.11 BOILER DEPT 2 12.12.11 SUGGESTEDAIR SEALING LAYOUT FOR AIR PREHEATER
807 52 1-52-212-02318 0 2 12.12.11 BOILER DEPT 2 12.12.11 OBSERVATION PORT AND LIGHT ASSY
808 52 1-52-220-02355 1 2 12.12.11 BOILER DEPT 2 12.12.11 GA OF AIR PREHEATER 27.5 VIMT 2000
809 52 4-52-000-02906 5 2 12.12.11 BOILER DEPT 2 12.12.11 ITEMS PER CONTRACT
810 52 4-52-013-00718 4 2 12.12.11 BOILER DEPT 2 12.12.11 SEAL GAUGE (RADIAL)
811 52 4-52-210-03030 1 2 12.12.11 BOILER DEPT 2 12.12.11 ACCESS DOOR ASSY
812 52 4-52-220-03638 0 2 12.12.11 BOILER DEPT 2 12.12.11 GENERAL DETAILS
813 52 3-52-329-01025 1 2 12.12.11 BOILER DEPT 2 12.12.11 CAM AND LINK SETTING DETAIL
814 52 3-52-000-01184 4 2 12.12.11 BOILER DEPT 2 12.12.11 JACKING PROCEDURES
815 52 3-52-000-01278 0 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT. OF HYDRAULIC LIFTING CYLINDER (75T)
816 52 3-52-041-01411 0 2 12.12.11 BOILER DEPT 2 12.12.11 ERECTION NOTES
817 52 3-52-272-01891 1 2 12.12.11 BOILER DEPT 2 12.12.11 OIL DRAIN ASSY (S.Brg)
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
818 52 3-52-220-02000 0 2 12.12.11 BOILER DEPT 2 12.12.11 OIL CARRY OVER DETECTOR
819 52 3-52-220-02250 1 2 12.12.11 BOILER DEPT 2 12.12.11 GAD NOTES FOR AIR PREHEATER 27.5 VIMT 2000
820 52 3-52-220-02310 0 2 12.12.11 BOILER DEPT 2 12.12.11 NAME PLATE FOR AIR PREHEATER
821 52 1-52-220-00899 4 2 12.12.11 BOILER DEPT 2 12.12.11 SEAL INSTYALLATION AND SETTING
822 52 1-52-272-01311 7 2 12.12.11 BOILER DEPT 2 12.12.11 LUB. OIL PIPE ASSY (S.BERG) WITH STAND BY
823 52 1-52-041-01315 4 2 12.12.11 BOILER DEPT 2 12.12.11 BY-PASS SEAL ANGLE ASSEMBLY (HE)
824 52 1-52-041-01342 5 2 12.12.11 BOILER DEPT 2 12.12.11 STATIC SEAL ASSEMBLY (HOT END)
825 52 1-52-041-01391 3 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE MAIN ASSEMBLY (HE)
826 52 1-52-054-01410 3 2 12.12.11 BOILER DEPT 2 12.12.11 AXIAL SEAL ASSY
827 52 1-52-042-01841 0 2 12.12.11 BOILER DEPT 2 12.12.11 CONN. PL SECTOR PL STATIC SEAL ASSY (CE)
828 52 0-52-011-01109 3 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR POST, TRUNNION & SPOOL ASSY.
829 52 0-52-271-01064 7 2 12.12.11 BOILER DEPT 2 12.12.11 LUB. OIL PIPING ASSY (S.BERG) WITH STAND BY
830 52 0-52-042-01059 2 2 12.12.11 BOILER DEPT 2 12.12.11 CENTER SECTION ASSY(C.E)
831 52 0-52-261-01030 4 2 12.12.11 BOILER DEPT 2 12.12.11 GUIDE BEARING ASSEMBLY
832 52 0-52-042-00743 4 2 12.12.11 BOILER DEPT 2 12.12.11 STATIC SEAL ASSEMBLY (COLD END)
833 52 0-52-220-00434 1 2 12.12.11 BOILER DEPT 2 12.12.11 CENTRELINE PROCEDURES
834 52 0-52-326-00018 6 2 12.12.11 BOILER DEPT 2 12.12.11 ARRANGEMENT OF SOOT BLOWER LIMIT SWITCHES
835 52 0-52-329-01609 0 2 12.12.11 BOILER DEPT 2 12.12.11 CLEANING DEVICE ASSY.
836 52 0-52-030-01526 2 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR HOUSING ASSY
837 52 0-52-042-01331 2 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE ASSY. (72 DEGREE COLD END)
838 52 0-52-013-01257 4 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL SEAL ASSY
839 52 0-52-010-01250 1 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR ASSEMBLY
840 52 0-52-010-01249 1 2 12.12.11 BOILER DEPT 2 12.12.11 MODULE ASSY
841 52 0-52-041-01123 5 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE CENTRE SECTION (HE)
842 52 0-52-041-01122 5 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE ASSEMBLY (HE)
843 52 0-52-262-01113 2 2 12.12.11 BOILER DEPT 2 12.12.11 SUPPORT BEARING ASSEMBLY
844 55 1-55-011-01255 3 FD FAN FOUNDATION MATERIAL
845 55 1-55-031-01426 2 PA FAN ASSY. (PAF-17/11.8-2)
846 55 0-55-214-00867 3 IMPELLER HUB ASSY.
847 55 3-55-214-01018 0 STOPPER PLATE ASSY.
848 55 0-55-214-00995 1 FD FAN ASSY. (FAF 17-9.5-1)
849 55 0-55-214-00834 6 SUCTION CHAMBER ASSY.
850 55 0-55-214-00833 2 DIFFUSER ASSY.
851 55 0-55-214-00639 5 PROCEDURE FOR NON-SHRINK GROUTING & SHIMING
852 55 0-55-214-00868 1 SHAFT WITH BEARING ASSY.
853 55 1-55-214-01160 0 INTERMEDIATE SHAFT COVER
854 55 1-55-214-00988 1 BLADE BEARING ASSY.
855 55 1-55-214-00987 0 HYDRAULIC SUPPORT
856 55 1-55-214-00982 1 ACTUATOR FRAME ASSY (WITH FOUNDATION BOLT & PACKER)
857 55 0-55-214-00841 6 HOUSING ASSY.
858 55 0-55-214-00842 4 HOUSING ASSY. DETAILS
859 55 0-55-214-00853 3 SHETTING SHAFT ASSY.
860 55 0-55-214-00866 7 ROTOR ASSY (FAF 17/905-1)
861 55 2-55-214-00819 3 VIBRATION PICKUP PAD
862 55 3-55-214-01006 0 EXPANSION BAND (VAR 01&02)
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
863 55 0-55-334-01172 0 PA FAN ASSY. (PAF-17/11.8-2)
864 55 0-55-334-00938 1 SETTING SHAFT ASSY. (PAF 17/11.82)
865 55 0-55-334-00922 5 ROTOR ASSY(+10%) (PAF-17/11.8-2)
866 55 3-55-334-01146 0 STOPPER PLATE ASSY. (PAF-17/11.8-2)
867 55 1-55-334-01097 0 BLADE SHAFT BEARING ASSY.
868 55 2-55-334-01344 1 ACTUATOR FRAME ASSY (WITH FOUNDATION BOLT & PACKER)
869 55 2-55-334-00986 0 BLADE & ACCESSORIES
870 55 1-55-931-01098 2 ROOF WITH LUGS
871 55 1-55-931-01558 0 TRANSITION DUCT
872 55 2-55-931-01021 2 TRANSITION PIECE
873 55 2-55-931-01024 1 SUCTION HOOD ASSY
874 55 2-55-931-01511 0 SPACER DUCT
875 55 2-55-931-01512 0 SILENCER ASSY
876 55 3-55-930-01816 0 WIRING DIAGRAM FOR 20 LPM AT 35 BAR LUBE OIL SYSTEM FOR PA FAN
877 55 3-55-930-01815 0 PIPING LAYOUT FOR 15 LPM AT 35 BAR LUBE SYSTEM FOR PA FAN
878 55 3-55-930-01814 0 WIRING DIAGRAM FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR FD FAN
879 55 3-55-930-01813 0 PIPING LAYOUT FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR FD FAN
880 55 3-55-810-01730 0 SPACE COUPLING FOR FD FAN (80Q/500)
881 55 3-55-830-01719 0 SPACE COUPLING FOR PA FAN (80Q/501)
882 55 1-55-911-01581 0 SILENCER ASSY (FAF 17/9.5/1)
883 55 1-55-930-01754 0 P&I DIGRAM FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR PA FAN
884 55 1-55-910-01751 0 GA DWR FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR FD FAN
885 55 2-55-930-01753 0 GA DWR FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR PA FAN
886 55 2-55-911-01093 1 SPACER DUCT
887 55 0-55-000-01013 0 MOUNTING & DIS MOUNTING OF FD FAN FAF 17-9, 5-1
888 55 0-55-000-00964 1 MOUNTING & DIS MOUNTING OF PA FAN
889 55 0-55-214-00639 5 PROCEDURE FOR NON-SHRINK GROUTING & SHIMING
890 55 2-55-910-01752 0 P&I DIGRAM FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR FD FAN
891 55 2-55-214-00819 3 2 12.12.11 BOILER DEPT 2 12.12.11 VIBRATION PICKUP PAD
892 55 2-55-334-00986 0 2 12.12.11 BOILER DEPT 2 12.12.11 BLADE & ACCESSORIES
893 55 2-55-931-01021 2 2 12.12.11 BOILER DEPT 2 12.12.11 TRANSITION PIECE
894 55 2-55-931-01024 1 2 12.12.11 BOILER DEPT 2 12.12.11 SUCTION HOOD ASSY
895 55 2-55-334-01344 1 2 12.12.11 BOILER DEPT 2 12.12.11 ACTUATOR FRAME ASSY (WITH FDN.BOLT & PACKER)
896 55 2-55-931-01511 1 2 12.12.11 BOILER DEPT 2 12.12.11 SPACER DUCT
897 55 2-55-931-01512 0 2 12.12.11 BOILER DEPT 2 12.12.11 SILENCER ASSY
898 55 0-55-214-00841 6 2 12.12.11 BOILER DEPT 2 12.12.11 HOUSING ASSY.
899 55 0-55-214-00842 4 2 12.12.11 BOILER DEPT 2 12.12.11 HOUSING ASSY. DETAILS
900 55 0-55-214-00853 3 2 12.12.11 BOILER DEPT 2 12.12.11 SETTING SHAFT ASSY.
901 55 0-55-214-00866 7 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR ASSY (FAF 17/9.5-1)
902 55 0-55-214-00867 3 2 12.12.11 BOILER DEPT 2 12.12.11 IMPELLER HUB ASSY.
903 55 1-55-031-01426 2 2 12.12.11 BOILER DEPT 2 12.12.11 PA FAN FDN. MTLS (PAF-17/11.8-2)
904 55 1-55-931-01558 0 2 12.12.11 BOILER DEPT 2 12.12.11 TRANSITION DUCT
905 55 1-55-011-01255 3 2 12.12.11 BOILER DEPT 2 12.12.11 FD FAN FOUNDATION MATERIAL
906 55 1-55-214-00982 1 2 12.12.11 BOILER DEPT 2 12.12.11 ACTUATOR FRAME ASSY (WITH FDN.BOLT & PACKER)
907 55 1-55-214-00987 0 2 12.12.11 BOILER DEPT 2 12.12.11 HYDRAULIC SUPPORT
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
908 55 1-55-214-00988 1 2 12.12.11 BOILER DEPT 2 12.12.11 BLADE BEARING ASSY.
909 55 1-55-334-01097 0 2 12.12.11 BOILER DEPT 2 12.12.11 BLADE SHAFT BEARING ASSY.
910 55 1-55-931-01098 2 2 12.12.11 BOILER DEPT 2 12.12.11 ROOF WITH LUGS
911 55 3-55-214-01006 0 2 12.12.11 BOILER DEPT 2 12.12.11 EXPANSION BAND (VAR 01 & 02)
912 55 3-55-214-01018 0 2 12.12.11 BOILER DEPT 2 12.12.11 STOPPER PLATE ASSY
913 55 3-55-334-01146 0 2 12.12.11 BOILER DEPT 2 12.12.11 STOPPER PLATE ASSY (PAF 17/11.8-2)
914 55 1-55-214-01160 0 2 12.12.11 BOILER DEPT 2 12.12.11 INTERMEDIATE SHAFT COVER
915 55 0-55-214-00995 1 2 12.12.11 BOILER DEPT 2 12.12.11 FD FAN ASSY (FAF 17-9.5-1)
916 55 0-55-334-00938 1 2 12.12.11 BOILER DEPT 2 12.12.11 SETTING SHAFT ASSY. PAF 17/11.82
917 55 0-55-334-00922 5 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR ASSY (PAF 17/11.8-2)
918 55 0-55-214-00868 1 2 12.12.11 BOILER DEPT 2 12.12.11 SHAFT WITH BEARING ASSY.
919 55 0-55-214-00833 2 2 12.12.11 BOILER DEPT 2 12.12.11 DIFFUSER ASSY
920 55 0-55-214-00639 5 2 12.12.11 BOILER DEPT 2 12.12.11 PROCEDURE FOR NON - SHRINK GROUTING & SHIMING
921 55 0-55-334-01172 0 2 12.12.11 BOILER DEPT 2 12.12.11 PA FAN ASSY. (PAF-17/11.8-2)
922 55 0-55-214-00834 6 2 12.12.11 BOILER DEPT 2 12.12.11 SUCTION CHAMBER ASSY
923 56 0-56-226-02430 1 2 12.12.11 BOILER DEPT 2 12.12.11 BEARING PEDESTAL ASSEMBLY
924 56 0-56-226-02445 3 2 12.12.11 BOILER DEPT 2 12.12.11 SPIRAL CASING ASSY
925 56 0-56-227-02631 0 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR ASSY
926 56 0-56-227-02632 1 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL FAN ASSY
927 56 0-56-227-02633 0 2 12.12.11 BOILER DEPT 2 12.12.11 SECTIONAL ASSY (NDZV 33SIDOR)
928 56 1-56-227-02899 1 2 12.12.11 BOILER DEPT 2 12.12.11 8-FLAP DAMPER CONTROL ASSEMBLY
929 56 1-56-227-03346 0 2 12.12.11 BOILER DEPT 2 12.12.11 EXPANSION PILLOW BLOCK BEARING - 8" RTL
930 56 1-56-227-03347 0 2 12.12.11 BOILER DEPT 2 12.12.11 NON EXPANSION PILLOW BLOCK BEARING - 8" RTL
931 56 2-56-000-03223 1 2 12.12.11 BOILER DEPT 2 12.12.11 DAMPER LINK ASSY.
932 56 2-56-226-01846 0 2 12.12.11 BOILER DEPT 2 12.12.11 DAMPER CONTROL ASSY. - DETAILS
933 56 2-56-226-03249 0 2 12.12.11 BOILER DEPT 2 12.12.11 SEALING FOR IMPELLER
934 56 3-56-226-03889 0 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT OF SHIMS & PACKERS
935 56 3-56-227-04565 1 2 12.12.11 BOILER DEPT 2 12.12.11 SUPORT FOR ACTUATOR
936 56 3-56-870-05207 0 PIN BUSH COUPLING SIZE PB 160
937 56 3-56-920-05179 0 WIRING FOR 20 LPM AT 5 BAR LUBE OIL SYSTEM FOR ID FAN
938 56 3-56-920-05178 0 PIPING LAYOUT FOR 20 LPM AT 5 BAR LUBE SYSTEM FOR ID FAN
939 56 3-56-820-05131 0 TERMINAL PLAN FOR 1210 SVNL 21-22.5
940 56 3-56-820-05130 0 FUNCTION AND MEASURING POINTS DIAGRAM FOR 1210 SVNL 21-22.5
941 56 3-56-820-05129 0 WORKING OIL COOLER DUPLEX (H)

