Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 11

TABLE 1: MASTER SCHEDULE

Months
TOTAL DATE DATE NO OF
DESCRIPTION OF WORK QTY UNIT WT %
COST START FINISH Days
1 2 3 4 5 6 7 8 9 10 11 12

I CIVIL WORK

II STRUCTURAL

A RSB WORK

B FORM WORK

C CONCRETE

D STRUCTURAL STEEL

III ARCHITECTURAL

IV PLUMBING

V FIRE PROTECTION

VI ELECTRICAL

VII HVAC

VIII BUILDING TRANSPORATION

PLANNED (%)

ACTUAL (%)

SLIPPAGE (&)
ORGANIZED CONSTRUCTION ACTIVITIES

Acvitity Preceding
Construction Activity Quantity Unit Remarks
No. Activity

1 None Layout / Staking -Starting event.


2 1 Footing Excavation -Dependent on Activity 1 completion
3 2 Footing and Columns -Dependent on Activity 2
3.1 2 <>RSB Work 10 -Dependent on Activity 2
3.2 3.1 <>Form Work 11 -Dependent on Activity 2
3.3 3.2 <>Concrete Work 12 -Dependent on Act 3.1/3.2
4 2 Footing Tie-Beams -Dependent on Activity 2
4.1 2 <>RSB Work 14 -Dependent on Activity 2
4.2 4.1 <>Form Work 12 -Dependent on Activity 4.1
4.3 4.2 <>Concrete Work 30 -Dependent on Activity 4.2
5 3&4 Backfilling -Dependent on Activity 3 and 4
6 3 Columns - Ground Floor -Dependent on Event No. 3
6.1 3.3 <>RSB Work -Dependent on Activity 3.3
6.2 6.1 <>Form Work -Dependent on Activity 6.1
6.3 6.2 <>Concrete Work -Dependent on Activity 6.2
7 5 Ground Slab -Dependent on Event No. 5
7.1 5 a) Base Preparation -Dependent on Event No. 5
7.2 7.1 b) Gravel Bedding -Dependent on Activity 7.1
7.3 7.2 c) RSB Work -Dependent on Activity 7.2
7.4 7.3 d) Form Work -Dependent on Activity 7.3
7.5 7.4 e) Concrete Work -Dependent on Activity 7.4
nd
8 7 Floor Beams (2 Floor) -Dependent on Event No. 7
8.1 7.5 <>Scaffolds -Dependent on Activity 7.5
8.2 8.1 <>Form Work -Dependent on Activity 8.1
8.3 8.2 <>RSB Work -Dependent on Activity 8.2
8.4 8.3 <>Concrete Work -Dependent on Activity 8.3
9 7 Floor Slab (2nd FLoor) -Dependent on Event No. 7
9.1 7.5 <>Scaffolds -Dependent on Activity 7.5
9.2 9.1 <>Form Work -Dependent on Activity 9.1
9.3 9.2 <>RSB Work -Dependent on Activity 9.2
9.4 9.3 <>Concrete Work -Dependent on Activity 9.3
10 9 Columns - 2nd Floor -Dependent on Event No. 9
10.1 9.4 <>Form Work -Dependent on Activity 9.4
10.2 10.1 <>RSB Work -Dependent on Activity 10.1
10.3 10.2 <>Concrete Work -Dependent on Activity 10.2
11 10 Roof Beams -Dependent on Event No. 10
11.1 10 <>Scaffolds/Bottom form -Dependent on Event No. 10
11.2 11.1 <>RSB Work -Dependent on Activity 11.1
11.3 11.2 <>Form Work -Dependent on Activity 11.2
11.4 11.3 <>Concrete Work -Dependent on Activity 11.3
12 11 Steel Trusses -Dependent on Event No. 11
12.1 11 <>Steel Fabrication -Suceeding on Event No. 11
12.2 12.1 <>Installation -Dependent on Activity 12.1
13 12 Steel Purlins -Dependent on Event No. 12
13.1 12.1 <>Steel Fabrication -Dependent on Activity 12.1
13.2 13.1 <>Installation -Dependent on Activity 13.1
14 13 Roof Sheath -Dependent on Event No. 13

