Sir Rey’s Fence Project

Footings ( 1m x 1m x 0.25m x 4 pcs.)


Cement = 10 bags at 220

Sand = 0.6 cu.m at 600

Gravel = 1 cu.m at 700

12mm def. bar = 16 L at 185

Tie wire = 1.5kgs. at 70

Columns ( 0.3 x 0.3 x 2.5 x 4 columns)

Cement = 9 bags at 220

Sand = 0.5 cu.m at 600

Gravel = 0.9 cu.m at 700

12mm def. bar = 8 L at 185

10mm def. bar = 10 L at 150

Tie wire = 15kgs. at 70

Chb Wall (8 Layers only)

CHB = 240 pcs at 10

Cement = 9 bag at 220

Sand = 1.0 cu.m at 600

10mm def. bar = 14 L at 150

12mm def. bar = 4 L at 185

Tie wire = 10kgs. at 70

Formworks (salvage from fabrication)

Total Material Cost Estimates = Php 21,785.00