942 56 3-56-820-05128 0 ARRAMGEMENT DRAWING FOR VARIBLE SPEED HYDRAULIC COUPLING TYPE
1210 SVNL 21-22.5
ARRAMGEMENT PLAN FOR VARIBLE SPEED HYDRAULIC COUPLING TYPE 1210
943 56 3-56-820-05126 0
SVNL 21-22.5
944 56 3-56-820-04964 1 BASE PLATE AND HYDRAULIC COUPLING
945 56 3-56-820-04014 1 BASE PLATE
946 56 3-56-810-01616 2 COUPLING GUARD
947 56 1-56-911-03585 2 SILENCER
948 56 1-56-171-02714 2 RADIAL FAN ASSY
949 56 1-56-911-03584 0 ROOF WITH LUGS
950 56 2-56-920-05061 0 GA DWR FOR 20 LPM AT 5 BAR LUBE OIL SYSTEM FOR ID FAN
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
951 56 2-56-911-03510 2 TRANSITION PIECE
952 56 2-56-911-03511 0 SUCTION HOOD ASSY.
953 56 2-56-000-03422 0 PILLER ASSY.
954 56 2-56-171-02512 1 ROTOR ASSY
955 56 1-55-911-01587 0 TRANSITION DUCT
956 56 1-56-171-02708 2 3-FLAP DAMPER CONTROL ASSEMBLY
957 56 0-56-171-02264 1 SECTIONAL ASSY NDV 11.8 (N TYPE)
958 56 0-56-171-02256 4 SPIRAL CASING ASSY.
959 56 2-56-226-01846 0 2 12.12.11 BOILER DEPT 2 12.12.11 DAMPER CONTROL ASSY. - DETAILS
960 56 2-56-000-03223 1 2 12.12.11 BOILER DEPT 2 12.12.11 DAMPER LINK ASSY.
961 56 2-56-226-03249 0 2 12.12.11 BOILER DEPT 2 12.12.11 SEALING FOR IMPELLER
962 56 1-56-227-02899 1 2 12.12.11 BOILER DEPT 2 12.12.11 8-FLAP DAMPER CONTROL ASSEMBLY
963 56 1-56-227-03346 0 2 12.12.11 BOILER DEPT 2 12.12.11 EXPANSION PILLOW BLOCK BEARING - 8" RTL
964 56 1-56-227-03347 0 2 12.12.11 BOILER DEPT 2 12.12.11 NON EXPANSION PILLOW BLOCK BEARING - 8" RTL
965 56 3-56-226-03889 0 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT OF SHIMS & PACKERS
966 56 3-56-227-04565 1 2 12.12.11 BOILER DEPT 2 12.12.11 SUPORT FOR ACTUATOR
967 56 0-56-227-02632 1 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL FAN ASSY
968 56 0-56-227-02631 0 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR ASSY
969 56 0-56-227-02633 0 2 12.12.11 BOILER DEPT 2 12.12.11 SECTIONAL ASSY (NDZV 33SIDOR)
970 56 0-56-226-02445 3 2 12.12.11 BOILER DEPT 2 12.12.11 SPIRAL CASING ASSY
971 56 0-56-226-02430 1 2 12.12.11 BOILER DEPT 2 12.12.11 BEARING PEDESTAL ASSEMBLY
972 57 0-57-010-01711 0 G.GATE (HT= 6359) (3000X2200(S))
973 57 0-57-030-01712 0 G.GATE (HT= 4459) (2600X1250(S))
974 57 0-57-110-01713 0 G.GATE (HT= 7658) (2200X2700(S))
975 57 0-57-460-01714 0 G.GATE (HT= 7559) (2800X2800(S))
976 57 0-57-470-01715 0 G.GATE (HT= 7559) (2800X2800(S))
977 57 0-57-480-01716 0 G.GATE (HT= 10508) (3800X4125(S))
978 57 0-57-490-01717 0 G.GATE (HT= 10508) (3800X4125(S))
979 57 0-57-113-01703 0 LOUVER DAMPER ASSY.(2200X2700BL)(RH)
980 57 0-57-203-01705 0 LOUVER DAMPER ASSY.(3500X4000BL)(RH)
981 57 0-57-223-01706 0 LOUVER DAMPER ASSY.(2500X2500BL)(RH)
982 57 0-57-223-01707 0 LOUVER DAMPER ASSY.(2500X2500BL)(RH)
983 57 0-57-383-01709 0 LOUVER DAMPER ASSY.(7200X3100BL)(RH)
984 57 0-57-433-01710 0 LOUVER DAMPER ASSY.(7200X3100BL)(RH)
985 57 0-57-023-01702 0 CONTROL DAMPER ASSY. (1250X2600BL)(RH)
986 57 0-57-273-01708 0 CONTROL DAMPER ASSY. (1250X2000BL)(RH)
987 57 3-57-193-07578 0 LEVER-1
988 57 3-57-270-14558 0 THROAT SUPPORT
989 57 0-57-270-01719 0 A.GATE HT= 5234 ASSY(200X1250(S))
990 57 2-57-999-07578 0 KEY PLAN AND TEST DATA SHEET
991 57 4-57-209-05096 0 SUPPORT FOR AIRCYLINDER
992 57 4-57-466-05090 0 LADDER AND PLAT FORM FOR GATES
993 57 1-57-209-01235 0 TYPICAL POWER CYLINDER MOUNTING ARRGT.
994 57 1-57-466-08063 0 LADDER (STROKE=4125; SPROCKET=17.69)
995 57 1-57-466-08062 0 LADDER (STROKE=4125; SPROCKET=17.69)
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
996 57 1-57-466-08057 0 LADDER (STROKE=2700; SPROCKET=17.69)
997 57 1-57-466-08058 0 LADDER (STROKE=2200; SPROCKET=11.69)
998 57 2-57-466-08061 0 LADDER (STROKE=2800; SPROCKET=11.69)
999 57 2-57-466-08060 0 LADDER (STROKE=2800; SPROCKET=11.69)
1000 57 2-57-466-08062 0 P&I DIGRAM FOR 20 LPM AT 5 BAR LUBE OIL SYSTEM FOR ID FAN
1001 57 2-57-999-07578 0 2 12.12.11 BOILER DEPT 2 12.12.11 KEY PLAN AND TEST DATA SHEET
1002 57 3-57-193-07578 0 2 12.12.11 BOILER DEPT 2 12.12.11 LEVER-I
1003 57 3-57-270-14558 0 2 12.12.11 BOILER DEPT 2 12.12.11 THROAT SUPPORT
1004 57 0-57-480-01716 0 2 12.12.11 BOILER DEPT 2 12.12.11 G. GATE (HT=10508) (3800X4125(S))
1005 57 0-57-470-01715 0 2 12.12.11 BOILER DEPT 2 12.12.11 G. GATE (HT=7559) (2800X2800(S))
1006 57 0-57-460-01714 0 2 12.12.11 BOILER DEPT 2 12.12.11 G. GATE (HT=7559) (2800X2800(S))
1007 57 0-57-110-01713 0 2 12.12.11 BOILER DEPT 2 12.12.11 G. GATE (HT=7658) (2200X2700(S))
1008 57 0-57-030-01712 0 2 12.12.11 BOILER DEPT 2 12.12.11 G. GATE (HT=4459) (2600X1250(S))
1009 57 0-57-010-01711 0 2 12.12.11 BOILER DEPT 2 12.12.11 G. GATE (HT=6259) (3000X2200(S))
1010 57 0-57-433-01710 0 2 12.12.11 BOILER DEPT 2 12.12.11 LOUVER DAMPER ASSY. (7200X3100BL)(RH)
1011 57 0-57-113-01703 0 2 12.12.11 BOILER DEPT 2 12.12.11 LOUVER DAMPER ASSY. (2200X2700BL)(RH)
1012 57 0-57-273-01708 0 2 12.12.11 BOILER DEPT 2 12.12.11 CONTROL DAMPER ASSY. (1250X2000BL)(RH)
1013 57 0-57-223-01707 0 2 12.12.11 BOILER DEPT 2 12.12.11 LOUVER DAMPER ASSY. (2500X2500BL)(RH)
1014 57 0-57-383-01709 0 2 12.12.11 BOILER DEPT 2 12.12.11 LOUVER DAMPER ASSY. (7200X3100BL)(RH)
1015 57 0-57-203-01705 0 2 12.12.11 BOILER DEPT 2 12.12.11 LOUVER DAMPER ASSY. (3500X4000BL)(RH)
1016 57 0-57-223-01705 0 2 12.12.11 BOILER DEPT 2 12.12.11 LOUVER DAMPER ASSY. (2500X2500BL)(RH)
1017 57 0-57-023-01702 0 2 12.12.11 BOILER DEPT 2 12.12.11 CONTROL DAMPER ASSY. (1250X2600BL)(RH)
1018 57 0-57-270-01719 0 2 12.12.11 BOILER DEPT 2 12.12.11 A. GATE HT =~5234 - ASSY (2000X1250(S))
1019 57 0-57-490-01717 0 2 12.12.11 BOILER DEPT 2 12.12.11 G. GATE (HT =10508) (3800X4125(S))
1020 65 0-65-736-002111 4 BOILER DEPT 3 GRAVIMETRIC FEEDER ASSY
1021 65 1-65-000-008928 2 BOILER DEPT 3 36'' GRAVIMETRIC FEEDER ASSY
1022 65 2-65-736-00239 3 BOILER DEPT 3 EMERGENCY DISCH. CHUTE ASSY.
1023 65 2-65-736-00278 2 BOILER DEPT 3 ARRANGEMENT OF BULL'S EYE GLASS CLEANING
1024 65 3-65-000-00992 0 BOILER DEPT 3 ACCESSORIES FOR FEEDER ASSY.
1025 65 3-65-736-01014 0 BOILER DEPT 3 36'' GRAVIMETRIC FEEDER ASSY.
1026 67 1-67-801-00616 0 4 14.11.11 DEPT 3 14.11.11 DOWN SPOUT ASSY
1027 67 1-67-801-00619 0 4 14.11.11 DEPT 3 14.11.11 MAINTENANCE PLATFORM FOR RC GATE (BUNKER OUTLET)
1028 67 1-67-803-00620 0 4 14.11.11 DEPT 3 14.11.11 FEED PIPE TO MILL ASSEMBLY
1029 67 2-67-803-00444 3 4 14.11.11 DEPT 3 14.11.11 INSTALLATION OF NOZZLE IN FEED PIPE
1030 67 0-67-802-00283 0 4 05.03.12 BOILET 3 05.03.12 BURNER EMPTYING CHUTE ASSY 2
1031 67 0-67-283-00144 5 BOILET 3 FEEDER OUTLET ISO. GATE
1032 67 1-67-283-00091 7 BOILET 3 AIR CYLINDER ASSY
1033 67 1-67-204-00285 3 BOILET 3 NEEDLE GATE ASSY
36'' RAW COAL GATE
1034 67 0-67-276-00150 5 BOILET 3
(Chain Operated)
36'' RAW COAL GATE
1035 67 0-67-272-00165 7 BOILET 3
(Actuator Operated)
OUTLET GAS DISTRIBUTOR ASSY
1036 71 2-71-408-02656 0
(ERECTION DETAIL)
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies

1037 71 2-71-408-02657 1 INLET GAS DISTRIBUTOR ASSY


(ERECTION DSTAIL)
1038 71 2-71-408-02656 0 2 12.12.11 BOILER DEPT 2 12.12.11 OUTLET GAS DISTRIBUTOR ASSY (ERECTION DETAIL)
1039 71 2-71-408-02657 1 2 12.12.11 BOILER DEPT 2 12.12.11 INTLET GAS DISTRIBUTOR ASSY (ERECTION DETAIL)
1040 73 2-73-301-02124 1 SLIDE SUPPORTS FOR ESP
1041 73 2-73-301-02124 1 2 12.12.11 BOILER DEPT 2 12.12.11 SLIDE SUPPORTS FOR ESP
1042 75 1-75-419-01285 1 SUSPN. FRAME OF COIL. ELECT. DETAILS
1043 75 1-75-419-01285 1 2 12.12.11 BOILER DEPT 2 12.12.11 SUSPN.FRAME OF COLL ELECT. DETAILS
1044 78 2-78-466-03378 0 TYPICAL ERECTION DETAILS FOR WATER WASHING SYSTEM
1045 78 1-78-148-01728 1 ESP CASING ERECTION DETAILS
1046 78 1-78-049-01912 2 ESP CASING SHEEL ERECTION DETAIL
1047 78 2-78-466-03378 0 2 12.12.11 BOILER DEPT 2 12.12.11 TYPICAL ERECTION DETAILS FOR WATER WASHING SYSTEM
1048 78 1-78-148-01728 1 2 12.12.11 BOILER DEPT 2 12.12.11 ESP CASING ERECTION DETAILS
1049 78 1-78-049-01912 2 2 12.12.11 BOILER DEPT 2 12.12.11 ESP CASING SHELL ERECTION DETAILS
20.12.201
1050 79 3-79-001-01227 0 4 Boiler 3 20.12.2011 ESP SUPPORT BEARING PLATE DIMENSIONS 2
1
20.12.201
1051 79 2-79-013-00700 0 4 Boiler 3 20.12.2011 EMITTING SYSTEM SUSPENSION 2
1
20.12.201
1052 79 1-79-017-00579 0 4 Boiler 3 20.12.2011 DRIVE ARRANGEMENT FOR EMITTING RAPPING 2
1
20.12.201
1053 79 1-79-020-00422 3 4 Boiler 3 20.12.2011 ARRANGEMENT OF COLL ELECTRODES 2
1
20.12.201
1054 79 2-79-023-00661 2 4 0 Boiler 3 20.12.2011 FIXING ARRANGEMENT OF DOOR ASSY. 2

20.12.201 Boiler
1055 79 3-79-024-01259 0 4 3 20.12.2011 SHOCK BAR ASSEMBLY - 400 2
1
20.12.201
1056 79 1-79-026-00524 1 4 Boiler 3 20.12.2011 DRIVE ARRANGEMENT FOR COLLECTING ELECTRODE RAPPING 2
1

1057 79 2-79-065-02931 0 4 20.12.201 Boiler 3 20.12.2011 LINK CHAIN ERECTION DETAILS ( HOPPER APPROACH PLATFORM) 2
1
20.12.201
1058 79 1-79-501-02334 0 4 Boiler 3 20.12.2011 SLIDE SUPPORT FOR ESP 2
1
1059 79 0-79-506-01169 0 4 Boiler 3 INSULATOR HOUSING ASSY. 2
20.12.201
1060 79 3-79-506-02560 0 4 Boiler 3 20.12.2011 RAILING ARRANGEMENT 2
1
20.12.201
1061 79 1-79-508-02440 0 4 Boiler 3 20.12.2011 INLET GAS DISTRIBUTOR ASSY. 2
1
20.12.201
1062 79 1-79-508-02441 0 4 1 Boiler 3 20.12.2011 OUTLET GAS DISTRIBUTOR ASSY. 2

20.12.201
1063 79 1-79-508-02442 0 4 Boiler 3 20.12.2011 INLET GAS DISTRIBUTOR AT INLET FUNNEL ASSEMBLY 2
1
20.12.201
1064 79 3-79-508-02349 0 4 Boiler 3 20.12.2011 GAS DISTRIBUTOR ASSY. 2
1

1065 79 1-79-509-02438 0 4 20.12.201 Boiler 3 20.12.2011 GD RAPPING MECHANISM 2


1
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies

1066 79 1-79-511-02376 1 4 20.12.201 Boiler 3 20.12.2011 DEFLECTION PLATE ASSEMBLY 2


1
20.12.201
1067 79 1-79-517-02439 0 4 Boiler 3 20.12.2011 RAPPING MECHANISM FOR EMITTING ELECTRODE 2
1
20.12.201
1068 79 1-79-519-02616 0 4 Boiler 3 20.12.2011 SUSPETION ARRANGEMENT FOR COLLECTING ELECTRODE 2
1

1069 79 1-79-521-02652 0 4 20.12.201 Boiler 3 20.12.2011 FRAME OF EMITTING SYSTEM 2


1
20.12.201 Boiler
1070 79 1-79-525-02715 0 4 3 20.12.2011 HOPPER APPROACH PLATFORM (SH 2/2) 2
1
20.12.201 Boiler
1071 79 1-79-525-02634 0 4 3 20.12.2011 RAPPING MECHANISM FOR COLLECTING ELECTRODES 2
1
20.12.201
1072 79 1-79-525-02635 0 4 Boiler 3 20.12.2011 RAPPING MECHANISM FOR COLLECTING ERECTION DETAILS 2
1
20.12.201
1073 79 2-79-525-03457 0 4 Boiler 3 20.12.2011 COMPLETE SHAFT FOR COLL. ERECT. RAPPING MECH. (400 mm PITCH) 2
1
20.12.201
1074 79 2-79-542-03353 0 4 Boiler 3 20.12.2011 OUTER ROOF OF ESP 2
1
20.12.201
1075 79 1-79-542-02497 0 4 Boiler 3 20.12.2011 OUTER ROOF OF ESP 2
1
1076 79 0-79-543-01137 0 4 Boiler 3 HOPPER RIDGES 2
1077 79 0-79-544-01165 0 4 Boiler 3 HOPPER ASSEMBLY 2
20.12.201
1078 79 1-79-546-02499 0 4 1 Boiler 3 20.12.2011 INSULATOR SUPPORT PANEL ASSY. 2

20.12.201 Boiler
1079 79 2-79-548-03289 0 4 3 20.12.2011 EP CASING FRAME ASSLY. TP & LR BEAMS 2
1
20.12.201
1080 79 1-79-548-02449 0 4 Boiler 3 20.12.2011 LONGITUDINAL ROOF BEAM (MIDDLE) 2
1

1081 79 1-79-548-02448 0 4 20.12.201 Boiler 3 20.12.2011 LONGITUDINAL ROOF BEAM (SIDE) 2


1
20.12.201
1082 79 1-79-548-02450 0 4 Boiler 3 20.12.2011 EP. CASING FRAME ASSY. 2
1
20.12.201
1083 79 1-79-549-02461 0 4 Boiler 3 20.12.2011 INLET GD HOUSE ASSEMBLY 2
1

1084 79 1-79-549-02460 0 4 20.12.201 Boiler 3 20.12.2011 EP. CASING SHELL ASSY. 2


1
20.12.201
1085 79 2-79-550-03320 0 4 Boiler 3 20.12.2011 EP. FUNNEL ASSY. 2
1
20.12.201
1086 79 1-79-550-02463 0 4 Boiler 3 20.12.2011 EP. OUTLET FUNNEL 2
1
20.12.201
1087 79 1-79-550-02462 0 4 Boiler 3 20.12.2011 EP. INTEL FUNNEL 2
1
20.12.201
1088 79 1-79-555-02661 0 4 Boiler 3 20.12.2011 PENT HOUSE 2
1
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies

1089 79 1-79-555-02662 0 4 20.12.201 Boiler 3 20.12.2011 PENT HOUSE 2


1
20.12.201
1090 79 1-79-555-02663 0 4 Boiler 3 20.12.2011 PENT HOUSE 2
1
20.12.201
1091 79 1-79-555-02664 0 4 Boiler 3 20.12.2011 PENT HOUSE 2
1
1092 79 1-79-555-02665 0 PENT HOUSE
20.12.201
1093 79 2-79-557-03338 0 4 Boiler 3 20.12.2011 SPLITTERS & GUIDE VANES 2
1
20.12.201
1094 79 2-79-561-03461 0 4 1 Boiler 3 20.12.2011 LOCATION OF ESP PG TEST POCKETS 2

1095 79 0-79-565-01151 0 4 Boiler 3 HOPPER APPROACH PLATFORM (SH 1/2) 2


20.12.201
1096 79 1-76-566-02589 0 4 Boiler 3 20.12.2011 WATER WASING SYSTEM 2
1
20.12.201
1097 79 4-79-580-00893 0 4 Boiler 3 20.12.2011 GROUP OF COLUMNS 2
1
1098 79 0-79-581-01121 0 4 Boiler 3 ESP SUPPORTING STRUCTURE 2
20.12.201
1099 79 2-79-809-01388 0 Boiler 3 20.12.2011 COMPLETE SHAFT FOR G.D RAPPING 2
1
20.12.201
1100 79 2-79-816-01599 1 4 Boiler 3 20.12.2011 COMPLETE SHAFT ASSY. FOR ENITTING RAPPING SYSTEM 2
1
20.12.201 Boiler
1101 79 2-79-825-01482 2 3 20.12.2011 BRACKET ASSY. (400MM PITCH) 2
1
20.12.201
1102 79 2-79-825-01483 0 4 Boiler 3 20.12.2011 SHOCK BAR GUIDE ASSY. RAPPING SIDE 2
1
20.12.201
1103 79 2-79-825-01487 0 4 Boiler 3 20.12.2011 SHOCK BAR GUIDE ASSY. NON RAPPING SIDE 2
1
1104 79 1-79-508-02442 0 2 12.12.11 BOILER DEPT 2 12.12.11 INLET GAS DISTRIBUTOR AT INLET FUNNEL ASSEMBLY
1105 79 1-79-548-02450 0 2 12.12.11 BOILER DEPT 2 12.12.11 EP. CASING FRAME ASSY.
1106 79 1-79-549-02460 0 2 12.12.11 BOILER DEPT 2 12.12.11 EP. CASING SHELL ASSY.
1107 79 1-79-549-02461 0 2 12.12.11 BOILER DEPT 2 12.12.11 INLET GD HOUSE ASSEMBLY
1108 79 1-79-550-02462 0 2 12.12.11 BOILER DEPT 2 12.12.11 EP. INLET FUNNEL
1109 79 1-79-550-02463 0 2 12.12.11 BOILER DEPT 2 12.12.11 EP. OUTLET FUNNEL
1110 79 1-79-542-02497 0 2 12.12.11 BOILER DEPT 2 12.12.11 OUTER ROOF OF ESP
1111 79 1-79-508-02440 0 2 12.12.11 BOILER DEPT 2 12.12.11 INLET GAS DISTRIBUTOR ASSY
1112 79 1-79-508-02441 0 2 12.12.11 BOILER DEPT 2 12.12.11 OUTLET GAS DISTRIBUTOR ASSY
1113 79 1-79-548-02448 0 2 12.12.11 BOILER DEPT 2 12.12.11 LONGITUDINAL ROOF BEAM (SIDE)
1114 79 1-79-548-02449 0 2 12.12.11 BOILER DEPT 2 12.12.11 LONGITUDINAL ROOF BEAM (MIDDLE)
1115 79 1-79-825-01483 0 2 12.12.11 BOILER DEPT 2 12.12.11 SHOCK BAR GUIDE ASSY. RAPPING SIDE
1116 79 2-79-825-01487 0 2 12.12.11 BOILER DEPT 2 12.12.11 SHOCK BAR GUIDE ASSY. NONRAPPING SIDE
1117 79 2-79-816-01599 1 2 12.12.11 BOILER DEPT 2 12.12.11 COMPLETE SHAFT ASSY. FOR EMITTING RAPPING SYSTEM
1118 79 2-79-065-02931 0 2 12.12.11 BOILER DEPT 2 12.12.11 LINK CHAIN ERECTION DETAILS @ HOPPER APPROACH PLATFORM
1119 79 2-79-548-03289 0 2 12.12.11 BOILER DEPT 2 12.12.11 EP CASING FRAME ASSLY. TR & LR BEAMS
1120 79 2-79-550-03320 0 2 12.12.11 BOILER DEPT 2 12.12.11 EP. FUNNEL ASSY.
1121 79 2-79-557-03338 0 2 12.12.11 BOILER DEPT 2 12.12.11 SPLITTERS & GUIDE VANES
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
1122 79 2-79-542-03353 0 2 12.12.11 BOILER DEPT 2 12.12.11 OUTER ROOF OF ESP
1123 79 2-79-525-03457 0 2 12.12.11 BOILER DEPT 2 12.12.11 COMPLETE SHAFT FOR COLL. ELECT. RAPPING MECH.
1124 79 2-79-561-03461 0 2 12.12.11 BOILER DEPT 2 12.12.11 COMPLETE SHAFT FOR COLL. ELECT. RAPPING MECH.
1125 79 2-79-023-00661 2 2 12.12.11 BOILER DEPT 2 12.12.11 FIXING ARRANGEMENT OF DOOR ASSY.
1126 79 2-79-013-00700 0 2 12.12.11 BOILER DEPT 2 12.12.11 EMITTING SYSTEM SUSPENSION
1127 79 2-79-809-01388 0 2 12.12.11 BOILER DEPT 2 12.12.11 COMPLETE SHAFT FOR GD RAPPING
1128 79 2-79-825-01482 0 2 12.12.11 BOILER DEPT 2 12.12.11 BRACKET ASSY.
1129 79 1-79-020-00422 3 2 12.12.11 BOILER DEPT 2 12.12.11 ARRANGEMENT OF COLUMN ELECTRODES
1130 79 1-79-026-00524 1 2 12.12.11 BOILER DEPT 2 12.12.11 DRIVE ARRGT FOR COLLECTING ELECTRODE RAPPING
1131 79 1-79-017-00579 0 2 12.12.11 BOILER DEPT 2 12.12.11 DRIVE ARRGT FOR EMITTING RAPPING
1132 79 1-79-501-02334 0 2 12.12.11 BOILER DEPT 2 12.12.11 SLIDE SUPPORTS FOR ESP
1133 79 1-79-511-02376 1 2 12.12.11 BOILER DEPT 2 12.12.11 DEFLECTION PLATE ASSEMBLY
1134 79 1-79-509-02438 0 2 12.12.11 BOILER DEPT 2 12.12.11 G.D RAPPING MECHANISM
1135 79 1-79-555-02665 0 2 12.12.11 BOILER DEPT 2 12.12.11 PENT HOUSE
1136 79 1-79-555-02664 0 2 12.12.11 BOILER DEPT 2 12.12.11 PENT HOUSE
1137 79 1-79-555-02662 0 2 12.12.11 BOILER DEPT 2 12.12.11 PENT HOUSE
1138 79 1-79-555-02663 0 2 12.12.11 BOILER DEPT 2 12.12.11 PENT HOUSE
1139 79 1-79-521-02652 0 2 12.12.11 BOILER DEPT 2 12.12.11 FRAME OF EMITTING SYSTEM
1140 79 1-79-555-02661 0 2 12.12.11 BOILER DEPT 2 12.12.11 PENT HOUSE
1141 79 1-79-525-02635 0 2 12.12.11 BOILER DEPT 2 12.12.11 RAPP. MECH FOR C.E. ERECTION DETAILS
1142 79 1-79-565-02715 0 2 12.12.11 BOILER DEPT 2 12.12.11 HOPPER APPROACH PLATFORM (SH 2/2)
1143 79 1-79-519-02616 0 2 12.12.11 BOILER DEPT 2 12.12.11 SUSPENSION ARRANGEMENT FOR COLLECTING ELECTRODE
1144 79 1-79-525-02634 0 2 12.12.11 BOILER DEPT 2 12.12.11 RAPP. MECH FOR COLLECTING ELECTRODES
1145 79 1-79-546-02499 0 2 12.12.11 BOILER DEPT 2 12.12.11 INSULATOR SUPPORT PANEL ASSY
1146 79 1-79-566-02589 0 2 12.12.11 BOILER DEPT 2 12.12.11 WATER WASHING SYSTEM
1147 79 4-79-580-00893 0 2 12.12.11 BOILER DEPT 2 12.12.11 GROUP OF COLUMNS FOR TEMPLATES
1148 79 3-79-024-01259 0 2 12.12.11 BOILER DEPT 2 12.12.11 SHOCK BAR ASSEMBLY-400
1149 79 3-79-508-02349 0 2 12.12.11 BOILER DEPT 2 12.12.11 GAS DISTRIBUTOR ASSY.
1150 79 3-79-506-02560 0 2 12.12.11 BOILER DEPT 2 12.12.11 RAILING ARRANGEMENT
1151 79 1-79-517-02439 0 2 12.12.11 BOILER DEPT 2 12.12.11 RAPPING MECH. FOR EMITTING ELECTRODE
1152 79 0-79-543-01137 0 2 12.12.11 BOILER DEPT 2 12.12.11 HOPPER RIDGES
1153 79 0-79-581-01121 0 2 12.12.11 BOILER DEPT 2 12.12.11 ESP SUPPORTING STRUCTURE
1154 79 0-79-506-01169 0 2 12.12.11 BOILER DEPT 2 12.12.11 INSULATOR HOUSING ASSY.
1155 79 0-79-544-01165 0 2 12.12.11 BOILER DEPT 2 12.12.11 HOPPER ASSEMBLY
1156 79 0-79-565-01151 0 2 12.12.11 BOILER DEPT 2 12.12.11 HOPEER APPROACH PLATFORM (SH 1/2)
1157 89 0-89-610-00769 0 GALLERIES & RAILINGS OF ESP (SH 1/3)
1158 89 0-89-610-00770 0 GALLERIES & RAILINGS OF ESP (SH 1/2)
1159 89 0-89-610-00771 0 ESP GALLERIES AND RAILINGS (SH 3/3)
1160 89 1-89-610-00771 0 2 12.12.11 BOILER DEPT 2 12.12.11 ESP GALLERIES AND RAILINGS (SH 3/3)
1161 89 1-89-610-00769 0 2 12.12.11 BOILER DEPT 2 12.12.11 ESP GALLERIES AND RAILINGS (SH 1/3)
1162 89 0-89-610-00770 0 2 12.12.11 BOILER DEPT 2 12.12.11 GALLERIES & RAILING OF ESP. (SH 2/3)
1163 95 2-95-090-01348 3 BOILER DEPT 3 Piping and wiring diagram of pulverizer hot Air Gate 2
1164 95 2-95-090-01348 3 2 12.12.11 BOILER DEPT 2 12.12.11 PIPING AND WIRING DIAGRAM OF PULVERIZER HOT AIR GATE
1165 99 1-99-100-40745 0 BOILER DEPT 3 PA & FD Handling Arrangement 2
1166 99 1-99-100-40746 0 BOILER DEPT 3 ID Fan Handling Arragment 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
1167 99 2-99-400-40665 0 BOILER DEPT 3 APH element Handling Arragment 2
Date of issue to
B&R
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
Date of issue to
B&R