Note: 1. Dependent means the suceeding activity cannot start unless the preceding activity is completed
2. Suceeding floor levels shall be added after Activity 10.3
RSB Work
MANPOWER ALLOCATION
Quantity Work Parameter Mhr**
Description of Activity Mhr* Days
kgs (assumed) Days x 8hr
Footing and Columns 10 #DIV/0! 0
Footing Tie-Beams 14 #DIV/0! 0
Columns - Ground Floor 0 #DIV/0! 0
Ground Slab 0 #DIV/0! 0
Floor Beams (2nd Floor) 0 #DIV/0! 0
Floor Slab (2nd FLoor) 0 #DIV/0! 0
Columns - 2nd Floor 0 #DIV/0! 0
Roof Beams 0 #DIV/0! 0
TOTAL 24
Note: 1. Days refer to the master schedule and distribute to work items accordingly
2. Quantity refer to the master schedule
Manpower Footing and Footing Tie- Columns - Ground
1 ITEM No.
Required Columns Beams Ground Floor Slab
2 kgs.
3 %
4 DAYS
5 M-Hours

rk items accordingly
Floor Beams Floor Slab Columns -
Roof Beams TOTAL
(2nd Floor) (2nd FLoor) 2nd Floor
0

49 9.761
110 21.912
43 8.566
5 0.996
97 19.323
107 21.315
29 5.777
62 12.351
502
UNIT
kgs.
sq.m.
cu.m.
Lot
LS
m
pcs
RESOURCES
CONSTRUCTION ACTIVITIES
MATERIAL EQUIPMENT
i GRAND TOTAL
ii SUB-TOTAL
iii 10-20% CONTINGENCY
I CIVIL WORK
1 Clearing and Grubbing
2 Layout/Staking
3 Excavation
3.1 Demolition of Existing Structure
3.2 Demolition of 0.1m depth of existing slab
4 Backfill and Compaction
4.1 Backfill and compaction of 0.1 depth
II STRUCTURAL WORK
1 DSB - Deformed Steel Bar
DSB Fabrication
DSB Installation
2 FORMWORK
3 CONCRETE WORK
3.1 Slab
4 ROOF TRUSSES & ROOFING
4.1 Truss work
4.1.1 Cutting work
4.1.2 Welding work
4.1.3 Installation
4.2 Roof Work
4.2.1 C Purlins
4.2.1.1 Cutting work
4.2.1.2 Welding work
4.2.1.3 Installation
4.2.1.4 Roof sheath
IV ARCHITECTURAL WORK
1 MASONRY WORK
1.1 CHB Wall
1.1.1 Mixing of Mortar
1.1.2 Laying of CHB
1.2 Wall Plaster
2 TILE WORK
2.1 Floor Tile
2.1.1 Cleaning of floor
2.1.2 Mixing of tile adhesive
2.1.3 Laying of tiles
2.1.4 Grouting
V ELECTRICAL
WP M-hr Mhr/8 d/D d/MP
Quantity
Work Parameter Q x WP d MP D(days)
32 days
27 days
5 days
8
6 cu.m 10.0 cu.m/mhr 55 7 4 2
6 cu.m 10.0 cu.m/mhr 55 7 4 2
6 cu.m 10.0 cu.m/mhr 55 7 4 2

6 cu.m 10.0 cu.m/mhr 55 7 4 2

11

339 kgs 0.080 27 3 2 2


339 kgs 0.100 34 4 2 2
see item 4

6 cu.m 0.6 cu.m/mhr 3 3 2 2


5

182 cuts 30 cut/hr 6 1 2 1


210 joints 10 joint/hr 21 3 2 2
included

12 cuts 30 cut/hr 0 0 2 1
6 joints 10 joint/hr 1 0 2 1
included
included 1
8
4

11 sq.m 0.040 0 0 2 1
11 sq.m 0.600 7 1 2 1
44 sq.m 0.700 31 4 2 2
4

54 sq.m 0.050 3 0 2 0
54 sq.m 0.025 1 0 1 0
54 sq.m 0.800 44 5 2 3
54 sq.m 0.100 5 1 1 1

You might also like