From: PM&S Supervisor

Sent: Thursday, July 23, 2020 12:25 PM


To: Zeeshan Subhani
Subject: FW: RELAMPING REQUIRED

From: PM&S Supervisor <pms@engro.com>


Sent: Monday, July 20, 2020 2:15 AM
To: Amna Afzaal <aafzaal@engro.com>; Muhammad Rafay Usman <mrusman@engro.com>
Cc: Sheeraz Hussain Syed <shsyed@engro.com>; PM&SOPS_EFERTDHK
<PM&SOPS_EFERTDHK@engro.com>; Asim Jamil <ajamil@engro.com>
Subject: RELAMPING REQUIRED

Dear sir,
During evening audit conducted on out of order lights, please plan to re-lamp of
the
below-mentioned area.

1. CO-501 gallery and head end side 06 each relamping required.


2. CO-506 gallery side 02 each relamping required.
3. CO-502 gallery side 06 each relamping required.
4. CO-507 gallery side 02 each relamping required.
5. CO-508 gallery side 02 each relamping required.
6. CO-512 gallery side 03 each relamping required.
7. CO-513 gallery side 02 each relamping required.
8. CO-504 gallery side 02 each relamping required.
9. CO-524 gallery side 02 each relamping required.