20.01.2012

20.01.2012

20.01.2012

11.01.12
11.01.12

11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
Date of issue to
B&R
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
Date of issue to
B&R
11.01.12
11.01.12
11.01.12

11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
Date of issue to
B&R

25.01.12
25.01.12

25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
Date of issue to
B&R
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
Date of issue to
B&R
25.01.12
25.01.12
25.01.12

25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12

25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
Date of issue to
B&R
25.01.2012

25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012

25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
07.02.13
Date of issue to
B&R

08.10.11
08.10.11
Date of issue to
B&R
08.10.11
08.10.11
08.10.11

08.10.11
08.10.11
08.10.11
08.10.11
08.10.11

08.10.11
08.10.11
08.10.11
08.10.11

08.10.11
08.10.11
08.10.11
08.10.11

08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
Date of issue to
B&R
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
Date of issue to
B&R
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
Date of issue to
B&R
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
Date of issue to
B&R
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

04.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012
Date of issue to
B&R

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

04.01.2012
04.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012
Date of issue to
B&R

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

04.01.2012

20.01.2012

20.01.2012

04.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012
Date of issue to
B&R

15.03.2012
15.03.2012
Date of issue to
B&R
15.03.2012
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
1 0 0-00-027-40293 2 4 20.07.11 BOILER DEPT 3 20.07.11 ERECTION WELDING DETAIL OF FUSION WELDED PANEL 2
2 0 0-00-030-45967 0 4 20.07.11 BOILER DEPT 3 20.07.11 PPA-EXPANSION MOVEMENT DIAGRAM 2
3 0 0-00-027-45968 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-GENERAL ARRANGEMENT OF PR.PARTS(PGMA) 2
4 0 0-00-027-45969 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-UPPER SECTIONAL SIDE ELEVATION-I PASS 2
5 0 0-00-027-45970 1 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-SECTIONAL SIDE ELEVATION-II PASS 2
6 0 0-00-027-45971 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-DOWN COMER ARRANGEMENT 2
7 0 0-00-027-45972 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PANEL ARRANGEMENT I-PASS 2
8 0 0-00-027-45973 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PANEL ARRANGEMENT II-PASS 2
9 0 0-00-027-45974 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-WATER WALL UPPER CORNER TRANSITION 2
10 0 0-00-027-45975 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-WATER WALL LOWER CORNER TRANSITION 2
11 0 0-00-027-45976 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-TRANSITION AT REAR ARCH TUBES 2
12 0 0-00-027-45977 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-ASSY.OF REAR ARCH SCREEN AND HANGER TUBES 2
13 0 0-00-027-45978 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-LTSH TERMINAL TUBES(SEC.VV) 2
14 0 0-00-027-45979 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-EXTENDED SIDE SUPPLY TUBES 2
15 0 0-00-027-45980 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-FRONT AND REAR REHEATER SECTIONS 2
16 0 0-00-027-45981 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PLAN OVER HDRS.,LINKS & RISERS(SEC.AA&BB) 2
17 0 0-00-027-45982 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PLAN OVER ROOF TUBES(SEC.CC&C1C1) 2
18 0 0-00-027-45983 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-SEC.THROUGH FURNACE(SEC.DD&D1D1) 2
19 0 0-00-027-45984 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PLAN FOR ECNOMISER ASSY. 2
20 0 0-00-027-45985 0 4 20.07.11 BOILER DEPT 3 20.07.11  PPA-PLAN OVER BACK PASS "U" HEADERS 2
21 0 0-00-260-87609 1 4 10.08.11 BOILER DEPT 3 10.08.11 DUCT CONSTRUCTION DETAIL (FLANGE & EXPANSION JOINT) 2
22 0 0-00-260-87610 0 4 10.08.11 BOILER DEPT 3 10.08.11 DUCT CONSTRUCTION DETAIL (SUPORT & FIELD JOINT) 2
23 0 0-00-260-87611 0 4 10.08.11 BOILER DEPT 3 10.08.11 DUCT CONSTRUCTION DETAIL (CORNER CONSTRUCTION WELDING) 2
24 0 0-00-260-87612 0 4 10.08.11 BOILER DEPT 3 10.08.11 DUCT CONSTRUCTION DETAIL (STIFFNER & OTHER WELDING) 2
25 0 0-00-260-89244 0 4 10.08.11 BOILER DEPT 3 10.08.11 FD FAN TO AH DUCTING 2
26 0 0-00-260-89245 0 4 10.08.11 BOILER DEPT 3 10.08.11 FD FAN TO AH DUCTING 2
27 0 0-00-260-89246 0 4 10.08.11 BOILER DEPT 3 10.08.11 FD FAN TO AH DUCTING 2
28 0 0-00-265-89250 0 4 10.08.11 BOILER DEPT 3 10.08.11 AH TO MILL DUCT ARRANGEMENT 2
29 0 0-00-265-89251 0 4 10.08.11 BOILER DEPT 3 10.08.11 AH TO MILL DUCT ARRANGEMENT 2
30 0 0-00-272-89072 0 4 10.08.11 BOILER DEPT 3 10.08.11 EP TO ID FAN DUCTING 2
31 0 1-00-272-20436 0 4 10.08.11 BOILER DEPT 3 10.08.11 EP TO ID FAN DUCTING 2
32 0 1-00-272-20437 0 4 10.08.11 BOILER DEPT 3 10.08.11 EP TO ID FAN DUCTING 2
33 0 2-00-047-47535 0 4 10.08.11 BOILER DEPT 3 10.08.11 SAFETY VALVE SETTING FOR DRUM, SH, RH AND SB 2
34 0 3-00-047-47022 1 4 10.08.11 BOILER DEPT 3 10.08.11 GUIDE LINE DURING SAMPLE COOLER ERECTIO 2
35 0 0-00-266-89272 0 4 09.09.11 BOILER DEPT 3 09.09.11 BUS TO MILL DUCT ARRANGEMENT 2
36 0 0-00-266-89273 1 4 09.09.11 BOILER DEPT 3 09.09.11 BUS TO MILL DUCT ARRANGEMENT 2
37 0 1-00-266-20547 0 4 09.09.11 BOILER DEPT 3 09.09.11 BUS TO MILL DUCT ARRANGEMENT 2
38 0 0-00-271-88735 0 4 17.09.11 BOILER DEPT 3 17.09.11 BOF TO EP DUCTING 2
39 0 0-00-271-88737 0 4 17.09.11 BOILER DEPT 3 17.09.11 BOF TO EP DUCTING 2
40 0 0-00-271-89283 0 4 17.09.11 BOILER DEPT 3 17.09.11 BOF TO EP DUCTING 2
41 0 0-00-202-22547 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE BOTTOM ENCLOSURE 2
42 0 0-00-202-22548 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF FURNACE BOTTOM ENCLOSURE 2
43 0 0-00-203-22549 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE EXTENDED SIDE BOTTOM ENCLOSURE FRAMING 2
44 0 0-00-204-22550 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE REAR ARCH ENCLOSURE 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
45 0 0-00-205-22551 0 4 14.11.11 BOILER DEPT 3 14.11.11 MAIN BOILER INSULATION ARRANGEMENT 2
46 0 0-00-205-22552 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE REAR ARCH INSULATION ARRANGEMENT 2
47 0 0-00-205-22553 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF VERTICAL ROOF AND DECK SUPPORT INSULATION 2
48 0 0-00-205-22554 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF VERTICAL ROOF ENCLOSURE INSULATION 2
49 0 0-00-205-22555 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF ROOF TUBES REFRRACTORY ARRANGEMENT. 2
50 0 0-00-206-22556 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
51 0 0-00-206-22557 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
52 0 0-00-206-22558 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
53 0 0-00-206-22559 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
54 0 0-00-206-22560 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
55 0 0-00-206-22561 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF VERTICAL ROOF ENCLOSURE FRAMING. 2
56 0 0-00-208-22562 0 4 14.11.11 BOILER DEPT 3 14.11.11 ASSEMBLY OF DECK SUPPORT AND SEALS 2
57 0 0-00-208-22563 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF DECK SUPPORT AND SEALS 2
58 0 0-00-220-22564 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE BOTTOM SKIN CASING 2
59 0 0-00-221-22565 0 4 14.11.11 BOILER DEPT 3 14.11.11 COMPONENTS WELDED TO PRESSURE PARTS 2
60 0 0-00-221-22566 0 4 14.11.11 BOILER DEPT 3 14.11.11 COMPONENTS WELDED TO PRESSURE PARTS 2
61 0 0-00-221-22567 0 4 14.11.11 BOILER DEPT 3 14.11.11 COMPONENTS WELDED TO PRESSURE PARTS 2
62 0 0-00-222-22568 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE REAR ARCH SKIN CASING 2
63 0 0-00-222-22569 0 4 14.11.11 BOILER DEPT 3 14.11.11 FURNACE REAR ARCH SKIN CASING 2
64 0 0-00-229-22570 0 4 14.11.11 BOILER DEPT 3 14.11.11 BOILER OUTER CASING 2
65 0 0-00-229-22571 0 4 14.11.11 BOILER DEPT 3 14.11.11 BOILER OUTER CASING 2
66 0 0-00-229-22572 0 4 14.11.11 BOILER DEPT 3 14.11.11 DETAILS OF BOILER OUTER CASING 2
67 0 0-00-230-22573 0 4 14.11.11 BOILER DEPT 3 14.11.11 FIXING DETAILS OF OBD AND ADF 2
68 0 0-00-230-22574 0 4 14.11.11 BOILER DEPT 3 14.11.11 INSULATION AND REFRACTORY AROUND INSTRUMENT TAPPINGS. 2
69 0 0-00-269-89313 0 4 14.11.11 BOILER DEPT 3 14.11.11 AH TO BOF DUCT ARRANGEMENT 2
70 0 0-00-269-89314 0 4 14.11.11 BOILER DEPT 3 14.11.11 AH TO BOF DUCT ARRANGEMENT 2
71 0 1-00-223-06888 0 4 14.11.11 BOILER DEPT 3 14.11.11 SECOND PASS SKIN CASING 2
72 0 1-00-230-06889 0 4 14.11.11 BOILER DEPT 3 14.11.11 FIXING DETAILS OF WACD 2
73 0 1-00-230-06890 0 4 14.11.11 BOILER DEPT 3 14.11.11 FIXING DETAILS OF ADE 2
74 0 2-00-205-06426 0 4 14.11.11 BOILER DEPT 3 14.11.11 HIGH TEMPERATURE INSULATION 2
75 0 2-00-229-06427 0 4 14.11.11 BOILER DEPT 3 14.11.11 CORNER CLOSING DETAIL OF OUTER CASING 2
76 0 3-00-229-06372 0 4 14.11.11 BOILER DEPT 3 14.11.11 NOTES FOR BOILER OUTER CASING 2
77 0 2-00-052-10106 2 BOILER DEPT 2
78 0 2-00-027-40315 0 BOILER DEPT ERECTION NOTES FOR PRESSURE PARTS (UTILITY BOILERS) 2
79 0 1-00-027-40509 0 BOILER DEPT PPA- ERECTION ATTACHEMENT ASSY. FOR PANELS/COILS. 2
80 0 0-00-268-89211 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
81 0 0-00-268-89212 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
82 0 0-00-268-89213 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
83 0 0-00-268-20495 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
84 0 0-00-268-20496 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
85 0 0-00-268-20497 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
86 0 0-00-268-20498 0 4 BOILER DEPT 3 ECO TO AH DUCTING 2
87 0 0-00-261-89716 0 4 BOILER DEPT 3 PA FAN TO AH DUCT ARRANGEMENT 2
88 0 0-00-261-89717 0 4 BOILER DEPT 3 PA FAN TO AH DUCT ARRANGEMENT 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies

89 0 2-00-235-06266 1 4 14.02.12 BOILER DEPT 3 14.02.12 SLOPE FOR HORIZONTAL DUCT 2


(FOR SINGAL LAYER OF INSULATION)
90 0 2-00-235-06270 0 4 14.02.12 BOILER DEPT 3 14.02.12 PIPE INSULATION 2
VERTICAL PIPE INSULATION
91 0 2-00-235-06272 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
(WELDING OF FIXING PINS NOT PERMITTED ON PIPES)
92 0 2-00-235-06277 0 4 14.02.12 BOILER DEPT 3 14.02.12 TYPICAL DAMPER INSULATION 2

93 0 2-00-235-06278 5 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION FOR METALLIC EXPENTION JOINT 2
(MULTIPLE BELLOWS)
94 0 2-00-235-06287 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION OF AIR PREHEATER 2
INSULATION FOR EXPANSION PIECE
95 0 3-00-235-06258 0 4 14.02.12 BOILER DEPT 3 14.02.12 (SINGAL BELLOW) 2

INSULATION FOR EXPANSION PIECE


96 0 3-00-235-06259 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
(SINGAL BELLOW SIFFENER CLEARED)
97 0 3-00-235-06260 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION FOR MANHOLE DOOR 2
98 0 3-00-235-06261 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION OF DRUM END 2
DUCT INSULATION
99 0 3-00-235-06262 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
(CLEARING STIFFENERS)
100 0 3-00-235-06263 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION OF FLANGED VALVES 2
101 0 3-00-235-06264 0 4 14.02.12 BOILER DEPT 3 14.02.12 DETACHABLE INSULATION ON VALVES 2
102 0 3-00-235-06265 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION FOR HOT AIR GATE 2
103 0 3-00-235-06266 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION F WIDE BOX 2
104 0 3-00-235-06267 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION FOR DUCT 2
105 0 3-00-235-06268 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION FIXING DETAIL FOR FLAT SURFACE 2
106 0 3-00-235-06275 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION OF RADIAL FAN 2
107 0 0-00-056-10931 2 4 BOILER DEPT 3 SCHEME OF FUEL OIL SYSTEM-BOILER FRONT
108 0 4-00-205-08525 0 4 14.11.11 BOILER DEPT 3 14.11.11 APPLICATION & CURING OF CASTABLE REFRACTORY 2
109 0 4-00-205-08526 0 4 14.11.11 BOILER DEPT 3 14.11.11 APPLICATION & CURING OF CASTABLE REFRACTORY 2
110 0 4-00-205-08527 0 4 14.11.11 BOILER DEPT 3 14.11.11 APPLICATION & CURING OF CASTABLE REFRACTORY 2
111 0 4-00-205-08528 0 4 14.11.11 BOILER DEPT 3 14.11.11 APPLICATION & CURING OF CASTABLE REFRACTORY 2
112 0 4-00-205-08529 0 4 14.11.11 BOILER DEPT 3 14.11.11 APPLICATION & CURING OF CASTABLE REFRACTORY 2
113 0 4-00-215-09548 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
114 0 4-00-215-09549 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
115 0 4-00-215-09550 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
116 0 4-00-215-09551 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
117 0 4-00-215-09552 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
118 0 4-00-215-09553 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
119 0 4-00-215-09554 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
120 0 4-00-215-09555 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
121 0 4-00-215-09556 0 4 14.11.11 BOILER DEPT 3 14.11.11 WALL SECTION 2
122 0 4-00-235-08535 0 4 14.02.12 BOILER DEPT 3 14.02.12 GENERAL NOTES ON ERECTION OF INSULATION 2
123 0 4-00-235-08536 0 4 14.02.12 BOILER DEPT 3 14.02.12 GENERAL NOTES ON ERECTION OF INSULATION 2
124 0 4-00-235-08537 0 4 14.02.12 BOILER DEPT 3 14.02.12 GENERAL NOTES ON ERECTION OF INSULATION 2
125 0 4-00-235-08538 0 4 14.02.12 BOILER DEPT 3 14.02.12 GENERAL NOTES ON ERECTION OF INSULATION 2
126 0 4-00-235-08539 0 4 14.02.12 BOILER DEPT 3 14.02.12 GENERAL NOTES ON ERECTION OF INSULATION 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies

