1. ALL DIMENSIONS ARE IN MILLIMETER.
2 ± 0.00 M FFL CORRESPONDS TO +899.14 MSL.
TERMINAL 2
±0.00 M FFL CORRESPONDS TO ARRIVAL LEVEL (LEVEL-0)
L 3. THIS DRAWING TO BE READ AND NOT TO BE SCALED Bangalore
4. REFER TO GENERAL SHEETS FOR ABBREVIATIONS,
LEGEND OF SYMBOLS, AND MATERIAL KEYNOTES, International Airport
AND TYPICAL MOUNTING HEIGHTS.
5. THIS DRAWING SHALL BE READ IN CONJUCTION WITH
ALL RELEVANT ARCHITECTURAL, STRUCTURAL AND
SERVICES DRAWINGS. ANY DISCREPANCY NOTICED
SHALL BE BROUGHT TO THE ATTENTION OF THE
CONSULTANTS WITHIN 7 WORKING DAYS OF OWNER
E48 E49 E50 E51 E52 E53 E54 E55 RECEIVING THE DRAWINGS, PRIOR TO PROCUREMENT
/ EXECUTION OF WORKS.
6. ALL DIMENSIONS SHALL BE VERIFIED ON SITE PRIOR TO
START OF WORK AND ANY DISCREPANCY SHALL BE
BROUGHT TO THE NOTICE OF THE EDRC ARCHITECT.
9000 9000 9000 9000 9150 8750 11950
7. ALL WALL/CEILING/FLOOR PENETRATION FOR DUCTS, Bangalore International Airport Limited
PIPES, WIRES, CONDUITS AND GROUPED CONBINATIONS
THEREOF ARE TO BE FIRE STOPPED WITH THE Project Office
APPROPRIATE TESTED AND APPROVED FIRE STOPPING Kempegowda International
K SEE: 1 / SEE: 1 / SEE: 1 / SEE: 1 / SYSTEM TO MATCH THE RATING Airport Bengaluru
KIA-B03-L&T-A_ KIA-B03-L&T-A_ KIA-B03-L&T-A_ KIA-B03-L&T-A_ OF THE FLOOR THROUGH WHICH THEY ARE PENTRATING Devanahalli, Bangalore 560 300 India
WD-L1-DWG-1160 WD-L1-DWG-1170 WD-L1-DWG-1170 WD-L1-DWG-1180 8. ALL SHAFT ENCLOSURE WALL TO BE CONSTRUCTED AFTER
THE INSTALLATION OF RELATED SERVICE EQUIPMENT.
MATCHLINE MATCHLINE MATCHLINE MATCHLINE 9. PROVIDE HOUSEKEEPING PADS AT UTILITY ROOMS AS PER LEAD CONSULTANT
JANITOR'S 50MM GAP BETWEEN CIRCULATION FIRERESISTANCE RATING FOR THE INTENDED SPACE
MEN'S TOILETS FACADE & BLOCK WORK (TYP.) ARUP LTD. BNP Associate s
CLOSET 13. REFER FIINSHING SCHEDULE DWG NO.
1370 3700 4000 4040 1715 77 Water Street P.O. Box 32746
KIA-B03-L&T-A_WD-XX-DWG-7501 to 7507 FIINSHING New York, NY 10005 Abu Dhabi, UAE
J
TAG MARKED IN ENLARGED DETAIL DWG. LIGHTING CONSULTANT LANDSCAPE
695
BPI Grant Associates
350
275 P12 GENERAL NOTES.
N1 15. CONTROL JOINS TO BE PROVIDED PER SPECIFICATIONS 302 5th Ave, 12th FL 22 Milk Street
595
1665 700 570 2650 2190 700 200 P6 P6
2 16. REFER TO FIREPROOFING DRAWINGS FOR THE New York, NY 10001 Bath, UK BA1 1UT
P7
1645
1T71-12 32 m²
775
2171-2 1T71-11 14 m² TYPES AND EXTENTS OF APPLIED FIREPROOFING. IT / SECURITY / PA / FAS SIGNAGE / WAYFINDING
870
1T61-17B 1T71-04A
3120
P12 6 7 TELECOM. RM 17. REFER TO LANDSCAPING DRAWINGS,
MECHANICAL 2171-3 MBII MSD
3470
P6 FOR GARDEN DETAILS.
