No.

Main Activities

1 Depot Site Work

1.1 Concrete casting for part-1 in tank-3

1.2 Concrete casting for roof and wall of RBC-7 and guardrail in RBC-1

1.3 Insepction for water leak test in oily drum pit NA-21-V-01

1.4 Continue in the excavation work for booster pump

1.5 Continue in the excavation work for pipe supports near tank-7

1.6 Continue in the rebar work for Tank-4

1.7

1.8

1.9

1.10

1.11

0
Remarks
1.1 Concrete casting for part-1 in tank-3 1.2 Concrete casting for roof and wall of RBC-7

1.3 Insepction for water leak test in oily drum pit NA-21-V-01
1.5 Continue in the excavation work for pipe supports near tank-7

1.9 Contnue in Excavation for pipe support near tank-1&3


1.2 Concrete casting for roof and wall of RBC-7 and guardrail in RBC-1

1.4 Continue in the excavation work for booster pump


1.6 Continue in the rebar work for Tank-4