How To Prepare Schedule of Loads - Electrical Axis PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

8/18/2020 How To Prepare Schedule of Loads - Electrical Axis

Electrical Axis
ABOUT  FAULT ANALYSIS 
Date: August 18, 2020 Electrical Notes
ELECTRICAL MACHINES  and Articles
CIRCUIT ANALYSIS  NEED HELP? 

Search... 
Home  Electrical Design  How To Prepare Schedule of Loads

How To Prepare Schedule of Loads

 TAGS ELECTRICAL DESIGN

Like on FB

Electrical Axis
Like Page 6K likes

Hits

1,415,444

Jobs in Engineering

Contract Administrator | Qatar


Project Management
(QPM) - 8/17/2020 - 

Schedule of load preparation is essential and a basic Chief Estimator | QS


calculation for electrical engineers. In this process the Quest - 8/17/2020 - 
Have too many tasks to handle?
proper sizing of conductors, overload protection and
Mechanical Commissioning
conduits are determined.
Engineer - Power Plants |
Guildhall - 8/16/2020 - 
While there are different methods doing an electrical
E&I Engineer - Power Plant
design but there is only one thing that cannot be altered
| Guildhall - 8/16/2020 - 
--- code requirements must be followed.
Commissioning Lead /
Manager - Power Plant |
Guildhall - 8/16/2020 -  
www.electricalaxis.com/2015/03/how-to-prepare-schedule-of-loads.html 1/9
8/18/2020 How To Prepare Schedule of Loads - Electrical Axis

This example emphasized the procedure rather Popular Topics


Electrical Axis the actual loads of a residential
than mimicking
unit.
Fault Analysis Power
System Electrical
ABOUT  FAULT
In
Date: August 18, ANALYSIS
this example theELECTRICAL
2020 MACHINES
voltage drop and short
 CIRCUIT
circuit ANALYSIS  NEED HELP? 
Installation Electrical
calculation is not included. Machines power system
The system voltage of this example is 220 VAC, 60
analysis
Search... short circuit

analysis Unbalanced Fault
Hz.
Analysis electrical protection
power system protection
Earthing System Energy E ciency
Schedule of Loads
Transmission Lines circuit breaker
symmetrical components Advance
Ckt Load Ph Rating No. VA Volt Amp Wire
Per of s s Circuit Theory Renewable Energy
outlet Outle AC Machines Circuit Analysis DC
ts Circuit IEC standard Transformer
electrical testing AC Circuit DC
1 L.O. 1 100 VA 12 1,200 220 5.45 #14 TW
Machines Generator earth fault loop
impedance power system stability
2 L.O. 1 100 VA 9 900 220 4.09 #14 TW ampacity electrical wiring single line to
ground fault
3 L.O. 1 100 VA 6 600 220 2.73 #14 TW

Popular Posts
4 C.O 1 180 VA 10 1,800 220 8.18 #12 TW

How to Calculate
5 C.O 1 180 VA 12 2,160 220 9.82 #12 TW Transformer
Voltage Drop
6 ACU 1 2.5 HP 1 2331 220 10.6 #10 TW
0 How To Prepare
Schedule of Loads
7 ACU 1 2.5 HP 1 2331 220 10.6 #10 TW
0

8 ACU 1 2.5 HP 1 2331 220 10.6 #10 TW 10 mistakes


0
Have too many tasks to handle? people make
9 Ran 1 5000 W 1 5000 220 22.7 # 8 TW working on
ge 1 electrical systems
Load

What is Multiple
Earthed Neutral?
Schedule of Loads

What is SELV and


PELV Circuits?
Schedule of loads are just a summary of data to easily
identify and facilitate the necessary values and 
www.electricalaxis.com/2015/03/how-to-prepare-schedule-of-loads.html 2/9
8/18/2020 How To Prepare Schedule of Loads - Electrical Axis

equipment rating to be used in any electrical installation.


Electrical
Any data givenAxis
in the schedule of loads were backed by
Basic Safety
Provision for
calculation based on a well settled electrical principles Electrical
Installation According to BS 7671
and code
ABOUT requirements.
FAULT ANALYSIS  ELECTRICAL MACHINES  CIRCUIT ANALYSIS  NEED HELP? 
Date: August 18, 2020
How to determine
the resistance of
Search... 
Computations earth electrode?

