To: Zeeshan Subhani Subject: FW: RELAMPING REQUIRED
From: PM&S Supervisor <pms@engro.com>
Sent: Monday, July 20, 2020 2:15 AM To: Amna Afzaal <aafzaal@engro.com>; Muhammad Rafay Usman <mrusman@engro.com> Cc: Sheeraz Hussain Syed <shsyed@engro.com>; PM&SOPS_EFERTDHK <PM&SOPS_EFERTDHK@engro.com>; Asim Jamil <ajamil@engro.com> Subject: RELAMPING REQUIRED
Dear sir, During evening audit conducted on out of order lights, please plan to re-lamp of the below-mentioned area.
1. CO-501 gallery and head end side 06 each relamping required.
2. CO-506 gallery side 02 each relamping required. 3. CO-502 gallery side 06 each relamping required. 4. CO-507 gallery side 02 each relamping required. 5. CO-508 gallery side 02 each relamping required. 6. CO-512 gallery side 03 each relamping required. 7. CO-513 gallery side 02 each relamping required. 8. CO-504 gallery side 02 each relamping required. 9. CO-524 gallery side 02 each relamping required. BR, QAMAR ZAMAN KHAN