127 0 4-00-235-08540 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION OF DRUM END 2


(DRG. NO.3-00-235-06261, 3-32-010-00054)
INSULATION OF PIPES AND BUNCH OF TUBES
128 0 4-00-235-08541 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
(DRG. NO.2-00-235-06270, 4-00-235-08550)
INSULATION OF VERTICAL PIPES
129 0 4-00-235-08543 0 4 14.02.12 BOILER DEPT 3 14.02.12 DRG. NO.2-00-235-06272 2
(WELDING OF FIXING PINS NOT PERMITTED ON PIPES)
130 0 4-00-235-08545 0 4 14.02.12 BOILER DEPT 3 14.02.12 INSULATION OF VALVE 2
131 0 4-00-235-08546 0 4 14.02.12 BOILER DEPT 3 14.02.12 TEE INSULATION 2
132 0 4-00-235-08547 0 4 14.02.12 BOILER DEPT 3 14.02.12 ELBOW INSULATION 2
133 0 4-00-235-08548 0 4 14.02.12 BOILER DEPT 3 14.02.12 FLANGE INSULATION 2
134 0 4-00-235-08549 0 4 14.02.12 BOILER DEPT 3 14.02.12 EXPANSION JOINT FOR PIPES 2
135 0 4-00-235-08550 0 4 14.02.12 BOILER DEPT 3 14.02.12 BUNCH INSULATION 2
INSULATION OF DUCT/FLAT SURFACE
136 0 4-00-235-08560 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
DGR. Nos. 3-00-235-06267, 3-00-235-06268
INSULATION OF DUCT
137 0 4-00-235-08634 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
(CLEARING STIFFENERS) DGR. No. 3-00-235-06262
FICOM BLR PP INSUL, BLR PP MIRL WOOL,
138 0 4-00-231-09675 0 4 14.02.12 BOILER DEPT 3 14.02.12 FICOM BLR MNTNGS INSUL, BLR MNTNGS WOOL, 2
FICOM SB PIPES INSUL, SB PIPES MINRL WOOL

FICOM AIR DUCTS INSUL, AIR DUCTS MINRLWOOL,


139 0 4-00-231-09676 0 4 14.02.12 BOILER DEPT 3 14.02.12 FICOM AH GAS DUCT INSUL, AH GAS DUCT MINRL WOOL, FICOM AH GAS DUCT 2
INSUL, ID DUCT MINRL WOOL
32-710 FICOM OIL SYST INSUL,
140 0 4-00-231-09677 0 4 14.02.12 BOILER DEPT 3 14.02.12 2
33-721 OIL SYST MINRL WOOL
141 0 1-00-112-21969 2 foundation plan and loading details of ESP
142 0 0-00-214-23020 0 BOILER DEPT 3 ANTI VIBRATION BAFFLES
SOFT
SOFT COPY
143 0 0-00-273-89073 1 ID FAN TO CHIMNEY DUCTING COPY
RECEIVED
ISSUE

SOFT
SOFT COPY
144 0 1-00-273-20438 0 ID FAN TO CHIMNEY DUCTING COPY
RECEIVED
ISSUE

SOFT COPY SOFT


145 0 1-00-273-20439 0 ID FAN TO CHIMNEY DUCTING COPY
RECEIVED ISSUE
GENERAL ARRANGEMENT OF BOWL MILL XRP 883 (WITH PLANETARY GEAR
146 0 0-00-620-85870 3 8 09.08.12 BOILER DEPT 8 09.08.12 2
BOX)

147 0 0-00-610-85871 3 8 09.08.12 BOILER DEPT 8 09.08.12 FOUNDATION PLAN OF BOWL MILL XPR 883 (WITH PLANETARY GEAR BOX 2

148 0 0-00-264-88209 0 3 18.10.12 AH TO WB CONNECTING DUCT (SHEET 01 OF 05)


149 0 0-00-264-88210 3 18.10.12 AH TO WB CONNECTING DUCT (SHEET 02 OF 05)
150 0 0-00-264-88211 3 18.10.12 AH TO WB CONNECTING DUCT (SHEET 03 OF 05)
151 0 1-00-264-20196 3 18.10.12 AH TO WB CONNECTING DUCT (SHEET 04 OF 05)
152 0 0-00-264-88447 3 18.10.12 AH TO WB CONNECTING DUCT (SHEET 05 OF 05)
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
153 3 2-03-000-00037 1 4 BOILER 3 HEMISPHERICAL DISHED END COVER (RAW FORMING) 2
154 3 2-03-000-00068 2 4 BOILER 3 SUSPENSION LUGS 2
155 3 3-03-000-00013 1 4 17.10.11 BOILER 3 17.10.11 MOUNTING ARRGT OF T30 MARK IE. SEAL PL.
156 3 3-03-000-00014 1 4 17.10.11 BOILER 3 17.10.11 MOUNTING ARRGT OF RW- 5E ( SEAL PL.)
157 3 2-03-000-00042 2 4 17.10.11 BOILER 3 17.10.11 SCH. PIPE INSPECTOR'S PRESS
158 3 2-03-000-00041 2 4 17.10.11 BOILER 3 17.10.11 SCH. PIPE COND. LOOP ASSY - AS
159 4 0-04-126-01278 1 4 BOILER 3 BOILER DRUM WITH STUBS AND DRILLING DETAILS 2
160 4 0-04-126-01279 1 4 BOILER 3 BOILER DRUM WITH STUBS AND DRILLING DETAILS 2
161 4 0-04-136-00795 0 4 BOILER 3 SITE ASSEMBLED DRUM INTERNALS 2
162 4 2-04-146-00662 1 4 BOILER 3 DRUM SUSPENSION ASSY WITH ROCKER 2
163 5 1-05-137-01249 0 4 BOILER 3 FRONT WALL INLET HEADER-H1 2
164 5 2-05-155-00381 4 4 BOILER 3 HAND HOLE PIPE 2
165 5 1-05-155-01250 0 4 BOILER 3 REAR WALL INLET HEADER H-2 2
166 5 1-05-155-01251 0 4 BOILER 3  LEFT SIDE WW INLET HEADER H-3 2
167 5 1-05-155-01252 0 4 BOILER 3 RIGHT SIDE WW INLET HEADER H-4 2
168 5 2-05-175-00567 0 4 BOILER 3 EXTENDED SIDE WALL INLET HEADER (LEFT)H10 2
169 5 2-05-175-00568 0 4 BOILER 3 EXTENDED SIDE WALL INLET HEADER (RIGHT)H11 2
170 6 2-06-651-08844 1 4 20.07.11 BOILER 3 20.07.11 OPENING FOR ASLD 2
171 7 0-07-109-00826 2 4 BOILER 3 DOWN COMER PIPES 2
172 7 0-07-109-00827 1 4 BOILER 3 DOWN COMER PIPES 2
173 7 3-07-109-05186 3 4 BOILER 3 NITROGEN BUBBLING ARRANGEMENT 2
174 7 0-07-109-00859 0 4 17.09.11 BOILER 3 17.09.11 DOWN COMER PIPES 2
175 7 0-07-109-00860 0 4 17.09.11 BOILER 3 17.09.11 DOWN COMER PIPES 2
176 7 2-07-216-06254 0 4 BOILER 3 RISER PIPE 2
177 7 2-07-216-06255 0 4 BOILER 3 RISER PIPE 2
178 7 2-07-216-06256 0 4 BOILER 3 RISER PIPE 2
179 7 2-07-216-06257 0 4 BOILER 3 RISER PIPE 2
180 7 2-07-216-06258 0 4 BOILER 3 RISER PIPE 2
181 7 2-07-216-06259 0 4 BOILER 3 RISER PIPE 2
182 7 2-07-216-06260 0 4 BOILER 3 RISER PIPE 2
183 7 2-07-216-06261 0 4 BOILER 3 RISER PIPE 2
184 7 2-07-216-06262 0 4 BOILER 3 RISER PIPE 2
185 7 2-07-216-06263 0 4 BOILER 3 RISER PIPE 2
186 7 2-07-216-06264 0 4 BOILER 3 RISER PIPE 2
187 7 2-07-216-06265 0 4 BOILER 3 RISER PIPE 2
188 7 2-07-216-06266 0 4 BOILER 3 RISER PIPE 2
189 7 2-07-216-06267 0 4 BOILER 3 RISER PIPE 2
190 7 2-07-216-06268 0 4 BOILER 3 RISER PIPE 2
191 7 2-07-216-06269 0 4 BOILER 3 RISER PIPE 2
192 7 2-07-216-06270 0 4 BOILER 3 RISER PIPE 2
193 7 2-07-216-06271 0 4 BOILER 3 RISER PIPE 2
194 7 2-07-216-06272 0 4 BOILER 3 RISER PIPE 2
195 7 2-07-216-06273 0 4 BOILER 3 RISER PIPE 2
196 7 2-07-216-06274 0 4 BOILER 3 RISER PIPE 2
197 7 2-07-216-06275 0 4 BOILER 3 RISER PIPE 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
198 7 2-07-216-06276 0 4 BOILER 3 RISER PIPE 2
199 7 2-07-216-06277 0 4 BOILER 3 RISER PIPE 2
200 7 2-07-216-06278 0 4 BOILER 3 RISER PIPE 2
201 7 2-07-216-06279 0 4 BOILER 3 RISER PIPE 2
202 7 2-07-216-06280 0 4 BOILER 3 RISER PIPE 2
203 7 2-07-216-06281 0 4 BOILER 3 RISER PIPE 2
204 7 2-07-216-06282 0 4 BOILER 3 RISER PIPE 2
205 7 2-07-216-06283 0 4 BOILER 3 RISER PIPE 2
206 7 2-07-216-06284 0 4 BOILER 3 RISER PIPE 2
207 7 2-07-216-06285 0 4 BOILER 3 RISER PIPE 2
208 7 2-07-216-06286 0 4 BOILER 3 RISER PIPE 2
209 7 2-07-216-06287 0 4 BOILER 3 RISER PIPE 2
210 7 2-07-216-06288 0 4 BOILER 3 RISER PIPE 2
211 7 2-07-216-06289 0 4 BOILER 3 RISER PIPE 2
212 7 2-07-216-06290 0 4 BOILER 3 RISER PIPE 2
213 7 2-07-216-06291 0 4 BOILER 3 RISER PIPE 2
214 7 2-07-216-06292 0 4 BOILER 3 RISER PIPE 2
215 7 2-07-216-06293 0 4 BOILER 3 RISER PIPE 2
216 7 2-07-216-06294 0 4 BOILER 3 RISER PIPE 2
217 7 2-07-216-06295 0 4 BOILER 3 RISER PIPE 2
218 7 2-07-216-06296 0 4 BOILER 3 RISER PIPE 2
219 7 2-07-216-06297 0 4 BOILER 3 RISER PIPE 2
220 7 2-07-216-06298 0 4 BOILER 3 RISER PIPE 2
221 7 2-07-216-06299 0 4 BOILER 3 RISER PIPE 2
222 7 2-07-216-06300 0 4 BOILER 3 RISER PIPE 2
223 7 2-07-216-06301 0 4 BOILER 3 RISER PIPE 2
224 7 2-07-218-05487 0 4 BOILER 3 RISER PIPE 2
225 7 2-07-218-05491 0 4 BOILER 3 RISER PIPE 2
226 7 0-07-401-00789 2 4 BOILER 3 WW HEADER SUSPENSION 2
227 7 0-07-410-00824 0 4 BOILER 3 DOWNCOMER SUSPENSION ARRANGEMENT 2
228 7 4-07-410-04925 0 4 BOILER 3 DOWN COMER SUSPENSION 2
229 7 0-07-420-00538 0 4 20.07.11 BOILER 3 DOWN COMER SEISMIC GUIDES 2
230 7 0-07-431-00820 1 4 BOILER 3 RISER TUBE SUPPORTS 2
231 7 2-07-500-05212 0 4 BOILER 3 WELDING DETAIL OF PROTECTION SHIELDS FOR WW SCREEN TUBES 2
232 7 1-07-601-00440 0 4 09.09.11 BOILER 3 09.09.11 PRESSURE PARTS SEALS ARRANGEMENT 2

