SLAB
FLOORING

FM 200 CYL. A B C
10 LBS 7.07 INCHES 13.34 INCHES 17.30 INCHES
C 20 LBS 7.07 INCHES 21.01 INCHES 24.97 INCHES
40 LBS 9.00 INCHES 22.80 INCHES 26.76 INCHES FM-200 DISCHARGE NOZZLE FM-200 DISCHARGE NOZZLE @
70 LBS 9.00 INCHES 34.87 INCHES 38.83 INCHES UNDER RAISED FLR. ROOM SPACE
B 125 LBS 12.75 INCHES 31.97 INCHES 35.93 INCHES
200 LBS 12.75 INCHES 47.5 INCHES 52.75 INCHES
350 LBS 16.00 INCHES 53.14 INCHES 58.36 INCHES SLAB
600 LBS 22.00 INCHES 50.51 INCHES 56.72 INCHES ℄
900 LBS 24.00 INCHES 62.00 INCHES 70.00 INCHES

A
FM-200 CYLINDER DIMENSION
FM-200 SMOKE DETECTOR
@ ROOM SPACE FM-200 SMOKE DETECTOR
UNDER RAISED FLR.
CEILING LINE
USE 4 X 4 SQUARE BACK BOX
R
FOR BELL & HORN STOBE
A E
G L
E E
N A
T S
E
ALARM BELL HORN W/ STROBE
CEILING LINE CEILING LINE CEILING LINE CEILING LINE CEILING LINE

VARIES
STROBE HORN ALARM BELL
CONTROL PANEL
FM 200 CONTROL PANEL
8 8 8
MANUAL PULL SYSTEM ABORT

483

114

120
AEGIS USE 2 X 4 UTILITY BACK BOX
FOR MANUAL & ABORT
MPS ABORT
GROUND LEVEL SECTION-1 SECTION-2 SECTION-3 SECTION-4 SECTION-5
FM-200 PANEL SHOP DRAWING FM-200 DEVICES INSTALLATION DETAILS
CONSTRUCTION DRAWING
APPROVED BY : PROJECT TITLE : DESIGNER: OWNER:
DESIGNED BY: OWNER : REVISIONS: SHEET CONTENTS : PLOT DATE
DRAWN BY : CHECKED BY:
INSTALLATION OF FM 200 FIRE SUPPRESSION FOR SHIMIZU PHILIPPINE CONTRACTOR'S INC.
REV. NO. DATE DESCRIPTION
PROFESSIONAL MECHANICAL ENGINEER SOLVENT STORAGE ROOM
REG NO. PTR NO. RECOMMENDING APPROVAL: APPROVED BY : CHECKED BY: CHECKED BY: AS SHOWN SHEET NO. DWG. NO.
2/3 FP -02
LOCATION :
EXP. DATE. DATE