Unbalanced Fault
Circuit 1: Analysis: Line to
Line Fault
I = 1,200 VA/ 220 V = 5.45 Ampere
Example: Single
Wire = 5.45 / 80% = 6.82 Amperes , Use 2.0 sqmm TW
Line-to-Ground
wire or #14 AWG [1]
Fault Calculation
Circuit Breaker = Use 15 A Circuit Breaker
Conduit = Use 1/2" diameter PVC conduit. Earthing System
According to BS
7671
Circuit 2:

I = 900 VA/ 220 V = 4.09 Ampere Follow by Email


Wire = 4.09/ 80%= 5.11 Amperes , Use 2.0 sqmm TW
wire or #14 AWG
Email address... Submit
Circuit Breaker = Use 15 A Circuit Breaker
Conduit = Use 1/2" diameter PVC conduit.

Circuit 3:

I = 600 VA/ 220 V = 2.72 Ampere Powered by Blogger.


Wire = 2.72/ 80%= 3.41 Amperes , Use 2.0 sqmm TW
Mor
Have too many tasks to handle?
wire or #14 AWG
Circuit Breaker = 6.82 Amperes, Use 15 A Circuit
Breaker
Conduit = Use 1/2" diameter PVC conduit.

Circuit 4:

I = 1,800 VA/ 220 V = 8.18 Ampere


Wire = 8.18/ 80%= 10.23 Amperes , Use 3.5 sqmm TW 
www.electricalaxis.com/2015/03/how-to-prepare-schedule-of-loads.html 3/9
8/18/2020 How To Prepare Schedule of Loads - Electrical Axis

wire or #12 AWG


Electrical Axis
Circuit Breaker = Use 20 A CB
Conduit = Use 3/4" diameter PVC conduit.
ABOUT  FAULT ANALYSIS  ELECTRICAL MACHINES  CIRCUIT ANALYSIS  NEED HELP? 
Date: August 18, 2020
Circuit 5:

Search... 
I = 2,160 VA/ 220 V = 9.82 Ampere
Wire = 9.82/ 80% = 12.27 Amperes , Use 3.5 sqmm TW
wire or #12 AWG
Circuit Breaker = Use 20 A CB
Conduit = Use 3/4" diameter PVC conduit.

Circuit 6-8:

VA = [ 2.5 HP x ( 746 Watts/ HP ) ] / 0.8 pf (assume 0.8


pf)
VA = 2331 VA

I = 2,331 VA/ 220 V = 10.60 Ampere


Wire = 10.60 x 125% = 13.24 Amperes , Use 3.5 sqmm
TW wire or #12 AWG [2]
Circuit Breaker = 5.45 x 250% = 26.5 Amperes, Use
30 A Circuit Breaker [3]
Conduit = Use 3/4" diameter PVC conduit.

Note: since the breaker is 30 Ampere, we could


increase the cable size to 5.5 sqmm (rated 30 amps
by NEC ) to maintain the coordination of cable and
Have too many
the circuit tasks to handle?
breaker.

Circuit 9:

VA = 5000 W / 1.0 pf (heating load is a resistive load w/


100% pf)
VA = 5,000 VA

I = 5, 000 VA/ 220 V = 22.72 Ampere 


www.electricalaxis.com/2015/03/how-to-prepare-schedule-of-loads.html 4/9
8/18/2020 How To Prepare Schedule of Loads - Electrical Axis

Wire = 22.71 / 80% = 28.41 Amperes , Use 8.0 sqmm


Electrical
TW wire or #8 Axis
AWG
Circuit Breaker = Use 40 A Circuit Breaker
Conduit
ABOUT  = Use
FAULT 1.0" diameter
ANALYSIS  PVC conduit.
ELECTRICAL MACHINES  CIRCUIT ANALYSIS  NEED HELP? 
Date: August 18, 2020

Main Feeder Search... 

By inspection:

Continuous loads = 9,963 VA or 45.29 A @ 220V


(lighting loads and ACU)
Non- Continuous = 8, 960 VA or 40.72 @ 220V (conv.
outlet & range load)
Total Loads = 19, 923 VA

Main Feeder Current = (45.29 x 100% ) + (40.72 x


125%) = 96.19 Amperes [4]

Use 50 sqmm TW cable as main feeder or service


entrance wire
Use 100 Ampere MCCB, 1 pole - 10 kAIC*

note: 10 kAIC is just an assumed value, we


need short circuit calculation to determine the right
specs of the OCPD to be used in this example

Rules Applied:
Have too many tasks to handle?