233 7 0-07-109-01069 1 4 05.03.2012 BOILER 3 05.03.2012 DOWN COMER PIPES 2

234 7 0-07-109-0100 1 4 05.03.2012 BOILER 3 05.03.2012 DOWN COMER PIPES 2

235 8 1-08-000-00266 4 4 BOILER 3  BUCKSTAY CORNER ARRANGEMENT 2


236 8 1-08-000-00318 5 4 BOILER 3  DETAILS OF BUCKSTAYS 2
237 8 1-08-000-00319 4 4 BOILER 3  DETAILS OF BUCKSTAYS-(SITE) 2
238 8 4-08-000-02900 0 4 BOILER 3  PRODUCTION NOTES 2
239 8 1-08-000-00267 4 4 BOILER 3  BUCKSTAY CORNER ARRANGEMENT (H 2
240 8 2-08-000-00548 3 4 BOILER 3  BUCKSTAY CORNER ARRANGEMENT 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
241 8 4-08-000-03070 0 4 BOILER 3  EXPANSION MOVEMENT MEASURING ARRANGEMENT DETAILS 2
242 8 0-08-101-03124 0 4 BOILER 3  ASSEMBLY OF FURNACE UPPER BUCKSTAYS (SH. 01 OF 02) 2
243 8 0-08-101-03125 1 4 BOILER 3  DETAILS OF FURNACE UPPER BUCKSTAYS (SH. 02 OF 02) 2
244 8 0-08-104-03203 0 4 BOILER 3  ASSEMBLY OF FURNACE INTER BUCKSTAYS 2
245 8 0-08-104-03204 0 4 BOILER 3  ASSY. OF WIND BOX CONN. DUCT TRUSS WORK 2
246 8 0-08-107-03121 0 4 BOILER 3  ASSEMBLY OF FURNACE LOWER BUCKSTAYS 2
247 8 0-08-111-01136 3 4 BOILER 3  ASSY. OF FURN. REAR ARCH BUCKSTAYS 2
248 8 0-08-111-01152 2 4 BOILER 3  ASSEMBLY OF FURNACE BOTTOM SUPPORTS 2
249 8 0-08-400-03406 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +19.800M 2
250 8 0-08-400-03407 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +35.800M 2
251 8 0-08-400-03408 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +36.800M 2
252 8 0-08-400-03409 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +49.800M 2
253 8 0-08-400-03410 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +53.400M 2
254 8 0-08-400-03411 0 4 14.11.11 BOILER 3 14.11.11 FURNACE GUIDE AT +52.000M & 54.400M 2
255 8 1-08-400-04807 0 4 14.11.11 BOILER 3 14.11.11 BRACINGS AT +19.800M 2
256 8 0-08-500-03138 0 4 BOILER 3  ASSEMBLY OF BACKPASS BUCKSTAYS (SH.01/03) 2
257 8 0-08-500-03139 0 4 BOILER 3  DETAILS OF BACK PASS BUCKSTAYS (SH.02/03) 2
258 8 1-08-500-03138 0 4 BOILER 3  DETAILS OF BACK PASS BUCKSTAYS (SH.03/03) 2
259 8 2-08-500-00494 1 4 BOILER 3  BUCKSTAY CORNER ARRANGEMENT 2
260 8 3-08-500-02132 0 4 BOILER 3  BUCKSTAY ARRANGEMENT AT SH-H9 2
261 8 0-08-900-01281 1 4 BOILER 3  ASSY.OF FURNACE KEY BUCKSTAYS (SH.01 OF 02) 2
262 8 0-08-900-01282 1 4 BOILER 3  ASSY.OF FURNACE KEY BUCKSTAYS (SH.02 OF 02) 2
263 9 0-09-001-00197 0 4 20.07.11 BOILER 3 20.07.11  LOCATION OF SEAL BOXES FOR FURNACE OPENINGS 2
264 9 1-09-001-00124 1 4 20.07.11 BOILER 3 20.07.11  SEAL BOX FOR OBSERVATION DOOR 2
265 9 1-09-001-00135 1 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY FOR WALL BLOWER 2
266 9 1-09-001-00138 0 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY.FOR SOOT BLOWER 2
267 9 1-09-001-00139 2 4 20.07.11 BOILER 3 20.07.11  0SEAL BOX ASSY FOR ACCESS DOOR 2
268 9 1-09-001-00179 2 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY.FOR OBSERVATION DOOR 2
269 9 1-09-001-00366 1 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY FOR ACCESS DOOR 2
270 9 2-09-001-00684 0 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY FOR RET. SOOT BLOWER 2
271 9 2-09-001-00696 0 4 20.07.11 BOILER 3 20.07.11  SEAL BOX ASSY FOR RETRACTABLE SOOT BLOWER 2
272 9 2-09-001-01021 0 4 20.07.11 BOILER 3 20.07.11  WATER COOLED ACCESS DOOR SEAL BOX ASSY 2
273 9 0-09-002-00225 0 4 14.02.12 BOILER 3 14.02.12 LOCATION OF SEAL BOXES FOR INSTRUMENT INSERTS 2
274 11 0-11-691-00120 1 4 20.07.11 BOILER 3 20.07.11  FIELD FINNING OF RAD.ROOF TUBES 2
275 11 0-11-691-00229 0 4 20.07.11 BOILER 3 20.07.11  FIELD FINNING OF RADIANT ROOF TUBES 2
276 11 3-11-791-01157 0 4 20.07.11 BOILER 3 20.07.11  SH.RADIANT ROOF PANELS WELDING DETAILS 2
277 12 1-12-174-01340 1 4 BOILER 3  FINAL SH INLET LINKS 2
278 12 1-12-184-01357 0 4 BOILER 3  SH BP EXTD SIDE WALL INLET PIPES 2
279 12 1-12-187-01358 1 4 BOILER 3  REAR ROOF SH. INLET PIPES 2
280 12 0-12-803-01458 0 4 BOILER 3  STEAM COOLED SPACER (FOR RH ASSY.) 2
281 12 0-12-803-01459 0 4 BOILER 3  STEAM COOLED SPACER (FOR PLATEN ASSY.) 2
282 12 0-12-850-01219 0 4 BOILER 3  SH CONNECTING PIPES (SATURATED)-ASSY. 2
283 12 0-12-852-01474 4 4 14.02.12 BOILER 3 14.02.12 SH. DESH. LINKS STAGE-1 2
284 12 0-12-900-01475 1 4 BOILER 3  ASSY. OF SH. DESH. 2
285 12 0-12-903-00309 2 4 BOILER 3  BACKPASS PANEL ATTACHMENT FOR DUCT 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
286 12 0-12-903-00774 0 4 BOILER 3  CASETTE BAFFLE FOR LTSH & ECO. 2
287 12 3-12-903-03372 1 4 BOILER 3  CASSETTE BAFFLE SLIDING ARRESTOR ARRANG 2
288 12 0-12-906-01422 0 4 20.07.11 BOILER 3  SUPPORT FOR EXT.SIDE WALL INLET HDR(SHH-6) & PANELS 2
289 12 0-12-906-01460 0 4 20.07.11 BOILER 3  SUSPN.OF DESH LINKS& FINAL SH LINKS 2
290 12 2-12-906-02644 0 4 20.07.11 BOILER 3  HANGER SUPPORT FOR SUPPLY TUBES 2
291 12 2-12-906-02645 0 4 20.07.11 BOILER 3  GUIDE FOR CONN. TUBES SHH 5-6 2
292 12 2-12-914-02542 0 4 BOILER 3  SUSPN. OF RAD. ROOF OUTLET HDR. 2
293 12 2-12-914-02578 0 4 BOILER 3  SUSPTN. OF RADIANT ROOF INLET HDR. 2
294 12 1-12-917-01266 0 4 BOILER 3  SUSPN. OF RADIANT ROOF ROWS (B&C) 2
295 12 0-12-924-01435 1 4 BOILER 3  SUSPN. OF SH SIDE WALL HDRS. SHH.3&3A 2
296 12 1-12-924-01267 0 4 BOILER 3  SUSPN. OF REAR ROOF JUNCTION HDR-SHH 7 2
297 12 1-12-924-01332 1 4 BOILER 3  SUSPN. OF LTSH OUTLET HDR-SHH-10(ROW-R) 2
298 12 0-12-924-08518 2 4 BOILER 3 VLH 11/80 WITH NEW BOTTOM ROD & TURN BUCKLE 2
299 12 1-12-927-01327 1 4 BOILER 3  SUSPENSION OF REAR ROOF TUBES(ROW-V) 2
300 12 1-12-928-01269 1 4 BOILER 3  SUSPOREAR WALL ROW-Z 2
301 12 2-12-944-02543 0 4 BOILER 3  SUSPN. OF SHH 11 (ROW-D1) 2
302 12 2-12-944-02544 0 4 BOILER 3  SUSPN. OF SHH 12 ( ROW-D2) 2
303 12 0-12-948-01436 1 4 BOILER 3  SUSPN. OF SH.VERT. SP.ASSY ROWS(N&P) 2
304 12 1-12-954-00600 2 4 BOILER 3  HEADER GUIDES SHH-14 2
305 12 1-12-954-01271 0 4 BOILER 3  SUSPN.OF.SHH-13 (ROW-N1) 2
306 12 1-12-954-01272 0 4 BOILER 3  SUSPN.OF.SHH-14HEADERS (ROW-N2) 2
307 12 0-12-968-01441 1 4 BOILER 3  SUSPN. OF PLN.COILS AND RADIANT ROOF(ROW D&E) 2
308 12 3-12-852-08080 1 3 SITE HYDRO TEST PIPE 2
309 15 0-15-274-00199 0 4 BOILER 3  RH.OUTLET HEADER (RHH-2) 2
310 15 0-15-274-00200 2 4 BOILER 3  RH.OUTLET HEADER (RHH-3) 2
311 17 3-12-924-08518 2 4 BOILER 3  VLH 11/80 WITH NEW BOTTOM ROD & TURN BUCKLE 2
312 17 1-17-904-00131 2 4 BOILER 3  HDR.GUIDES 2
313 17 2-17-904-00801 0 4 BOILER 3  SUSPN.OF RHH2 AND RHH3 (ROW J1,J2) 2
314 17 2-17-904-00827 0 4 BOILER 3  SUSPENSION OF RHH-1(ROW - F1) 2
315 17 3-17-904-01045 0 4 BOILER 3  VLH SA 08/80 WITH NEW BOTTOM TIE ROD & TURN BUCKLE 2
316 17 0-17-919-00202 3 4 BOILER 3  SUSPN. OF RH FRT. SPCD. ASSY. ROW:F&G 2
317 17 0-17-929-00203 0 4 BOILER 3  SUSPN. OF RH REAR ASSY. ROW: J&K 2
318 18 1-18-001-00190 0 4 BOILER 3  FURNACE ROOF SKIN CASING (BOM) 2
319 18 0-18-001-00137 4 4 BOILER 3  FURN.ROOF SKIN CASING 2
320 18 0-18-001-00138 1 4 BOILER 3  FURN.ROOF SKIN CASING 2
321 18 0-18-001-00139 1 4 BOILER 3  FURN.ROOF SKIN CASING 2
322 18 0-18-001-00140 0 4 BOILER 3  FURN.ROOF SKIN CASING 2
323 18 1-18-001-00110 0 4 BOILER 3  FURN.ROOF SKIN CASING 2
324 18 0-18-010-00134 3 4 BOILER 3  FURN.ROOF SKIN CASING 2
325 18 0-18-010-00135 1 4 BOILER 3  FURNACE ROOF SKIN CASING 2
326 18 0-18-010-00136 1 4 BOILER 3  FURN.ROOF SKIN CASING 2
327 18 1-18-010-00191 0 4 BOILER 3  FURNACE ROOF SKIN CASING PR. PARTS ATTACHMENTS 2
328 18 1-18-020-00103 1 4 BOILER 3  VIBRATION SNUBBERS 2
329 19 0-19-701-00383 0 4 BOILER 3  ECO. INLET HEADER "EH-01" 2
330 19 0-19-753-00869 0 4 BOILER 3  ECO.INTERMEDIATE HEADER (REAR) 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
331 19 0-19-763-00870 0 4 BOILER 3  ECO. INTERMEDIATE HEADER (FRONT) 2
332 19 0-19-783-00868 0 4 BOILER 3  ECO. INTERMEDIATE HEADER 2
333 19 1-19-850-01993 0 4 BOILER 3  ECONOMISER FEED PIPE 2
334 19 1-19-851-01700 0 4 BOILER 3  ECO LINKS TO DRUM 2
335 19 1-19-904-01837 1 4 20.07.11 BOILER 3 20.07.11  SUSPENSIONS OF ECO. OUTLET HEADER 2
336 19 1-19-904-01838 1 4 20.07.11 BOILER 3 20.07.11  SUSPENSIONS OF ECO. HANGER TUBES (ROW S,U&W) 2
337 19 3-19-904-03464 0 4 20.07.11 BOILER 3 20.07.11  SUSPENSION OF ECO. HANGER TUBE (ACCESS) 2
338 19 1-19-906-01849 0 4 09.09.11 BOILER 3 09.09.11 ECO. CONN. LINKS SUSPN. (ROW-C&J1) 2
339 19 1-19-907-02287 0 4 17.10.11 BOILER 3 17.10.11 ECO FEED PIPE SUPPORT FW-1 2
340 19 4-19-907-06589 0 4 17.10.11 BOILER 3 17.10.11 LOAD MOVEMENT CHART 2
341 19 1-19-850-02333 3 BOILER 3 ECO. FEED PIPE
342 21 2-21-600-00080 1 4 17.10.11 BOILER 3 17.10.11 GENERAL ERECTION NOTES
343 21 2-21-600-00136 0 4 17.10.11 BOILER 3 17.10.11 CONDENSING LOOP ASSY -AS
344 21 2-21-600-00137 0 4 17.10.11 BOILER 3 17.10.11 INSPEC "S PR. GAUGE ASSY - AS
345 21 3-21-600-00029 4 4 17.10.11 BOILER 3 17.10.11 SUPPORT FOR LRSB
346 21 4-21-600-00173 0 4 17.10.11 BOILER 3 17.10.11 DETAIL OF SOCKET WELDING
347 21 2-21-601-00098 2 4 17.10.11 BOILER 3 17.10.11 TEMP. PROBE SUPPORT
348 21 3-21-601-00204 0 4 17.10.11 BOILER 3 17.10.11 SUPPORT FOR SAFETY VALVE
349 21 3-21-601-00242 2 4 17.10.11 BOILER 3 17.10.11 PIPE SADDLE 1
350 21 3-21-601-00243 2 4 17.10.11 BOILER 3 17.10.11 PIPE SADDLE 2
351 21 3-21-601-00244 2 4 17.10.11 BOILER 3 17.10.11 PIPE SADLE NB-80
352 21 3-21-601-00254 0 4 17.10.11 BOILER 3 17.10.11 PIPE GUIDE 2
353 21 3-21-601-00255 2 4 17.10.11 BOILER 3 17.10.11 PIPE ANCHOR 2
354 21 3-21-601-00260 2 4 17.10.11 BOILER 3 17.10.11 SINGLE TIE ROD HANGER 2
355 21 3-21-601-00572 1 4 17.10.11 BOILER 3 17.10.11 GUIDE FOR S.V. EXHAUST PIPE D166.5
356 21 3-21-601-00583 2 4 17.10.11 BOILER 3 17.10.11 SINGLE TIE ROD HANGER 2 WITH SCA
357 21 3-21-601-00590 1 4 17.10.11 BOILER 3 17.10.11 FIXED SUPPORT FOR SV EXHAUST PIPE D166.5
358 24 3-24-000-01573 1 4 10.08.11 BOILER 3 10.08.11 recentrecent 2
359 32 3-32-010-00054 3 4 09.09.11 BOILER 3 09.09.11 DRUM END DOOR COVER 2
360 35 0-35-110-08605 3 4 BOILER 3  WPI COLUMN MFG.& WELD DETAILS 2
361 35 0-35-110-11107 1 4 BOILER 3  COLUMNS ASSEMBLY S6L&R,S7L&R,S8L&R,S9L&R,S10L&R 2
362 35 0-35-130-11108 1 4 BOILER 3  COLUMN ASSEMBLY S11,S12,S13&S16 2
363 35 1-35-140-06373 1 4 BOILER 3  BOX COLUMN MFG.& WELD DETAIL 2
364 35 0-35-140-11112 1 4 BOILER 3  COLUMNS ASSEMBLY S1L&R,S2L&R,S3L&R,S4L&R,S5L&R 2
365 35 3-35-110-00995 3 4 BOILER 3  PRODUCTION NOTES 2
366 35 0-35-160-11109 0 4 BOILER 3  AIR HEATER COLUMNS S14 & S15 2
367 35 0-35-160-11111 0 4 BOILER 3  COLUMNS ASSY LC1,LC2,LC3,LC4 2
368 35 1-35-160-09111 0 4 BOILER 3  AIR HEATER COLUMN S17,S18 (L&R) 2
369 35 1-35-190-09078 0 4 BOILER 3  GIRDER PIN CONNECTION COLUMNS S7(L&R) , S8(L&R) & S9(L&R) 2
370 35 0-35-210-11014 1 4 BOILER 3  CEILING STRUCTURE WELDED BEAM-1 2
371 35 0-35-210-11015 1 4 BOILER 3  CEILING STRUCTURE WELDED BEAM-2 2
372 35 0-35-210-11016 1 4 BOILER 3  CEILING STRUCTURE WELDED BEAM-3 2
373 35 0-35-210-11017 0 4 BOILER 3  CEILING STRUCTURE ASSEMBLY-1 PASS 2
374 35 0-35-210-11018 0 4 BOILER 3  CEILING STRUCTURE ASSEMBLY-2 PASS 2
375 35 0-35-210-11019 0 4 BOILER 3  CEILING GIRDER-B 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
376 35 0-35-210-11020 0 4 BOILER 3  CEILING GIRDER-C 2
377 35 0-35-210-11021 0 4 BOILER 3  CEILING GIRDER-D 2
378 35 1-35-210-09034 0 4 BOILER 3  CEILING STRUCTURE WELDED BEAM-4 2
379 35 1-35-210-09035 0 4 BOILER 3  CEILING GIRDER-A 2
380 35 1-35-210-09036 0 4 BOILER 3  CEILING GIRDER-B (DETAILS) 2
381 35 1-35-210-09037 0 4 BOILER 3  CEILING GIRDER-C (DETAILS) 2
382 35 1-35-210-09038 0 4 BOILER 3  CEILING GIRDER-D (DETAILS) 2
383 35 1-35-210-09039 0 4 BOILER 3  CEILING GIRDER-E 2
384 35 1-35-210-09040 0 4 BOILER 3  DRUM SUPPORT BEAM 2
385 35 0-35-220-11022 0 4 BOILER 3  CEILING STRUCTURE ROLLED BEAM 2
386 35 2-35-220-01210 0 4 BOILER 3  TYPE DRAWINGS 2
387 35 0-35-230-11023 0 4 BOILER 3  CEILING BRACING (DETAIL) 2
388 35 0-35-230-11024 0 4 BOILER 3  CEILING BRACING 2
389 35 0-35-310-11460 0 4 BOILER 3  HOR. TRUSS WORK AT +7.000M 2
390 35 0-35-310-11461 0 4 BOILER 3  HOR. TRUSS WORK AT +7.000M (DETAILS) 2
391 35 0-35-320-11316 1 4 BOILER 3  HORIZONTAL BRACING @ 16.500M 2
392 35 0-35-320-11317 0 4 BOILER 3  HORIZONTAL BRACING @ 16.500M DETAILS 2
393 35 0-35-330-11401 0 4 BOILER 3  HORIZONTAL TRUSS WORK AT +25.725M 2
394 35 0-35-330-11402 0 4 BOILER 3  HORIZONTAL TRUSS WORK AT +25.725M (DETAIL) 2
395 35 0-35-340-11490 0 4 BOILER 3  HORIZONTAL BRACING AT +36.800M 2
396 35 0-35-340-11491 0 4 BOILER 3  HORIZONTAL BRACING AT + 36.800M (DETAILS) 2
397 35 0-35-350-11508 0 4 BOILER 3  HOR.BRACING AT 43.725M (T.O.S) 2
398 35 1-35-350-10079 0 4 BOILER 3  HOR.BRACING AT 43.725M (T.O.S) DETAIL 2
399 35 0-35-360-11560 0 4 BOILER 3  HORIZONTAL BRACING AT +52.975M (T.O.S.) 2
400 35 0-35-360-11561 0 4 BOILER 3  HORIZONTAL BRACING AT +52 .975M (T.O.S.) DETAILS 2
401 35 0-35-380-11513 0 4 BOILER 3  LANDING PLATFORM AT +7.000M (T.O.F) 2
402 35 0-35-380-11514 0 4 BOILER 3  LANDING PLATFORM AT +28.250M & +30.000M (T.O.F) 2
403 35 0-35-380-11527 0 4 BOILER 3  LANDING PLATFORMS AT +22.900M (T.O.F) 2
404 35 0-35-380-11528 0 4 BOILER 3  LANDING PLATFORMS AT +36.800M (T.O.F) 2
405 35 0-35-380-11529 0 4 BOILER 3  LANDING PLATFORMS AT +43.750M (T.O.F) 2
406 35 1-35-380-10093 0 4 BOILER 3  LANDING PLATFORM AT +2.500M & +4.000M (T.O.F) 2
407 35 1-35-380-10094 0 4 BOILER 3  LANDING PLATFORM AT +10.000M & +13.500M (T.O.F) 2
408 35 1-35-380-10095 0 4 BOILER 3  LANDING PLATFORM AT +40.550M (T.O.F) 2
409 35 1-35-380-10096 0 4 BOILER 3  LANDING PLATFORM AT +46.700M (T.O.F) 2
410 35 1-35-380-10097 0 4 BOILER 3  LANDING PLATFORM AT +57.000M (T.O.F) 2
411 35 1-35-380-10111 0 4 BOILER 3  LANDING PLATFORMS AT +16.500M (T.O.F) 2
412 35 1-35-380-10114 0 4 BOILER 3  LANDING PLATFORMS AT +19.800M(T.O.F) 2
413 35 1-35-380-10115 0 4 BOILER 3  LANDING PLATFORMS AT +25.750M (T.O.F) 2
414 35 1-35-380-10116 0 4 BOILER 3  LANDING PLATFORMS AT +33.050M(T.O.F) 2
415 35 2-35-380-10572 0 4 BOILER 3  LANDING PLATFORM AT +49.800M (T.O.F) 2
416 35 2-35-380-10574 0 4 BOILER 3  LANDING PLATFORMS AT +53.000M&+59.850M (T.O.F) 2
417 35 0-35-390-11713 0 4 BOILER 3  FLOOR AT +57.000M & 56.300M 2
418 35 0-35-390-11714 0 4 BOILER 3  FLOOR AT +57.000M & 56.300M (DETAILS) 2
419 35 2-35-390-11121 0 4 BOILER 3  STAIR 2
420 35 2-35-390-11122 0 4 BOILER 3  DRUM FLOOR AT +57.000M 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
421 35 2-35-390-11123 0 4 BOILER 3  DRUM FLOOR AT +57.000M 2
422 35 2-35-390-11124 0 4 BOILER 3  DRUM FLOOR AT +57.000M 2
423 35 1-35-441-09182 0 4 BOILER 3  ASSEMBLY B.O.M 2
424 35 1-35-441-09183 0 4 BOILER 3  FRAME S1L&R - S2L&R - S3L&R - S4L&R - S5L&R 2
425 35 1-35-441-09184 0 4 BOILER 3  FRAME S1L-S6L-S11-S6R-S1R 2
426 35 1-35-441-09185 0 4 BOILER 3  FRAME S2L-S7L-S7R-S2R 2
427 35 1-35-441-09186 0 4 BOILER 3  FRAME S3L-S8L-S8R-S3R 2
428 35 1-35-441-09187 0 4 BOILER 3  FRAME S4L-S9L-S13-S9R-S4R 2
429 35 1-35-441-09188 0 4 BOILER 3  FRAME S5L-S10L-S16-S10R-S5R 2
430 35 1-35-441-09189 0 4 BOILER 3  FRAME S6L&R-S7L&R-S8L&R-S9L&R-S10L&R 2
431 35 1-35-441-09190 0 4 BOILER 3  FRAME S11-S12-S13-S14-S15-S16 2
432 35 0-35-443-11578 0 4 BOILER 3  FRAME S1L-S6L-S11-S6R-S1R 2
433 35 0-35-443-11579 0 4 BOILER 3  FRAME S2L-S7L-S7R-S2R 2
434 35 0-35-443-11580 0 4 BOILER 3  FRAME S3L-S8L-S8R-S3R 2
435 35 0-35-443-11581 0 4 BOILER 3  FRAME S4L-S9L-S13-S9R-S4R 2
436 35 0-35-443-11582 0 4 BOILER 3  FRAME S5L-S10L-S16-S10R-S5R 2
437 35 0-35-443-11583 0 4 BOILER 3  FRAME S1-S2-S3-S4-S5 (L&R) 2
438 35 0-35-443-11584 0 4 BOILER 3  FRAME S6-S7-S8-S9-S10 (L&R) 2
439 35 0-35-443-11585 0 4 BOILER 3  FRAME S11-S12-S13-S14-S15-S16 2
440 35 1-35-443-10279 0 4 BOILER 3  ASSEMBLY B.O.M 2
441 35 0-35-521-11223 0 4 BOILER 3  GUSSET PLATE DETAILS FOR SIDE BREACING LOWER 2
442 35 1-35-511-05699 4 4 BOILER 3  WELDED VBRACING PRODUCTION & ERECTION NOTES 2
443 35 1-35-511-09286 0 4 BOILER 3  FRAME S1L-S6L-S11-S6R-S1R 2
444 35 2-35-511-09066 0 4 BOILER 3  GUSSET PLATE DETAILS FOR FRONT BRACING LOWER 2
445 35 0-35-513-11586 0 4 BOILER 3  FRAME S1L -S6L-S11-S6R-S1R 2
446 35 1-35-521-09281 0 4 BOILER 3  FRAME S6L&R-S7L&R-S8L&R-S9L&R-SIOL&R 2
447 35 1-35-521-09282 0 4 BOILER 3  FRAME S11-S12-S13-S14-S15-S16 2
448 35 0-35-523-11576 0 4 BOILER 3  FRAME S1-S2-S3-S4-S5 (L&R) 2
449 35 0-35-523-11577 0 4 BOILER 3  FRAME S6-S7-S8-S9-S10 (L&R) 2
450 35 1-35-531-09284 0 4 BOILER 3  FRAME S4L-S9L-S13-S9R-S4R 2
451 35 1-35-531-09285 0 4 BOILER 3  FRAME S5L-S10L-S16-S10R-S5R 2
452 35 1-35-531-09301 0 4 BOILER 3  GUSSET PLATE DETAILS FOR REAR BRACING LOWER 2
453 35 0-35-533-11574 0 4 BOILER 3  FRAME S4L-S9L-S13-S9R-S4R 2
454 35 0-35-533-11575 0 4 BOILER 3  FRAME S5L-S10L-S16-S10R -S5R 2
455 35 1-35-821-09032 0 4 BOILER 3  STAIRS 2
456 35 2-35-823-08739 0 4 BOILER 3  STAIRS 2
457 35 1-35-851-02994 2 4 BOILER 3  FIXING ARRGT. FOR HAND RAILS, POSTS AND GUARD PLATE 2
458 35 1-35-995-02927 0 4 BOILER 3  CHUTE PIPE FOR ERECTION 2
459 35 3-35-995-00693 0 4 BOILER 3  VERTICAL LADDER FOR ERECTION 2
460 35 0-35-311-09136 5 4 BOILER 3  HORI.BRACING PRODUCTION AND ERECTION NOTES 2
461 35 2-35-511-00775 2 4 10.08.11 BOILER 3 STITCH PL. FIXING ARRGT. 2
462 36 0-36-310-11678 0 4 BOILER 3  FLOOR AT +4.500M 2
463 36 0-36-310-11679 0 4 BOILER 3  FLOOR AT +5.200M , +1.250 & +2.000M 2
464 36 0-36-310-11680 0 4 BOILER 3  FLOOR AT +7.000M 2
465 36 0-36-310-11681 0 4 BOILER 3  FLOOR AT +7.000M 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
466 36 0-36-310-11682 0 4 BOILER 3  FLOOR AT +7.000M 2
467 36 0-36-310-11683 0 4 BOILER 3  BRACING AT +7.000M 2
468 36 0-36-310-11684 0 4 BOILER 3  BRACING AT +7.000M 2
469 36 3-36-310-00620 0 4 BOILER 3  ERECTION NOTES 2
470 36 0-36-311-11699 0 4 BOILER 3  FLOOR AT +10.000M (DETAILS) 2
471 36 0-36-311-11700 0 4 BOILER 3  FLOOR AT +12.300M & 12.900M 2
472 36 0-36-311-11701 0 4 BOILER 3  FLOOR AT +10.000M 2
473 36 2-36-311-12524 0 4 BOILER 3  FLOOR AT +10.000M (DETAILS) 2
474 36 0-36-320-11690 0 4 BOILER 3  FLOOR AT EL.16.500M (BEAMS-I PASS) 2
475 36 0-36-320-11691 0 4 BOILER 3  FLOOR AT EL.16.500M (BEAMS-I PASS) (DETAILS) 2
476 36 0-36-320-11692 0 4 BOILER 3  BRACING AT +16.500M (I PASS) 2
477 36 0-36-320-11693 0 4 BOILER 3  BRACING AT EL.16.500M (I-PASS) (DETAILS) 2
478 36 0-36-320-11694 0 4 BOILER 3  FLOOR AT +16.500M (BEAMS-II PASS ) 2
479 36 0-36-320-11695 0 4 BOILER 3  FLOOR AT +16.500M ( BRACING - II PASS) 2
480 36 0-36-321-11761 0 4 BOILER 3  FLOOR AT +19.800M (RHS ONLY) 2
481 36 0-36-321-11762 0 4 BOILER 3  FLOOR AT +19.800M (LHS) 2
482 36 0-36-321-11763 0 4 BOILER 3  FLOOR AT +19.800M (RHS & LHS) 2
483 36 1-36-321-05948 0 4 BOILER 3  FLOOR AT +19.800M (RHS DETAILS) 2
484 36 1-36-321-05949 0 4 BOILER 3  FLOOR AT +19.800M (LHS DETAILS) 2
485 36 1-36-321-05950 0 4 BOILER 3  FLOOR AT +19.800M (POST DETAILS) 2
486 36 1-36-321-05951 0 4 BOILER 3  SHIPLADDER & STAIRCASE AT +19.800M 2
487 36 0-36-322-11809 0 4 BOILER 3  FLOOR AT +22.900M (LHS ONLY) 2
488 36 0-36-322-11810 0 4 BOILER 3  FLOOR AT +22.900M (LHS DETAILS) 2
489 36 0-36-322-11811 0 4 BOILER 3  FLOOR AT +22.900M (RHS DETAILS) 2
490 36 0-36-322-11812 0 4 BOILER 3  FLOOR AT +22.900M (RHS ) 2
491 36 0-36-322-11813 0 4 BOILER 3  FLOOR AT +22.900M (RHS DETAILS) 2
492 36 1-36-322-05960 0 4 BOILER 3  FLOOR AT +22.900M (LHS DETAILS) 2
493 36 0-36-330-11926 0 4 20.07.11 BOILER 3  FLOOR AT +23.600M (T.O.F) 2
494 36 0-36-330-11927 0 4 20.07.11 BOILER 3  FLOOR AT +25.750M (T.O.F) 2
495 36 0-36-330-11928 0 4 20.07.11 BOILER 3  FLOOR AT +26.900M(T.O.F) 2
496 36 2-36-330-14594 0 4 BOILER 3 BEAM AT +25.725M (T.O.S)
497 36 0-36-331-11945 0 4 10.08.11 BOILER 3 FLOOR AT +30.000M (TOE) 2
498 36 0-36-331-11948 0 4 10.08.11 BOILER 3 ASSY BOM 2
499 36 0-36-332-11962 0 4 10.08.11 BOILER 3 FLOOR AT 33.050M (TOF) 2
500 36 1-36-332-06030 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
501 36 3-36-332-01114 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
502 36 0-36-340-11989 0 4 10.08.11 BOILER 3 FLOOR AT 36.800M (TOF) 2
503 36 0-36-340-11990 0 4 10.08.11 BOILER 3 BENCH AT EL. +37.200M(TOF) 2
504 36 1-36-340-06043 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
505 36 1-36-340-06044 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
506 36 0-36-341-12029 0 4 10.08.11 BOILER 3 FLOOR AT 40.55 M (TOF) RHS 2
507 36 0-36-341-12030 0 4 10.08.11 BOILER 3 FLOOR AT 40.55 M (TOF) LHS 2
508 36 1-36-341-06086 0 4 10.08.11 BOILER 3 FLOOR AT +40.550M BOM 2
509 36 0-36-350-12004 0 4 10.08.11 BOILER 3 FLOOR AT 43.750 M (TOF) 2
510 36 0-36-350-12005 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
511 36 0-36-351-12031 0 4 10.08.11 BOILER 3 FLOOR AT +46.700M (TOS +46.675) 2
512 36 1-36-351-06087 0 4 10.08.11 BOILER 3 FLOOR AT +46.700M BOM 2
513 36 0-36-352-12045 0 4 09.09.11 BOILER 3 FLOOR AT +49.800M (TOF) 2
514 36 1-36-352-06093 1 4 09.09.11 BOILER 3 ASSEMBLY BOM 2
515 36 0-36-360-11995 0 4 10.08.11 BOILER 3 FLOOR AT +53.700M (TOF) 2
516 36 0-36-360-11996 0 4 10.08.11 BOILER 3 EXISTING TRUSS WORK AT +53.000M (TOF) 2
517 36 1-36-360-06046 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
518 36 0-36-361-12003 0 4 10.08.11 BOILER 3 FLOOR AT +59.850M (TOF) 2
519 36 1-36-361-06052 0 4 10.08.11 BOILER 3 FLOOR AT +59.000M & 59.200M (TOF) 2
520 36 1-36-361-06054 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
521 36 1-36-361-06055 0 4 10.08.11 BOILER 3 ASSEMBLY BOM 2
522 36 2-36-361-13124 0 4 10.08.11 BOILER 3 FLOOR AT +61.200M (TOF) 2
523 36 0-36-391-12057 0 4 09.09.11 BOILER 3 FLOOR AT +10.000M (TOF) 2
524 36 0-36-391-12058 0 4 09.09.11 BOILER 3 FLOOR AT +16.500M (TOF) 2
525 36 0-36-391-12061 0 4 09.09.11 BOILER 3 MISC FLOOR AT +19.800M (TOF) 2
526 36 0-36-391-12062 0 4 09.09.11 BOILER 3 FLOOR AT +25.750M (TOF) 2
527 36 0-36-391-12070 0 4 09.09.11 BOILER 3 APH ELEMENT HANDLING ARRANGEMENT 2
528 36 0-36-391-12071 0 4 09.09.11 BOILER 3 APH ELEMENT HANDLING ARRANGEMENT 2
529 36 0-36-391-12087 0 4 09.09.11 BOILER 3 POST AND HANGERS 2
530 36 1-36-391-06115 0 4 09.09.11 BOILER 3 LANDING PLATFORM AT +4.00M (TOF) 2
531 36 1-36-391-06116 0 4 09.09.11 BOILER 3 FLOOR AT +16.500M (TOF) 2
532 36 1-36-391-06117 0 4 09.09.11 BOILER 3 HORIZONTAL BEAMS AT +15.075M (TOS) 2
533 36 1-36-391-06134 0 4 09.09.11 BOILER 3 HOR. BEAMS AT +19.800M (TOF) 2
534 36 2-36-391-13405 0 4 09.09.11 BOILER 3 FLOOR AT +16.500M (TOF) 2
535 36 2-36-391-13455 0 4 09.09.11 BOILER 3 HOR. BEAMS AT +25.750 M (TOF) 2
536 36 3-36-391-01568 0 4 09.09.11 BOILER 3 FLOOR AT +7.000M (TOF) 2
537 36 3-36-391-01569 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +22.900M (TOF) 2
538 36 3-36-391-01574 0 4 09.09.11 BOILER 3 FLOOR AT +7.000M (TOF) 2
539 36 1-36-392-06132 0 4 09.09.11 BOILER 3 MISC FLOOR AT +54.900M (TOF) 2
540 36 1-36-392-06135 0 4 09.09.11 BOILER 3 FLOOR AT +59.900M (TOF) 2
541 36 2-36-392-13453 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +55.400M (TOF) 2
542 36 2-36-392-13454 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +53.400M (TOF) 2
543 36 3-36-392-01570 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +30.000 M(TOF) 2
544 36 3-36-392-01571 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +33.050 M(TOF) 2
545 36 3-36-392-01572 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +36.800 M(TOF) 2
546 36 3-36-392-01573 0 4 09.09.11 BOILER 3 MISC. FLOOR AT +49.800 M(TOF) 2
547 36 0-36-610-11966 0 4 10.08.11 BOILER 3 BOILER ROOF PLAN (SHEET-1) 2
548 36 0-36-610-11967 0 4 10.08.11 BOILER 3 BOILER ROOF PLAN (SHEET-2) 2
549 36 0-36-610-11968 0 4 10.08.11 BOILER 3 BOILER ROOF & COMPRESSION FLANGE SUPPORT DETAILS (SH-3) 2
550 36 0-36-610-11969 0 4 10.08.11 BOILER 3 BOILER ROOF DETAILS (SH-4) 2
551 36 1-36-610-06035 0 4 10.08.11 BOILER 3 BOILER ROOF DETAILS 2
552 36 1-36-612-06031 0 4 10.08.11 BOILER 3 GUTTER & DRAIN PIPE ARRANGEMENT OF BOILER 2
553 36 2-36-613-01198 2 4 10.08.11 BOILER 3 DRAIN PIPES, SHOES, SPL BEND & CLAMPS 2
554 36 2-36-613-01199 5 4 10.08.11 BOILER 3 GUTTER & GUTTER END PIECES 2
555 36 2-36-613-01200 1 4 10.08.11 BOILER 3 BRACKET FOR GUTTER & FIXING CHANELS. 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
556 36 0-36-620-12114 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
557 36 0-36-620-12115 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
558 36 0-36-620-12116 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
559 36 0-36-620-12117 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
560 36 0-36-620-12118 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
561 36 0-36-620-12119 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
562 36 0-36-620-12120 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
563 36 0-36-620-12121 0 4 17.09.11 BOILER 3 BOILER SIDE CLADDING STRUCTURE 2
564 36 2-36-740-13967 0 4 09.09.11 BOILER 3 POST AND HANGERS 2
565 36 1-36-820-05556 0 4 BOILER 3  STAIRS 2
566 36 1-36-820-05557 0 4 BOILER 3  VERTICAL LADDERS 2
567 36 1-36-820-05558 0 4 BOILER 3  HOOD LADDERS 2
568 36 2-36-820-09341 0 4 BOILER 3  SHIP LADDERS 2
569 38 0-38-110-02707 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE (RHS ONLY) 2
570 38 1-38-210-01250 0 4 17.09.11 BOILER 3 17.09.11 LIFT INTERCONNECTION PLATFORMS 2
571 38 0-38-310-02733 0 4 17.09.11 BOILER 3 17.09.11 FLOOR AT +4.500M (TOF) 2
572 38 1-38-310-01251 0 4 17.09.11 BOILER 3 17.09.11 FLOOR AT +10.000M (TOF) 2
573 38 1-38-310-01252 0 4 17.09.11 BOILER 3 17.09.11 FLOOR AT +58.000M (TOF) 2
574 38 1-38-310-01267 0 4 17.09.11 BOILER 3 17.09.11 FLOOR AT +47.703M (TOF) 2
575 38 2-38-310-01050 0 4 17.09.11 BOILER 3 17.09.11 FLOOR AT +19.800M (TOF) 2
576 38 1-38-310-01396 0 4 BOILER 3 FLOOR AT +25.750 (T.O.F)
577 38 2-38-410-02750 0 4 17.10.11 BOILER 3 17.10.11 MILL MAINTENANCE PLATFORM AT +3.971M (TOF) 2
578 38 2-38-410-02751 0 4 17.10.11 BOILER 3 17.10.11 MILL MAINTENANCE PLATFORM (DETAILS) 2
579 38 0-38-510-02695 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC1, LC2 2
580 38 0-38-510-02696 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC1, LC2 (DETAILS) 2
581 38 0-38-510-02697 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC1, LC3 & S1R 2
582 38 0-38-510-02698 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC1, LC3 ,LC2,LC3 2
583 38 0-38-510-02699 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC4, LC3 2
584 38 0-38-510-02700 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC4, LC3 2
585 38 0-38-510-02701 0 4 09.09.11 BOILER 3 09.09.11 LIFT STRUCTURE FRAME LC4, LC2 2
586 38 0-38-610-02708 0 4 17.09.11 BOILER 3 17.09.11 ELEVATOR CLADDING STRUCTURE (ASSEMBLY) 2
587 38 1-38-610-01246 0 4 17.09.11 BOILER 3 17.09.11 ELEVATOR CLADDING STRUCTURE (DETAILS) 2
588 38 0-38-710-02709 0 4 09.09.11 BOILER 3 09.09.11 MACHINE ROOM STRUCTURE 2
589 38 0-38-710-02710 0 4 09.09.11 BOILER 3 09.09.11 MACHINE ROOM STRUCTURE (DETAILS) 2
590 38 0-38-299-02794 0 4 05.03.2012 BOILER 3 05.03.12 MILL HANDLING STRUCTURE AT +11.000M (DET) 2
591 38 0-38-299-02795 0 4 05.03.2012 BOILER 3 05.03.12 MILL HANDLING STRUCTURE AT +11.000M 2
592 38 2-38-299-01180 0 4 05.03.2012 BOILER 3 05.03.12 MILL HANDLING STRUCTURE AT +11.000M (DETAIL) 2
593 39 4-39-012-00435 0 4 BOILER 3  DUCT SUPPORT PEDESTAL DETAILS 2
594 39 0-39-101-06412 0 4 09.09.11 BOILER 3 09.09.11 COLUMNS P-ROW 2
595 39 0-39-101-06410 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P1-P2-P3-P4-P5-P6-P7-P8-P9 2
596 39 1-39-101-10211 0 4 09.09.11 BOILER 3 09.09.11 ASSEMBLY BOM 2
597 39 1-39-101-10212 0 4 09.09.11 BOILER 3 09.09.11 COLUMNS Q-ROW 2
598 39 0-39-102-04844 6 4 14.11.11 BOILER 3 14.11.11 ID SYSTEM BEAMS & BRACINGS PRODUCTION NOTES. 2
599 39 1-39-102-10175 0 4 09.09.11 BOILER 3 09.09.11 FRAMES Q3-Q4-Q5-Q6-Q7 2
600 39 1-39-102-10210 0 4 09.09.11 BOILER 3 09.09.11 ASSEMBLY BOM 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
601 39 2-39-102-08237 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P3-Q3 2
602 39 2-39-102-08238 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P4-Q4 2
603 39 2-39-102-08239 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P5-Q5 2
604 39 2-39-102-08240 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P6-Q6 2
605 39 2-39-102-08241 0 4 09.09.11 BOILER 3 09.09.11 FRAMES P7-Q7 2
606 39 0-39-140-06359 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R2-R3-R4-R5-R6 2
607 39 0-39-140-06360 0 4 10.08.11 BOILER 3 10.08.11 FRAMES T2-T3-T4-T5-T6 2
608 39 0-39-140-06361 0 4 10.08.11 BOILER 3 10.08.11 FRAMES U1-U2-U3-U4-U5-U6-U7 2
609 39 0-39-140-06362 0 4 10.08.11 BOILER 3 10.08.11 FRAMES V1-V2-V3-V4-V5-V6-V7 2
610 39 0-39-140-06363 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R2-T2-U2-V2 2
611 39 0-39-140-06364 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R3-T3-U3-V3 2
612 39 0-39-140-06365 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R4-T4-U4-V4 2
613 39 0-39-140-06366 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R5-T5-U5-V5 2
614 39 0-39-140-06367 0 4 10.08.11 BOILER 3 10.08.11 FRAMES R6-T6-U6-V6 2
615 39 0-39-140-06370 0 4 10.08.11 BOILER 3 10.08.11 COLUMNS R-ROW 2
616 39 0-39-140-06371 0 4 10.08.11 BOILER 3 10.08.11 COLUMNS T-ROW 2
617 39 0-39-140-06372 0 4 10.08.11 BOILER 3 10.08.11 COLUMNS U-ROW 2
618 39 0-39-140-06373 0 4 10.08.11 BOILER 3 10.08.11 COLUMNS V-ROW 2
619 39 1-39-140-09749 0 4 10.08.11 BOILER 3 10.08.11 FRAMES U1-V1 2
620 39 1-39-140-09750 0 4 10.08.11 BOILER 3 10.08.11 FRAMES U7-V7 2
621 39 1-39-140-09751 0 4 10.08.11 BOILER 3 10.08.11 ASSEMBLY BOM 2
622 39 1-39-140-09754 0 4 10.08.11 BOILER 3 10.08.11 ASSEMBLY BOM 2
623 39 0-39-150-06375 0 4 10.08.11 BOILER 3 10.08.11 FRAMES W1-X1, W2-X2, X1-X2, W1-W2 2
624 39 0-39-300-06549 0 4 BOILER 3 FLOOR AT +13.250M(T.O.F)
625 39 0-39-300-06550 1 4 BOILER 3 FLOOR AT +16.450M(T.O.F)
626 39 1-39-300-10843 1 4 BOILER 3 FLOOR AT +12.000M(T.O.F)
627 39 1-39-300-10936 0 4 BOILER 3 FLOOR AT +49.800M(T.O.F)
628 39 1-39-300-10972 0 4 BOILER 3 FLOOR AT +16.000M(T.O.F)
629 39 1-39-300-10973 0 4 BOILER 3 VERTICAL LADDER AND BENCH
630 39 3-39-300-00740 0 4 BOILER 3 FLOOR AT +4.000M (T.O.F)
631 39 3-39-300-00764 0 4 BOILER 3 FLOOR AT +8.000M (T.O.F)
632 39 1-39-301-03767 0 4 17.09.11 BOILER 3 17.09.11 FIXING ARRGT. OF HANDRAIL, POSTS & G.PLATE 2
633 39 1-39-301-10256 0 4 17.09.11 BOILER 3 17.09.11 STRUC & PLATFORM FOR FANS (FOR FD,ID & PA FANS) 2
HANDRAIL POST & M.HANDRAIL (FOR GRILL, CHEQD. PL & CONCRETE
634 39 2-39-301-01240 1 4 17.09.11 BOILER 3 17.09.11 2
PLATFORM)
635 39 2-39-301-01241 1 4 17.09.11 BOILER 3 17.09.11 HANDRAIL POST & M.HANDRAIL (FOR CONCRETE STAIRS) 2
636 39 1-39-302-02413 4 4 09.09.11 BOILER 3 09.09.11 HOOD DETAILS FOR HAN MOTOR 2
637 39 0-39-303-06643 0 4 BOILER 3 ID FAN HANDLING ARRANGEMENT AT 17.050M(T.O.S)
638 39 0-39-303-06644 0 4 BOILER 3 ID FAN HANDLING ARRANGEMENT AT 17.050M(T.O.S)
639 39 0-39-303-06646 0 4 BOILER 3 PA & FD FAN HANDLING ARRANGEMENT AT 7.850M (T.O.S)
640 39 0-39-303-06648 0 4 BOILER 3 PA & FD FAN HANDLING ARRANGEMENT AT +9.100M(T.O.S)
641 39 1-39-303-11304 0 4 BOILER 3 ASSEMBLY B.O.M
642 39 1-39-303-11306 0 4 BOILER 3 PA & FD FAN HANDLING ARRANGEMENT AT +7.850M(T.O.S)
643 39 1-39-303-11325 0 4 BOILER 3 PA & FD FAN HANDLING ARRANGEMENT AT +9.1000M(T.O.S)
644 39 1-39-303-11326 0 4 BOILER 3 BEAMS AT +16.450 (T.O.S)
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
645 39 1-39-303-11327 0 4 BOILER 3 SILENCER SUPPORT AT +10.000M (T.O.S)
646 39 2-39-303-09433 0 4 BOILER 3 ASSEMBLY B.O.M
647 39 2-39-303-09479 0 4 BOILER 3 ASSEMBLY B.O.M
648 39 2-39-303-09480 0 4 BOILER 3 BEAMS AT +7.000 (T.O.S)
649 39 2-39-303-09481 0 4 BOILER 3 BEAMS AT +10.000 (T.O.S)
650 39 2-39-303-09482 0 4 BOILER 3 BEAMS AT +16.450 (T.O.S)
651 39 2-39-303-09483 0 4 BOILER 3 ASSEMBLY B.O.M
652 39 0-39-304-06540 0 4 14.11.11 BOILER 3 14.11.11 COLUMNS ASSEMBLY FH5L&R, FH6L&R, FH7L&R, & FH8L&R 2
653 39 1-39-304-10805 0 4 14.11.11 BOILER 3 14.11.11 COLUMNS ASSEMBLY FH1L&R, FH2L&R, FH3L&R, & FH4L&R 2
654 39 0-39-305-06541 0 4 14.11.11 BOILER 3 14.11.11 FRAMES FH1L&R- FH2L&R- FH3L&R- FH4L&R & FH3L&R-FH7L&R 2
655 39 0-39-305-06542 0 4 14.11.11 BOILER 3 14.11.11 FRAMES FH5L&R- FH6L&R- FH7L&R- FH8L&R & FH1L&R-FH5L&R 2
656 39 0-39-305-06543 0 4 14.11.11 BOILER 3 14.11.11 FRAMES FH4L&R- FH8L&R & FH2L&R- FH6L&R 2
657 39 2-39-305-08899 0 4 14.11.11 BOILER 3 14.11.11 ASSEMBLY BOM 2
658 39 3-39-305-00716 0 4 14.11.11 BOILER 3 14.11.11 KEY PLAN FOR FAN HANDLING STRUCTURES 2
659 39 1-39-820-10257 0 4 17.09.11 BOILER 3 17.09.11 STAIRS 2
660 41 4-41-310-00786 2 4 09.09.11 BOILER 3 09.09.11 OIL GUN HYDRO TEST TIP 2
661 41 4-41-350-01166 2 4 09.09.11 BOILER 3 09.09.11 TOOL FOR NOZZLE SLEEVE NUT 2
662 41 4-41-350-01921 0 4 09.09.11 BOILER 3 09.09.11 BOM FOR A.C OIL GUN ASSY. 2
663 41 4-41-390-01780 0 4 09.09.11 BOILER 3 09.09.11 BOM FOR OIL GUN VICE AND RACK 2
664 41 2-41-500-00320 4 4 09.09.11 BOILER 3 09.09.11 HEA IGNITOR INSTALLATION 2