4060
EQUIP. CLOSET 44 Mobile Drive 2 Young Place
4285
3260 2235 4415 2040 1T71-12A REFER EXPANSION P6 18. REFER TO LANDSCAPING DRAWINGS FOR Toronto, ON M4A 2P2 East Kilbride, GLA G75 0TD
JOINT DETAILS (TYP.)
5 5740 P6 150 P6 FORECOURT PAVING LAYOUT
1T61-17A
300
310 19. EXACT LOCATION OF SLEEVE DETAILS IN RC WALLS
2300 1100 300 1900 1150 800 3740
1365 1000 570 P6 P6 REFER STRUCTURAL DRAWING.
P12
3950
275 P6 1T71-11A 300 20. ALL DIMENSIONS FOR THE DOORS ARE ACTUAL DOOR OPENING WITHOUT
P1 P6
1T71-13A
2171-1 1T71-05 7 m² ANY SEALANTS / FINISH.
1100
P12 6 5
555 P6
2300
1905
CHASE P6 21. DOOR FRAME TO BE FLUSHED WITH EXTERIOR FINISH. BIAL DESIGN
P12 4 INTERFACE DETAIL BETWEEN ESCALATOR 2171-5 2171-3 P6 22. REFER LINTEL DETAILS & R.C. MULLIONS & TRANSOM AS PER CHECKED BY APPROVED BY
500
750
450
AND STAIRCASE WILL BE 1T71-16 26 m²
900
STRUCTURAL DRAWINGS- KIA-B03-L&T-C_NU-XX-
940
7 150 500
4415
I ISSUED AS SEPERATE DRAWING MAITENANCE/ 1 2 DWG-3000,3001,3002,3003,3004,3005
ROP 1100
11950
1150
STORAGE 4 P6 2171-3
1 23.THIS DRAWINGS TO BE READ IN CONJUCTION WITH RESPECTIVE MEP
4325
4005
900
700
2650 3090
1T71-05A P6
1T71-10A
2171-2 1T75-59 5 m²
300
6
1630
DRAWING/SHOP DRAWING.
1100
2171-2 P6 INTERFACE DETAIL BETWEEN ESCALATOR
2171-1
1T71-14A
ELEVATOR AND STAIRCASE WILL BE 24. ALL DIMENSIONS FROM TOP OF STRUCTURAL SLAB LEVEL. ARCHITECTS & ENGINEERS:
1050
3 4
950
875
1T71-16B
3000
SHAFT ISSUED AS SEPERATE DRAWING 25. ALL OPENINGS TO BE REVIEWED AND COORNDINATED WITH VENDOR GFC
2171-3 1T71-13 32 m² Engineering Design and Research Center (EDRC),
P12 3 P6 ELECTRICAL SHOP DRAWINGS. L&T Construction - Buildings & Factories.
1100
735 570 26. VHT OPENING TO BE REVIEWED AND COORNDINATED WITH VENDOR
P1 2560 700 3530 5470 2495 1100 CLOSET
P6 2 715 1910 1700 2800 1995 2835
1770
P12 P6 5 1T71-02 37 m²
SHOP DRAWINGS. DESIGN BY DRAWN BY CHECKED BY APPROVED BY
810
4305
1005
1710 2171-1 2171-2 EGRESS 1 2171-4
1T71-10 23 m² 28. 1st BLOCK WORK COURSE SHALL BE FULL COURSE STARTING FROM SSL.
P12 CORRIDOR
4780
1155
4065
2 4030 1T71-14 12 m² P6
700
SSK GOPI DG DG
30. SLAB INDICATES CONCRETE SLAB / DECK SLAB AS PER STRUCTURE.
505
3660
CLOSET
3565
3180
P6 SERVICE
3035
3015
31. FOR DECK SLAB LEVEL AND STEEL STRUCTURE REFER STRUCTURAL
175
1T71-03A STORAGE
P6 STEEL DRAWINGS.
150
1010 1630 P6 32. FHC & FEC SHALL BE COORDINATED AS PER VENDOR DETAIL
P12 P6 P6
900
900
465 P6
660 735
1T71-03 12 m² 700 2195 33. 20MM STRUCTURAL TOLERANCE WITH SEALANT / FIRE SEALANT
N2 P7 WHEREVER APPLICABLE.
