DOC/PS-EN6150-FM REV01-20

Edited by: oussama esseddik youssari

EN6150 enclosure
Quick settings
guide-Rev01

Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
1 Email: Contact@elec-engineer.net - +213556898238/+213782276734
 ENSURE THAT AT LIST 03 RECTIFIERS ARE
INSTALLED
Date(s): 16/12/2015 Toutes les précautions et mesures de sécurité ont été prises en compte lors de cette opération
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.net
2 - +213556898238/+213782276734
 Entry Pin code «1 »
 Admin level password is «640275 »
Date(s): 16/12/2015 Toutes les précautions et mesures de sécurité ont été prises en compte lors de cette opération
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.net
3 - +213556898238/+213782276734
Wrong Battery Vfloating voltage

THE VALUE SHOULD


BE = 54,96V AT 20C°
FOR 12V/180AH
BATTERIES
CAPACITIES AND
MORE
 ENSURE THAT THE BATTERIES FLOATING VOLTAGE IS
WELL SETTED

Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
4 - +213556898238/+213782276734
Battery capacity Setting:

01 string Battery capacity x


number of set

 ENSURE THAT THE Battery capacity is well setted


following the number & capacity of each string

Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
5 - +213556898238/+213782276734
Battery Charging current

0,1xC10

 ENSURE THAT the battery charging current is


0,1C10

Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
6 - +213556898238/+213782276734
LVD1 Threshold
Should be
enabled and
setted at 45V

 LVD1 related to mains loads (circuit breakers)


should be enabled and setted as above

Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
7 - +213556898238/+213782276734
LVD2 Threshold
Should be
enabled and
setted at 43V

1,8 VPC at 20C°

2000
Cycles
Numbers
 LVD2 related to Battery
disconnection should be enabled
and setted as above
Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
8 - +213556898238/+213782276734
Compensation
voltage per Set
should be setted at:
96mv/C° Starting
from 20C°

 Battery compensation voltage should be setted


minutely as shown above

Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
9 - +213556898238/+213782276734
Equalization
operation should be
Setted at:
VEQU=56,4V
Period depend on
batteries status

 BATTERIES voltage EQUALIZATION SHOULD BE SCHEDULED


FOR 20MIN AT Veq=56,4V

Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
10 - +213556898238/+213782276734
Environnement
settings should not
be Changed

 Fans speed & aircon temerature levels should not be


changed

Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
11 - +213556898238/+213782276734
 Ensure that the rectifier output voltage (system
voltage) is not less than 54,5v
Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
12 - +213556898238/+213782276734
(1-7PL)
Priority Loads
CB’s

 Priority load should be feeded from CB’s located on


the extreme right of the dcdu
Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
13 - +213556898238/+213782276734
Swap 02 CB’s
16A with
2x25A

 Install 2 x25A CB’s on the priority loads to allow


future mpls router power supply
Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
14 - +213556898238/+213782276734
Edited by: oussama esseddik youssari

merci

Date(s): 16/12/2015
All the values and adjustments proposed in this document are derived from the equipment manufacturer's datasheet
Carried out by GEOCOM : Aouili Ahmed
Email: Contact@elec-engineer.com
15 - +213556898238/+213782276734

You might also like