665 42 0-42-000-01944 0 3 17.10.11 BOILER 17.10.11 PIPING, OPERATING FLOOR LFO /AIR 2
666 42 0-42-000-00338 4 3 17.10.11 BOILER 17.10.11 STEAM TRACER ERECTION NOTES (FO SYSTEM) 2
667 42 1-42-001-02106 0 3 14.02.12 BOILER 14.02.12 PNEUMATIC FITTINGS 2
668 42 1-42-005-02136 0 3 14.02.12 BOILER 14.02.12 INSTRUMENT FITTINGS 2
669 42 0-42-010-01977 1 3 17.10.11 BOILER 17.10.11 LFO PUMP SET 2
670 42 0-42-020-01981 0 3 17.10.11 BOILER 17.10.11 HFO PUMP SET 2
671 42 0-42-030-01943 0 3 17.10.11 BOILER 17.10.11 HFO HEATER SET 40 SQM (2 NOS)1233 2
672 42 1-42-070-02116 0 3 BOILER PIPING - OIL BURNER FITTINGS 2
673 42 1-42-070-02117 0 3 BOILER OIL BURNER ASSY - HFO & LFO (SKID MOUNTING) 2
674 42 1-42-070-02118 0 3 BOILER OIL BURNER ASSY - HFO (SKID MOUNTING) 2
PIPING-PUMP HOUSE
675 42 0-42-120-02005 1 3 14.02.12 BOILER 14.02.12 2
(PUMP HOUSE LAYOUT & SUPPORT DETAILS)
676 42 0-42-150-01972 0 3 17.10.11 BOILER 17.10.11 PIPING- OPERATING FLOOR HFO AND TRACER STEAM 2
677 42 0-42-154-01979 0 3 14.11.11 BOILER 14.11.11 PIPING, OPERATING FLOOR DRAIN OIL SYSTEM. 2
678 42 0-42-158-01945 0 3 17.10.11 BOILER 17.10.11 PIPING, OPERATING FLOOR STEAM /IBR 2
679 42 4-42-005-02589 1 SEAL POT ERECTION NOTES
680 42 4-42-002-03958 0 STEAM BLOWING MATERIALS
681 42 4-42-992-03959 0 SUMMARY LIST OF SITE ELECTRODES
682 42 4-42-992-03960 0 ERECTION WELDING MANUAL (NPP)
683 42 4-42-992-03961 0 ERECTION WELDING MANUAL (NPP)
684 42 2-42-070-02102 0 3 07.02.13 SHIPPING FRAME FOR BURNER TRIP SKID ASSLY 2
685 42 3-42-900-00035 0 3 07.02.13 LIFTING EYE NB50 2
686 43 0-43-000-00522 0 4 17.10.11 BOILER 3 17.10.11 SCANNER-GUN AIR SYSTEM
687 45 0-45-220-01260 0 4 20.07.11 BOILER 3 20.07.11  T T BURNERS ASSY 2
688 45 3-45-000-00601 0 4 20.07.11 BOILER 3 20.07.11  TILT MECH ASSY 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
689 45 0-45-221-01298 0 4 09.09.11 BOILER 3 09.09.11 WB SUPPTS AND ACTUATOR MOUTGS 2
690 45 1-45-221-00830 1 4 09.09.11 BOILER 3 09.09.11 SEAL BOX (FOR WIND BOX) 2
691 45 1-45-221-01193 0 4 09.09.11 BOILER 3 09.09.11 WB DAMPER DRIVE MOUTG DETAILS 2
692 45 1-45-221-01340 0 4 09.09.11 BOILER 3 09.09.11 BURNER TILT DRIVE MOUNTING DETAILS 2
693 47 0-47-221-02075 0 4 17.10.11 BOILER 3 17.10.11 PULVERISED COAL PIPE LOADING PLAN
694 47 0-47-221-02340 0 4 17.10.11 BOILER 3 17.10.11 FUEL PIPE SUPPORTS
695 47 3-47-001-00647 0 4 17.10.11 BOILER 3 17.10.11 SUPPORT
696 47 3-47-221-01522 0 4 17.10.11 BOILER 3 17.10.11 LOAD MOVEMENT CHART
697 48 0-48-207-35356 0 4 10.08.11 BOILER 3 10.08.11 AIR FOIL ASSEMBLY 2510 (W)X4010(H)X2820(L) 2
698 48 0-48-999-33149 1 4 BOILER 3  RCEJ - FULL SIZE - SDU - 2 STYLE #01,#02 2
699 48 0-48-999-33150 1 4 20.07.11 BOILER 3 20.07.11  RCEJ - FULL SIZE - SDU -3 STYLE #01,#02 2
700 48 0-48-999-33152 2 4 10.08.11 BOILER 3 10.08.11  RCEJ - FULL SIZE - SDU -2 STYLE #04,#06 2
701 48 0-48-999-33153 1 4 20.07.11 BOILER 3 20.07.11  RCEJ - FULL SIZE - SDU -3 STYLE #04,#06 2
702 48 0-48-999-33154 1 4 10.08.11 BOILER 3 10.08.11  RCEJ - HS- SDU -1 STYLE #01,#02,#04, #06 2
703 48 0-48-999-33155 1 4 10.08.11 BOILER 3 10.08.11  RCEJ - HS- SDU -2 STYLE #01,#02,#04, #06 2
704 48 0-48-999-33156 1 4 20.07.11 BOILER 3 20.07.11  RCEJ - HS- SDU -3 STYLE #01,#02,#04, #06 2
705 48 0-48-999-33157 1 4 BOILER 3  RCEJ - FULL SIZE - MDU - 2 STYLE #01,#02 2
706 48 0-48-999-33158 2 4 20.07.11 BOILER 3 20.07.11  RCEJ - FULL SIZE - MDU -2 STYLE #04,#06 2
707 48 2-48-141-42566 1 4 10.08.11 BOILER 3 10.08.11 TYPICAL SEAL AIR LINE FOR HOT AIR GATES 2
708 48 4-48-200-60292 0 BOILER 3 TAPING POINTS ON DUCTS
SOFT
SOFT COPY
709 48 2-48-499-51392 2 CHIMNEY WALL FRAME COPY
RECEIVED
ISSUE
710 48 0-48-466-33279 3 PLATFORM FOR GATES
711 52 2-52-000-02434 3 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL SEAL STRAIGHT EDGE ASSY
712 52 3-52-000-01184 4 2 12.12.11 BOILER DEPT 2 12.12.11 JACKING PROCEDURES
713 52 3-52-000-01278 0 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT. OF HYDRAULIC LIFTING CYLINDER (75T)
714 52 4-52-000-02906 5 2 12.12.11 BOILER DEPT 2 12.12.11 ITEMS PER CONTRACT
715 52 0-52-010-01249 1 2 12.12.11 BOILER DEPT 2 12.12.11 MODULE ASSY
716 52 0-52-010-01250 1 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR ASSEMBLY
717 52 2-52-010-02128 2 2 12.12.11 BOILER DEPT 2 12.12.11 MOUDLE LIFTING ARRGT
718 52 0-52-011-01109 3 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR POST, TRUNNION & SPOOL ASSY.
719 52 2-52-012-02121 1 2 12.12.11 BOILER DEPT 2 12.12.11 PIN RACK ASSY
720 52 0-52-013-01257 4 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL SEAL ASSY
721 52 4-52-013-00718 4 2 12.12.11 BOILER DEPT 2 12.12.11 SEAL GAUGE (RADIAL)
722 52 2-52-024-02141 0 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT OF BASKETED COLD END HEATING BASKETS
723 52 2-52-025-02130 3 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT OF HOT & HOT INTER BASKETED HEATING ELEMENTS
724 52 0-52-030-01526 2 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR HOUSING ASSY
725 52 0-52-041-01122 5 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE ASSEMBLY (HE)
726 52 0-52-041-01123 5 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE CENTRE SECTION (HE)
727 52 1-52-041-00846 4 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE DUCT BRACING
728 52 1-52-041-01315 4 2 12.12.11 BOILER DEPT 2 12.12.11 BY-PASS SEAL ANGLE ASSEMBLY (HE)
729 52 1-52-041-01342 5 2 12.12.11 BOILER DEPT 2 12.12.11 STATIC SEAL ASSEMBLY (HOT END)
730 52 1-52-041-01391 3 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE MAIN ASSEMBLY (HE)
731 52 3-52-041-01411 0 2 12.12.11 BOILER DEPT 2 12.12.11 ERECTION NOTES
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
732 52 0-52-042-00743 4 2 12.12.11 BOILER DEPT 2 12.12.11 STATIC SEAL ASSEMBLY (COLD END)
733 52 0-52-042-01059 2 2 12.12.11 BOILER DEPT 2 12.12.11 CENTER SECTION ASSY(C.E)
734 52 0-52-042-01331 2 2 12.12.11 BOILER DEPT 2 12.12.11 CONNECTING PLATE ASSY. (72 DEGREE COLD END)
735 52 1-52-042-01841 0 2 12.12.11 BOILER DEPT 2 12.12.11 CONN. PL SECTOR PL STATIC SEAL ASSY (CE)
736 52 2-52-042-02146 2 2 12.12.11 BOILER DEPT 2 12.12.11 BYPASS SEAL BAR ASSY
737 52 1-52-047-00295 9 2 12.12.11 BOILER DEPT 2 12.12.11 HOT END STATIONARY SPOOL SEAL ASSY.
738 52 1-52-054-01410 3 2 12.12.11 BOILER DEPT 2 12.12.11 AXIAL SEAL ASSY
739 52 2-52-055-01151 5 2 12.12.11 BOILER DEPT 2 12.12.11 BYPASS SEAL ASSY
740 52 1-52-100-01935 1 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR DRIVE ASSEMBLY
741 52 4-52-210-03030 1 2 12.12.11 BOILER DEPT 2 12.12.11 ACCESS DOOR ASSY
742 52 1-52-211-01491 4 2 12.12.11 BOILER DEPT 2 12.12.11 SUGGESTEDAIR SEALING LAYOUT FOR AIR PREHEATER
743 52 1-52-212-02318 0 2 12.12.11 BOILER DEPT 2 12.12.11 OBSERVATION PORT AND LIGHT ASSY
744 52 1-52-217-02041 2 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR STOPPAGE ALARM ASSY (INT BRG)
745 52 0-52-220-00434 1 2 12.12.11 BOILER DEPT 2 12.12.11 CENTRELINE PROCEDURES
746 52 1-52-220-00899 4 2 12.12.11 BOILER DEPT 2 12.12.11 SEAL INSTYALLATION AND SETTING
747 52 1-52-220-01950 1 2 12.12.11 BOILER DEPT 2 12.12.11 ARRANGEMENT OF SERVICING BEAM
748 52 1-52-220-02355 1 2 12.12.11 BOILER DEPT 2 12.12.11 GA OF AIR PREHEATER 27.5 VIMT 2000
749 52 2-52-220-01000 8 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL SEAL STRAIGHT EDGE ASSY
750 52 2-52-220-01147 6 2 12.12.11 BOILER DEPT 2 12.12.11 PLATFORM SUPPORT (APH GUIDE BEARING)
751 52 2-52-220-01286 1 2 12.12.11 BOILER DEPT 2 12.12.11 SEAL SETTING PROCEDURE
752 52 3-52-220-02000 0 2 12.12.11 BOILER DEPT 2 12.12.11 OIL CARRY OVER DETECTOR
753 52 3-52-220-02250 1 2 12.12.11 BOILER DEPT 2 12.12.11 GAD NOTES FOR AIR PREHEATER 27.5 VIMT 2000
754 52 3-52-220-02310 0 2 12.12.11 BOILER DEPT 2 12.12.11 NAME PLATE FOR AIR PREHEATER
755 52 4-52-220-03638 0 2 12.12.11 BOILER DEPT 2 12.12.11 GENERAL DETAILS
756 52 0-52-261-01030 4 2 12.12.11 BOILER DEPT 2 12.12.11 GUIDE BEARING ASSEMBLY
757 52 2-52-261-01704 0 2 12.12.11 BOILER DEPT 2 12.12.11 ERECTION NOTES
758 52 0-52-262-01113 2 2 12.12.11 BOILER DEPT 2 12.12.11 SUPPORT BEARING ASSEMBLY
759 52 0-52-271-01064 7 2 12.12.11 BOILER DEPT 2 12.12.11 LUB. OIL PIPING ASSY (S.BERG) WITH STAND BY
760 52 1-52-272-01311 7 2 12.12.11 BOILER DEPT 2 12.12.11 LUB. OIL PIPE ASSY (S.BERG) WITH STAND BY
761 52 3-52-272-01891 1 2 12.12.11 BOILER DEPT 2 12.12.11 OIL DRAIN ASSY (S.Brg)
762 52 1-52-301-00750 10 2 12.12.11 BOILER DEPT 2 12.12.11 DELUGE AND WASH PIPE ASSEMBLY (HOT END)
763 52 1-52-302-00751 12 2 12.12.11 BOILER DEPT 2 12.12.11 DELUGE AND WASH PIPE ASSEMBLY (COLD END)
764 52 0-52-326-00018 6 2 12.12.11 BOILER DEPT 2 12.12.11 ARRANGEMENT OF SOOT BLOWER LIMIT SWITCHES
765 52 1-52-326-01905 2 2 12.12.11 BOILER DEPT 2 12.12.11 TWIN NOZZLE CLEANING DEVICE ARRGT (C.E)
766 52 0-52-329-01609 0 2 12.12.11 BOILER DEPT 2 12.12.11 CLEANING DEVICE ASSY.
767 52 2-52-329-03062 0 2 12.12.11 BOILER DEPT 2 12.12.11 CLEANING EQUIPMENT DRIVE UNIT
768 52 3-52-329-01025 1 2 12.12.11 BOILER DEPT 2 12.12.11 CAM AND LINK SETTING DETAIL
769 52 2-52-360-02188 2 2 12.12.11 BOILER DEPT 2 12.12.11 FIRE SENSING DEVICE ASSY.
770 52 4-79-580-00893 2 12.12.11 BOILER DEPT 2 12.12.11 GROUP OF COLUMNS FOR TEMPLATES
771 55 1-55-011-01255 3 FD FAN FOUNDATION MATERIAL
772 55 1-55-031-01426 2 PA FAN ASSY. (PAF-17/11.8-2)
773 55 0-55-214-00867 3 IMPELLER HUB ASSY.
774 55 3-55-214-01018 0 STOPPER PLATE ASSY.
775 55 0-55-214-00995 1 FD FAN ASSY. (FAF 17-9.5-1)
776 55 0-55-214-00834 6 SUCTION CHAMBER ASSY.
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
777 55 0-55-214-00833 2 DIFFUSER ASSY.
778 55 0-55-214-00639 5 PROCEDURE FOR NON-SHRINK GROUTING & SHIMING
779 55 0-55-214-00868 1 SHAFT WITH BEARING ASSY.
780 55 1-55-214-01160 0 INTERMEDIATE SHAFT COVER
781 55 1-55-214-00988 1 BLADE BEARING ASSY.
782 55 1-55-214-00987 0 HYDRAULIC SUPPORT
783 55 1-55-214-00982 1 ACTUATOR FRAME ASSY (WITH FOUNDATION BOLT & PACKER)
784 55 0-55-214-00841 6 HOUSING ASSY.
785 55 0-55-214-00842 4 HOUSING ASSY. DETAILS
786 55 0-55-214-00853 3 SHETTING SHAFT ASSY.
787 55 0-55-214-00866 7 ROTOR ASSY (FAF 17/905-1)
788 55 2-55-214-00819 3 VIBRATION PICKUP PAD
789 55 3-55-214-01006 0 EXPANSION BAND (VAR 01&02)
790 55 0-55-334-01172 0 PA FAN ASSY. (PAF-17/11.8-2)
791 55 0-55-334-00938 1 SETTING SHAFT ASSY. (PAF 17/11.82)
792 55 0-55-334-00922 5 ROTOR ASSY(+10%) (PAF-17/11.8-2)
793 55 3-55-334-01146 0 STOPPER PLATE ASSY. (PAF-17/11.8-2)
794 55 1-55-334-01097 0 BLADE SHAFT BEARING ASSY.
795 55 2-55-334-01344 1 ACTUATOR FRAME ASSY (WITH FOUNDATION BOLT & PACKER)
796 55 2-55-334-00986 0 BLADE & ACCESSORIES
797 55 1-55-911-00794 2 ACOUSTIC INSULATION (200 mm THICK)
798 55 1-55-931-01098 2 ROOF WITH LUGS
799 55 1-55-931-01558 0 TRANSITION DUCT
800 55 2-55-931-01021 2 TRANSITION PIECE
801 55 2-55-931-01024 1 SUCTION HOOD ASSY
802 55 2-55-931-01511 0 SPACER DUCT
803 55 2-55-931-01512 0 SILENCER ASSY
804 55 3-55-930-01816 0 WIRING DIAGRAM FOR 20 LPM AT 35 BAR LUBE OIL SYSTEM FOR PA FAN
805 55 3-55-930-01815 0 PIPING LAYOUT FOR 15 LPM AT 35 BAR LUBE SYSTEM FOR PA FAN
806 55 3-55-930-01814 0 WIRING DIAGRAM FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR FD FAN
807 55 3-55-930-01813 0 PIPING LAYOUT FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR FD FAN
808 55 3-55-810-01730 0 SPACE COUPLING FOR FD FAN (80Q/500)
809 55 3-55-830-01719 0 SPACE COUPLING FOR PA FAN (80Q/501)
810 55 1-55-911-01581 0 SILENCER ASSY (FAF 17/9.5/1)
811 55 1-55-911-00662 3 ACOUSTIC INSULATION (50 mm THICK)
812 55 1-55-930-01754 0 P&I DIGRAM FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR PA FAN
813 55 1-55-910-01751 0 GA DWR FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR FD FAN
814 55 2-55-930-01753 0 GA DWR FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR PA FAN
815 55 2-55-911-01093 1 SPACER DUCT
816 55 0-55-000-01013 0 MOUNTING & DIS MOUNTING OF FD FAN FAF 17-9, 5-1
817 55 0-55-000-00964 1 MOUNTING & DIS MOUNTING OF PA FAN
818 55 2-55-910-01752 0 P&I DIGRAM FOR 15 LPM AT 35 BAR LUBE OIL SYSTEM FOR FD FAN
819 56 0-56-226-02430 1 2 12.12.11 BOILER DEPT 2 12.12.11 BEARING PEDESTAL ASSEMBLY
820 56 0-56-226-02445 3 2 12.12.11 BOILER DEPT 2 12.12.11 SPIRAL CASING ASSY
821 56 0-56-227-02631 0 2 12.12.11 BOILER DEPT 2 12.12.11 ROTOR ASSY
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
822 56 0-56-227-02632 1 2 12.12.11 BOILER DEPT 2 12.12.11 RADIAL FAN ASSY
823 56 0-56-227-02633 0 2 12.12.11 BOILER DEPT 2 12.12.11 SECTIONAL ASSY (NDZV 33SIDOR)
824 56 1-56-227-02899 1 2 12.12.11 BOILER DEPT 2 12.12.11 8-FLAP DAMPER CONTROL ASSEMBLY
825 56 1-56-227-03346 0 2 12.12.11 BOILER DEPT 2 12.12.11 EXPANSION PILLOW BLOCK BEARING - 8" RTL
826 56 1-56-227-03347 0 2 12.12.11 BOILER DEPT 2 12.12.11 NON EXPANSION PILLOW BLOCK BEARING - 8" RTL
827 56 2-56-000-03223 1 2 12.12.11 BOILER DEPT 2 12.12.11 DAMPER LINK ASSY.
828 56 2-56-226-01846 0 2 12.12.11 BOILER DEPT 2 12.12.11 DAMPER CONTROL ASSY. - DETAILS
829 56 2-56-226-03249 0 2 12.12.11 BOILER DEPT 2 12.12.11 SEALING FOR IMPELLER
830 56 3-56-226-03889 0 2 12.12.11 BOILER DEPT 2 12.12.11 ARRGT OF SHIMS & PACKERS
831 56 3-56-227-04565 1 2 12.12.11 BOILER DEPT 2 12.12.11 SUPORT FOR ACTUATOR
832 56 3-56-870-05207 0 PIN BUSH COUPLING SIZE PB 160
833 56 3-56-920-05179 0 WIRING FOR 20 LPM AT 5 BAR LUBE OIL SYSTEM FOR ID FAN
834 56 3-56-920-05178 0 PIPING LAYOUT FOR 20 LPM AT 5 BAR LUBE SYSTEM FOR ID FAN
835 56 3-56-820-05131 0 TERMINAL PLAN FOR 1210 SVNL 21-22.5
836 56 3-56-820-05130 0 FUNCTION AND MEASURING POINTS DIAGRAM FOR 1210 SVNL 21-22.5
837 56 3-56-820-05129 0 WORKING OIL COOLER DUPLEX (H)
ARRAMGEMENT DRAWING FOR VARIBLE SPEED HYDRAULIC COUPLING TYPE
838 56 3-56-820-05128 0
1210 SVNL 21-22.5
ARRAMGEMENT PLAN FOR VARIBLE SPEED HYDRAULIC COUPLING TYPE 1210
839 56 3-56-820-05126 0
SVNL 21-22.5
840 56 3-56-820-04964 1 BASE PLATE AND HYDRAULIC COUPLING
841 56 3-56-820-04014 1 BASE PLATE
842 56 3-56-810-01616 2 COUPLING GUARD
843 56 1-56-911-03585 2 SILENCER
844 56 1-56-171-02714 2 RADIAL FAN ASSY
845 56 1-56-911-03584 0 ROOF WITH LUGS
846 56 2-56-920-05061 0 GA DWR FOR 20 LPM AT 5 BAR LUBE OIL SYSTEM FOR ID FAN
847 56 2-56-911-03510 2 TRANSITION PIECE
848 56 2-56-911-03511 0 SUCTION HOOD ASSY.
849 56 2-56-000-03422 0 PILLER ASSY.
850 56 2-56-171-02512 1 ROTOR ASSY
851 56 1-55-911-01587 0 TRANSITION DUCT
852 56 1-56-171-02708 2 3-FLAP DAMPER CONTROL ASSEMBLY
853 56 0-56-171-02264 1 SECTIONAL ASSY NDV 11.8 (N TYPE)
854 56 0-56-171-02256 4 SPIRAL CASING ASSY.
855 57 0-57-010-01711 0 G.GATE (HT= 6359) (3000X2200(S))
856 57 0-57-030-01712 0 G.GATE (HT= 4459) (2600X1250(S))
857 57 0-57-110-01713 0 G.GATE (HT= 7658) (2200X2700(S))
858 57 0-57-460-01714 0 G.GATE (HT= 7559) (2800X2800(S))
859 57 0-57-470-01715 0 G.GATE (HT= 7559) (2800X2800(S))
860 57 0-57-480-01716 0 G.GATE (HT= 10508) (3800X4125(S))
861 57 0-57-490-01717 0 G.GATE (HT= 10508) (3800X4125(S))
862 57 0-57-113-01703 0 LOUVER DAMPER ASSY.(2200X2700BL)(RH)
863 57 0-57-203-01705 0 LOUVER DAMPER ASSY.(3500X4000BL)(RH)
864 57 0-57-223-01706 0 LOUVER DAMPER ASSY.(2500X2500BL)(RH)
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
865 57 0-57-223-01707 0 LOUVER DAMPER ASSY.(2500X2500BL)(RH)
866 57 0-57-383-01709 0 LOUVER DAMPER ASSY.(7200X3100BL)(RH)
867 57 0-57-433-01710 0 LOUVER DAMPER ASSY.(7200X3100BL)(RH)
868 57 0-57-023-01702 0 CONTROL DAMPER ASSY. (1250X2600BL)(RH)
869 57 0-57-273-01708 0 CONTROL DAMPER ASSY. (1250X2000BL)(RH)
870 57 3-57-193-07578 0 LEVER-1
871 57 3-57-270-14558 0 THROAT SUPPORT
872 57 0-57-270-01719 0 A.GATE HT= 5234 ASSY(200X1250(S))
873 57 2-57-999-07578 0 KEY PLAN AND TEST DATA SHEET
874 57 4-57-209-05096 0 SUPPORT FOR AIRCYLINDER
875 57 4-57-466-05090 0 LADDER AND PLAT FORM FOR GATES
876 57 1-57-209-01235 0 TYPICAL POWER CYLINDER MOUNTING ARRGT.
877 57 1-57-466-08063 0 LADDER (STROKE=4125; SPROCKET=17.69)
878 57 1-57-466-08062 0 LADDER (STROKE=4125; SPROCKET=17.69)
879 57 1-57-466-08057 0 LADDER (STROKE=2700; SPROCKET=17.69)
880 57 1-57-466-08058 0 LADDER (STROKE=2200; SPROCKET=11.69)
881 57 2-57-466-08061 0 LADDER (STROKE=2800; SPROCKET=11.69)
882 57 2-57-466-08060 0 LADDER (STROKE=2800; SPROCKET=11.69)
883 57 2-57-466-08062 0 P&I DIGRAM FOR 20 LPM AT 5 BAR LUBE OIL SYSTEM FOR ID FAN
884 57 0-57-223-01705 0 2 12.12.11 BOILER DEPT 2 12.12.11 LOUVER DAMPER ASSY. (2500X2500BL)(RH)