1780
1T71-08A
275
CHASE 300
660
H KEYPLAN
755
P7 34. ALL CUT-OUTS SHOWN IN TOILET AREA ARE INDICATIVE AND SHALL BE AS
1115
1T71-18B
1510
P7 PER APPROVED TOILET SHOP DWG'S
1480
1010
1T71-09A FEC 35. REQUIRED OPENINGS FOR FAS CABLING TO BE COORDINATE AS PER
1T71-02A REFER EXPANSION
JOINT DETAILS
T00 T10 T20 T30 T40 T50 T60 T70 T80
FEC P6
275
260
P7 P7 P7 DRAWINGS
1530 570 P7 350
400 100 300 150 100 500 P7 36. IN HORIZONTAL TRANSOM WHERE EVER ITS CONNECTING TO STEEL T01 T11 T21 T31 T41 T51 T61 T71 T81
150 2590 2650 3260 8460 540 3665 635 6070 2100 530 1370 3700 1900 400 3740
P12 4 MEMBER, THE REBAR OF THE TRANSOM SHOULD BE PROPERLY WELDED
80 150 150 300
P7 1T71-15 10 m² 4700 150 ACCORDINGLY T02 T12 T22 T32 T42 T52 T62 T72 T82
150 2171-4
3950
1 6
7 8 3 CHASE
T03 T13 T23 T33 T43 T53 T63 T83
2171-1 2171-5 2171-2 P7 T73
2171-1 2171-2
5500
8750
400
2171-4 FEC
2171-5
HATCH LEGEND T06 T16 T26 T36 T46 T56 T66 T76 T86
P6
SERVICE RECESSED FOR COORDINATION WITH
2 STRUCTURES & MEP
T07 T17 T27 T37 T47 T57 T67 T77 T87
3285
G
2171-5
1T71-24B
1740
P7 2171-4
N3 1T71-24 26 m²
BLOCK WALL SEAL & SIGNATURE
405
MAITENANCE/
1765
1850
1100
ISSUED FOR
1T71-24A
STORAGE
3 DOUBLE HEIGHT AREA
2171-4 SHOP DRAWING SUBMISSION.
3890
7
P7 TOP OF LEVEL 3 - RETAIL
2171-4 CHECKED BY SIGN DATE CHECKED BY SIGN DATE
5 P6 ARCHITECTURE FPS
950 900 950
6900
3215
EARTH CIVIL & STRUCTURAL PIPING
2171-5 ELECTRICAL PHE
P7 ROP 1100 ELV SYSTEM AIRPORT SYSTEM
650 BLOCK WORK SHOWN INDICATIVELY
HVAC VHT
1T75-60 5 m²
2375
F P6 P7
P6
ELEVATOR
1200
SHAFT Revision Schedule
FHC
635
3
R.C. MULLIONS Revision Revision Revision
2171-5 Number Description Date
1370
Issued by Issued to
N4 P7 P6
735
P7
ISSUED FOR
890 810 3515 2710 2800 2115
0 APPROVAL
24.12. L&T BIAL
WALL LEGEND
P7 2019
ISSUED FOR
P7 4 P7 Wall Tag Description 1 APPROVAL
07.01. L&T BIAL
2171-5 2020
ISSUED FOR
P1 23-13 21 11 13 - 200mm 2 GFC
16.01. L&T BIAL
THK CMU WALL UPTO 2020
SLAB NON FIRE RATED
9000
E P6 23-13 21 11 15 - 200mm
THK AAC WALL UPTO
SLAB/DECK SLAB. (2HR
FIRE RATED)
P7 23-13 21 11 15 - 200mm
THK AAC WALL UPTO
SLAB. (NON FIRE RATED)
P12 23-13 21 11 13 - 150mm
N5 THK CMU WALL UPTO
SLAB NON FIRE RATED
REVISION HISTORY - 2
D
1.REVISED AS PER STRUCTURAL
REQUIREMENT
1T71-E-01
9000
EXT-ST-06 28 m²
(0-3)
STAIRCASE
C N6
SEE: 1 / SEE: 1 /
KIA-B03-L&T-A_ KIA-B03-L&T-A_
WD-L1-DWG-1161 WD-L1-DWG-1181
MATCHLINE MATCHLINE
DRAWING TITLE
LEVEL 1 - ARRIVAL
MEZZANINE- PART PLAN 71
BLOCK WORK SETTING OUT
A PLAN
DRAWING NUMBER