1. NEC 210-9a - Maximum to be served by branch circuit


must not be less than 80% of the ampacity of the
condutor

2. NEC 430 -22 = The size of the wire supplying


motorized load shall not be less than 125% of the rated
full load current of the motor.

www.electricalaxis.com/2015/03/how-to-prepare-schedule-of-loads.html 5/9
8/18/2020 How To Prepare Schedule of Loads - Electrical Axis

3. NEC 430- 52 = The size of the branch circuit


Electrical Axisloads shall not be greater than
protection for motor
250% of motor full load current for CB and 300% for
non-time
ABOUT  delay
FAULT fuses on
ANALYSIS  full voltage MACHINES
ELECTRICAL starting.  CIRCUIT ANALYSIS  NEED HELP? 
Date: August 18, 2020

4. NEC 210-22(C) = Over-Current Protection Device shall


Search... 
be calculated as 100% of non-continuous load + 125% of
the continuous load.

References:

1. National Electrical Code 2011 (Handbook)


2. General Electric Circuit Breaker Catalogue

 Google
 Facebook

 Twitter

Search this blog... 

Related Articles

Have too many tasks to handle?

Video: Tutorial on What are the Conditions


Power System in Selecting Current
f


www.electricalaxis.com/2015/03/how-to-prepare-schedule-of-loads.html 6/9
8/18/2020 How To Prepare Schedule of Loads - Electrical Axis

Electrical Axis
ABOUT  FAULT ANALYSIS  ELECTRICAL MACHINES  CIRCUIT ANALYSIS  NEED HELP? 
Date: August 18, 2020

Search... 

What are the Different Video: Tutorial on How


Electric Current to Calculate Feeder

cecolejr 
  

10 mistakes people make How to Calculate Transformer


 
working on electrical systems Voltage Drop

Select Topics
3D printing ABB Manuals AC Circuit AC Machines Advance Circuit Theory ampacity arc
ash Assignment help AUS/NZ 3000 BS7671 building wiring Circuit Analysis circuit
Have too many tasks to handle?
breaker Current Nomenclatures DC Circuit DC Machines disruptive technologies earth
fault loop impedance Earthing System ebook Electrical Design
Electrical Equipment Electrical Installation Electrical Machines
electrical protection Electrical Safety electrical testing electrical wiring
Electricity Spot Market Energy E ciency Fault Analysis Generator how IEC
standard inspection checklist Line to Line Fault Manual National Electrical Code NFPA
70E Philippine Electrical Code Power System power system analysis power
system operation power system protection power system stability protective relaying
quiz Renewable Energy Resources schneider electric short circuit analysis
single line to ground fault symmetrical components Technical Topics

www.electricalaxis.com/2015/03/how-to-prepare-schedule-of-loads.html 7/9
8/18/2020 How To Prepare Schedule of Loads - Electrical Axis

Terms of use Theoretical Transformer Transmission Lines tutorial video


Electrical Axis
Unbalanced Fault Analysis video tutorial what

ABOUT  FAULT ANALYSIS  ELECTRICAL MACHINES  CIRCUIT ANALYSIS  NEED HELP? 


Date: August 18, 2020

Search... 

Popular Posts

How To Prepare Schedule of Loads


Schedule of load preparation is essential and a basic calculation
for electrical engineers. In this process the proper sizing of
condu...

How to Calculate Transformer Voltage Drop


Introduction Transformer voltage drop is important to know
since it is one of the factors that affect the performance of an
electrical...

What is Multiple Earthed Neutral?


Multiple Earthed Neutral Earthing System De ned Aus/NZ 3000
(known as Australian/New Zealand Wiring Rules) de ned
Multiple Earthed Neut...

What is SELV and PELV Circuits?


Application and arrangements of SELV and PELV circuits 1. SELV
- De nition according to BS 7671 SELV - Safety (Separated)
Extr...

Earthing System According to BS 7671


What is earthing? According to BS 7671 Connection of the
exposed conductive parts of an installation to the main
earthing terminal of...

 About  Web Tools 


www.electricalaxis.com/2015/03/how-to-prepare-schedule-of-loads.html 8/9
8/18/2020 How To Prepare Schedule of Loads - Electrical Axis

Google today announced IT admins Contact Form


Electrical Axis
can now apply policies to Chrome on Disclaimer
Android and iOS, in addition to Privacy Policy
Windows, Mac, Linux, and Chrome Sitemap
ABOUT  FAULT ANALYSIS  ELECTRICAL MACHINES  CIRCUIT ANALYSIS  NEED HELP? 
Date: August 18, 2020
OS. Terms of Service
 Newsletter
Search... 
  
Subscribe via email.

Email address

Submit

Copyright © 2020 Electrical Axis All Right Reserved


Designed by Arlina Design | Distributed By Blogger Templates20 Powered by Blogger


www.electricalaxis.com/2015/03/how-to-prepare-schedule-of-loads.html 9/9