DRP001-OUF-STA-GMD-Z-000-049 O2 - TRA FOR SCAFFOLDING WORKS Code 04-1 - First Page PDF
DRP001-OUF-STA-GMD-Z-000-049 O2 - TRA FOR SCAFFOLDING WORKS Code 04-1 - First Page PDF
,a o
DUQM REFINERY
SAMSUNG
ENGINEERING Petrofac 6
Subcontractor Document Review Cover Sheet
Project: Duqm Refinery EPC Package 2 - Utitities & Offsites
SUBCONTRACTOR NO : Jt-2037t04-018
Engineering, Procurement & Construction of Tank Works
SUBCONTRACTOR DESCRIPTION :
(fackage TPl, TP2)
SUBCONTRACTOR NAME : S-Tank Al-Alamia LLC.
COMPANY DOCUMENT NUMBER : DRP001-OUF-STA-GMD-Z-000-049 lReV: IOZ
SUBCONTRACTOR DOCUMENT NUMBER : STA-PCS-T-1007-000424 lRev: lOz
DOCUMENT CLASS: 2
DUQM REFINERY
Company Approval Status
Status :
Signed :
Dept
Date
COMMENT STATUS CODE: A-Accepted; B-Accepted With Comments
C-Reviewed with Comments; D-NoComments; E-Rejected
tr INFORMATION ONLY.
ACCEPTED FOR INFORMATION ONLY. WORK MAY PROCEED.
Reviewing Engineer's Full Name (lN BLOCK LETTERS), Sign and Date
Purchaser,sreviewofthisdocumentdoesnotrelieveVendoroftheresponsibilityfor
to proceed does not constitute acceptance of design, detail and calculations, test mefhods or materials developed or selected by the
Vendor and does not relieve the Vendor from full compliance with the Purchase Order or any other obligations, nor detract from iny of
the Purchasels rights.
Au^?one*
NAME: DISCIPLINE:
Smwq)
MAOAq@
PSJV Reviewing Engineer to confirm action re
which is not applicable.
ls this document requrred to be submitted to
,tu src)*rpff: