This water filling report documents the filling of a pipeline with water. It provides details of the project name, section details, chainage, pipeline volume, pipe specifications, start and completion times of water filling, and records of water meter readings and volumes filled at different stages including initial flushing, pig launching, and final volume. The report is signed off by the contractor, TPI, and approved by the PMC/client to verify the water filling process.
This water filling report documents the filling of a pipeline with water. It provides details of the project name, section details, chainage, pipeline volume, pipe specifications, start and completion times of water filling, and records of water meter readings and volumes filled at different stages including initial flushing, pig launching, and final volume. The report is signed off by the contractor, TPI, and approved by the PMC/client to verify the water filling process.
This water filling report documents the filling of a pipeline with water. It provides details of the project name, section details, chainage, pipeline volume, pipe specifications, start and completion times of water filling, and records of water meter readings and volumes filled at different stages including initial flushing, pig launching, and final volume. The report is signed off by the contractor, TPI, and approved by the PMC/client to verify the water filling process.
2. Section Details : Weather : 3. Chainage : 4. Section Length with Header : 5. Pipeline Volume : 6. Pipe Size & Specifications : 7. Water filling started : 8. Water filling completed : 9. Water filling record : WATER METER FILLING TIME (Hrs) Sr. No. DATE READING (M3) VOLUME OF WATER FILLED (M3) CUMULATIVE WATER VOLUME (M3) FROM TO INITIAL FINAL Water for flushing the pipe line
Ist Pig Launching
Final water volume
NOTE: Suitable Corrosion Inhibiter Shall be used.
Contractor TPI Approved By PMC/ Client
Sign Name Date
Rev A.-12.07.2019 Torrent GAS CGD Project Page 1 of 1