885 65 0-65-736-002111 4 BOILER DEPT 3 GRAVIMETRIC FEEDER ASSY

886 65 1-65-000-008928 2 BOILER DEPT 3 36'' GRAVIMETRIC FEEDER ASSY

887 65 2-65-736-00239 3 BOILER DEPT 3 EMERGENCY DISCH. CHUTE ASSY.


888 65 2-65-736-00278 2 BOILER DEPT 3 ARRANGEMENT OF BULL'S EYE GLASS CLEANING
889 65 3-65-000-00992 0 BOILER DEPT 3 ACCESSORIES FOR FEEDER ASSY.
890 65 3-65-736-01014 0 BOILER DEPT 3 36'' GRAVIMETRIC FEEDER ASSY.
891 67 1-67-801-00616 0 4 14.11.11 DEPT 3 14.11.11 DOWN SPOUT ASSY
892 67 1-67-801-00619 0 4 14.11.11 DEPT 3 14.11.11 MAINTENANCE PLATFORM FOR RC GATE (BUNKER OUTLET)
893 67 1-67-803-00620 0 4 14.11.11 DEPT 3 14.11.11 FEED PIPE TO MILL ASSEMBLY
894 67 2-67-803-00444 3 4 14.11.11 DEPT 3 14.11.11 INSTALLATION OF NOZZLE IN FEED PIPE
895 67 0-67-802-00283 0 4 05.03.12 BOILET 3 05.03.12 BURNER EMPTYING CHUTE ASSY 2
896 67 0-67-283-00144 5 BOILET 3 FEEDER OUTLET ISO. GATE
897 67 1-67-283-00091 7 BOILET 3 AIR CYLINDER ASSY
898 67 1-67-204-00285 3 BOILET 3 NEEDLE GATE ASSY
36'' RAW COAL GATE
899 67 0-67-276-00150 5 BOILET 3
(Chain Operated)
36'' RAW COAL GATE
900 67 0-67-272-00165 7 BOILET 3
(Actuator Operated)
OUTLET GAS DISTRIBUTOR ASSY
901 71 2-71-408-02656 0
(ERECTION DETAIL)
INLET GAS DISTRIBUTOR ASSY
902 71 2-71-408-02657 1
(ERECTION DSTAIL)
903 73 2-73-301-02124 1 SLIDE SUPPORTS FOR ESP
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies
904 75 1-75-419-01285 1 SUSPN. FRAME OF COIL. ELECT. DETAILS
905 78 2-78-466-03378 0 TYPICAL ERECTION DETAILS FOR WATER WASHING SYSTEM
906 78 1-78-148-01728 1 ESP CASING ERECTION DETAILS
907 78 1-78-049-01912 2 ESP CASING SHEEL ERECTION DETAIL

908 79 3-79-001-01227 0 4 20.12.2011 Boiler 3 20.12.2011 ESP SUPPORT BEARING PLATE DIMENSIONS 2

909 79 2-79-013-00700 0 4 20.12.2011 Boiler 3 20.12.2011 EMITTING SYSTEM SUSPENSION 2

910 79 1-79-017-00579 0 4 20.12.2011 Boiler 3 20.12.2011 DRIVE ARRANGEMENT FOR EMITTING RAPPING 2

911 79 1-79-020-00422 3 4 20.12.2011 Boiler 3 20.12.2011 ARRANGEMENT OF COLL ELECTRODES 2

912 79 2-79-023-00661 2 4 20.12.2010 Boiler 3 20.12.2011 FIXING ARRANGEMENT OF DOOR ASSY. 2

913 79 3-79-024-01259 0 4 20.12.2011 Boiler 3 20.12.2011 SHOCK BAR ASSEMBLY - 400 2

914 79 1-79-026-00524 1 4 20.12.2011 Boiler 3 20.12.2011 DRIVE ARRANGEMENT FOR COLLECTING ELECTRODE RAPPING 2

915 79 2-79-065-02931 0 4 20.12.2011 Boiler 3 20.12.2011 LINK CHAIN ERECTION DETAILS ( HOPPER APPROACH PLATFORM) 2

916 79 3-79-068-00660 0 4 20.12.2011 Boiler 3 20.12.2011 ERECTION NOTES ON INSULATION OF ELECTROSTATIC PRECIPITATOR 2

917 79 1-79-068-00528 1 4 20.12.2011 Boiler 3 20.12.2011 INSULATION DETAILS FOR ESP 2

918 79 1-79-501-02334 0 4 20.12.2011 Boiler 3 20.12.2011 SLIDE SUPPORT FOR ESP 2

919 79 0-79-506-01169 0 4 Boiler 3 INSULATOR HOUSING ASSY. 2

920 79 3-79-506-02560 0 4 20.12.2011 Boiler 3 20.12.2011 RAILING ARRANGEMENT 2

921 79 1-79-508-02440 0 4 20.12.2011 Boiler 3 20.12.2011 INLET GAS DISTRIBUTOR ASSY. 2

922 79 1-79-508-02441 0 4 20.12.2011 Boiler 3 20.12.2011 OUTLET GAS DISTRIBUTOR ASSY. 2

923 79 1-79-508-02442 0 4 20.12.2011 Boiler 3 20.12.2011 INLET GAS DISTRIBUTOR AT INLET FUNNEL ASSEMBLY 2

924 79 3-79-508-02349 0 4 20.12.2011 Boiler 3 20.12.2011 GAS DISTRIBUTOR ASSY. 2

925 79 1-79-509-02438 0 4 20.12.2011 Boiler 3 20.12.2011 GD RAPPING MECHANISM 2

926 79 1-79-511-02376 1 4 20.12.2011 Boiler 3 20.12.2011 DEFLECTION PLATE ASSEMBLY 2

927 79 1-79-517-02439 0 4 20.12.2011 Boiler 3 20.12.2011 RAPPING MECHANISM FOR EMITTING ELECTRODE 2

928 79 1-79-519-02616 0 4 20.12.2011 Boiler 3 20.12.2011 SUSPETION ARRANGEMENT FOR COLLECTING ELECTRODE 2
RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies

929 79 1-79-521-02652 0 4 20.12.2011 Boiler 3 20.12.2011 FRAME OF EMITTING SYSTEM 2

930 79 1-79-525-02715 0 4 20.12.2011 Boiler 3 20.12.2011 HOPPER APPROACH PLATFORM (SH 2/2) 2

931 79 1-79-525-02634 0 4 20.12.2011 Boiler 3 20.12.2011 RAPPING MECHANISM FOR COLLECTING ELECTRODES 2

932 79 1-79-525-02635 0 4 20.12.2011 Boiler 3 20.12.2011 RAPPING MECHANISM FOR COLLECTING ERECTION DETAILS 2

933 79 2-79-525-03457 0 4 20.12.2011 Boiler 3 20.12.2011 COMPLETE SHAFT FOR COLL. ERECT. RAPPING MECH. (400 mm PITCH) 2

934 79 2-79-542-03353 0 4 20.12.2011 Boiler 3 20.12.2011 OUTER ROOF OF ESP 2

935 79 1-79-542-02497 0 4 20.12.2011 Boiler 3 20.12.2011 OUTER ROOF OF ESP 2

936 79 0-79-543-01137 0 4 Boiler 3 HOPPER RIDGES 2


937 79 0-79-544-01165 0 4 Boiler 3 HOPPER ASSEMBLY 2

938 79 1-79-546-02499 0 4 20.12.2011 Boiler 3 20.12.2011 INSULATOR SUPPORT PANEL ASSY. 2

939 79 2-79-548-03289 0 4 20.12.2011 Boiler 3 20.12.2011 EP CASING FRAME ASSLY. TP & LR BEAMS 2

940 79 1-79-548-02449 0 4 20.12.2011 Boiler 3 20.12.2011 LONGITUDINAL ROOF BEAM (MIDDLE) 2

941 79 1-79-548-02448 0 4 20.12.2011 Boiler 3 20.12.2011 LONGITUDINAL ROOF BEAM (SIDE) 2

942 79 1-79-548-02450 0 4 20.12.2011 Boiler 3 20.12.2011 EP. CASING FRAME ASSY. 2

943 79 1-79-549-02461 0 4 20.12.2011 Boiler 3 20.12.2011 INLET GD HOUSE ASSEMBLY 2

944 79 1-79-549-02460 0 4 20.12.2011 Boiler 3 20.12.2011 EP. CASING SHELL ASSY. 2

945 79 2-79-550-03320 0 4 20.12.2011 Boiler 3 20.12.2011 EP. FUNNEL ASSY. 2

946 79 1-79-550-02463 0 4 20.12.2011 Boiler 3 20.12.2011 EP. OUTLET FUNNEL 2

947 79 1-79-550-02462 0 4 20.12.2011 Boiler 3 20.12.2011 EP. INTEL FUNNEL 2

948 79 1-79-555-02661 0 4 20.12.2011 Boiler 3 20.12.2011 PENT HOUSE 2

949 79 1-79-555-02662 0 4 20.12.2011 Boiler 3 20.12.2011 PENT HOUSE 2

950 79 1-79-555-02663 0 4 20.12.2011 Boiler 3 20.12.2011 PENT HOUSE 2

951 79 1-79-555-02664 0 4 20.12.2011 Boiler 3 20.12.2011 PENT HOUSE 2

952 79 1-79-555-02665 0 PENT HOUSE


RIV NO OF DATE OF ISSUE No of
SL NO PG DRAWING NO TO WHOM DATE DESCRIPTION
NO COPIES RECEIVED NOS Copies

953 79 2-79-557-03338 0 4 20.12.2011 Boiler 3 20.12.2011 SPLITTERS & GUIDE VANES 2

954 79 2-79-561-03461 0 4 20.12.2011 Boiler 3 20.12.2011 LOCATION OF ESP PG TEST POCKETS 2

955 79 0-79-565-01151 0 4 Boiler 3 HOPPER APPROACH PLATFORM (SH 1/2) 2

956 79 1-76-566-02589 0 4 20.12.2011 Boiler 3 20.12.2011 WATER WASING SYSTEM 2

957 79 4-79-568-00936 0 4 20.12.2011 Boiler 3 20.12.2011 ESP INSULATION FIXING PIN DETAILS 2

958 79 0-79-581-01121 0 4 Boiler 3 ESP SUPPORTING STRUCTURE 2

959 79 2-79-809-01388 0 20.12.2011 Boiler 3 20.12.2011 COMPLETE SHAFT FOR G.D RAPPING 2

960 79 2-79-816-01599 1 4 20.12.2011 Boiler 3 20.12.2011 COMPLETE SHAFT ASSY. FOR ENITTING RAPPING SYSTEM 2

961 79 2-79-825-01482 2 20.12.2011 Boiler 3 20.12.2011 BRACKET ASSY. (400MM PITCH) 2

962 79 2-79-825-01483 0 4 20.12.2011 Boiler 3 20.12.2011 SHOCK BAR GUIDE ASSY. RAPPING SIDE 2

963 79 2-79-825-01487 0 4 20.12.2011 Boiler 3 20.12.2011 SHOCK BAR GUIDE ASSY. NON RAPPING SIDE 2

964 79 1-79-825-01483 0 2 12.12.11 BOILER DEPT 2 12.12.11 SHOCK BAR GUIDE ASSY. RAPPING SIDE
965 79 1-79-026-00528 1 2 12.12.11 BOILER DEPT 2 12.12.11 INSULATION DETAILS FOR ESP
966 79 1-79-565-02715 0 2 12.12.11 BOILER DEPT 2 12.12.11 HOPPER APPROACH PLATFORM (SH 2/2)
967 79 1-79-566-02589 0 2 12.12.11 BOILER DEPT 2 12.12.11 WATER WASHING SYSTEM
968 89 0-89-610-00769 0 GALLERIES & RAILINGS OF ESP (SH 1/3)
969 89 0-89-610-00770 0 GALLERIES & RAILINGS OF ESP (SH 1/2)
970 89 0-89-610-00771 0 ESP GALLERIES AND RAILINGS (SH 3/3)
971 89 1-89-610-00771 0 2 12.12.11 BOILER DEPT 2 12.12.11 ESP GALLERIES AND RAILINGS (SH 3/3)
972 89 1-89-610-00769 0 2 12.12.11 BOILER DEPT 2 12.12.11 ESP GALLERIES AND RAILINGS (SH 1/3)
973 95 2-95-090-01348 3 BOILER DEPT 3 Piping and wiring diagram of pulverizer hot Air Gate 2
974 99 1-99-100-40745 0 BOILER DEPT 3 PA & FD Handling Arrangement 2
975 99 1-99-100-40746 0 BOILER DEPT 3 ID Fan Handling Arragment 2
976 99 2-99-400-40665 0 BOILER DEPT 3 APH element Handling Arragment 2
Date of issue to
B&R
11.01.12
11.01.12

11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
Date of issue to
B&R
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
Date of issue to
B&R

11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
11.01.12
Date of issue to
B&R
Date of issue to
B&R
25.01.12
25.01.12

25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
Date of issue to
B&R
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12

25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
Date of issue to
B&R
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.12
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012

25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012

25.01.2012
25.01.2012
Date of issue to
B&R
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
25.01.2012
07.02.13
Date of issue to
B&R

08.10.11
08.10.11
08.10.11
08.10.11
08.10.11

08.10.11
08.10.11
08.10.11
08.10.11
08.10.11

08.10.11
08.10.11
Date of issue to
B&R
08.10.11
08.10.11

08.10.11
08.10.11
08.10.11
08.10.11

08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
Date of issue to
B&R
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
08.10.11
19.01.12
19.01.12
19.01.12
19.01.12
Date of issue to
B&R
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12

19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
Date of issue to
B&R
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
Date of issue to
B&R
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
19.01.12
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R
Date of issue to
B&R

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

04.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012
Date of issue to
B&R

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

04.01.2012
04.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012
Date of issue to
B&R

20.01.2012

20.01.2012

04.01.2012

20.01.2012

20.01.2012

04.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

20.01.2012

15.03.2012
15.03.2012
15.03.2012

You might also like