Estimate Water Resaurver
Estimate Water Resaurver
188 cft
PC 2 2 Nos 2.25 40 CFT each = 180 cft
PC 3 1 Nos 2.25 160.29 CFT each = 360.6525 cft
Column 14 Nos 31.95 CFT each = 447.3 cft
Total = 2380.14 cft Concrete with stone chips
Stone chips = 1700.1 cft
Sylhet Sand = 850.05 cft
Cement = 340.02 Bags
beam 31.83
33.83
19.07
19.17
14
45.25
41.57
33
10
14.75
262.47 ft 1.25 cft per ft = 328.0875 cft Concrete with brick chips
Brick chips = 234.3482 cft = 4546.849
Sylhet Sand = 117.1741 cft
Cement = 46.86964 Bags
Lift core 27.67 ft 1 15 415.05 415.05 cft Concrete with brick chips
Brick chips = 296.4643 cft = 5752.031
Sylhet Sand = 148.2321 cft
Cement = 59.29286 Bags
Reinforcement (60 Grade)
Column 14 Nos 15 20 = 4200 ft 20mm bar
14 22 11 = 3388 ft 10mm bar
Pile cap
PC 1 11 Nos Bottom 7.5 26 7.5 26 390
Top 7.5 23 7.5 23 345
Total 3585
7708
974.2
8047.7
with stone chips
ft 20mm bar
ft 12mm bar
ft 20mm bar
ft 20mm bar
ft 16mm bar
ft 12mm bar
ft 12mm bar