Table 1: Master Schedule: Description of Work QTY Unit WT% Months Total Cost Date Start Date Finish No of Days
Table 1: Master Schedule: Description of Work QTY Unit WT% Months Total Cost Date Start Date Finish No of Days
Months
TOTAL DATE DATE NO OF
DESCRIPTION OF WORK QTY UNIT WT %
COST START FINISH Days
1 2 3 4 5 6 7 8 9 10 11 12
I CIVIL WORK
II STRUCTURAL
A RSB WORK
B FORM WORK
C CONCRETE
D STRUCTURAL STEEL
III ARCHITECTURAL
IV PLUMBING
V FIRE PROTECTION
VI ELECTRICAL
VII HVAC
PLANNED (%)
ACTUAL (%)
SLIPPAGE (&)
ORGANIZED CONSTRUCTION ACTIVITIES
Acvitity Preceding
Construction Activity Quantity Unit Remarks
No. Activity
Note: 1. Dependent means the suceeding activity cannot start unless the preceding activity is completed
2. Suceeding floor levels shall be added after Activity 10.3
RSB Work
MANPOWER ALLOCATION
Quantity Work Parameter Mhr**
Description of Activity Mhr* Days
kgs (assumed) Days x 8hr
Footing and Columns 10 #DIV/0! 0
Footing Tie-Beams 14 #DIV/0! 0
Columns - Ground Floor 0 #DIV/0! 0
Ground Slab 0 #DIV/0! 0
Floor Beams (2nd Floor) 0 #DIV/0! 0
Floor Slab (2nd FLoor) 0 #DIV/0! 0
Columns - 2nd Floor 0 #DIV/0! 0
Roof Beams 0 #DIV/0! 0
TOTAL 24
Note: 1. Days refer to the master schedule and distribute to work items accordingly
2. Quantity refer to the master schedule
Manpower Footing and Footing Tie- Columns - Ground
1 ITEM No.
Required Columns Beams Ground Floor Slab
2 kgs.
3 %
4 DAYS
5 M-Hours
rk items accordingly
Floor Beams Floor Slab Columns -
Roof Beams TOTAL
(2nd Floor) (2nd FLoor) 2nd Floor
0
49 9.761
110 21.912
43 8.566
5 0.996
97 19.323
107 21.315
29 5.777
62 12.351
502
UNIT
kgs.
sq.m.
cu.m.
Lot
LS
m
pcs
RESOURCES
CONSTRUCTION ACTIVITIES
MATERIAL EQUIPMENT
i GRAND TOTAL
ii SUB-TOTAL
iii 10-20% CONTINGENCY
I CIVIL WORK
1 Clearing and Grubbing
2 Layout/Staking
3 Excavation
3.1 Demolition of Existing Structure
3.2 Demolition of 0.1m depth of existing slab
4 Backfill and Compaction
4.1 Backfill and compaction of 0.1 depth
II STRUCTURAL WORK
1 DSB - Deformed Steel Bar
DSB Fabrication
DSB Installation
2 FORMWORK
3 CONCRETE WORK
3.1 Slab
4 ROOF TRUSSES & ROOFING
4.1 Truss work
4.1.1 Cutting work
4.1.2 Welding work
4.1.3 Installation
4.2 Roof Work
4.2.1 C Purlins
4.2.1.1 Cutting work
4.2.1.2 Welding work
4.2.1.3 Installation
4.2.1.4 Roof sheath
IV ARCHITECTURAL WORK
1 MASONRY WORK
1.1 CHB Wall
1.1.1 Mixing of Mortar
1.1.2 Laying of CHB
1.2 Wall Plaster
2 TILE WORK
2.1 Floor Tile
2.1.1 Cleaning of floor
2.1.2 Mixing of tile adhesive
2.1.3 Laying of tiles
2.1.4 Grouting
V ELECTRICAL
WP M-hr Mhr/8 d/D d/MP
Quantity
Work Parameter Q x WP d MP D(days)
32 days
27 days
5 days
8
6 cu.m 10.0 cu.m/mhr 55 7 4 2
6 cu.m 10.0 cu.m/mhr 55 7 4 2
6 cu.m 10.0 cu.m/mhr 55 7 4 2
11
12 cuts 30 cut/hr 0 0 2 1
6 joints 10 joint/hr 1 0 2 1
included
included 1
8
4
11 sq.m 0.040 0 0 2 1
11 sq.m 0.600 7 1 2 1
44 sq.m 0.700 31 4 2 2
4
54 sq.m 0.050 3 0 2 0
54 sq.m 0.025 1 0 1 0
54 sq.m 0.800 44 5 2 3
54 sq.m 0.100 5 1 1 1